Shortage

Similar documents
प वर स स टम ऑपर शन क प र शन स समट ड (भ रत रक र क उद यम)

Shortage

Shortage

Shortage

Determination of Average Pooled Purchase Cost for FY

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

Future Power Supply Scenario

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Agenda Note for 29 th meeting of the Standing Committee on Power System Planning of Northern Region

Subject: Project No MW wind farm at Village Badabagh, District Jaisalmer, Rajasthan.

No.1/9/06-SP&PA/ Dated: As per List enclosed-

POWER SYSTEM OPERATION CORPORATION LIMITED NATIONAL LOAD DESPATCH CENTRE B-9, QUTUB INSTITUTIONAL AREA NEW DELHI

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

भ त क Government of India ववद य त म त र लय Ministry of Power उत त क ष त र य ववद य त वमवत Northern Regional Power Committee. -sd-

Thereafter, the agenda items were taken up.

Standing Committee on Power System Planning in Northern Region

Evacuation system from Chamera III HEP (231 MW).

8.Director(Operation) Delhi Transco Ltd. Shakti Sadan,Kotla Marg, New Delhi (Fax )

I. Operational Feedback from NLDC:

MD, PTCUL welcomed the participants and expressed his happiness for the opportunity of holding the meeting of the Standing Committee in Uttrakhand.

Overview of Indian Power Sector. February 29, 2008

BSES. Date 4" May 231C. Ref RA/ /01/N 19

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

The Electric Power System

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

Power evacuation system for RAPP Generating Units No. 5,6 (2x220 MW) and 7,8 (2x700 MW).

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Indian Power System Framework

Minutes of meeting held on at SLDC, Conference Hall at 03.00PM to discuss about High Voltage problems existing in the Grid.

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

HVDC Systems in India

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

List of Addresses. 1. Sh. V.Ramakrishna Member(Power system),cea, Sewa Bhawan, R.K. Puram, New Delhi 66

Government of India Central Electricity Authority SP&PA Division R.K. Puram, New Delhi

1. Operational Feedback on Transmission Constraint: January 2015 & October Description of the. Antecedent constraints Conditions

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen

वव षय: उतर क त क वव द त पण र ल य जन पर सथ य सवमवत क 40 व ब ठक क क यरव त

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

OPERATION & MAINTENANCE OF HVDC STATION

No. 1/9/SP&PA-2013 / Dated:

List of the participants is enclosed at Annexure I.

S.No. Proposed Transmission System for Power Evacuation Scheme of Solar Power Projects in Rajasthan

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

SOLUTIONS FOR LARGE POWER SYSTEM INTERCONNECTIONS. V. Sitnikov D. Povh, D. Retzmann E. Teltsch

Petition for Determination of Average Pooled Purchase Cost for FY

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region

Dietmar Retzmann From Blackout towards a Smart Grid more Reliability and Flexibility with Power Electronics

भ रतसरक र Government of India व द य तम त र लय Ministry of Power उत तरक ष त र यव द य तसवमवत Northern Regional Power Committee

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

POWER MAP OF EASTERN REGION Addtional Power Export to Bangladesh ALIPURDUAR - AGRA HVDC : 2000MW High Hydro - NER Surplus - Base Case

Role of System Operator in a Vibrant Power Market & Smart Grid

No. NRPC/OPR/107/01/2016/ Dated: फ स द श /FAX MESSAGE

A Qualitative analysis of Power System Blackouts -Northern Grid Case Study

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Comparative Analysis of Grid Failures in Recent World History

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT

Use of Advanced Solutions for UHV Transmission

Government Of India Ministry of Power Central Electricity Authority New Delhi

No. उ. क ष. व. स./प रच लन/106/01/2017/ द न क: स व म : प रच लन समन वय उपसममत क सदस य To: Members of OCC

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

List of Grid Disturbances above 10 MW. Page 1 of 8

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

FREQUENCY RESPONSE CHARACTER- ISTICS OF AN INTERCONNECTED POWER SYSTEM - A CASE STUDY OF REGIONAL GRIDS IN INDIA

Transmission Line Survey

Executive Summary on Power Sector. Jul-18

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

No.: NERPC/COM/CC_Min/2016/ Dated: 13 th January 2017

Generation Projection (July Sep 2017)

