DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

Similar documents
D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

One Harbor Point Residential

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE


Traffic Impact Analysis Update

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Weaver Road Senior Housing Traffic Impact Analysis

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

TECHNICAL MEMORANDUM

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Parking/Traffic Assessment Study

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

830 Main Street Halifax Regional Municipality

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated)

LOST LAKE CORRIDOR REVIEW

Sweetwater Landing Traffic Impact Analysis

Proposed Pit Development

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

1 st Street Intersection Study

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

886 March Road McDonald's Transportation Study

Oakbrook Village Plaza City of Laguna Hills

HONDA DEALERSHIP LAKE ELSINORE, CALIFORNIA. Prepared by:

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

10 th Street Residences Development Traffic Impact Analysis

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Sugarland Crossing Gwinnett County, Georgia

Alpine Highway to North County Boulevard Connector Study

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx

Tijuana River Valley Regional Park Campground and Education Center

Date: December 20, Project #:

FORT MYERS CITY COUNCIL OSCAR M. CORBIN, JR. CITY HALL, 2200 SECOND STREET FORT MYERS, FLORIDA

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Lacey Gateway Residential Phase 1

INDUSTRIAL DEVELOPMENT

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

Traffic Engineering Study

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey

King Soopers #116 Thornton, Colorado

Village of Richmond Transportation Brief

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

Appendix H: Construction Impacts H-2 Transportation

Proposed Hotel and Restaurant Development

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Provide an overview of the development proposal including projected site traffic volumes;

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Appendix E: Emission Reduction Calculations

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Downtown One Way Street Conversion Technical Feasibility Report

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

CastleGlenn Consultants Inc.

STANDARD LIMITATIONS

Appendix B: Traffic Reports

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Traffic Impact Analysis

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Lakeside Terrace Development

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

(A) Project Manager, Infrastructure Approvals

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

TRAFFIC IMPACT ANALYSIS

RTE. 1 at RTE. 637 & RTE. 639

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

Transcription:

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and Mitigation Measures...20 Appendix LIST OF TABLES 1. Existing Level of Service...10 2. Sight Distance...11 3. Project Trip Generation...12 4. Future 2022 Background Level of Service...18 5. Future 2022 Level of Service with Project...19 LIST OF FIGURES 1. Vicinity Map & Roadway System...4 2. Site Plan...5 3. Existing Peak Hour Volumes...9 4. Trip Distribution & Assignment...14 5. Pipeline Volumes...15 6. 2022 Background Peak Hour Volumes...16 7. 2022 Peak Hour Volumes with Project...17 2

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS 1. INTRODUCTION This report summarizes traffic impacts related to the proposed Division Street Plat. The general goals of this impact study concentrate on 1) the assessment of existing roadway conditions and intersection congestion, 2) forecasts of newly generated project traffic, 3) estimations of future delay, and 4) recommendations for mitigation. Preliminary tasks include the detailed collection of roadway information, road improvement information, and peak hour traffic counts. A level of service analysis for existing traffic conditions is then made to determine the present degree of intersection congestion. Based on this analysis, forecasts of future traffic levels on the surrounding street system are found. Following this forecast, the future service levels for the key intersections are investigated. As a final step, applicable conclusions and possible on-site or off-site mitigation measures are defined. The findings of this study are intended to ensure safe and efficient progression of vehicular and non-motorist traffic near the site. 2. PROJECT DESCRIPTION The proposed Division Street Residential Plat consists of constructing up to 81 single family dwelling units located in the City of Buckley. The project is approximately 15 acres, located on the east side of South Division Street on tax parcel #: 0619102016. Access to the site is proposed via two new entrances extending east from South Division Street. The anticipated buildout year is assumed to be 2020. A five-year horizon of 2022 was used to assess impacts under future conditions. Figure 1 on the following page shows the site location and roadway network serving the site. The general configuration of the project is shown in the design schematic on Figure 2. 3. EXISTING CONDITIONS 3.1 Existing Street System The street network serving the proposed project consists of a variety of roadways. Streets near the site mainly consist of two-lane local roadways and state routes. Characteristics for these roadways vary with respect to lane widths, grades, speeds, and function. Differences are based on specific designations and proximity to major employment areas in the region. The major roadways and arterials surrounding the site are described on page 6. 3

4

5

Ryan Road: is an east-west two-lane roadway that is located to the north of the project site and provides connection to SR-165. The posted speed limit is 25 mph and lane widths are approximately 10 feet. Designated 5-foot bicycle facilities can be found along the majority of either side of the roadway. On-street parking is available on the south side of Ryan Road in the vicinity. Shoulders consist of curb/gutter/sidewalk and grades are mild. S. Division Street: is a north-south, two-lane local access roadway that borders the west side of the site with a posted speed limit of 25 mph. Paving is asphalt concrete and lane widths are around 10 feet. Shoulders near the site are primarily grass/gravel. Sidewalks are available generally north of Mountain View Avenue. The grade of the road is generally level. 3.2 Existing Peak Hour Volumes Field data collected for this study was taken in March of 2017. The traffic counts were taken during the morning peak period between 7 AM to 9 AM and the evening peak period between the hours of 4 PM to 6 PM. These specific peak periods were targeted for analysis purposes since they generally represent a worst case scenario for roadways with respect to traffic conditions. This is primarily due to the common 8 AM to 5 PM work schedule and the greater number of personal trips occurring before and after work hours. Most commuters leave and return to their dwellings at the same time of day which translates to a natural peak with respect to intersection traffic loads. Figure 3 on page 9 shows the existing AM and PM peak hour volumes for the studied intersections of: Signalized: SR-410 & SR-165 All-way Stop: SR-165 & 112th Street E/Ryan Road Two-Way Stop: S. River Avenue & Ryan Road S. Division Street & Ryan Road 6

3.3 Roadway Improvements A review of a current City of Buckley 6-Year 2017-2022 Transportation Improvement Plan indicates that improvement projects are currently planned in the vicinity of the site. Descriptions of the nearest capacity related projects are provided below. River Avenue Pedestrian Improvements (Priority #7) This project plans to widen and pave River Avenue and install curb/gutter/sidewalk, storm, relocate power and install lighting from Jefferson Avenue to the Buckley skate park. The project has an estimated cost of $157,100 and is projected to be completed in 2017. SR-410 & Park Avenue Safety Improvement Project (Priority #8): This project plans on installing a new right-turn pocket on Park Avenue to northbound SR- 410. Pedestrian improvements include curb/gutter/sidewalk and relocating the crosswalk to the south of the intersection. The project has an estimated cost of $285,000 and is projected to be completed in 2018. Main Street Rehabilitation (Priority #9): This project plans on reconstructing and improving Main Street from River Avenue to SR- 410. Plans also include installation of curb/gutter/sidewalk, landscape, and lighting. The project has an estimated cost of $285,600 and is projected to be completed in 2018. Ryan Road (Phase II) Reconstruct (Priority #13): This project plans on reconstructing, grind, widen, curb/gutter/sidewalk on one side of the roadway, sewer and storm, and other improvements on Ryan Road from Spiketon Road to Davis Street. The project has an estimated cost of $2,686,800 and is projected to be completed in 2020. River Avenue & Main Street Intersection Improvements (Priority #18): This project plans on installing a signal at the Main Street & River Avenue intersection with turn lanes and pedestrian facilities. The project has an estimated cost of $1,089,600 and is projected to be completed in 2022. 3.4 Existing Level of Service Existing peak hour delays were determined using the Highway Capacity Manual (HCM). Capacity analysis is used to determine level of service (LOS) which is an established measure of congestion for transportation facilities. LOS is defined for a variety of facilities including intersections, freeways, arterials, etc. A complete definition of level of service and related criteria can be found in the HCM. 7

