Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Similar documents
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

CT Consultants, Inc.

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

Steese Rd - Curb & Sidewalk Improvement

Maine Turnpike Authority

MoDOT 2016 UNIT BID PRICES Northwest District

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

Maine Turnpike Authority

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Project Book Worksheet for Cost Estimation

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

Federal Project No.: NHFP-081-1(346)

Maine Turnpike Authority

Federal Project No.: OC-095-1(348)

Maine Turnpike Authority

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

Macomb County Department of Roads Bid Comparison

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Maine Turnpike Authority

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

Maine Turnpike Authority

Federal Project No.: HSIP-5A27(567)

Maine Turnpike Authority

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

Federal Project No.: STP-5128(388)

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

DESCRIPTION QUANTITY PRICE TOTAL

Wentzville Parkway South Phase 2 & 2A

Riverside County Transportation Department Summary of Bids

Items Unit Quantity Unit Price Total Unit Price Total

Licensed Class C Virginia Contractor No.

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

Federal Project No.: STP-5A27(380), STP-5A27(381)

PAGE 1 of 18 WEIGHTED AVERAGE

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

2, total unit $ total unit $ total unit $ total $

Schedule of Pay Items

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

STREET IMPROVEMENTS PROPOSAL BID ITEMS

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES

METRO Magnolia Transit Center - Bid Tab

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

The Tulalip Tribes of Washington

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018

Agility Service Exchanges

On-the-Job Training Program. Overview of Training Programs

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

County of Los Angeles Department of Public Works BID SUMMARY

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

.MAINTENANCE. Strategic Initiative Four:

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

Riverside County Transportation Department Summary of Bids

MO 370 Interchange Ramp at Salt River Road - Phase 1

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal

STANDARD DRAWING INDEX

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

COST ESTIMATES: Curb-Running

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

Transcription:

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion Date: 6/30/2019 Contract Awarded To: J D WILLIAMSON CONSTRUCTION CO INC Award Amount: $7,848,580.10 Engineer's Estimate: $8,435,000.00 Bidder 1 J D WILLIAMSON CONSTRUCTION CO INC 441 GENEVA AVE, PO BOX 113 Summit TALLMADGE, OH 44278 Bid $7,848,580.10 Bidder 3 RUHLIN COMPANY P O BOX 190 Medina SHARON CENTER, OH 44274 Bid $7,989,826.37 Bidder 5 GREAT LAKES CONSTRUCTION CO 2608 GREAT LAKES WAY Medina HINCKLEY, OH 44233 Bid $8,231,698.86 Bidder 2 KENMORE CONSTRUCTION CO INC 700 HOME AVE Summit AKRON, OH 44310 Bid $7,929,291.10 Bidder 4 INDEPENDENCE EXCAVATING INC 5720 SCHAAF RD Cuyahoga INDEPENDENCE, OH 44131 Bid $8,118,504.00 Bidder 6 KOKOSING CONSTRUCTION COMPANY INC 886 MC KINLEY AVE Franklin COLUMBUS, OH 43222 Bid $8,572,448.04 170607 - Page 1

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $25,000.00 $25,000.00 2 $15,000.00 $15,000.00 3 $25,000.00 $25,000.00 4 $40,000.00 $40,000.00 5 $25,000.00 $25,000.00 6 $15,000.00 $15,000.00 Ref #2 202E22900 APPROACH SLAB REMOVED, (116 SY) Awd $25.00 $2,900.00 2 $20.00 $2,320.00 3 $40.00 $4,640.00 4 $28.00 $3,248.00 5 $45.00 $5,220.00 6 $75.00 $8,700.00 Ref #3 202E23000 PAVEMENT REMOVED, (4453 SY) Awd $10.25 $45,643.25 2 $10.00 $44,530.00 3 $15.00 $66,795.00 4 $6.00 $26,718.00 5 $10.00 $44,530.00 6 $20.00 $89,060.00 Ref #4 202E30700 CONCRETE BARRIER REMOVED, (139 FT) Awd $15.00 $2,085.00 2 $20.00 $2,780.00 3 $20.00 $2,780.00 4 $12.00 $1,668.00 5 $35.00 $4,865.00 6 $45.00 $6,255.00 Ref #5 202E30800 TRAFFIC ISLAND REMOVED, (41 SY) Awd $10.00 $410.00 2 $9.00 $369.00 3 $20.00 $820.00 4 $12.00 $492.00 5 $20.00 $820.00 6 $30.00 $1,230.00 Ref #6 202E32000 CURB REMOVED, (1056 FT) Awd $4.00 $4,224.00 2 $2.00 $2,112.00 3 $3.00 $3,168.00 4 $4.00 $4,224.00 5 $4.00 $4,224.00 6 $3.00 $3,168.00 Ref #7 202E35100 PIPE REMOVED, 24" AND UNDER, (540 FT) Awd $12.00 $6,480.00 2 $22.00 $11,880.00 3 $25.00 $13,500.00 4 $40.00 $21,600.00 5 $20.00 $10,800.00 6 $75.00 $40,500.00 170607 - Page 2

Ref #8 202E35200 PIPE REMOVED, OVER 24", (16 FT) Awd $20.00 $320.00 2 $10.00 $160.00 3 $35.00 $560.00 4 $80.00 $1,280.00 5 $40.00 $640.00 6 $85.00 $1,360.00 Ref #9 202E38000 GUARDRAIL REMOVED, (1952 FT) Awd $1.60 $3,123.20 2 $2.00 $3,904.00 3 $2.00 $3,904.00 4 $4.00 $7,808.00 5 $2.00 $3,904.00 6 $2.00 $3,904.00 Ref #10 202E58000 MANHOLE REMOVED, (1 EACH) Awd $2,500.00 $2,500.00 2 $1,500.00 $1,500.00 3 $1,000.00 $1,000.00 4 $250.00 $250.00 5 $480.00 $480.00 6 $2,500.00 $2,500.00 Ref #11 202E58100 CATCH BASIN REMOVED, (3 EACH) Awd $750.00 $2,250.00 2 $200.00 $600.00 3 $500.00 $1,500.00 4 $250.00 $750.00 5 $480.00 $1,440.00 6 $750.00 $2,250.00 Ref #12 202E58200 INLET REMOVED, (1 EACH) Awd $350.00 $350.00 2 $200.00 $200.00 3 $500.00 $500.00 4 $250.00 $250.00 5 $480.00 $480.00 6 $800.00 $800.00 Ref #13 202E75000 FENCE REMOVED, (100 FT) Awd $2.00 $200.00 2 $4.00 $400.00 3 $2.30 $230.00 4 $2.00 $200.00 5 $2.40 $240.00 6 $10.00 $1,000.00 Ref #14 202E98100 REMOVAL MISC.:IRON PIN IN WATER VALVE BOX, (1 EACH) Awd $150.00 $150.00 2 $50.00 $50.00 3 $250.00 $250.00 4 $50.00 $50.00 5 $250.00 $250.00 6 $150.00 $150.00 170607 - Page 3