Tender for Consultancy of Grid connected Rooftop Solar PV Power Plant over PGCIL(5MW) & CPRI(800KW) Premises under CAPEX mode

SPECIFICATIONS OF SELF PROPELLED REAPER

Report. the feasibility of

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Annexure. Technical Details Package 1

Transmission System Planning under Uncertainty in Indian Context

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

Renewable Energy Integration- Transmission an Enabler

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

Power Electronics Projects

Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

Sewa Bhawan, R. K. Puram, New Delhi As per List Enclosed-

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1

Draft National Electricity Plan

THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL REFERRED TO ENVIRONMENTAL RESOURCES AND ENERGY, FEBRUARY 6, 2017 AN ACT

BPCL,Bottling Plant, Solapur, Pune, Bhitoni, Verna, Jalgoan, Nagpur, Indore

The agenda of the meeting has been uploaded on SLDC, Delhi website ( You are requested to make it convenient to attend the meeting

Chapter 4. Electricity Supply and Transmission System. In India, there are five regions namely, Northern Region, North Eastern Region,

Bangladesh s Power Sector : At a Glance

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

Government Of India Ministry of Power Central Electricity Authority New Delhi

Smart Grid Initiatives in EHV Transmission in Indian Power Sector

Indian Energy Exchange December For Public Use

Transcription:

I. Regional Availability/Demand: Evening Peak (20:00 Hrs) MW Off Peak (03:00 Hrs) MW Day Energy (Net MU) Demand Met Shortage Requirement Freq* (Hz) Demand Met Shortage Requirement Freq* (Hz) Demand Met Shortage 51535 1350 52885 49.90 51261 289 51550 50.04 1213.26 13.28 * Half hourly (two 15 minutes block--one block each before and after the designated time) average frequency II. A. 's Load Details (At s periphery) in MUs: Thermal Hydro Gas/Naptha/ Diesal Wind Other (/ Small hydro/ Co-Generation etc.) Total UI [OD:(+ve), UD: (-ve)] Drawal Schedule Actual Drawal UI Consumption Shortages * (Net MU) (Net MU) (Net MU) (Net MU) (MU) Punjab 84.48 11.58 4.16 2.66 102.87 76.52 75.78-0.74 178.66 Haryana 73.16 0.48 0.75 74.55 84.45 86.65 2.20 161.20 0.37 Rajasthan 122.66 3.92 11.51 23.01 4.41 165.51 65.85 66.94 1.09 232.45 0.82 Delhi 6.96 22.82 29.78 87.70 86.84-0.86 116.62 UP 206.17 11.60 3.40 12.00 233.17 177.62 179.99 2.37 413.16 Uttarakhand 14.07 5.36 0.73 2 19.89 21.46 1.57 41.61 3.19 HP 12.64 3.48 16.12 9.56 9.71 0.15 25.83 0.04 J & K 14.86 14.86 23.56 22.91-0.65 37.77 8.86 Chandigarh 5.64 5.98 0.34 5.98 Total 493.44 65.23 32.10 19.94 23.01 23.29 657.02 550.79 556.25 5.46 1213.26 13.28 * Shortage furnished by the respective constituent.$ Others include UP Co-generation and JK Diesel II. B. 's Demand Met in MWs: Evening Peak (20:00 Hrs) MW Demand Met Shortage UI प वर स स टम ऑपर शन क प र शन स समट ड (भ रत रक र क उद यम) उत तर क ष त र य भ र प र षण क द र CIN: U40105DL2009GOI188682 Power Supply Position in Northern Region for 22.05.2018 Date of Reporting : 23.05.2018 's Control Area Generation (Net MU) Off Peak (03:00 Hrs) MW STOA/PX transaction Demand Met Shortage UI STOA/PX transaction UI/OA/PX [OD/Import: (+ve), UD/Export: (-ve) Punjab 6665 0 71 21 6965 0 91 21 8037 23 0 Haryana 7582 0 115 246 6575 0 19 518 7662 21 0 Rajasthan 8789 0-71 -335 9504 0 55-537 10395 10 0 Delhi 4848 0-106 39 4970 0 71 54 5735 17 0 UP 18353 800 79 1423 18702 0 367 1851 19082 22 0 Uttarakhand 1996 75 83 273 1721 0 85 496 1996 20 75 HP 1155 0-74 -888 977 0-115 -473 1289 18 0 J&K 1900 475 40-98 1635 289-9 40 2042 21 510 Chandigarh 248 0-15 -45 212 0 18 0 319 15 0 Total 51535 1350 123 635 51261 289 583 1970 53826 23 1126 * STOA figures are at sellers boundary & PX figures are at regional boundary. # figures may not be at simultaneous hour. Diversity is 1.05 III. Regional Entities : UI [OG:(+ve), UG: (-ve)] / Inst. Capacity Declared Peak MW Off Peak MW Energy Average Schedule Constituent (Effective) MW Capacity(MW) (Gross) (Gross) (Net MU) Sentout(MW) Net MU A. NTPC Singrauli STPS (5*200+2*500) 2000 1660 1813 1822 40.43 1684 39.84 Rihand I STPS (2*500) 1000 923 990 1013 22.24 927 22.11 Rihand II STPS (2*500) 1000 471 486 492 11.42 476 11.28 Rihand III STPS (2*500) 1000 