The methodology for determining the LOS at signalized intersections strives to determine the volume to capacity (v/c) ratios for the various intersection movements as well as the average control delay for those movements. Delay is generally used to measure the degree of driver discomfort, frustration, fuel consumption, and lost time. Control delay, in particular, includes movements at slower speeds and stops on intersection approaches as vehicles move up in queue position or slow down upstream of an intersection. Aside from the overall quantity of traffic, three specific factors influence signalized intersection LOS. These include the type of signal operation provided, the signal phasing pattern, and the specific allocation of green time The methodology for determining the LOS at unsignalized intersections strives to determine the potential capacities for the various vehicle movements and ultimately determines the average total delay for each movement. Potential Capacity represents the number of additional vehicles that could effectively utilize a particular movement, which is essentially the equivalent of the difference between the movement capacity and the existing movement volume. Total delay is described as the elapsed time from when a vehicle stops at the end of a queue until the vehicle departs from the stop line. Average total delay is simply the mean total delay over the entire stream. A number of factors influence potential capacity and total delay including the availability/usefulness of gaps. The range for intersection level of service is LOS A to LOS F with the former indicating the best operating conditions with low control delays and the latter indicating the worst conditions with heavy control delays. Existing LOS for the peak hours of travel are shown in Table 1 on page 10. Delay analysis involved the use of the Synchro 9.1 analysis program. 8

9

TABLE 1 Existing Level of Service Delays given in seconds per vehicle AM Peak Hour PM Peak Hour Intersection Control Approach LOS Delay LOS Delay SR-410 & SR-165 SR-165 & 112th St E/Ryan Rd S. River Avenue & Ryan Road S. Division Street & Ryan Road Signal AWSC 1 TWSC 2 TWSC Eastbound B 12.3 B 11.5 Westbound A 8.7 A 8.1 Northbound C 21.5 C 25.3 Southbound B 17.3 C 21.4 Overall B 12.9 B 11.7 Eastbound B 10.5 B 10.6 Westbound B 11.2 B 11.8 Northbound B 14.8 B 12.8 Southbound B 10.6 B 14.4 Overall B 12.3 B 12.9 Eastbound LT A 7.9 A 7.7 Southbound B 10.8 B 10.2 Eastbound LT A 7.5 A 7.6 Westbound LT A 7.6 A 7.5 Northbound B 11.3 B 11.5 Southbound A 9.4 B 10.6 As shown in Table 1, existing delays are generally mild with delays in the LOS A to LOS C range. Synchro analysis depicts current lane geometries and configurations with the recent completion of the SR-410 & SR-165 realignment project; signal timing was obtained from WSDOT 3. The City of Buckley has a level of service standard of LOS D for all roadways and intersections 4 while WSDOT has a LOS standard of LOS C for Tier 3 State Highways (SR-165) and LOS D for Tier 4 State Highways (SR-410) 5. 1 AWSC: All-Way Stop Control 2 TWSC: Two-Way Stop Control 3 Timing obtained from John Holdren, WSDOT, March 2017. 4 City of Buckley Comprehensive Plan, Transportation Element, 2016 5 Level of Service Standards for Washington State Highways, 2010 10

3.5 Pedestrian and Bicycle Activity Pedestrian and bicycle activity was observed in the vicinity of the project during peak hours of travel. Observations were made during routine peak hour movement counts and during site visits. Minimal pedestrian and bicycle volumes were noted in the area primarily due to inclement weather during the time of field data collection. However, the growing availability of pedestrian facilities, generally in the form of sidewalks, crosswalks, and bike lanes, help minimize any potential conflict between motorist and non-motorist traffic. 3.6 Public Transit A review of the Pierce Transit regional bus schedule shows transit service is not provided in the area. 3.7 Sight Distance at Access Driveways Assessments of the proposed access driveways were made to determine whether or not adequate entering sight distance (ESD) can be provided for project traffic. Sight distance requirements were obtained from the American Association of State Highway and Transportation Officials (AASHTO) standards for left- and right-turn movements. Table 2 below summarizes the recommended and available sight distance at the proposed project entrances. Roadway Table 2 Entering Sight Distance (ESD) Measurements given in feet Posted Speed Limit S. Division Street 25 mph Direction Recommended Available North 240 >300 South 280 >300 Based on preliminary examinations of the proposed access locations, sight distance appears to be met for both locations. S. Division Street has minor vertical grade (< 1%) and no horizontal curvature, offering a clear sight of visibility. No safety issues are anticipated or detected with the proposed access layout or locations. 11

4. FORECASTED TRAFFIC DEMAND AND ANALYSIS 4.1 Trip Generation Trip generation is used to determine the magnitude of project impacts on the surrounding street system. This is usually denoted by the quantity or specific number of new trips that enter and exit a project during a designated time period, such as a specific peak hour (AM or PM) or an entire day. Data presented in this report was taken from the Institute of Transportation Engineer's publication Trip Generation, Ninth Edition. The designated lane use for this project is defined as Single Family Detached Housing (LUC 210). Data for the AM and PM peak hours were used for estimation purposes and was applied to the intersection network for future capacity analysis. Table 3 below summarizes the estimated project trip generation. Included are the average weekday volume and the AM and PM peak hour volumes. Table 3 Project Trip Generation 81 New Single Family Dwelling Units Time Period AWDT AM Peak Inbound AM Peak Outbound AM Peak Total PM Peak Inbound PM Peak Outbound PM Peak Total (vpd: vehicles per day; vph: vehicles per hour) Volume 865 vpd 17 vph 49 vph 66 vph 55 vph 32 vph 87 vph 4.2 Trip Assignment and Distribution The destination and origination of the generated traffic primarily influences the project entrances and the key intersections which would effectively receive the majority of project related traffic. In traffic engineering, trip assignment and distribution is used to determine and apply the expected future project traffic to the road system and the primary roadways. The trips generated by the project are expected to follow the general patterns as shown in Figure 4. Percentages are generally based on the nearby roadway network, existing traffic volumes, and similar nearby projects completed in the past. 12

4.3 Future Traffic Volumes With and Without the Project The year 2022 was used for a 5 year horizon for future traffic delay analysis. Future 2022 background traffic volumes without the project were derived by applying a 2.0 percent compound annual growth rate per year to the existing traffic volumes shown in Figure 3. In addition, pipeline volumes from the nearby Spiketon plat are included in future analysis and are shown in Figure 5. Future 2022 background volumes (cumulative annual growth and pipeline volumes) are shown in Figure 6 while Figure 7 portrays future 2022 volumes with the addition of project-generated traffic 13