Ref #15 203E10000 EXCAVATION, (3974 CY) Awd $15.00 $59,610.00 2 $16.00 $63,584.00 3 $12.00 $47,688.00 4 $8.00 $31,792.00 5 $10.00 $39,740.00 6 $11.00 $43,714.00 Ref #16 203E20000 EMBANKMENT, (10123 CY) Awd $19.00 $192,337.00 2 $18.00 $182,214.00 3 $20.00 $202,460.00 4 $8.00 $80,984.00 5 $10.00 $101,230.00 6 $15.00 $151,845.00 Ref #17 203E20001 EMBANKMENT, AS PER PLAN, (2890 CY) Awd $19.00 $54,910.00 2 $44.00 $127,160.00 3 $20.00 $57,800.00 4 $17.00 $49,130.00 5 $20.00 $57,800.00 6 $15.00 $43,350.00 Ref #18 203E57150 SPECIAL - FOUNDATION EXCAVATION, (7759 CY) Awd $11.00 $85,349.00 2 $18.00 $139,662.00 3 $15.00 $116,385.00 4 $12.00 $93,108.00 5 $13.00 $100,867.00 6 $11.00 $85,349.00 Ref #19 203E98000 ROADWAY, MISC.:EPS GEOFOAM FILL, (17225 CY) Awd $107.00 $1,843,075.00 2 $120.00 $2,067,000.00 3 $104.00 $1,791,400.00 4 $103.50 $1,782,787.50 5 $115.00 $1,980,875.00 6 $100.00 $1,722,500.00 Ref #20 204E10000 SUBGRADE COMPACTION, (5457 SY) Awd $3.00 $16,371.00 2 $1.25 $6,821.25 3 $2.50 $13,642.50 4 $1.25 $6,821.25 5 $2.00 $10,914.00 6 $2.00 $10,914.00 Ref #21 204E13000 EXCAVATION OF SUBGRADE, (767 CY) Awd $20.00 $15,340.00 2 $18.00 $13,806.00 3 $30.00 $23,010.00 4 $13.00 $9,971.00 5 $21.00 $16,107.00 6 $12.00 $9,204.00 170607 - Page 4

Ref #22 204E20000 EMBANKMENT, (500 CY) Awd $26.00 $13,000.00 2 $30.00 $15,000.00 3 $20.00 $10,000.00 4 $12.00 $6,000.00 5 $12.00 $6,000.00 6 $15.00 $7,500.00 Ref #23 204E30010 GRANULAR MATERIAL, TYPE B, (336 CY) Awd $45.00 $15,120.00 2 $45.00 $15,120.00 3 $50.00 $16,800.00 4 $38.00 $12,768.00 5 $40.00 $13,440.00 6 $60.00 $20,160.00 Ref #24 204E45000 PROOF ROLLING, (3 HOUR) Awd $250.00 $750.00 2 $120.00 $360.00 3 $200.00 $600.00 4 $140.00 $420.00 5 $300.00 $900.00 6 $230.00 $690.00 Ref #25 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN, (22 STA) Awd $175.00 $3,850.00 2 $300.00 $6,600.00 3 $120.00 $2,640.00 4 $72.00 $1,584.00 5 $400.00 $8,800.00 6 $1,400.00 $30,800.00 Ref #26 606E15050 GUARDRAIL, TYPE MGS, (2344.5 FT) Awd $15.75 $36,925.88 2 $15.00 $35,167.50 3 $15.00 $35,167.50 4 $15.66 $36,714.87 5 $15.00 $35,167.50 6 $15.00 $35,167.50 Ref #27 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (3 EACH) Awd $1,875.00 $5,625.00 2 $19.50 $58.50 3 $1,950.00 $5,850.00 4 $1,900.35 $5,701.05 5 $1,950.00 $5,850.00 6 $1,950.00 $5,850.00 Ref #28 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (2 EACH) Awd $760.00 $1,520.00 2 $800.00 $1,600.00 3 $800.00 $1,600.00 4 $772.50 $1,545.00 5 $800.00 $1,600.00 6 $800.00 $1,600.00 170607 - Page 5

Ref #29 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (3 EACH) Awd $2,000.00 $6,000.00 2 $1,900.00 $5,700.00 3 $1,900.00 $5,700.00 4 $2,023.95 $6,071.85 5 $1,900.00 $5,700.00 6 $1,900.00 $5,700.00 Ref #30 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (2 EACH) Awd $385.00 $770.00 2 $350.00 $700.00 3 $350.00 $700.00 4 $391.40 $782.80 5 $350.00 $700.00 6 $350.00 $700.00 Ref #31 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL) 35 MPH/2, (1 EACH) Awd $16,000.00 $16,000.00 2 $16,000.00 $16,000.00 3 $16,750.00 $16,750.00 4 $15,398.50 $15,398.50 5 $16,750.00 $16,750.00 6 $16,750.00 $16,750.00 Ref #32 607E23000 FENCE, TYPE CLT, (100 FT) Awd $40.00 $4,000.00 2 $38.00 $3,800.00 3 $35.00 $3,500.00 4 $24.47 $2,447.00 5 $40.65 $4,065.00 6 $40.65 $4,065.00 Ref #33 622E10120 CONCRETE BARRIER, SINGLE SLOPE, TYPE C, (242 FT) Awd $145.00 $35,090.00 2 $130.00 $31,460.00 3 $150.00 $36,300.00 4 $115.00 $27,830.00 5 $90.00 $21,780.00 6 $100.00 $24,200.00 Ref #34 622E24840 CONCRETE BARRIER END SECTION, TYPE B, (1 EACH) Awd $8,000.00 $8,000.00 2 $4,700.00 $4,700.00 3 $5,000.00 $5,000.00 4 $7,900.00 $7,900.00 5 $8,000.00 $8,000.00 6 $7,500.00 $7,500.00 Ref #35 622E25008 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE, (1 EACH) Awd $5,000.00 $5,000.00 2 $3,800.00 $3,800.00 3 $4,000.00 $4,000.00 4 $2,700.00 $2,700.00 5 $4,000.00 $4,000.00 6 $2,500.00 $2,500.00 170607 - Page 6