943 1014 1020 22.75 948 22.55 Dadri I STPS (4*210) 840 769 780 522 15.96 665 16.42 Dadri II STPS (2*490) 980 929 984 914 20.93 872 21.17 Unchahar I TPS (2*210) 420 382 428 375 8.69 362 8.75 Unchahar II TPS (2*210) 420 382 395 410 8.75 364 8.71 Unchahar III TPS (1*210) 210 191 202 191 4.31 180 4.40 Unchahar IV TPS(1*500) 500 ISTPP (Jhajjhar) (3*500) 1500 670 751 737 15.73 655 15.91 Dadri GPS (4*130.19+2*154.51) 830 0 131 129 3.35 140 3.36 Anta GPS (3*88.71+1*153.2) 419 Auraiya GPS (4*111.19+2*109.30) 663 Dadri (5) 5 1 0 0 0.02 1 0.02 Unchahar (10) 10 2 0 0 0.05 2 0.05 Singrauli (15) 15 3 0 0 0.07 3 0.05 KHEP(4*200) 800 872 846 218 6.16 257 5.62 Sub Total (A) 12612 8196 8820 7843 181 7536 180 B. NPC NAPS (2*220) 440 420 388 427 8.83 368 10.08 RAPS- B (2*220) 440 355 393 400 8.49 354 8.52 RAPS- C (2*220) 440 410 453 454 9.70 404 9.84 Sub Total (B) 1320 1185 1234 1281 27.02 1126 28.44 C. NHPC Chamera I HPS (3*180) 540 534 550 183 5.62 234 5.34 Chamera II HPS (3*100) 300 296 298 300 6.52 272 6.45 Chamera III HPS (3*77) 231 228 232 160 4.46 186 4.30 Bairasuil HPS(3*60) 180 58 0 60 1.60 67 1.39 Salal-HPS (6*115) 690 353 347 345 9.21 384 8.48 Tanakpur-HPS (3*31.4) 94 41 53 31 1.12 47 0.97 Uri-I HPS (4*120) 480 475 483 484 11.78 491 11.40 Uri-II HPS (4*60) 240 234 244 244 5.72 238 5.61 Dhauliganga-HPS (4*70) 280 277 277 69 4.08 170 3.92 Dulhasti-HPS (3*130) 390 387 396 403 9.50 396 9.28 Sewa-II HPS (3*40) 120 119 122 0 0.76 32 0.70 Parbati 3 (4*130) 520 76 514 0 1.97 82 1.83 Sub Total (C ) 4065 3077 3516 2279 62 2597 60 D.SJVNL NJPC (6*250) 1500 1497 1624 709 19.59 816 18.40 Rampur HEP (6*68.67) 412 412 439 205 5.56 232 5.12 Sub Total (D) 1912 1910 2063 914 25.15 1048 23.52 E. THDC Tehri HPS (4*250) 1000 516 536 0 3.23 135 3.29 Koteshwar HPS (4*100) 400 74 101 74 1.84 77 1.77 Sub Total (E) 1400 590 637 74 5.07 211 5.06 F. BBMB Bhakra HPS (2*108+3*126+5*157) 1379 638 1053 526 15.41 642 15.32 Dehar HPS (6*165) 990 412 660 165 10.06 419 9.88 Pong HPS (6*66) 396 67 150 50 1.68 70 1.62 Sub Total (F) 2765 1117 1863 741 27.15 1131 26.82 G. IPP(s)/JV(s) Allain DuhanganHPS(IPP) (2*96) 192 0 93 86 2.17 90 2.01 Karcham Wangtoo HPS(IPP) (4*250) 1000 0 1000 400 10.39 433 9.97 Malana Stg-II HPS (2*50) 100 0 0 90 0.92 38 0.84 Shree Cement TPS (2*150) 300 0 255 256 6.14 256 6.57 Budhil HPS(IPP) (2*35) 70 0 35 70 0.99 41 1.02 Sainj HPS (IPP) (2*50) 100 0 0.94 Sub Total (G ) 1762 0 1383 901 20.60 858 20.41 H. Total Regional Entities (A-G) 25837 16075 19515 14033 348.19 14508 344.16 Demand Met (MW) and Time(Hrs) UI Net MU 0.58 0.13 0.14 0.20-0.46-0.24-0.06 0.04-0.09-0.18-0.01 0.02 0.54 0.62-1.25-0.03-0.14-1.42 0.28 0.07 0.21 0.73 0.15 0.38 0.11 0.22 0.06 0.14 2.67 1.19 0.44 1.63-0.06 0.07 0.01 0.09 0.17 0.06 0.33 0.42 0.08-0.43-0.03 0.19 4.03 Shortage (MW)

