THE NETHERLANDS (N E D E R L A N D) COMMUNICATION. Approval number: E4-110R Extension number: 00

Similar documents
THE NETHERLANDS (N E D E R L A N D) COMMUNICATION

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION. Approval number: E4-7R Extension number: 00

Proposal for amendments to UN Regulation No. 110 CNG/LNG vehicles

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION. Approval number: E4-112R Extension number: 00

CNG Receptacle of class 0 Of BMT Co. Ltd. Make

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION. Approval number: E4-23R Extension number: 00

QINGDAO KEBEK TIRE CO.,LIMITED LinGong Road MengYinEconomic Development Zone.Lin Yi City. ShanDong Province P.R. China

E/ECE/324/Rev.2/Add.109/Rev.3/Amend.4 E/ECE/TRANS/505/Rev.2/Add.109/Rev.3/Amend.4

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION. Approval number: E4-3R Extension number: 00

THE NETHERLANDS (NEDERLAND) EC TYPE-APPROVAL CERTIFICATE. Reason for extension : Not applicable Approval mark : See example of type plate

THE UNITED KINGDOM VEHICLE APPROVAL AUTHORITY. 4. If applicable, name and address of manufacturer's representative: not applicable

Approval mark PL HCR 1a A

Build the future, prepare for LNG

APPLICATION FOR APPROVAL OF A TYPE OF PNEUMATIC TYRE ACCORDING TO ECE REGULATION No. 30, 02 SERIES OF AMENDMENTS

Draft amendments for ECE/TRANS/WP.29/GRSG/2015/27

Economic and Social Council

11-Feb-14. VCA job number: CSP Date: 11 February Dear Sirs,

Economic and Social Council

DieselBlend LPG. a Westport Fuel Systems company

24-Jan-12 THE UNITED KINGDOM VEHICLE APPROVAL AUTHORITY

THE UNITED KINGDOM VEHICLE APPROVAL AUTHORITY

10-Feb-14. VCA job number: CSP Date: 10 February Dear Sirs,

E/ECE/324/Rev.1/Add.38/Rev.2 E/ECE/TRANS/505/Rev.1/Add.38/Rev.2

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION

E/ECE/324/Rev.2/Add.104/Rev.2 E/ECE/TRANS/505/Rev.2/Add.104/Rev.2

ANNEX. to the. Commission Delegated Regulation (EU).../...

THE UNITED KINGDOM TYPE APPROVAL AUTHORITY

THE UNITED KINGDOM VEHICLE APPROVAL AUTHORITY

E/ECE/324/Rev.2/Add.104/Rev.2/Amend.3 E/ECE/TRANS/505/Rev.2/Add.104/Rev.2/Amend.3

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

APPLICATION FOR APPROVAL OF A TYPE OF PNEUMATIC TYRE ACCORDING TO ECE REGULATION No. 54, 00 SERIES OF AMENDMENTS

THE UNITED KINGDOM VEHICLE APPROVAL AUTHORITY. 4. If applicable, name and address of manufacturer's representative: Not Applicable

AGREEMENT. (Revision 2, including the amendments entered into force on 16 October 1995) Addendum 102: Regulation No. 103

23-Jul-14. VCA job number: CSQ Date: 23 July Dear Sirs,

E/ECE/324/Rev.1/Add.84/Amend.5 E/ECE/TRANS/505/Rev.1/Add.84/Amend.5

(Non-legislative acts) REGULATIONS

30-Aug-11. VCA job number: CSM Date: 30 August Dear Sirs,

HOUSE BILL NO. HB0235. Sponsored by: Representative(s) Roscoe and Miller A BILL. for. AN ACT relating to motor vehicles; providing that the

This document is a preview generated by EVS

SERVICE LETTER. COMPLIANCE DISCRETIONARY. This service letter should be accomplished at a scheduled Check 1, Check 2, or HSI. LABOR HOURS KEY WORD

E/ECE/324/Rev.2/Add.114/Rev.1 E/ECE/TRANS/505/Rev.2/Add.114/Rev.1

ISO INTERNATIONAL STANDARD. Liquid hydrogen Land vehicle fuel tanks. Hydrogène liquide Réservoirs de carburant pour véhicules terrestres

FLUX FOOD Certified conformity. New!