Section 1 - ROADWAY - Totals Awd $2,514,278.33 2 $2,826,118.25 3 $2,521,640.00 4 $2,290,994.82 5 $2,543,178.50 6 $2,405,935.50 Ref #36 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (5 SY) Awd $260.00 $1,300.00 2 $80.00 $400.00 3 $150.00 $750.00 4 $60.00 $300.00 5 $250.00 $1,250.00 6 $130.00 $650.00 Ref #37 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (172 SY) Awd $75.00 $12,900.00 2 $80.00 $13,760.00 3 $55.00 $9,460.00 4 $35.00 $6,020.00 5 $85.00 $14,620.00 6 $80.00 $13,760.00 Ref #38 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (69 CY) Awd $130.00 $8,970.00 2 $105.00 $7,245.00 3 $125.00 $8,625.00 4 $85.00 $5,865.00 5 $132.00 $9,108.00 6 $250.00 $17,250.00 Ref #39 659E00100 SOIL ANALYSIS TEST, (2 EACH) Awd $50.00 $100.00 2 $100.00 $200.00 3 $50.00 $100.00 4 $250.00 $500.00 5 $50.00 $100.00 6 $101.98 $203.96 Ref #40 659E00300 TOPSOIL, (1139 CY) Awd $18.00 $20,502.00 2 $15.00 $17,085.00 3 $18.00 $20,502.00 4 $20.00 $22,780.00 5 $18.00 $20,502.00 6 $30.00 $34,170.00 Ref #41 659E10000 SEEDING AND MULCHING, (12067 SY) Awd $0.79 $9,532.93 2 $0.65 $7,843.55 3 $0.75 $9,050.25 4 $0.66 $7,964.22 5 $0.78 $9,412.26 6 $0.67 $8,084.89 170607 - Page 7

Ref #42 659E14000 REPAIR SEEDING AND MULCHING, (603 SY) Awd $1.00 $603.00 2 $1.00 $603.00 3 $1.00 $603.00 4 $0.66 $397.98 5 $1.00 $603.00 6 $0.67 $404.01 Ref #43 659E15000 INTER-SEEDING, (603 SY) Awd $0.12 $72.36 2 $1.00 $603.00 3 $0.01 $6.03 4 $0.66 $397.98 5 $1.00 $603.00 6 $0.67 $404.01 Ref #44 659E20000 COMMERCIAL FERTILIZER, (1.68 TON) Awd $400.00 $672.00 2 $600.00 $1,008.00 3 $700.00 $1,176.00 4 $600.00 $1,008.00 5 $700.00 $1,176.00 6 $611.86 $1,027.92 Ref #45 659E31000 LIME, (2.49 ACRE) Awd $1.00 $2.49 2 $70.00 $174.30 3 $1.00 $2.49 4 $70.00 $174.30 5 $100.00 $249.00 6 $71.38 $177.74 Ref #46 659E35000 WATER, (67 MGAL) Awd $1.00 $67.00 2 $1.00 $67.00 3 $0.01 $0.67 4 $1.00 $67.00 5 $2.00 $134.00 6 $1.02 $68.34 Ref #47 659E40000 MOWING, (27 MSF) Awd $1.00 $27.00 2 $3.00 $81.00 3 $0.01 $0.27 4 $3.80 $102.60 5 $1.00 $27.00 6 $10.00 $270.00 Ref #48 670E00500 SLOPE EROSION PROTECTION, (509 SY) Awd $3.00 $1,527.00 2 $4.00 $2,036.00 3 $3.00 $1,527.00 4 $2.50 $1,272.50 5 $3.00 $1,527.00 6 $3.88 $1,974.92 170607 - Page 8

Ref #49 670E00700 DITCH EROSION PROTECTION, (650 SY) Awd $2.00 $1,300.00 2 $3.20 $2,080.00 3 $2.00 $1,300.00 4 $2.50 $1,625.00 5 $2.00 $1,300.00 6 $3.26 $2,119.00 Ref #50 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM) Awd $3,000.00 $3,000.00 2 $1,200.00 $1,200.00 3 $1,500.00 $1,500.00 4 $5,000.00 $5,000.00 5 $25,000.00 $25,000.00 6 $3,125.00 $3,125.00 Ref #51 832E30000 EROSION CONTROL, (32200 EACH) Awd $1.00 $32,200.00 2 $1.00 $32,200.00 3 $1.00 $32,200.00 4 $1.00 $32,200.00 5 $1.00 $32,200.00 6 $1.00 $32,200.00 Ref #301 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM) Awd $30,000.00 $30,000.00 2 $10,000.00 $10,000.00 3 $35,000.00 $35,000.00 4 $20,000.00 $20,000.00 5 $10,000.00 $10,000.00 6 $29,597.30 $29,597.30 Section 2 - EROSION CONTROL - Totals Awd $122,775.78 2 $96,585.85 3 $121,802.71 4 $105,674.58 5 $127,811.26 6 $145,487.09 Ref #52 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, (2695 FT) Awd $11.50 $30,992.50 2 $10.00 $26,950.00 3 $15.00 $40,425.00 4 $14.00 $37,730.00 5 $8.00 $21,560.00 6 $15.00 $40,425.00 Ref #53 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F, (404 FT) Awd $11.50 $4,646.00 2 $16.00 $6,464.00 3 $25.00 $10,100.00 4 $15.00 $6,060.00 5 $15.00 $6,060.00 6 $20.00 $8,080.00 170607 - Page 9

Ref #54 605E13411 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F, (874 FT) Awd $12.75 $11,143.50 2 $10.00 $8,740.00 3 $20.00 $17,480.00 4 $14.00 $12,236.00 5 $10.00 $8,740.00 6 $12.00 $10,488.00 Ref #55 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (125 FT) Awd $17.50 $2,187.50 2 $20.00 $2,500.00 3 $15.00 $1,875.00 4 $27.00 $3,375.00 5 $23.00 $2,875.00 6 $35.00 $4,375.00 Ref #56 611E00900 6" CONDUIT, TYPE B, (87 FT) Awd $25.00 $2,175.00 2 $55.00 $4,785.00 3 $35.00 $3,045.00 4 $38.00 $3,306.00 5 $25.00 $2,175.00 6 $45.00 $3,915.00 Ref #57 611E01500 6" CONDUIT, TYPE F, (30 FT) Awd $18.00 $540.00 2 $25.00 $750.00 3 $20.00 $600.00 4 $42.00 $1,260.00 5 $25.00 $750.00 6 $50.00 $1,500.00 Ref #58 611E05900 15" CONDUIT, TYPE B, (259 FT) Awd $115.00 $29,785.00 2 $87.00 $22,533.00 3 $100.00 $25,900.00 4 $92.00 $23,828.00 5 $100.00 $25,900.00 6 $150.00 $38,850.00 Ref #59 611E06100 15" CONDUIT, TYPE C, (201 FT) Awd $42.00 $8,442.00 2 $60.00 $12,060.00 3 $65.00 $13,065.00 4 $120.00 $24,120.00 5 $90.00 $18,090.00 6 $175.00 $35,175.00 Ref #60 611E07400 18" CONDUIT, TYPE B, (6 FT) Awd $130.00 $780.00 2 $300.00 $1,800.00 3 $200.00 $1,200.00 4 $169.00 $1,014.00 5 $265.00 $1,590.00 6 $300.00 $1,800.00 170607 - Page 10