Effective Installed I. Entities Average(Sentout Capacity Peak MW Off Peak MW Energy(MU) (MW) MW) Punjab Guru Gobind Singh TPS (Ropar) (6*210) 1260 340 340 7.92 330 Guru Nanak Dev TPS(Bhatinda) (2*110+2*120) Guru Hargobind Singh TPS(L.mbt) (2*210+2*250) Goindwal(GVK) (2*270) Rajpura (2*700) Talwandi Saboo (3*660) 460 0 0-0.02-1 920 722 569 14.33 597 540 290 290 8.62 359 1400 820 1320 28.99 1208 1980 924 974 24.64 1027 6560 3096 3493 84.48 3520 1000 449 430 11.58 483 303 0 0 2.66 111 859 0 0 4.16 173 1162 0 0 6.81 284 8722 3545 3923 102.87 4286 Total Punjab Haryana Panipat TPS (2*210+2*250) 920 821 823 19.45 811 DCRTPP (Yamuna nagar) (2*300) 600 564 569 13.19 549 Faridabad GPS (NTPC)(2*137.75+1*156) 432 0 0 0 RGTPP (khedar) (IPP) (2*600) 1200 1090 1139 26.05 1085 Magnum Diesel (IPP) 25 0 0 0 Jhajjar(CLP) (2*660) 1320 617 615 14.48 603 4497 3092 3146 73.16 3049 62 10 19 0.48 20 106 0 0 0.75 31 50 0 0 7 156 0 0 0.91 38 Total Haryana 4715 3102 3165 74.55 3106 Rajasthan kota TPS (2*110+2*195+3*210) 1240 1132 906 25.43 1060 suratgarh TPS (6*250) 1500 1246 1046 26.62 1109 Chabra TPS (4*250) 1000 924 928 22.14 923 Chabra TPS (1*660) 66 Dholpur GPS (3*110) 33 Ramgarh GPS(1*37.5 + 1*35.5 +2*37.5 +1*110 +1*50) 271 158 159 3.92 163 RAPS A (NPC) (1*100+1*200) 300 174 172 4.03 168 Barsingsar (NLC) (2*125) 250 104 111 2.33 97 Giral LTPS (2*125) 25 Rajwest LTPS (IPP) (8*135) 1080 847 851 20.18 841 VS LIGNITE LTPS (IPP) (1*135) 135 0 0 0 Kalisindh Thermal(2*600) 1200 563 559 12.76 531 Kawai(Adani) (2*660) 1320 501 625 13.21 551 9536 5649 5357 130.62 5442 55 Wind power 4292 501 1413 23.01 959 102 16 16 0.38 16 1995 27 0 11.51 479 Renewable/Others (Total) 6389 544 1429 34.90 1454 Total Rajasthan 16475 6193 6786 165.51 6896 UP Anpara TPS (3*210+2*500) 1630 1328 1318 32.40 1350 Obra TPS (2*50+2*94+5*200) 1194 316 298 7.50 313 Paricha TPS (2*110+2*220+2*250) 1160 812 884 16.50 688 Panki TPS (2*105) 21 Harduaganj TPS (1*60+1*105+2*250) 665 524 523 10.80 450 Tanda TPS (NTPC) (4*110) 440 390 390 7.57 315 Roza TPS (IPP) (4*300) 1200 1065 1097 22.60 942 Anpara-C (IPP) (2*600) 1200 1096 1082 24.80 1033 Bajaj Energy Pvt.Ltd(IPP) TPS (10*45) 450 401 401 7.00 292 Anpara-D(2*500) 1000 903 900 21.60 900 Lalitpur TPS(3*660) 1980 966 1752 3 1250 Bara(3*660) 1980 1130 1075 25.40 1058 13109 8931 9720 206.17 8590 Vishnuparyag HPS (IPP)(4*110) 440 375 345 8.00 333 Alaknanada(4*82.5) 330 76 82 2.70 113 Other Hydro 527 23 4 0.90 38 Cogeneration 1360 500 500 12.00 500 26 0 0 0 472 0 0 3.40 142 498 0 0 3.40 142 Total UP 16264 9905 10651 233.17 9715 Uttarakhand Other Hydro 1250 694 400 14.07 586 Total Gas 450 213 223 5.36 223 127 0 0 0 100 0 0 0.73 30 Small Hydro (< 25 MW) 18 407 0 0 0.73 30 Total Uttarakhand 2107 907 623 2 840 Delhi Rajghat TPS (2*67.5) 135 0 0 0 Delhi Gas Turbine (6x30 + 3x34) 282 100 103 2.44 102 Pragati Gas Turbine (2x104+ 1x122) 330 270 268 6.63 276 Rithala GPS (3*36) 95 0 0 0 Bawana GPS (4*216+2*253) 1370 570 558 13.75 573 Badarpur TPS (NTPC) (3*95+2*210) 705 307 301 6.96 290 2917 1247 1231 29.78 1241 16 36 35 0 2 0 0 0 18 36 35 0 Total Delhi 2935 1283 1266 29.78 1241