14

15

16

17

4.4 Future Level of Service Results A level of service analysis was made of the future peak hour volumes without (background) and with project generated trips. Results for intersection delay conditions were again determined using Synchro 9.1 and the HCM analysis program. A summary of the analysis results are shown in Table 4 for the 2022 peak hour background traffic volumes and Table 4 for the 2022 peak hour volumes with project-generated traffic added. TABLE 4 Future 2022 Background Traffic Level of Service Delays given in seconds per vehicle AM Peak Hour PM Peak Hour Intersection Control Approach LOS Delay LOS Delay SR-410 & SR-165 SR-165 & 112th St E/Ryan Rd S. River Avenue & Ryan Road S. Division Street & Ryan Road Signal AWSC TWSC TWSC (TWSC: Two-Way Stop Control; AWSC: All-Way Stop Control) Eastbound B 14.1 B 13.3 Westbound B 10.2 B 10.2 Northbound C 24.7 C 30.2 Southbound B 19.7 C 24.8 Overall B 15.0 B 14.1 Eastbound B 11.4 B 11.5 Westbound B 13.3 B 13.7 Northbound C 18.7 B 14.8 Southbound B 11.7 C 17.1 Overall B 14.6 B 15.0 Eastbound LT A 8.2 A 7.9 Southbound B 11.9 B 10.8 Eastbound LT A 7.7 A 7.7 Westbound LT A 7.7 A 7.6 Northbound B 12.4 B 12.7 Southbound A 9.9 B 11.5 As shown in Table 4, future 2022 background volumes are expected to remain mild at LOS C or better for all studied intersections. Table 5 below portrays the forecasted 2022 peak hour volumes with the addition of project traffic. 18

TABLE 5 Future 2022 Level of Service with Project Delays given in seconds per vehicle AM Peak Hour PM Peak Hour Intersection Control Approach LOS Delay LOS Delay SR-410 & SR-165 SR-165 & 112th St E/Ryan Rd S. River Avenue & Ryan Road S. Division Street & Ryan Road Signal AWSC TWSC TWSC (TWSC: Two-Way Stop Control; AWSC: All-Way Stop Control) Eastbound B 14.8 B 14.6 Westbound B 10.8 B 11.9 Northbound C 25.1 C 31.1 Southbound B 19.9 C 25.5 Overall B 15.8 B 15.7 Eastbound B 11.8 B 12.0 Westbound C 15.4 C 15.3 Northbound C 20.5 C 16.1 Southbound B 12.6 C 18.3 Overall C 16.1 C 16.3 Eastbound LT A 8.4 A 7.9 Southbound B 12.8 B 11.2 Eastbound LT A 7.7 A 7.7 Westbound LT A 7.7 A 7.8 Northbound B 13.7 B 13.9 Southbound B 10.2 B 12.2 Table 5 indicates only minor increase in delays with the addition of project generated traffic. All LOS delays are expected to remain at or under the City and WSDOT LOS standards. Overall, the local roadway network servicing the site has the available and future capacity to support the incoming project. 4.5 Turn Lane Warrants turn lanes are a means of providing necessary storage space for left turning vehicles at intersections. Methods have been developed by various agencies to determine under what circumstances a left turn lane would be needed. For this impact study, procedures 19

described by the WSDOT Design Manual Exhibit 1310-7a were used to ascertain storage requirements on S. Division Street at the project entrance. Based on both AM and PM 2022 peak hour volumes with project traffic a left turn lane would not be warranted. Refer to the appendix for the warrant nomographs. 5. CONCLUSIONS AND MITIGATION MEASURES The Division Street Plat project consists of constructing up to 81 new single family dwelling units in the City of Buckley. The project is approximately 15 acres, located on the east side of S. Division Street on tax parcel #: 0619102016. Proposed access is via two new entrances extending east from S. Division Street as shown in the design schematic on Figure 2; preliminary examinations indicate sight distance is adequately met. On a daily basis, roughly 865 new trip movements into and out of the site would be expected. Of this total daily traffic, 66 trips may be associated with the AM peak hour and 87 trips associated with the PM peak hour based on ITE data. Existing delays currently meet the City of Buckley (City roadways) and WSDOT (State Routes) standards and operate with overall delays up to LOS B. Delays are outlined in Table 1 and reflect the recent completion of the SR-410 & SR-165 realignment project. A horizon year of 2022 was used to assess future congestion; forecast delays are outlined in Table 3 for background traffic and Table 4 with project traffic. Delays are expected to operate at LOS C or better, meeting City and WSDOT LOS standards. A left turn lane is not warranted on S. Division Street at the project entrance based of 2022 AM or PM peak hour volumes. Based on the above, no off-site mitigation is recommended. 20

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS APPENDIX 21

LEVEL OF SERVICE The following are excerpts from the 2010 Highway Capacity Manual - Transportation Research Board Special Report 209. Quality of service requires quantitative measures to characterize operational conditions within a traffic stream. Level of service (LOS) is a quality measure describing operational conditions within a traffic stream, generally in terms of such service measures as speed and travel time, freedom to maneuver, traffic interruptions, and comfort and convenience. Six LOS are defined for each type of facility that has analysis procedures available. Letters designate each level, from A to F, with LOS A representing the best operating conditions and LOS F the worst. Each level of service represents a range of operating conditions and the driver s perception of those conditions. Level-of-Service definitions The following definitions generally define the various levels of service for arterials. Level of service A represents primarily free-flow operations at average travel speeds, usually about 90 percent of the free-flow speed for the arterial classification. Vehicles are seldom impeded in their ability to maneuver in the traffic stream. Delay at signalized intersections is minimal. Level of service B represents reasonably unimpeded operations at average travel speeds, usually about 70 percent of the free-flow speed for the arterial classification. The ability to maneuver in the traffic stream is only slightly restricted and delays are not bothersome. Level of service C represents stable operations; however, ability to maneuver and change lanes in midblock locations may be more restricted than in LOS B, and longer queues, adverse signal coordination, or both may contribute to lower average travel speeds of about 50 percent of the average free-flow speed for the arterial classification. Level of service D borders on a range in which small increases in flow may cause substantial increases in approach delay and hence decreases in arterial speed. LOS D may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these. Average travel speeds are about 40 percent of free-flow speed. Level of service E is characterized by significant delays and average travel speeds of onethird the free-flow speed or less. Such operations are caused by some combination of adverse progression, high signal density, high volumes, extensive delays at critical intersections, and inappropriate signal timing. 22

Level of service F characterizes arterial flow at extremely low speeds, from less than onethird to one-quarter of the free-flow speed. Intersection congestion is likely at critical signalized locations, with long delays and extensive queuing. These definitions are general and conceptual in nature, and they apply primarily to uninterrupted flow. Levels of service for interrupted flow facilities vary widely in terms of both the user's perception of service quality and the operational variables used to describe them. For each type of facility, levels of service are defined based on one or more operational parameters that best describe operating quality for the subject facility type. While the concept of level of service attempts to address a wide range of operating conditions, limitations on data collection and availability make it impractical to treat the full range of operational parameters for every type of facility. The parameters selected to define levels of service for each facility type are called "measures of effectiveness" or "MOE's", and represent available measures that best describe the quality of operation on the subject facility type. Each level of service represents a range of conditions, as defined by a range in the parameters given. Thus, a level of service is not a discrete condition, but rather a range of conditions for which boundaries are established. The following tables describe levels of service for signalized and unsignalized intersections. Level of service for signalized intersections is defined in terms of average control delay. Delay is a measure of driver discomfort, frustration, fuel consumption and lost travel time, as well as time from movements at slower speeds and stops on intersection approaches as vehicles move up in queue position or slow down upstream of an intersection. Level of service for unsignalized intersections is determined by the computed or measured control delay and is determined for each minor movement. Level of Service A B C D E F Signalized Intersections - Level of Service Control Delay per Vehicle (sec) 10 10 and 20 20 and 35 35 and 55 55 and 80 80 23