Ref #61 611E10400 24" CONDUIT, TYPE B, (343 FT) Awd $130.00 $44,590.00 2 $140.00 $48,020.00 3 $115.00 $39,445.00 4 $110.00 $37,730.00 5 $132.00 $45,276.00 6 $250.00 $85,750.00 Ref #62 611E10401 24" CONDUIT, TYPE B, AS PER PLAN, (89 FT) Awd $750.00 $66,750.00 2 $410.00 $36,490.00 3 $300.00 $26,700.00 4 $400.00 $35,600.00 5 $200.00 $17,800.00 6 $500.00 $44,500.00 Ref #63 611E13600 30" CONDUIT, TYPE C, (16 FT) Awd $150.00 $2,400.00 2 $300.00 $4,800.00 3 $150.00 $2,400.00 4 $170.00 $2,720.00 5 $200.00 $3,200.00 6 $500.00 $8,000.00 Ref #64 611E98300 CATCH BASIN, NO. 5, (1 EACH) Awd $3,500.00 $3,500.00 2 $2,600.00 $2,600.00 3 $4,000.00 $4,000.00 4 $4,000.00 $4,000.00 5 $3,500.00 $3,500.00 6 $4,500.00 $4,500.00 Ref #65 611E98370 CATCH BASIN, NO. 6, (1 EACH) Awd $3,000.00 $3,000.00 2 $2,700.00 $2,700.00 3 $4,500.00 $4,500.00 4 $3,500.00 $3,500.00 5 $4,000.00 $4,000.00 6 $4,300.00 $4,300.00 Ref #66 611E98410 CATCH BASIN, NO. 8, (3 EACH) Awd $5,000.00 $15,000.00 2 $3,000.00 $9,000.00 3 $4,000.00 $12,000.00 4 $3,500.00 $10,500.00 5 $3,700.00 $11,100.00 6 $4,000.00 $12,000.00 Ref #67 611E99104 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE C, (1 EACH) Awd $6,000.00 $6,000.00 2 $6,000.00 $6,000.00 3 $6,500.00 $6,500.00 4 $4,000.00 $4,000.00 5 $8,000.00 $8,000.00 6 $10,000.00 $10,000.00 170607 - Page 11

Ref #68 611E99574 MANHOLE, NO. 3, 48" BASE, (2 EACH) Awd $2,500.00 $5,000.00 2 $3,000.00 $6,000.00 3 $5,000.00 $10,000.00 4 $4,500.00 $9,000.00 5 $2,800.00 $5,600.00 6 $4,500.00 $9,000.00 Ref #69 611E99574 MANHOLE, NO. 3, 60" BASE, (1 EACH) Awd $3,000.00 $3,000.00 2 $3,500.00 $3,500.00 3 $6,000.00 $6,000.00 4 $4,500.00 $4,500.00 5 $3,400.00 $3,400.00 6 $5,000.00 $5,000.00 Ref #70 611E99574 MANHOLE, NO. 3, 72" BASE, (1 EACH) Awd $4,500.00 $4,500.00 2 $4,500.00 $4,500.00 3 $6,500.00 $6,500.00 4 $5,000.00 $5,000.00 5 $3,900.00 $3,900.00 6 $5,500.00 $5,500.00 Ref #71 611E99575 MANHOLE, NO. 3, AS PER PLAN, (1 EACH) Awd $15,000.00 $15,000.00 2 $10,000.00 $10,000.00 3 $10,000.00 $10,000.00 4 $15,000.00 $15,000.00 5 $4,700.00 $4,700.00 6 $15,000.00 $15,000.00 Ref #72 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (3 EACH) Awd $250.00 $750.00 2 $150.00 $450.00 3 $300.00 $900.00 4 $800.00 $2,400.00 5 $300.00 $900.00 6 $250.00 $750.00 Section 3 - DRAINAGE - Totals Awd $260,181.50 2 $220,642.00 3 $242,635.00 4 $246,879.00 5 $199,116.00 6 $348,908.00 Ref #73 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" MIN., (104 SY) Awd $31.00 $3,224.00 2 $15.00 $1,560.00 3 $6.00 $624.00 4 $60.00 $6,240.00 5 $6.00 $624.00 6 $26.44 $2,749.76 170607 - Page 12

Ref #74 302E46000 ASPHALT CONCRETE BASE, PG64-22, (1034 CY) Awd $133.00 $137,522.00 2 $145.00 $149,930.00 3 $125.00 $129,250.00 4 $145.00 $149,930.00 5 $125.00 $129,250.00 6 $166.07 $171,716.38 Ref #75 304E20000 AGGREGATE BASE, (952 CY) Awd $55.00 $52,360.00 2 $52.00 $49,504.00 3 $60.00 $57,120.00 4 $42.00 $39,984.00 5 $50.00 $47,600.00 6 $60.00 $57,120.00 Ref #76 407E10001 TACK COAT, AS PER PLAN, (574 GAL) Awd $2.00 $1,148.00 2 $3.50 $2,009.00 3 $1.00 $574.00 4 $5.00 $2,870.00 5 $1.00 $574.00 6 $4.76 $2,732.24 Ref #77 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (104 CY) Awd $370.00 $38,480.00 2 $210.00 $21,840.00 3 $265.00 $27,560.00 4 $222.00 $23,088.00 5 $265.00 $27,560.00 6 $272.95 $28,386.80 Ref #78 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (219 CY) Awd $205.00 $44,895.00 2 $210.00 $45,990.00 3 $222.00 $48,618.00 4 $246.00 $53,874.00 5 $222.00 $48,618.00 6 $273.17 $59,824.23 Ref #79 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE, (251 CY) Awd $155.00 $38,905.00 2 $190.00 $47,690.00 3 $160.00 $40,160.00 4 $182.00 $45,682.00 5 $160.00 $40,160.00 6 $203.31 $51,030.81 Ref #80 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.: 9" THICK,, (185 SY) Awd $90.00 $16,650.00 2 $80.00 $14,800.00 3 $115.00 $21,275.00 4 $65.00 $12,025.00 5 $80.00 $14,800.00 6 $75.00 $13,875.00 170607 - Page 13