HP Baspa HPS (IPP) (3*100) 300 176 274 4.61 192 Malana HPS (IPP) (2*43) 86 13 76 0.81 34 Other Hydro (>25MW) 372 321 304 7.22 301 Small Hydro (< 25 MW) 486 164 140 3.48 145 486 164 140 3.48 145 Total HP 1244 674 794 16.12 672 J & K Baglihar HPS (IPP) (3*150+3*150) 900 481 482 11.37 474 Other Hydro/IPP(including 98 MW Small Hydro) 308 159 132 3.49 145 Gas/Diesel/Others 19 Small Hydro (< 25 MW)Included in Other Hydro Abov 98 0 0 0 98 0 0 0 Total J & K 1398 640 614 15 619 Total Control Area Generation 53860 26249 27821 657.02 27376 J. Net Inter Regional Exchange [Import (+ve)/export (-ve)] 10314 12858 227.71 9488 Total Regional Availability(Gross) 79697 56078 54712 1232.91 51371 IV. Generation: Regional Entities Hydro Control Area Hydro Total Regional Hydro V. Total Renewable Generation: Regional Entities Renewable Control Area Renewable Total Regional Renewable 12234 10017 4802 140.32 5806 7468 3154 2911 65.23 3116 19702 13171 7712 205.55 8922 30 0 0 0.15 6 9214 744 1604 50.22 2093 9244 744 1604 50.37 2099 VI(A). Inter Regional Exchange [Import (+ve)/export (-ve)] [Linkwise] Element Peak(20:00 Hrs) Off Peak(03:00 Hrs Interchange (MW) Energy (MU) Net Energy MW MW Import Export Import Export MU Vindhychal(HVDC B/B) -250 250 250 250 4.65 1.04 3.61 765 KV Gwalior-Agra (D/C) 1237 1689 1689 0 31.10 31.10 400 KV Zerda-Kankroli -243-268 0 356 7.09-7.09 400 KV Zerda-Bhinmal -174-227 37 315 5.41-5.41 220 KV Auraiya-Malanpur 28 93 93 0 1.08 1.08 220 KV Badod-Kota/Morak -77 46 46 124 0.91-0.91 Mundra-Mohindergarh(HVDC Bipole) 1002 801 1304 0 21.94 21.94 400 KV RAPPC-Sujalpur 104 192 200 230 0.39 0.39 400 KV Vindhyachal-Rihand 964 954 0 966 22.97-22.97 765 kv Phagi-Gwalior (D/C) 844 1661 1661 0 32.19 32.19 +/- 800 kv HVDC Champa-Kurushetra 2500 2000 2500 0 54.60 0 54.60 765KV Orai-Jabalpur 684 1060 1081 0 17.38 0 17.38 765KV Orai-Satna 1762 1799 1813 0 42.02 0 42.02 765KV Orai-Gwalior -275-393 0 438 9-8.82 Sub Total WR 8106 9657 205.34 46.23 159.10 400 kv Sasaram - Varanasi 0 18 0 50 0.83-0.83 400 kv Sasaram - Allahabad -104-92 0 124 1.99-1.99 400 KV MZP- GKP (D/C) 16 174 348 8 4.46 4.46 400 KV Patna-Balia(D/C) X 2 390 718 893 0 14.62 14.62 400 KV B'Sharif-Balia (D/C) 151 375 432 0 8.62 8.62 765 KV Gaya-Balia 443 565 593 0 11.31 11.31 765 KV Gaya-Varanasi (D/C) 76 196 223 0 3.97 3.97 220 KV Pusauli-Sahupuri 196 177 200 0 4.19 4.19 132 KV K'nasa-Sahupuri 0.00 132 KV Son Ngr-Rihand 0.00 132 KV Garhwa-Rihand 0.00 765 KV Sasaram - Fatehpur -184-136 51 184 1.74-1.74 400 KV Motihari -GKP (D/C) 112 152 190 0 3.50 3.50 400 kv B'Sharif - Varanasi (D/C) 112 54-45 159 0.53-0.53 +/- 800 KV HVDC Alipurduar-Agra 500 500 500 0 11.52 11.52 Sub Total ER 1708 2701 62.18 5.09 57.09 +/- 800 KV HVDC BiswanathCharialli-Agra 500 500 500 11.52 11.52 Sub Total NER 500 500 11.52 11.52 Total IR Exch 10314 12858 279.04 51.33 227.71 VI(B). Inter Regional Schedule & Actual Exchanges [Import (+ve)/export (-ve)] [Corridor wise] ISGS/LT Schedule (MU) Bilateral Schedule (MU) Power Exchange Shdl (MU) Wheeling (MU) ER Bhutan Total Through ER Through WR Through ER Through WR Through ER Through WR 52.84 1.17 54.01 24.86 7.08-5.16-1.67 Total IR Schedule (MU) Through ER Through WR Inclds Mndra Total Total IR Actual (MU) Through ER(including NER) Through WR Total Through ER (including NER) Through WR Total 72.54 149.53 222.07 68.61 159.10 227.71-3.93 9.57 5.64 VI(C). Inter National Exchange with Nepal [Import (+ve)/export (-ve)] [Linkwise] Element 132 KV Tanakpur - Mahendarnagar Peak(20:00 Hrs) Off Peak(03:00 Hrs Interchange (MW) Energy (MU) Net IR UI (MU) Net Energy MW MW Import Export Import Export MU -26-21 0 27 0 0-0.47 VII. Frequency Profile <-------------------------------------------------- % of Time Frequency --------------------------------------------------> <49.2 <49.7 <49.8 <49.9 <50.0 49.9-50.05 50.05-50.10 50.10-50.20 >50.20 >50.50 0.60 6.00 38.60 87.20 59.10 2.30 <------------------------- Frequency (Hz) -------------------------> Average Frequency Frequency in 15 Min Block Frequency Variation Std. Dev. MAX MIN Freq Dev Index (% of Time) Freq Time Freq Time Hz Index (Hz) (Hz) 50.10 6.03 49.65 15.17 49.92 0.125 0.075 40.90