Unsignalized Intersections - Level of Service Level of Service A B C D E F Average Total Delay per Vehicle (sec) 10 10 and 15 15 and 25 25 and 35 35 and 50 50 As described in the 2010 Highway Capacity Manual, level of service breakpoints for allway stop controlled (AWSC) intersections are somewhat different than the criteria used for signalized intersections. The primary reason for this difference is that drivers expect different levels of performance from distinct kinds of transportation facilities. The expectation is that a signalized intersection is designed to carry higher traffic volumes than an AWSC intersection. Thus, a higher level of control delay is acceptable at a signalized intersection for the same level of service. AWSC Intersections - Level of Service Level of Service A B C D E F Average Total Delay per Vehicle (sec) 10 10 and 15 15 and 25 25 and 35 35 and 50 50 24

Detailed Average Rate Trip Calculations For 81 Dwelling Units of Single Family Detached Housing(210) - [E] Project: Division Plat Phase: Open Date: Analysis Date: Description: Average Standard Adjustment Driveway Rate Deviation Factor Volume Avg. Weekday 2-Way Volume 10.68 0.00 1.00 865 7-9 AM Peak Hour Enter 0.21 0.00 1.00 17 7-9 AM Peak Hour Exit 0.62 0.00 1.00 49 7-9 AM Peak Hour Total 0.82 0.00 1.00 66 4-6 PM Peak Hour Enter 0.68 0.00 1.00 55 4-6 PM Peak Hour Exit 0.40 0.00 1.00 32 4-6 PM Peak Hour Total 1.07 0.00 1.00 87 AM Pk Hr, Generator, Enter 0.22 0.00 1.00 18 AM Pk Hr, Generator, Exit 0.63 0.00 1.00 51 AM Pk Hr, Generator, Total 0.85 0.00 1.00 69 PM Pk Hr, Generator, Enter 0.70 0.00 1.00 57 PM Pk Hr, Generator, Exit 0.39 0.00 1.00 32 PM Pk Hr, Generator, Total 1.10 0.00 1.00 89 Saturday 2-Way Volume 10.30 0.00 1.00 835 Saturday Peak Hour Enter 0.54 0.00 1.00 44 Saturday Peak Hour Exit 0.46 0.00 1.00 37 Saturday Peak Hour Total 1.00 0.00 1.00 81 Sunday 2-Way Volume 8.62 0.00 1.00 698 Sunday Peak Hour Enter 0.49 0.00 1.00 39 Sunday Peak Hour Exit 0.43 0.00 1.00 35 Sunday Peak Hour Total 0.92 0.00 1.00 74 The above rates were calculated from these equations: 24-Hr. 2-Way Volume: LN(T) =.92LN(X) + 2.72, R^2 = 0.95 7-9 AM Peak Hr. Total: T =.7(X) + 9.74 R^2 = 0.89, 0.25 Enter, 0.75 Exit 4-6 PM Peak Hr. Total: LN(T) =.9LN(X) +.51 R^2 = 0.91, 0.63 Enter, 0.37 Exit AM Gen Pk Hr. Total: T =.7(X) + 12.12 R^2 = 0.89, 0.26 Enter, 0.74 Exit PM Gen Pk Hr. Total: LN(T) =.88LN(X) +.62 R^2 = 0.91, 0.64 Enter, 0.36 Exit Sat. 2-Way Volume: LN(T) =.93LN(X) + 2.64, R^2 = 0.92 Sat. Pk Hr. Total: T =.89(X) + 8.77 R^2 = 0.91, 0.54 Enter, 0.46 Exit Sun. 2-Way Volume: T = 8.63(X) + -.63, R^2 = 0.93 Sun. Pk Hr. Total: LN(T) =.91LN(X) +.31 R^2 = 0.88, 0.53 Enter, 0.47 Exit Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation Manual, 9th Edition, 2012 TRIP GENERATION 2013, TRAFFICWARE, LLC 25

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 Driveway Southbound SR-410 Westbound Groups Printed- Unshifted SR-165 Northbound File Name : 3923a Site Code : 00003923 Start Date : 3/22/2017 Page No : 1 SR-410 Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total 07:00 AM 2 0 5 7 0 102 24 126 53 0 28 81 14 100 1 115 329 07:15 AM 0 0 0 0 0 105 31 136 61 0 11 72 20 113 0 133 341 07:30 AM 0 0 1 1 0 120 16 136 58 0 17 75 25 176 0 201 413 07:45 AM 1 1 0 2 0 139 21 160 51 0 20 71 38 103 0 141 374 Total 3 1 6 10 0 466 92 558 223 0 76 299 97 492 1 590 1457 08:00 AM 3 0 1 4 0 91 19 110 42 1 23 66 15 96 2 113 293 08:15 AM 0 0 0 0 0 99 20 119 47 0 12 59 21 109 0 130 308 08:30 AM 1 0 0 1 0 104 20 124 66 0 32 98 23 132 1 156 379 08:45 AM 0 0 0 0 2 128 15 145 54 0 23 77 16 109 0 125 347 Total 4 0 1 5 2 422 74 498 209 1 90 300 75 446 3 524 1327 Grand Total 7 1 7 15 2 888 166 1056 432 1 166 599 172 938 4 1114 2784 Apprch % 46.7 6.7 46.7 0.2 84.1 15.7 72.1 0.2 27.7 15.4 84.2 0.4 Total % 0.3 0 0.3 0.5 0.1 31.9 6 37.9 15.5 0 6 21.5 6.2 33.7 0.1 40 Driveway 7 15 22 7 1 7 SR-410 1061 1114 2175 4 938 172 3/22/2017 07:00 AM 3/22/2017 08:45 AM Unshifted North 2 888 166 1377 1056 2433 SR-410 166 1 432 339 599 938 SR-165 26

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 File Name : 3923a Site Code : 00003923 Start Date : 3/22/2017 Page No : 2 Driveway Southbound SR-410 Westbound SR-165 Northbound SR-410 Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 AM 07:00 AM 2 0 5 7 0 102 24 126 53 0 28 81 14 100 1 115 329 07:15 AM 0 0 0 0 0 105 31 136 61 0 11 72 20 113 0 133 341 07:30 AM 0 0 1 1 0 120 16 136 58 0 17 75 25 176 0 201 413 07:45 AM 1 1 0 2 0 139 21 160 51 0 20 71 38 103 0 141 374 Total Volume 3 1 6 10 0 466 92 558 223 0 76 299 97 492 1 590 1457 % App. Total 30 10 60 0 83.5 16.5 74.6 0 25.4 16.4 83.4 0.2 PHF.375.250.300.357.000.838.742.872.914.000.679.923.638.699.250.734.882 Driveway 1 10 11 3 1 6 Peak Hour Data SR-410 545 590 1135 1 492 97 Peak Hour Begins at 07:00 AM Unshifted North 0 466 92 721 558 1279 SR-410 76 0 223 190 299 489 SR-165 27