Ref #81 609E24510 CURB, TYPE 4-C, (122 FT) Awd $30.00 $3,660.00 2 $25.00 $3,050.00 3 $20.00 $2,440.00 4 $30.00 $3,660.00 5 $30.00 $3,660.00 6 $35.00 $4,270.00 Ref #82 609E26000 CURB, TYPE 6, (378 FT) Awd $30.00 $11,340.00 2 $24.00 $9,072.00 3 $20.00 $7,560.00 4 $30.00 $11,340.00 5 $30.00 $11,340.00 6 $32.00 $12,096.00 Ref #83 690E12050 SPECIAL - REINFORCED MESH FOR TRANSVERSE AND/OR LO, (173 SY) Awd $50.00 $8,650.00 2 $50.00 $8,650.00 3 $25.00 $4,325.00 4 $50.00 $8,650.00 5 $17.00 $2,941.00 6 $25.00 $4,325.00 Section 4 - PAVEMENT - Totals Awd $356,834.00 2 $354,095.00 3 $339,506.00 4 $357,343.00 5 $327,127.00 6 $408,126.22 Ref #84 611E00400 4" CONDUIT, TYPE E, (160 FT) Awd $2.00 $320.00 2 $10.00 $1,600.00 3 $2.00 $320.00 4 $10.00 $1,600.00 5 $2.00 $320.00 6 $2.00 $320.00 Ref #85 625E00450 CONNECTION, FUSED PULL APART, (26 EACH) Awd $91.00 $2,366.00 2 $125.00 $3,250.00 3 $90.00 $2,340.00 4 $125.00 $3,250.00 5 $90.00 $2,340.00 6 $90.00 $2,340.00 Ref #86 625E00480 CONNECTION, UNFUSED PERMANENT, (24 EACH) Awd $91.00 $2,184.00 2 $125.00 $3,000.00 3 $90.00 $2,160.00 4 $125.00 $3,000.00 5 $90.00 $2,160.00 6 $90.00 $2,160.00 170607 - Page 14

Ref #87 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN NO. AT15B32.5, (6 EACH) Awd $2,015.00 $12,090.00 2 $2,200.00 $13,200.00 3 $1,975.00 $11,850.00 4 $2,200.00 $13,200.00 5 $1,975.00 $11,850.00 6 $1,975.00 $11,850.00 Ref #88 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN NO. AT18B40, (1 EACH) Awd $2,250.00 $2,250.00 2 $2,400.00 $2,400.00 3 $2,217.00 $2,217.00 4 $2,400.00 $2,400.00 5 $2,217.00 $2,217.00 6 $2,217.00 $2,217.00 Ref #89 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN NO. AT25B40, (1 EACH) Awd $2,800.00 $2,800.00 2 $2,800.00 $2,800.00 3 $2,750.00 $2,750.00 4 $2,800.00 $2,800.00 5 $2,750.00 $2,750.00 6 $2,750.00 $2,750.00 Ref #90 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DESIGN NO., (2 EACH) Awd $2,525.00 $5,050.00 2 $2,500.00 $5,000.00 3 $2,500.00 $5,000.00 4 $2,500.00 $5,000.00 5 $2,500.00 $5,000.00 6 $2,500.00 $5,000.00 Ref #91 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DESIGN NO., (1 EACH) Awd $3,150.00 $3,150.00 2 $3,100.00 $3,100.00 3 $3,100.00 $3,100.00 4 $3,100.00 $3,100.00 5 $3,100.00 $3,100.00 6 $3,100.00 $3,100.00 Ref #92 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DESIGN NO., (1 EACH) Awd $3,300.00 $3,300.00 2 $3,200.00 $3,200.00 3 $3,250.00 $3,250.00 4 $3,200.00 $3,200.00 5 $3,250.00 $3,250.00 6 $3,250.00 $3,250.00 Ref #93 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DESIGN NO., (1 EACH) Awd $4,025.00 $4,025.00 2 $3,800.00 $3,800.00 3 $3,950.00 $3,950.00 4 $3,800.00 $3,800.00 5 $3,950.00 $3,950.00 6 $3,950.00 $3,950.00 170607 - Page 15

Ref #94 625E10614 LIGHT POLE ANCHOR BOLTS ON STRUCTURE, (20 EACH) Awd $25.00 $500.00 2 $155.00 $3,100.00 3 $25.00 $500.00 4 $155.00 $3,100.00 5 $25.00 $500.00 6 $25.00 $500.00 Ref #95 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP, (5 EACH) Awd $1,675.00 $8,375.00 2 $1,300.00 $6,500.00 3 $1,650.00 $8,250.00 4 $1,300.00 $6,500.00 5 $1,650.00 $8,250.00 6 $1,650.00 $8,250.00 Ref #96 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP, (2 EACH) Awd $1,935.00 $3,870.00 2 $1,500.00 $3,000.00 3 $1,900.00 $3,800.00 4 $1,500.00 $3,000.00 5 $1,900.00 $3,800.00 6 $1,900.00 $3,800.00 Ref #97 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, (2582 FT) Awd $3.05 $7,875.10 2 $3.50 $9,037.00 3 $3.00 $7,746.00 4 $3.50 $9,037.00 5 $3.00 $7,746.00 6 $3.00 $7,746.00 Ref #98 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (1310 FT) Awd $1.50 $1,965.00 2 $1.80 $2,358.00 3 $1.50 $1,965.00 4 $1.80 $2,358.00 5 $1.50 $1,965.00 6 $1.50 $1,965.00 Ref #99 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB, (1443 FT) Awd $7.00 $10,101.00 2 $6.50 $9,379.50 3 $7.00 $10,101.00 4 $6.50 $9,379.50 5 $7.00 $10,101.00 6 $7.00 $10,101.00 Ref #100 625E25400 CONDUIT, 2", 725.04, (1005 FT) Awd $18.75 $18,843.75 2 $18.00 $18,090.00 3 $18.50 $18,592.50 4 $18.00 $18,090.00 5 $18.50 $18,592.50 6 $18.50 $18,592.50 170607 - Page 16