FLUX FOOD Certified conformity. More than just pumps

ANNEX C. Mobile Cath. Lab. Trailer. Philips Allura Centron Cardiovascular

XIII. Repair Parts 106

AGREEMENT. (Revision 2, including the amendments entered into force on 16 October 1995) Addendum 101: Regulation No. 102

Codes, Standards and Advisories Applicable to Natural Gas Vehicles and Infrastructure (N.B. This list is not all-inclusive)

AGREEMENT CONCERNING THE ADOPTION OF UNIFORM CONDITIONS OF APPROVAL AND RECIPROCAL RECOGNITION OF APPROVAL FOR MOTOR VEHICLE EQUIPMENT AND PARTS

LIST OF PUBLISHED STANDARDS

Water meters and measuring units

11 July 2005 AGREEMENT

AGREEMENT. (Revision 2, including the amendments entered into force on 16 October 1995) Addendum 25: Regulation No. 26.

08-Dec-10. VCA job number: CSL Date: 08 December Dear Sirs,

E/ECE/324/Rev.2/Add.140 E/ECE/TRANS/505/Rev.2/Add.140

These regulations are created pursuant to and of the Colorado Revised Statutes.

THE UNITED KINGDOM VEHICLE APPROVAL AUTHORITY. 4. If applicable, name and address of manufacturer's representative: not applicable

AGREEMENT CONCERNING THE ADOPTION OF UNIFORM CONDITIONS OF APPROVAL AND RECIPROCAL RECOGNITION OF APPROVAL FOR MOTOR VEHICLE EQUIPMENT AND PARTS

National Board Update

Department of Finance Purchasing Department INVITATION TO BID

Hydrogen Station Equipment Performance Device (HyStEP Device) Specification

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

UN Regulation No. 0 Second draft UNIFORM PROVISIONS CONCERNING INTERNATIONAL WHOLE VEHICLE TYPE APPROVAL (IWVTA)

THE NETHERLANDS (N E D E R L A N D) ECE R13, Annex 11 Appendix 3 Test report as prescribed in Paragraphs and of Appendix 2 to this Annex

E/ECE/324/Add.3/Rev.3 E/ECE/TRANS/505/Add.3/Rev.3

TECHNICAL CERTIFICATE

4. If applicable, name and address of manufacturer's representative: Not applicable

E/ECE/324/Rev.2/Add.105/Rev.2 E/ECE/TRANS/505/Rev.2/Add.105/Rev.2

APPLICATION for BUSINESS LICENSE Licensing & Permits City of Williston PO Box 1306, Williston, ND

Proposal for amendments to Regulations Nos. 19, 48 and 98.

Pete Jacobs. Business Development Manager Wartsila North America, Inc. (281)

THE NETHERLANDS (N E D E R L A N D) ECE R13, Annex 11 Appendix 3 Test report as prescribed in Paragraphs and of Appendix 2 to this Annex

San Joaquin Valley Air Pollution Control District Vapor Recovery Requirements for Permitted Agricultural Gasoline Storage and Dispensing Operations

Portable. Storage and Transport Dewars. CL/CLPB Series, CH Series, CFN/CFL Series

CLASSIFICATION NOTES. Type Testing Procedure for. Crankcase Explosion Relief Valves

NUMBER: rev S.M. REF.: Refer to 2.47 ENGINE: 50 DATE: June 2001

Informal document No. 80th GRSG, 2-6 April 2001, agenda item 6. Distr. GENERAL

} Rev.2/Add.104/Rev.1

An Overview of NSPS Subpart QQQ VOC Emissions from Petroleum Refinery Wastewater Systems

E/ECE/324/Rev.1/Add.33/Rev.3 E/ECE/TRANS/505/Rev.1/Add.33/Rev.3

HyTrEc Mixed Fuel Demonstrator Report

E/ECE/324/Rev.1/Add.53/Rev.3/Amend.3 E/ECE/TRANS/505/Rev.1/Add.53/Rev.3/Amend.3

E/ECE/324/Rev.1/Add.54/Rev.2 E/ECE/TRANS/505/Rev.1/Add.54/Rev.2

Compressed Natural Gas Vehicle Fuel System Inspection Guidance

AEROSTAT HP-N-Ex Ionising Air Blower

VIESMANN VITOTRANS 100 Plate heat exchanger

E/ECE/324/Rev.1/Add.74/Rev.2/Amend.4 E/ECE/TRANS/505/Rev.1/Add.74/Rev.2/Amend.4

Provide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext.