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 Driveway Southbound SR-410 Westbound Groups Printed- Unshifted SR-165 Northbound File Name : 3923b Site Code : 00003923 Start Date : 3/21/2017 Page No : 1 SR-410 Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total 04:00 PM 0 1 0 1 0 170 67 237 40 0 30 70 22 109 2 133 441 04:15 PM 2 1 0 3 0 155 75 230 31 0 22 53 17 150 0 167 453 04:30 PM 1 2 1 4 1 174 69 244 45 0 30 75 11 140 2 153 476 04:45 PM 0 3 1 4 1 176 73 250 39 2 20 61 24 148 1 173 488 Total 3 7 2 12 2 675 284 961 155 2 102 259 74 547 5 626 1858 05:00 PM 2 1 1 4 0 170 76 246 29 1 22 52 31 169 0 200 502 05:15 PM 2 2 1 5 0 150 95 245 45 0 23 68 17 169 0 186 504 05:30 PM 0 0 0 0 3 168 81 252 38 0 16 54 14 147 0 161 467 05:45 PM 2 2 0 4 0 183 82 265 32 0 9 41 22 151 0 173 483 Total 6 5 2 13 3 671 334 1008 144 1 70 215 84 636 0 720 1956 Grand Total 9 12 4 25 5 1346 618 1969 299 3 172 474 158 1183 5 1346 3814 Apprch % 36 48 16 0.3 68.4 31.4 63.1 0.6 36.3 11.7 87.9 0.4 Total % 0.2 0.3 0.1 0.7 0.1 35.3 16.2 51.6 7.8 0.1 4.5 12.4 4.1 31 0.1 35.3 Driveway 13 25 38 9 12 4 SR-410 1527 1346 2873 5 1183 158 3/21/2017 04:00 PM 3/21/2017 05:45 PM Unshifted North 5 1346 618 1486 1969 3455 SR-410 172 3 299 788 474 1262 SR-165 28

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 File Name : 3923b Site Code : 00003923 Start Date : 3/21/2017 Page No : 2 Driveway Southbound SR-410 Westbound SR-165 Northbound SR-410 Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 1 2 1 4 1 174 69 244 45 0 30 75 11 140 2 153 476 04:45 PM 0 3 1 4 1 176 73 250 39 2 20 61 24 148 1 173 488 05:00 PM 2 1 1 4 0 170 76 246 29 1 22 52 31 169 0 200 502 05:15 PM 2 2 1 5 0 150 95 245 45 0 23 68 17 169 0 186 504 Total Volume 5 8 4 17 2 670 313 985 158 3 95 256 83 626 3 712 1970 % App. Total 29.4 47.1 23.5 0.2 68 31.8 61.7 1.2 37.1 11.7 87.9 0.4 PHF.625.667 1.00.850.500.952.824.985.878.375.792.853.669.926.375.890.977 Driveway 8 17 25 5 8 4 Peak Hour Data SR-410 770 712 1482 3 626 83 Peak Hour Begins at 04:30 PM Unshifted North 2 670 313 788 985 1773 SR-410 95 3 158 404 256 660 SR-165 29

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 SR-165 Southbound Ryan Road Westbound Groups Printed- Unshifted SR-165 Northbound File Name : 3923c Site Code : 00003923 Start Date : 3/22/2017 Page No : 1 112th Street East Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total 07:00 AM 8 15 15 38 27 27 9 63 9 48 1 58 0 9 3 12 171 07:15 AM 7 14 25 46 8 28 4 40 11 59 1 71 0 12 3 15 172 07:30 AM 2 12 22 36 17 13 6 36 33 54 2 89 0 29 7 36 197 07:45 AM 4 21 38 63 16 21 23 60 23 49 1 73 1 26 1 28 224 Total 21 62 100 183 68 89 42 199 76 210 5 291 1 76 14 91 764 08:00 AM 2 14 16 32 19 11 5 35 16 43 0 59 1 6 2 9 135 08:15 AM 2 16 23 41 12 8 5 25 5 37 1 43 1 5 2 8 117 08:30 AM 2 14 23 39 21 11 3 35 8 58 0 66 1 7 3 11 151 08:45 AM 3 14 13 30 22 7 6 35 16 52 0 68 1 12 4 17 150 Total 9 58 75 142 74 37 19 130 45 190 1 236 4 30 11 45 553 Grand Total 30 120 175 325 142 126 61 329 121 400 6 527 5 106 25 136 1317 Apprch % 9.2 36.9 53.8 43.2 38.3 18.5 23 75.9 1.1 3.7 77.9 18.4 Total % 2.3 9.1 13.3 24.7 10.8 9.6 4.6 25 9.2 30.4 0.5 40 0.4 8 1.9 10.3 SR-165 567 325 892 30 120 175 112th Street East 162 136 298 25 106 5 3/22/2017 07:00 AM 3/22/2017 08:45 AM Unshifted North 142 126 61 402 329 731 Ryan Road 6 400 121 186 527 713 SR-165 30

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 File Name : 3923c Site Code : 00003923 Start Date : 3/22/2017 Page No : 2 SR-165 Southbound Ryan Road Westbound SR-165 Northbound 112th Street East Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 AM 07:00 AM 8 15 15 38 27 27 9 63 9 48 1 58 0 9 3 12 171 07:15 AM 7 14 25 46 8 28 4 40 11 59 1 71 0 12 3 15 172 07:30 AM 2 12 22 36 17 13 6 36 33 54 2 89 0 29 7 36 197 07:45 AM 4 21 38 63 16 21 23 60 23 49 1 73 1 26 1 28 224 Total Volume 21 62 100 183 68 89 42 199 76 210 5 291 1 76 14 91 764 % App. Total 11.5 33.9 54.6 34.2 44.7 21.1 26.1 72.2 1.7 1.1 83.5 15.4 PHF.656.738.658.726.630.795.457.790.576.890.625.817.250.655.500.632.853 SR-165 292 183 475 21 62 100 Peak Hour Data 112th Street East 115 91 206 14 76 1 Peak Hour Begins at 07:00 AM Unshifted North 68 89 42 252 199 451 Ryan Road 5 210 76 105 291 396 SR-165 31