Ref #101 625E25500 CONDUIT, 3", 725.04, (75 FT) Awd $27.50 $2,062.50 2 $22.00 $1,650.00 3 $27.00 $2,025.00 4 $22.00 $1,650.00 5 $27.00 $2,025.00 6 $27.00 $2,025.00 Ref #102 625E25900 CONDUIT, JACKED OR DRILLED, 3", (101 FT) Awd $44.75 $4,519.75 2 $65.00 $6,565.00 3 $44.00 $4,444.00 4 $65.00 $6,565.00 5 $44.00 $4,444.00 6 $44.00 $4,444.00 Ref #103 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN STYLE B, TYPE, (8 EACH) Awd $340.00 $2,720.00 2 $650.00 $5,200.00 3 $335.00 $2,680.00 4 $650.00 $5,200.00 5 $335.00 $2,680.00 6 $335.00 $2,680.00 Ref #104 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN STYLE C, TYPE, (5 EACH) Awd $345.00 $1,725.00 2 $650.00 $3,250.00 3 $340.00 $1,700.00 4 $650.00 $3,250.00 5 $340.00 $1,700.00 6 $340.00 $1,700.00 Ref #105 625E29002 TRENCH, 24" DEEP, (1564 FT) Awd $13.25 $20,723.00 2 $10.00 $15,640.00 3 $13.00 $20,332.00 4 $10.00 $15,640.00 5 $13.00 $20,332.00 6 $13.00 $20,332.00 Ref #106 625E30700 PULL BOX, 725.08, 18", (8 EACH) Awd $760.00 $6,080.00 2 $750.00 $6,000.00 3 $750.00 $6,000.00 4 $750.00 $6,000.00 5 $750.00 $6,000.00 6 $750.00 $6,000.00 Ref #107 625E31510 PULL BOX REMOVED, (4 EACH) Awd $142.00 $568.00 2 $300.00 $1,200.00 3 $140.00 $560.00 4 $300.00 $1,200.00 5 $140.00 $560.00 6 $140.00 $560.00 170607 - Page 17

Ref #108 625E32000 GROUND ROD, (7 EACH) Awd $239.00 $1,673.00 2 $155.00 $1,085.00 3 $235.00 $1,645.00 4 $155.00 $1,085.00 5 $235.00 $1,645.00 6 $235.00 $1,645.00 Ref #109 625E33000 STRUCTURE GROUNDING SYSTEM, BRIDGE CUY-21-10.04L, (1 EACH) Awd $1,885.00 $1,885.00 2 $5,200.00 $5,200.00 3 $1,850.00 $1,850.00 4 $5,500.00 $5,500.00 5 $1,850.00 $1,850.00 6 $1,850.00 $1,850.00 Ref #110 625E33000 STRUCTURE GROUNDING SYSTEM, FORWARD ABUTMENT AND W, (1 EACH) Awd $2,190.00 $2,190.00 2 $2,500.00 $2,500.00 3 $2,150.00 $2,150.00 4 $2,500.00 $2,500.00 5 $2,150.00 $2,150.00 6 $2,150.00 $2,150.00 Ref #111 625E33000 STRUCTURE GROUNDING SYSTEM, REAR ABUTMENT AND WING, (1 EACH) Awd $2,190.00 $2,190.00 2 $2,500.00 $2,500.00 3 $2,150.00 $2,150.00 4 $2,500.00 $2,500.00 5 $2,150.00 $2,150.00 6 $2,150.00 $2,150.00 Ref #112 625E36000 PLASTIC CAUTION TAPE, (1564 FT) Awd $0.30 $469.20 2 $1.00 $1,564.00 3 $0.30 $469.20 4 $1.00 $1,564.00 5 $0.30 $469.20 6 $0.30 $469.20 Ref #113 625E39520 PULL BOX CLEANED, (4 EACH) Awd $40.00 $160.00 2 $300.00 $1,200.00 3 $40.00 $160.00 4 $300.00 $1,200.00 5 $40.00 $160.00 6 $40.00 $160.00 Ref #114 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM) Awd $12,000.00 $12,000.00 2 $6,500.00 $6,500.00 3 $13,750.00 $13,750.00 4 $6,500.00 $6,500.00 5 $13,750.00 $13,750.00 6 $11,750.00 $11,750.00 170607 - Page 18

Ref #115 625E75400 LIGHT POLE REMOVED, (11 EACH) Awd $305.00 $3,355.00 2 $200.00 $2,200.00 3 $300.00 $3,300.00 4 $200.00 $2,200.00 5 $300.00 $3,300.00 6 $300.00 $3,300.00 Ref #116 625E75500 LIGHT POLE FOUNDATION REMOVED, (9 EACH) Awd $110.00 $990.00 2 $300.00 $2,700.00 3 $110.00 $990.00 4 $300.00 $2,700.00 5 $110.00 $990.00 6 $110.00 $990.00 Ref #117 625E75550 DISTRIBUTION CABLE REMOVED, (4938 FT) Awd $0.35 $1,728.30 2 $0.50 $2,469.00 3 $0.35 $1,728.30 4 $0.50 $2,469.00 5 $0.35 $1,728.30 6 $0.35 $1,728.30 Ref #118 625E75800 DISCONNECT CIRCUIT, (5 EACH) Awd $235.00 $1,175.00 2 $250.00 $1,250.00 3 $235.00 $1,175.00 4 $250.00 $1,250.00 5 $235.00 $1,175.00 6 $235.00 $1,175.00 Section 5 - LIGHTING - Totals Awd $155,278.60 2 $161,487.50 3 $155,000.00 4 $161,787.50 5 $155,000.00 6 $153,000.00 Ref #119 620E00500 DELINEATOR, POST GROUND MOUNTED, (16 EACH) Awd $76.00 $1,216.00 2 $40.00 $640.00 3 $40.00 $640.00 4 $25.00 $400.00 5 $40.00 $640.00 6 $40.00 $640.00 Ref #120 620E11000 DELINEATOR, BRACKET MOUNTED, (6 EACH) Awd $96.00 $576.00 2 $150.00 $900.00 3 $150.00 $900.00 4 $25.00 $150.00 5 $150.00 $900.00 6 $150.00 $900.00 170607 - Page 19

Ref #121 621E00100 RPM, (10 EACH) Awd $81.00 $810.00 2 $295.00 $2,950.00 3 $296.00 $2,960.00 4 $296.00 $2,960.00 5 $171.34 $1,713.40 6 $187.68 $1,876.80 Ref #122 621E00301 RPM REFLECTOR, AS PER PLAN, (60 EACH) Awd $79.00 $4,740.00 2 $18.00 $1,080.00 3 $30.00 $1,800.00 4 $19.00 $1,140.00 5 $32.61 $1,956.60 6 $35.72 $2,143.20 Ref #123 626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL, (13 EACH) Awd $6.70 $87.10 2 $12.50 $162.50 3 $12.50 $162.50 4 $25.00 $325.00 5 $12.50 $162.50 6 $12.50 $162.50 Ref #124 626E00110 BARRIER REFLECTOR, TYPE 2, 1WAY, (38 EACH) Awd $6.80 $258.40 2 $7.00 $266.00 3 $7.00 $266.00 4 $38.00 $1,444.00 5 $7.00 $266.00 6 $7.00 $266.00 Ref #125 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (25 FT) Awd $5.60 $140.00 2 $10.00 $250.00 3 $10.00 $250.00 4 $5.50 $137.50 5 $10.00 $250.00 6 $10.00 $250.00 Ref #126 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (164 FT) Awd $6.05 $992.20 2 $10.50 $1,722.00 3 $10.50 $1,722.00 4 $6.00 $984.00 5 $10.00 $1,640.00 6 $10.50 $1,722.00 Ref #127 630E66501 OVERHEAD SIGN SUPPORT, TYPE TC-15.115, AS PER PLAN, (1 EACH) Awd $41,000.00 $41,000.00 2 $30,000.00 $30,000.00 3 $34,000.00 $34,000.00 4 $34,000.00 $34,000.00 5 $34,000.00 $34,000.00 6 $34,000.00 $34,000.00 170607 - Page 20