VIII(A). Voltage profile 400 kv Voltage Voltage (in % of Time) Voltage Level (kv) Deviatio Voltage(KV) Time Voltage (KV) Time <380 kv <390 kv >420 kv >430 kv n Index Rihand 400 403 13:01 399 0:00 0.0 0.0 0.0 0.0 0.0 Gorakhpur 400 414 7:56 391 0:00 0.0 0.0 0.0 0.0 0.0 Bareilly(PG)400kV 400 415 7:45 382 0:04 0.0 0.1 0.0 0.0 0.0 Kanpur 400 417 7:01 398 14:43 0.0 0.0 0.0 0.0 0.0 Dadri 400 420 6:01 401 15:14 0.0 0.0 0.0 0.0 0.0 Ballabhgarh 400 419 5:59 397 15:13 0.0 0.0 0.0 0.0 0.0 Bawana 400 418 6:01 398 14:47 0.0 0.0 0.0 0.0 0.0 Bassi 400 415 5:59 392 22:17 0.0 0.0 0.0 0.0 0.0 Hissar 400 414 6:00 397 22:42 0.0 0.0 0.0 0.0 0.0 Moga 400 416 6:01 400 14:43 0.0 0.0 0.0 0.0 0.0 Abdullapur 400 418 5:59 400 15:37 0.0 0.0 0.0 0.0 0.0 Nalagarh 400 423 6:01 403 14:40 0.0 0.0 11.9 0.0 11.9 Kishenpur 400 413 2:59 403 15:36 0.0 0.0 0.0 0.0 0.0 Wagoora 400 405 3:21 390 11:35 0.0 0.0 0.0 0.0 0.0 Amritsar 400 418 3:26 401 15:42 0.0 0.0 0.0 0.0 0.0 Kashipur 400 402 0:00 402 0:00 0.0 0.0 0.0 0.0 0.0 Hamirpur 400 411 7:10 403 13:10 0.0 0.0 0.0 0.0 0.0 Rishikesh 400 413 7:01 388 15:41 0.0 1.9 0.0 0.0 0.0 VIII(B). Voltage profile 765 kv Voltage Voltage (in % of Time) Voltage Level (kv) Deviatio Voltage(KV) Time Voltage (KV) Time <728 kv <742 kv >800 kv >820 kv n Index Fatehpur 765 782 7:01 746 13:44 0.0 0.0 0.0 0.0 0.0 Balia 765 773 8:02 740 19:40 0.0 3.5 0.0 0.0 0.0 Moga 765 796 6:00 762 15:41 0.0 0.0 0.0 0.0 0.0 Agra 765 789 6:01 756 14:47 0.0 0.0 0.0 0.0 0.0 Bhiwani 765 801 5:58 767 14:42 0.0 0.0 1.0 0.0 1.0 Unnao 765 780 8:00 737 14:47 0.0 6.4 0.0 0.0 0.0 Lucknow 765 787 8:02 743 14:46 0.0 0.0 0.0 0.0 0.0 Meerut 765 808 6:00 761 15:44 0.0 0.0 4.1 0.0 4.1 Jhatikara 765 801 6:01 754 15:44 0.0 0.0 0.1 0.0 0.1 Bareilly 765 kv 765 791 8:01 753 0:00 0.0 0.0 0.0 0.0 0.0 Anta 765 790 6:01 765 22:19 0.0 0.0 0.0 0.0 0.0 Phagi 765 798 6:01 765 22:16 0.0 0.0 0.0 0.0 0.0 Note : "0" in Max / Min Col -> Telemetry Outage IX. Reservior Parameters: Name of Parameters Present Parameters Last Year Last day Reservior FRL (m) MDDL (m) Level (m) Energy (MU) Level (m) Energy (MU) Inflow (m 3 /s) Usage (m 3 /s) Bhakra 513.59 445.62 456.67 95.38 469.88 267.31 311.74 592.90 Pong 426.72 384.05 392.76 93.10 394.72 121.45 40.32 130.77 Tehri 829.79 740.04 744.70 22.50 747.20 35.13 135.77 116.00 Koteshwar 612.50 598.50 610.39 4.69 610.13 4.69 116.00 121.38 Chamera-I 76 748.75 753.85 177.86 151.47 Rihand 268.22 252.98 RPS 352.80 343.81 