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 SR-165 Southbound Ryan Road Westbound Groups Printed- Unshifted SR-165 Northbound File Name : 3923d Site Code : 00003923 Start Date : 3/22/2017 Page No : 1 112th Street E Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total 04:00 PM 8 63 11 82 19 17 25 61 18 44 5 67 4 9 6 19 229 04:15 PM 7 72 20 99 15 24 23 62 9 28 3 40 4 12 10 26 227 04:30 PM 8 58 14 80 27 28 19 74 13 31 0 44 1 16 7 24 222 04:45 PM 8 64 17 89 27 25 21 73 22 44 1 67 1 18 4 23 252 Total 31 257 62 350 88 94 88 270 62 147 9 218 10 55 27 92 930 05:00 PM 13 70 13 96 8 17 39 64 4 39 0 43 2 11 6 19 222 05:15 PM 9 60 24 93 18 18 15 51 14 27 3 44 0 12 7 19 207 05:30 PM 6 72 13 91 13 21 16 50 10 24 2 36 3 6 6 15 192 05:45 PM 5 88 22 115 18 27 14 59 3 38 0 41 2 10 4 16 231 Total 33 290 72 395 57 83 84 224 31 128 5 164 7 39 23 69 852 Grand Total 64 547 134 745 145 177 172 494 93 275 14 382 17 94 50 161 1782 Apprch % 8.6 73.4 18 29.4 35.8 34.8 24.3 72 3.7 10.6 58.4 31.1 Total % 3.6 30.7 7.5 41.8 8.1 9.9 9.7 27.7 5.2 15.4 0.8 21.4 1 5.3 2.8 9 SR-165 470 745 1215 64 547 134 112th Street E 255 161 416 50 94 17 3/22/2017 04:00 PM 3/22/2017 05:45 PM Unshifted North 145 177 172 321 494 815 Ryan Road 14 275 93 736 382 1118 SR-165 32

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 File Name : 3923d Site Code : 00003923 Start Date : 3/22/2017 Page No : 2 SR-165 Southbound Ryan Road Westbound SR-165 Northbound 112th Street E Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 8 63 11 82 19 17 25 61 18 44 5 67 4 9 6 19 229 04:15 PM 7 72 20 99 15 24 23 62 9 28 3 40 4 12 10 26 227 04:30 PM 8 58 14 80 27 28 19 74 13 31 0 44 1 16 7 24 222 04:45 PM 8 64 17 89 27 25 21 73 22 44 1 67 1 18 4 23 252 Total Volume 31 257 62 350 88 94 88 270 62 147 9 218 10 55 27 92 930 % App. Total 8.9 73.4 17.7 32.6 34.8 32.6 28.4 67.4 4.1 10.9 59.8 29.3 PHF.969.892.775.884.815.839.880.912.705.835.450.813.625.764.675.885.923 SR-165 262 350 612 31 257 62 Peak Hour Data 112th Street E 134 92 226 27 55 10 Peak Hour Begins at 04:00 PM Unshifted North 88 94 88 179 270 449 Ryan Road 9 147 62 355 218 573 SR-165 33

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 S. River Avenue Southbound Ryan Road Westbound Groups Printed- Unshifted Northbound File Name : 3923e Site Code : 00003923 Start Date : 3/23/2017 Page No : 1 Ryan Road Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total 07:00 AM 5 0 2 7 1 47 0 48 0 0 0 0 0 26 4 30 85 07:15 AM 15 0 1 16 2 42 0 44 0 0 0 0 0 37 6 43 103 07:30 AM 8 0 1 9 2 34 0 36 0 0 0 0 0 46 19 65 110 07:45 AM 26 0 3 29 1 31 0 32 0 0 0 0 0 64 49 113 174 Total 54 0 7 61 6 154 0 160 0 0 0 0 0 173 78 251 472 08:00 AM 15 0 1 16 2 23 0 25 0 0 0 0 0 34 9 43 84 08:15 AM 8 0 0 8 1 24 0 25 0 0 0 0 0 20 6 26 59 08:30 AM 2 0 1 3 4 25 0 29 0 0 0 0 0 22 8 30 62 08:45 AM 5 0 1 6 2 39 0 41 0 0 0 0 0 22 7 29 76 Total 30 0 3 33 9 111 0 120 0 0 0 0 0 98 30 128 281 Grand Total 84 0 10 94 15 265 0 280 0 0 0 0 0 271 108 379 753 Apprch % 89.4 0 10.6 5.4 94.6 0 0 0 0 0 71.5 28.5 Total % 11.2 0 1.3 12.5 2 35.2 0 37.2 0 0 0 0 0 36 14.3 50.3 S. River Avenue 123 94 217 84 0 10 Ryan Road 349 379 728 108 271 0 3/23/2017 07:00 AM 3/23/2017 08:45 AM Unshifted North 15 265 0 281 280 561 Ryan Road 0 0 0 0 0 0 34

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 File Name : 3923e Site Code : 00003923 Start Date : 3/23/2017 Page No : 2 S. River Avenue Southbound Ryan Road Westbound Northbound Ryan Road Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 AM 07:00 AM 5 0 2 7 1 47 0 48 0 0 0 0 0 26 4 30 85 07:15 AM 15 0 1 16 2 42 0 44 0 0 0 0 0 37 6 43 103 07:30 AM 8 0 1 9 2 34 0 36 0 0 0 0 0 46 19 65 110 07:45 AM 26 0 3 29 1 31 0 32 0 0 0 0 0 64 49 113 174 Total Volume 54 0 7 61 6 154 0 160 0 0 0 0 0 173 78 251 472 % App. Total 88.5 0 11.5 3.8 96.2 0 0 0 0 0 68.9 31.1 PHF.519.000.583.526.750.819.000.833.000.000.000.000.000.676.398.555.678 S. River Avenue 84 61 145 54 0 7 Peak Hour Data Ryan Road 208 251 459 78 173 0 Peak Hour Begins at 07:00 AM Unshifted North 6 154 0 180 160 340 Ryan Road 0 0 0 0 0 0 35

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 South River Avenue Southbound Ryan Road Westbound Groups Printed- Unshifted Northbound File Name : 3923f Site Code : 00003923 Start Date : 3/22/2017 Page No : 1 Ryan Road Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total 04:00 PM 27 0 3 30 1 41 0 42 0 0 0 0 0 29 11 40 112 04:15 PM 25 0 0 25 1 36 0 37 0 0 0 0 0 32 14 46 108 04:30 PM 24 0 1 25 2 61 0 63 0 0 0 0 0 32 14 46 134 04:45 PM 25 0 0 25 1 56 0 57 0 0 0 0 0 34 20 54 136 Total 101 0 4 105 5 194 0 199 0 0 0 0 0 127 59 186 490 05:00 PM 42 0 3 45 1 29 0 30 0 0 0 0 0 24 9 33 108 05:15 PM 29 0 2 31 2 27 0 29 0 0 0 0 0 46 12 58 118 05:30 PM 20 0 2 22 3 27 0 30 0 0 0 0 0 27 8 35 87 05:45 PM 22 0 1 23 1 44 0 45 0 0 0 0 0 29 7 36 104 Total 113 0 8 121 7 127 0 134 0 0 0 0 0 126 36 162 417 Grand Total 214 0 12 226 12 321 0 333 0 0 0 0 0 253 95 348 907 Apprch % 94.7 0 5.3 3.6 96.4 0 0 0 0 0 72.7 27.3 Total % 23.6 0 1.3 24.9 1.3 35.4 0 36.7 0 0 0 0 0 27.9 10.5 38.4 South River Avenue 107 226 333 214 0 12 Ryan Road 535 348 883 95 253 0 3/22/2017 04:00 PM 3/22/2017 05:45 PM Unshifted North 12 321 0 265 333 598 Ryan Road 0 0 0 0 0 0 36