Ref #128 630E80100 SIGN, FLAT SHEET, (106.7 SF) Awd $15.25 $1,627.18 2 $15.00 $1,600.50 3 $15.00 $1,600.50 4 $15.00 $1,600.50 5 $15.00 $1,600.50 6 $15.00 $1,600.50 Ref #129 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, (22 EACH) Awd $20.00 $440.00 2 $15.00 $330.00 3 $15.00 $330.00 4 $20.00 $440.00 5 $15.00 $330.00 6 $15.00 $330.00 Ref #130 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (16 EACH) Awd $25.25 $404.00 2 $15.00 $240.00 3 $15.00 $240.00 4 $25.00 $400.00 5 $15.00 $240.00 6 $15.00 $240.00 Ref #131 646E10010 EDGE LINE, 6", (0.86 MILE) Awd $6,600.00 $5,676.00 2 $6,000.00 $5,160.00 3 $8,430.00 $7,249.80 4 $6,500.00 $5,590.00 5 $6,500.00 $5,590.00 6 $6,500.00 $5,590.00 Ref #132 646E10110 LANE LINE, 6", (1.23 MILE) Awd $3,550.00 $4,366.50 2 $3,500.00 $4,305.00 3 $7,542.00 $9,276.66 4 $3,500.00 $4,305.00 5 $3,500.00 $4,305.00 6 $3,500.00 $4,305.00 Section 6 - TRAFFIC CONTROL - Totals Awd $62,333.38 2 $49,606.00 3 $61,397.46 4 $53,876.00 5 $53,594.00 6 $54,026.00 Ref #133 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (200 HOUR) Awd $72.00 $14,400.00 2 $70.00 $14,000.00 3 $50.00 $10,000.00 4 $55.00 $11,000.00 5 $70.00 $14,000.00 6 $80.00 $16,000.00 170607 - Page 21

Ref #134 614E11500 WORKSITE TRAFFIC SUPERVISOR, (18 MNTH) Awd $3,200.00 $57,600.00 2 $4,000.00 $72,000.00 3 $4,000.00 $72,000.00 4 $750.00 $13,500.00 5 $2,000.00 $36,000.00 6 $2,500.00 $45,000.00 Ref #135 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (2 EACH) Awd $2,025.00 $4,050.00 2 $2,400.00 $4,800.00 3 $1,900.00 $3,800.00 4 $1,900.00 $3,800.00 5 $1,900.00 $3,800.00 6 $1,900.00 $3,800.00 Ref #136 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (1 EACH) Awd $2,025.00 $2,025.00 2 $2,500.00 $2,500.00 3 $1,950.00 $1,950.00 4 $1,950.00 $1,950.00 5 $1,950.00 $1,950.00 6 $1,950.00 $1,950.00 Ref #137 614E12420 DETOUR SIGNING, (LUMP SUM) Awd $30,000.00 $30,000.00 2 $2,500.00 $2,500.00 3 $1,900.00 $1,900.00 4 $47,000.00 $47,000.00 5 $1,900.00 $1,900.00 6 $50,000.00 $50,000.00 Ref #138 614E12500 REPLACEMENT SIGN, (10 EACH) Awd $85.00 $850.00 2 $85.00 $850.00 3 $85.00 $850.00 4 $85.00 $850.00 5 $85.00 $850.00 6 $85.00 $850.00 Ref #139 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN, (52 EACH) Awd $140.00 $7,280.00 2 $137.00 $7,124.00 3 $80.00 $4,160.00 4 $7.50 $390.00 5 $137.60 $7,155.20 6 $137.60 $7,155.20 Ref #140 614E13310 BARRIER REFLECTOR, TYPE 1, (ONE-WAY), (30 EACH) Awd $7.05 $211.50 2 $7.00 $210.00 3 $7.00 $210.00 4 $7.00 $210.00 5 $7.00 $210.00 6 $7.38 $221.40 170607 - Page 22

Ref #141 614E13350 OBJECT MARKER, ONE WAY, (27 EACH) Awd $11.00 $297.00 2 $10.00 $270.00 3 $11.00 $297.00 4 $11.00 $297.00 5 $11.00 $297.00 6 $11.00 $297.00 Ref #142 614E18010 MAINTAINING TRAFFIC, MISC.:, ADDITIONAL SIGNS, GRO, (100 SF) Awd $14.75 $1,475.00 2 $15.00 $1,500.00 3 $14.50 $1,450.00 4 $14.50 $1,450.00 5 $14.50 $1,450.00 6 $14.50 $1,450.00 Ref #143 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN, (43 SNMT) Awd $1,100.00 $47,300.00 2 $850.00 $36,550.00 3 $500.00 $21,500.00 4 $950.00 $40,850.00 5 $600.00 $25,800.00 6 $600.00 $25,800.00 Ref #144 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I, (0.7 MILE) Awd $6,100.00 $4,270.00 2 $5,300.00 $3,710.00 3 $6,072.00 $4,250.40 4 $5,125.00 $3,587.50 5 $6,072.00 $4,250.40 6 $13,498.74 $9,449.12 Ref #145 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06,, (6074 FT) Awd $1.70 $10,325.80 2 $2.00 $12,148.00 3 $1.70 $10,325.80 4 $2.00 $12,148.00 5 $1.70 $10,325.80 6 $4.22 $25,632.28 Ref #146 616E10000 WATER, (76 MGAL) Awd $5.00 $380.00 2 $10.00 $760.00 3 $75.00 $5,700.00 4 $12.00 $912.00 5 $55.00 $4,180.00 6 $50.00 $3,800.00 Ref #147 622E41001 PORTABLE BARRIER, 32", AS PER PLAN, (1410 FT) Awd $15.00 $21,150.00 2 $12.00 $16,920.00 3 $15.00 $21,150.00 4 $18.00 $25,380.00 5 $7.41 $10,448.10 6 $15.00 $21,150.00 170607 - Page 23