First Responder Guide: CNG and LNG Vehicle Fuel Systems

New Jersey Motor Vehicle Commission

KOMO product certificate K4389/11

E/ECE/324/Rev.2/Add.115/Amend.3 E/ECE/TRANS/505/Rev.2/Add.115/Amend.3

E/ECE/324/Rev.2/Add.141 E/ECE/TRANS/505/Rev.2/Add.141

Bursting discs TECHNICAL GUIDE

Pressure degassing systems

Australian/New Zealand Standard

Transcription:

Vehicle Technology Division THE NETHERLANDS (N E D E R L A N D) COMMUNICATION Concerning (1) - approval granted - approval extended - approval refused - approval withdrawn - production definitely discontinued of a type of CNG/LNG component pursuant to Regulation number 110. Approval number E4-110R-010403 Extension number 00 1. CNG/LNG component considered - Container(s) or cylinder(s) (1) - Tank(s) or vessel(s) 2 - Pressure indicator (1) - Pressure relief valve (1) - Automatic valve(s) (1) - Excess flow valve (1) - Gas-tight housing (1) - Pressure regulator(s) (1) - Non-return valve(s) (1) - Pressure relief device (PRD)(temperature triggered) (1) - Manual valve (1) - Flexible fuel lines (1) - Filling unit or receptacle (1) - Gas injector(s) (1) - Gas flow adjuster (1) - Gas/air mixer (1) - Electronic control unit (1) - Pressure and temperature sensor(s) (1) - CNG filter(s) (1) - PRD (pressure triggered) (1) - Fuel rail 2 - Heat exchanger/vaporizer 2 - Natural gas detector 2 - LNG filling receptacle 2 - LNG pressure control regulator 2 - LNG pressure and/or temperature sensor 2 P.O. Box 777 Tel. + 31 (0)79 345 83 02 Vehicle Admission & Surveillance 2700 AT Zoetermeer E-mail ttv@rdw.nl The Netherlands www.rdw.nl CNG-components R110-00 v3.00 Page 1 of 5

Approval number E4-110R-010403 Extension number 00 - LNG manual valve 2 - LNG non return valve 2 - LNG pressure relief valve 2 - LNG excess flow valve 2 - LNG fuel pump 2 2. Trade name or mark LNG Tank 1324482 including vaporizer 3. Manufacturer s name and address Alutech GmbH Lend 25 5651 Lend Austria 4. If applicable, name and address of manufacturer s representative 5. Submitted for approval on June 2014 6. Technical service responsible for conducting approval tests Kiwa Nederland B.V. P.O. Box 137 7300 AC Apeldoorn The Netherlands 7. Date of report issued by that service June 15 th, 2015 8. Number of report issued by that service 150200266 9. Approval granted/refused/extended/withdrawn (1) 10. Reason(s) of extension (if applicable) 11. Place Zoetermeer 12. Date 13. Signature 14. The documents filed with the application or extension of approval can be obtained upon request. (1) Strike out what does not apply. CNG-components R110-00 v3.00 Page 2 of 5

Approval number E4-110R-010403 Extension number 00 ADDENDUM 1. Additional information concerning the type-approval of a type of CNG/LNG components pursuant to Regulation number 110. 1.1. Natural Gas Storage System 1.1.1. Container(s) or cylinder(s) 1.1.1.1 Dimensions Approved outer tank diameters 200 mm MIN O.D. 853 mm Max O.D. Approved inner tank diameters 150 mm MIN O.D. 803 mm MAX O.D. Approved tank length 842.5 mm MIN 2527.5 mm MAX 1.1.1.2. Material Stainless steel 1.1.2. 1.1.2.1. 1.1.2.2. Tank(s) or vessel(s) (for LNG system) Capacity Material Component Heat exchanger Fill receptacle Fill receptacle Vent receptacle Manual vent valve Economizer Final pressure regulator Automatic valve Excess flow valve Secondary relief valve Manual drain valve Fill check valve Primary relief valve Pressure gauge Pressure gauge Maximum allowable working pressure Temperature range Primary relief valve Secondary relief valve From 100 litre up to 935 litre The LNG tank system complying with the R110 consists out of the following components Certificate number Part of this approval E4-110R-010403-L E4-110R-010361 E4-110R-010362-L E4-110R-010363-L E4-110R-010357 E4-110R-010396 E4-110R-010374 E4-110R-000297 E4-110R-010399 E4-110R-010365 E4-110R-010357 E4-110R-010404 E4-110R-010369 E1-110R-010329-L E4-110R-010355-L 1.59MPa (15,9bar) -162 C up to 85 C 1.2. Pressure indicator 1.2.1. Working pressure(s) (2) 1.2.2. Material 1.3. Pressure relief valve (discharge valve) 1.3.1. Working pressure(s) (2) 1.3.2. Material 1.4. Automatic valve(s) 1.4.1. Working pressure(s) (2) 1.4.2. Material CNG-components R110-00 v3.00 Page 3 of 5