Heath & Associates, Inc 2214 Tacoma Road Puyallup, WA 98371 File Name : 3923f Site Code : 00003923 Start Date : 3/22/2017 Page No : 2 South River Avenue Southbound Ryan Road Westbound Northbound Ryan Road Eastbound Start Time App. Total App. Total App. Total App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 24 0 1 25 2 61 0 63 0 0 0 0 0 32 14 46 134 04:45 PM 25 0 0 25 1 56 0 57 0 0 0 0 0 34 20 54 136 05:00 PM 42 0 3 45 1 29 0 30 0 0 0 0 0 24 9 33 108 05:15 PM 29 0 2 31 2 27 0 29 0 0 0 0 0 46 12 58 118 Total Volume 120 0 6 126 6 173 0 179 0 0 0 0 0 136 55 191 496 % App. Total 95.2 0 4.8 3.4 96.6 0 0 0 0 0 71.2 28.8 PHF.714.000.500.700.750.709.000.710.000.000.000.000.000.739.688.823.912 South River Avenue 61 126 187 120 0 6 Peak Hour Data Ryan Road 293 191 484 55 136 0 Peak Hour Begins at 04:30 PM Unshifted North 6 173 0 142 179 321 Ryan Road 0 0 0 0 0 0 37

HCM 2010 Signalized Intersection Summary Existing AM Peak Hour 3: SR-165/Driveway & SR-410 4/4/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 1 492 97 92 466 0 76 0 223 6 1 3 Future Volume (veh/h) 1 492 97 92 466 0 76 0 223 6 1 3 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1881 1810 1810 1810 1810 1900 1863 1863 1900 1900 1881 1900 Adj Flow Rate, veh/h 1 559 110 105 530 0 86 0 253 7 1 3 Adj No. of Lanes 1 1 1 1 1 0 1 1 0 0 1 0 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, % 1 5 5 5 5 5 2 1 1 1 1 1 Cap, veh/h 435 810 689 432 966 0 424 0 344 164 35 34 Arrive On Green 0.00 0.45 0.45 0.09 0.53 0.00 0.22 0.00 0.22 0.22 0.22 0.22 Sat Flow, veh/h 1792 1810 1538 1723 1810 0 1407 0 1583 256 162 157 Grp Volume(v), veh/h 1 559 110 105 530 0 86 0 253 11 0 0 Grp Sat Flow(s),veh/h/ln 1792 1810 1538 1723 1810 0 1407 0 1583 575 0 0 Q Serve(g_s), s 0.0 13.5 2.3 1.5 10.5 0.0 0.0 0.0 8.1 0.1 0.0 0.0 Cycle Q Clear(g_c), s 0.0 13.5 2.3 1.5 10.5 0.0 3.0 0.0 8.1 8.2 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.00 1.00 1.00 0.64 0.27 Lane Grp Cap(c), veh/h 435 810 689 432 966 0 424 0 344 233 0 0 V/C Ratio(X) 0.00 0.69 0.16 0.24 0.55 0.00 0.20 0.00 0.74 0.05 0.00 0.00 Avail Cap(c_a), veh/h 760 1990 1692 913 1990 0 892 0 871 659 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 8.6 12.0 9.0 7.9 8.4 0.0 17.9 0.0 19.9 17.3 0.0 0.0 Incr Delay (d2), s/veh 0.0 1.0 0.1 0.3 0.4 0.0 0.2 0.0 2.8 0.1 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 6.9 1.0 0.7 5.3 0.0 1.1 0.0 3.8 0.1 0.0 0.0 LnGrp Delay(d),s/veh 8.6 13.0 9.1 8.1 8.8 0.0 18.1 0.0 22.7 17.3 0.0 0.0 LnGrp LOS A B A A A B C B Approach Vol, veh/h 670 635 339 11 Approach Delay, s/veh 12.3 8.7 21.5 17.3 Approach LOS B A C B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 16.3 9.3 28.9 16.3 4.6 33.6 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 30.0 20.0 60.0 30.0 10.0 60.0 Max Q Clear Time (g_c+i1), s 10.1 3.5 15.5 10.2 2.0 12.5 Green Ext Time (p_c), s 1.7 0.2 9.0 1.7 0.0 9.0 Intersection Summary HCM 2010 Ctrl Delay 12.9 HCM 2010 LOS B Baseline Synchro 9 Light Report Page 1 38

HCM 2010 AWSC Existing AM Peak Hour 6: SR-165 & 112th Street East/Ryan Road 4/4/2017 Intersection Intersection Delay, s/veh 12.3 Intersection LOS B Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR Traffic Vol, veh/h 0 14 76 1 0 42 89 68 0 5 210 76 Future Vol, veh/h 0 14 76 1 0 42 89 68 0 5 210 76 Peak Hour Factor 0.92 0.85 0.85 0.85 0.92 0.85 0.85 0.85 0.92 0.85 0.85 0.85 Heavy Vehicles, % 2 1 1 1 2 1 1 1 2 2 2 2 Mvmt Flow 0 16 89 1 0 49 105 80 0 6 247 89 Number of Lanes 0 1 1 0 0 1 1 0 0 1 1 0 Approach EB WB NB Opposing Approach WB EB SB Opposing Lanes 2 2 2 Conflicting Approach SB NB EB Conflicting Lanes 2 2 2 Conflicting Approach NB SB WB Conflicting Lanes 2 2 2 HCM Control Delay 10.5 11.2 14.8 HCM LOS B B B Lane NBLn1 NBLn2 EBLn1 EBLn2 WBLn1 WBLn2 SBLn1 SBLn2 Vol, % 100% 0% 100% 0% 100% 0% 100% 0% Vol, % 0% 73% 0% 99% 0% 57% 0% 75% Vol, % 0% 27% 0% 1% 0% 43% 0% 25% Sign Control Stop Stop Stop Stop Stop Stop Stop Stop Traffic Vol by Lane 5 286 14 77 42 157 100 83 LT Vol 5 0 14 0 42 0 100 0 Through Vol 0 210 0 76 0 89 0 62 RT Vol 0 76 0 1 0 68 0 21 Lane Flow Rate 6 336 16 91 49 185 118 98 Geometry Grp 7 7 7 7 7 7 7 7 Degree of Util (X) 0.01 0.535 0.032 0.164 0.094 0.308 0.216 0.161 Departure Headway (Hd) 6.412 5.719 7.039 6.521 6.813 5.998 6.609 5.922 Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes Cap 558 629 507 549 525 598 542 604 Service Time 4.156 3.462 4.797 4.279 4.562 3.747 4.358 3.671 HCM Lane V/C Ratio 0.011 0.534 0.032 0.166 0.093 0.309 0.218 0.162 HCM Control Delay 9.2 14.9 10 10.6 10.3 11.4 11.2 9.8 HCM Lane LOS A B A B B B B A HCM 95th-tile Q 0 3.2 0.1 0.6 0.3 1.3 0.8 0.6 Baseline Synchro 9 Light Report Page 1 39