Jawahar Sagar 298.70 295.78 RSD 527.91 487.91 498.84 3.10 513.96 6.98 127.72 138.22 * NA: Not Available X(A). Short-Term Open Access Details: Off- Peak Hours (03:00 Hrs) Peak Hours (20:00 Hrs) Day Energy (MU) Bilateral (MW) IEX (MW) PXIL (MW) Bilateral (MW) IEX (MW) PXIL (MW) Bilateral (MU) IEX / PXIL (MU) Total (MU) Punjab 121-101 0 121-101 0 2.92-2.41 0.51 Delhi 669-615 0 486-448 0 15.52-10.92 4.60 Haryana 489 29 0 232 14 0 4.84 1.03 5.87 HP -404-69 0-544 -345 0-9.13-1.79-10.92 J&K -753 794 0-753 655 0-18.07 14.05-4.02 CHD 0 0 0 0-45 0-0.13-0.13 Rajasthan -8-528 0-8 -327 0-0.20-4.49-4.69 UP 1851 0 0 1423 0 0 41.85-0.02 41.83 Uttarakhand 34 461 0 29 244 0 0.98 3.68 4.66 Total 1999-29 0 987-353 0 38.71-1.00 37.71 X(B). Short-Term Open Access Details: Bilateral (MW) IEX (MW) PXIL (MW) Punjab 121 121 101 101 0 0 Delhi 768 485 993 49 0 0 Haryana 535 18 128 0 0 0 HP 645 61 496 5 0 0 J&K 753 753 794 0 0 0 CHD 0 0 50 0 0 0 Rajasthan 8 8 1612 25 0 0 UP 1862 1339 5 0 0 0 Uttarakhand 64 29 482 3 0 0 XI. System Reliability Indices(Violation of TTC and ATC): (i)%age of times N-1 Criteria was violated in the inter - regional corridors WR 6.25% ER % Simultaneous % (ii)%age of times ATC violated on the inter-regional corridors WR 20.49% ER % Simultaneous 19.79% (iii)%age of times Angular Difference on Important Buses was beyond permissible limits(40 deg.)

Rihand - Dadri % XII. Zero Crossing Violations No. of violations( 8 in a day) number of continuous blocks without sign change Punjab 0 11 Haryana 1 18 Rajasthan 2 20 Delhi 4 44 UP 1 17 Uttarakhand 2 21 HP 2 22 J & K 5 63 Chandigarh 6 59 XIII.System Constraints: XIV. Grid Disturbance / Any Other Significant Event: XV. Weather Conditions For 22.05.2018 : XVI. Synchronisation of new generating units : XVII. Synchronisation of new 220 / 400 / 765 KV lines and energising of bus / /substation : 1) 220 KV Fatehpur Sarh Ckt-I and 220 kv Bus-I at Sarh(UP) first time charged at 18.29 Hrs & 18.38 Hrs respectively 2) 220 KV Fatehpur Sarh Ckt-II at Sarh(UP) first time charged at 19.58 Hrs XVIII. Tripping of lines in pooling stations : XIX. Complete generation loss in a generating station : Note: Data(regarding drawal,generation, shortage, inter-regional flows and reservoir levels)of the constituents filled in the report are as per last furnished data by the respective state/constituent to NRLDC. Report for : 22.05.2018 प र प रभ र असभय त / SHIFT CHARGE ENGINEER