Approval number E4-110R-010403 Extension number 00 1.5. Excess flow valve 1.5.1. Working pressure(s) (2) 1.5.2. Material 1.6. Gas-tight housing 1.6.1. Working pressure(s) (2) 1.6.2. Material 1.7. Pressure regulator(s) 1.7.1. Working pressure(s) (2) 1.7.2. Material 1.8. Non-return valve(s) or non-return valve(s) 1.8.1. Working pressure(s) (2) 1.8.2. Material 1.9. Pressure relief device (temperature triggered) 1.9.1. Working pressure(s) (2) 1.9.2. Material 1.10. Manual valve 1.10.1. Working pressure(s) (2) 1.10.2. Material 1.11. Flexible fuel lines 1.11.1. Working pressure(s) (2) 1.11.2. Material 1.12. Filling unit or receptacle 1.12.1. Working pressure(s) (2) 1.12.2. Material 1.13. Gas injector(s) 1.13.1. Working pressure(s) (2) 1.13.2. Material 1.14. Gas flow adjuster 1.14.1. Working pressure(s) (2) 1.14.2. Material 1.15. Gas/air mixer 1.15.1. Working pressure(s) (2) 1.15.2. Material 1.16. Electronic control unit (CNG-fuelling) 1.16.1. Basic software principles 1.17. Pressure and temperature sensor(s) 1.17.1. Working pressure(s) (2) 1.17.2. Material 1.18. CNG filter(s) 1.18.1. Working pressure(s) (2) 1.18.2. Material CNG-components R110-00 v3.00 Page 4 of 5

Approval number E4-110R-010403 Extension number 00 1.19. PRD (pressure triggered) 1.19.1. Working pressure(s) (2)... MPa 1.19.2. Material 1.20. Fuel rail(s) 1.20.1. Working pressure(s) (2)... MPa 1.20.2. Material 1.21. Heat Exchanger(s) / Vaporizer(s) 1.21.1. Working pressure(s) (2) MPa 1.21.2. Material 1.22. Natural gas detector(s) 1.22.1. Working pressure(s) (2)... MPa 1.22.2. Material 1.23. LNG filling receptacle(s) 1.23.1. Working pressure(s) (2)... MPa 1.23.2. Material 1.24. LNG pressure control regulator(s) 1.24.1. Working pressure(s) (2)... MPa 1.24.2. Material 1.25. LNG pressure and/or temperature sensor(s) 1.25.1. Working pressure(s) (2)... MPa 1.25.2. Material 1.26. LNG manual valve(s) 1.26.1. Working pressure(s) (2)... MPa 1.26.2. Material 1.27. LNG automatic valve(s) 1.27.1. Working pressure(s) (2)... MPa 1.27.2. Material 1.28. LNG non return valve(s) 1.28.1. Working pressure(s) (2)... MPa 1.28.2. Material 1.29. LNG pressure relief valve(s) 1.29.1. Working pressure(s) (2)... MPa 1.29.2. Material 1.30. LNG excess flow valve(s) 1.30.1. Working pressure(s) (2)... MPa 1.30.2. Material 1.31. LNG fuel pump(s) 1.31.1. Working pressure(s) (2)... MPa 1.31.2. Material (2) Specify the tolerance CNG-components R110-00 v3.00 Page 5 of 5