HCM 2010 AWSC Existing AM Peak Hour 6: SR-165 & 112th Street East/Ryan Road 4/4/2017 Intersection Intersection Delay, s/veh Intersection LOS Movement SBU SBL SBT SBR Traffic Vol, veh/h 0 100 62 21 Future Vol, veh/h 0 100 62 21 Peak Hour Factor 0.92 0.85 0.85 0.85 Heavy Vehicles, % 2 4 4 4 Mvmt Flow 0 118 73 25 Number of Lanes 0 1 1 0 Approach SB Opposing Approach NB Opposing Lanes 2 Conflicting Approach WB Conflicting Lanes 2 Conflicting Approach EB Conflicting Lanes 2 HCM Control Delay 10.6 HCM LOS B Lane Baseline Synchro 9 Light Report Page 2 40

HCM 2010 TWSC Existing AM Peak Hour 9: Ryan Road & S. River Avenue 4/4/2017 Intersection Int Delay, s/veh 2.7 Movement EBL EBT WBT WBR SBL SBR Traffic Vol, veh/h 78 173 154 6 7 54 Future Vol, veh/h 78 173 154 6 7 54 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 100 - - - 0 - Veh in Median Storage, # - 0 0-0 - Grade, % - 0 0-0 - Peak Hour Factor 68 68 68 68 68 68 Heavy Vehicles, % 1 1 1 1 1 1 Mvmt Flow 115 254 226 9 10 79 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 235 0-0 715 231 Stage 1 - - - - 231 - Stage 2 - - - - 484 - Critical Hdwy 4.11 - - - 6.41 6.21 Critical Hdwy Stg 1 - - - - 5.41 - Critical Hdwy Stg 2 - - - - 5.41 - Follow-up Hdwy 2.209 - - - 3.509 3.309 Pot Cap-1 Maneuver 1338 - - - 399 811 Stage 1 - - - - 810 - Stage 2 - - - - 622 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1338 - - - 365 811 Mov Cap-2 Maneuver - - - - 365 - Stage 1 - - - - 810 - Stage 2 - - - - 569 - Approach EB WB SB HCM Control Delay, s 2.5 0 10.8 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1338 - - - 711 HCM Lane V/C Ratio 0.086 - - - 0.126 HCM Control Delay (s) 7.9 - - - 10.8 HCM Lane LOS A - - - B HCM 95th %tile Q(veh) 0.3 - - - 0.4 Baseline Synchro 9 Light Report Page 1 41

HCM 2010 TWSC Existing AM Peak Hour 11: S. Division Street & Ryan Road 4/4/2017 Intersection Int Delay, s/veh 1.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Vol, veh/h 2 173 5 2 132 5 10 7 2 0 2 12 Future Vol, veh/h 2 173 5 2 132 5 10 7 2 0 2 12 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 80 88 88 88 88 Heavy Vehicles, % 1 1 1 1 1 1 1 1 1 1 1 1 Mvmt Flow 2 197 6 2 150 6 11 9 2 0 2 14 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 156 0 0 202 0 0 369 364 199 366 364 153 Stage 1 - - - - - - 204 204-157 157 - Stage 2 - - - - - - 165 160-209 207 - Critical Hdwy 4.11 - - 4.11 - - 7.11 6.51 6.21 7.11 6.51 6.21 Critical Hdwy Stg 1 - - - - - - 6.11 5.51-6.11 5.51 - Critical Hdwy Stg 2 - - - - - - 6.11 5.51-6.11 5.51 - Follow-up Hdwy 2.209 - - 2.209 - - 3.509 4.009 3.309 3.509 4.009 3.309 Pot Cap-1 Maneuver 1430 - - 1376 - - 589 566 845 592 566 896 Stage 1 - - - - - - 800 735-848 770 - Stage 2 - - - - - - 839 767-795 732 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1430 - - 1376 - - 576 564 845 582 564 896 Mov Cap-2 Maneuver - - - - - - 576 564-582 564 - Stage 1 - - - - - - 798 734-846 768 - Stage 2 - - - - - - 822 765-782 731 - Approach EB WB NB SB HCM Control Delay, s 0.1 0.1 11.3 9.4 HCM LOS B A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 590 1430 - - 1376 - - 826 HCM Lane V/C Ratio 0.038 0.002 - - 0.002 - - 0.019 HCM Control Delay (s) 11.3 7.5 0-7.6 0-9.4 HCM Lane LOS B A A - A A - A HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0.1 Baseline Synchro 9 Light Report Page 1 42

HCM 2010 Signalized Intersection Summary Existing PM Peak Hour 3: SR-165/Driveway & SR-410 4/4/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 3 626 83 313 670 2 95 3 158 4 8 5 Future Volume (veh/h) 3 626 83 313 670 2 95 3 158 4 8 5 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1881 1881 1881 1881 1881 1900 1881 1881 1900 1900 1881 1900 Adj Flow Rate, veh/h 3 639 85 319 684 2 97 3 161 4 8 5 Adj No. of Lanes 1 1 1 1 1 0 1 1 0 0 1 0 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 1 1 1 1 1 1 1 1 1 1 1 1 Cap, veh/h 430 936 795 515 1150 3 323 4 237 96 138 66 Arrive On Green 0.00 0.50 0.50 0.12 0.61 0.61 0.15 0.15 0.15 0.15 0.15 0.15 Sat Flow, veh/h 1792 1881 1599 1792 1875 5 1409 29 1574 134 915 437 Grp Volume(v), veh/h 3 639 85 319 0 686 97 0 164 17 0 0 Grp Sat Flow(s),veh/h/ln 1792 1881 1599 1792 0 1880 1409 0 1603 1486 0 0 Q Serve(g_s), s 0.0 15.1 1.6 4.4 0.0 13.0 0.0 0.0 5.7 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 15.1 1.6 4.4 0.0 13.0 4.1 0.0 5.7 5.7 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.00 1.00 0.98 0.24 0.29 Lane Grp Cap(c), veh/h 430 936 795 515 0 1154 323 0 241 300 0 0 V/C Ratio(X) 0.01 0.68 0.11 0.62 0.00 0.59 0.30 0.00 0.68 0.06 0.00 0.00 Avail Cap(c_a), veh/h 727 1931 1641 911 0 1930 834 0 823 879 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 7.6 11.2 7.8 8.7 0.0 6.9 22.8 0.0 23.5 21.3 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.8 0.1 1.1 0.0 0.4 0.5 0.0 3.0 0.1 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 8.0 0.7 2.7 0.0 6.8 1.5 0.0 2.7 0.2 0.0 0.0 LnGrp Delay(d),s/veh 7.6 12.0 7.8 9.8 0.0 7.3 23.3 0.0 26.5 21.4 0.0 0.0 LnGrp LOS A B A A A C C C Approach Vol, veh/h 727 1005 261 17 Approach Delay, s/veh 11.5 8.1 25.3 21.4 Approach LOS B A C C Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 13.3 11.6 33.6 13.3 4.8 40.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 30.0 20.0 60.0 30.0 10.0 60.0 Max Q Clear Time (g_c+i1), s 7.7 6.4 17.1 7.7 2.0 15.0 Green Ext Time (p_c), s 1.2 0.7 12.0 1.2 0.0 12.1 Intersection Summary HCM 2010 Ctrl Delay 11.7 HCM 2010 LOS B Baseline Synchro 9 Light Report Page 1 43