Ref #148 642E30000 REMOVAL OF PAVEMENT MARKING, (6642 FT) Awd $0.45 $2,988.90 2 $0.45 $2,988.90 3 $0.45 $2,988.90 4 $0.60 $3,985.20 5 $0.45 $2,988.90 6 $0.45 $2,988.90 Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $204,603.20 2 $178,830.90 3 $162,532.10 4 $167,309.70 5 $125,605.40 6 $215,543.90 Ref #149 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM) Awd $35,000.00 $35,000.00 2 $100,000.00 $100,000.00 3 $50,000.00 $50,000.00 4 $120,000.00 $120,000.00 5 $147,000.00 $147,000.00 6 $10,000.00 $10,000.00 Ref #150 503E21100 UNCLASSIFIED EXCAVATION, (248 CY) Awd $59.00 $14,632.00 2 $50.00 $12,400.00 3 $50.00 $12,400.00 4 $26.00 $6,448.00 5 $65.00 $16,120.00 6 $12.00 $2,976.00 Ref #151 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE, (1750 FT) Awd $23.25 $40,687.50 2 $22.00 $38,500.00 3 $10.00 $17,500.00 4 $11.50 $20,125.00 5 $8.00 $14,000.00 6 $16.00 $28,000.00 Ref #152 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI, (2000 FT) Awd $23.00 $46,000.00 2 $20.00 $40,000.00 3 $30.00 $60,000.00 4 $30.00 $60,000.00 5 $25.00 $50,000.00 6 $21.00 $42,000.00 Ref #153 509E10000 EPOXY COATED REINFORCING STEEL, (16396 LB) Awd $0.92 $15,084.32 2 $0.90 $14,756.40 3 $1.15 $18,855.40 4 $0.85 $13,936.60 5 $1.00 $16,396.00 6 $1.00 $16,396.00 170607 - Page 24

Ref #154 511E46213 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL, (255 CY) Awd $420.00 $107,100.00 2 $450.00 $114,750.00 3 $460.00 $117,300.00 4 $537.00 $136,935.00 5 $530.00 $135,150.00 6 $750.00 $191,250.00 Ref #155 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (238 SY) Awd $20.00 $4,760.00 2 $25.00 $5,950.00 3 $25.00 $5,950.00 4 $20.00 $4,760.00 5 $20.00 $4,760.00 6 $23.96 $5,702.48 Ref #156 512E33000 TYPE 2 WATERPROOFING, (11 SY) Awd $18.00 $198.00 2 $40.00 $440.00 3 $30.00 $330.00 4 $35.00 $385.00 5 $40.00 $440.00 6 $30.00 $330.00 Ref #157 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (34 SF) Awd $6.00 $204.00 2 $10.00 $340.00 3 $7.00 $238.00 4 $5.00 $170.00 5 $12.00 $408.00 6 $5.00 $170.00 Ref #158 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (75 CY) Awd $78.00 $5,850.00 2 $65.00 $4,875.00 3 $75.00 $5,625.00 4 $70.00 $5,250.00 5 $80.00 $6,000.00 6 $95.00 $7,125.00 Ref #159 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (173 FT) Awd $16.00 $2,768.00 2 $10.00 $1,730.00 3 $12.00 $2,076.00 4 $9.00 $1,557.00 5 $10.00 $1,730.00 6 $8.00 $1,384.00 Ref #160 523E20000 DYNAMIC LOAD TESTING, (1 EACH) Awd $3,300.00 $3,300.00 2 $6,000.00 $6,000.00 3 $3,500.00 $3,500.00 4 $6,500.00 $6,500.00 5 $3,200.00 $3,200.00 6 $3,500.00 $3,500.00 170607 - Page 25

Ref #300 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM) Awd $15,000.00 $15,000.00 2 $10,000.00 $10,000.00 3 $20,000.00 $20,000.00 4 $40,000.00 $40,000.00 5 $10,000.00 $10,000.00 6 $15,000.00 $15,000.00 Section 8 - RETAINING WALLS - Totals Awd $290,583.82 2 $349,741.40 3 $313,774.40 4 $416,066.60 5 $405,204.00 6 $323,833.48 Ref #161 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN, (LUMP SUM) Awd $140,000.00 $140,000.00 2 $120,000.00 $120,000.00 3 $100,000.00 $100,000.00 4 $310,000.00 $310,000.00 5 $115,500.00 $115,500.00 6 $290,486.54 $290,486.54 Ref #162 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM) Awd $55,000.00 $55,000.00 2 $15,000.00 $15,000.00 3 $50,000.00 $50,000.00 4 $1,000.00 $1,000.00 5 $25,000.00 $25,000.00 6 $40,000.00 $40,000.00 Ref #163 503E21100 UNCLASSIFIED EXCAVATION, (870 CY) Awd $40.00 $34,800.00 2 $50.00 $43,500.00 3 $50.00 $43,500.00 4 $25.00 $21,750.00 5 $55.00 $47,850.00 6 $12.00 $10,440.00 Ref #164 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM) Awd $24,000.00 $24,000.00 2 $15,000.00 $15,000.00 3 $35,000.00 $35,000.00 4 $40,000.00 $40,000.00 5 $40,000.00 $40,000.00 6 $15,000.00 $15,000.00 Ref #165 506E11100 STATIC LOAD TEST, (LUMP SUM) Awd $16,000.00 $16,000.00 2 $35,000.00 $35,000.00 3 $50,000.00 $50,000.00 4 $25,000.00 $25,000.00 5 $15,000.00 $15,000.00 6 $25,000.00 $25,000.00 170607 - Page 26

Ref #166 506E12200 SUBSEQUENT STATIC LOAD TEST, (2 EACH) Awd $10,000.00 $20,000.00 2 $7,500.00 $15,000.00 3 $25,000.00 $50,000.00 4 $25,000.00 $50,000.00 5 $10,000.00 $20,000.00 6 $15,000.00 $30,000.00 Ref #167 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE, (15390 FT) Awd $28.50 $438,615.00 2 $20.00 $307,800.00 3 $10.00 $153,900.00 4 $9.00 $138,510.00 5 $12.00 $184,680.00 6 $14.00 $215,460.00 Ref #168 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI, (16230 FT) Awd $26.00 $421,980.00 2 $26.00 $421,980.00 3 $40.00 $649,200.00 4 $38.00 $616,740.00 5 $35.00 $568,050.00 6 $26.00 $421,980.00 Ref #169 509E10000 EPOXY COATED REINFORCING STEEL, (158488 LB) Awd $0.93 $147,393.84 2 $0.90 $142,639.20 3 $1.15 $182,261.20 4 $0.85 $134,714.80 5 $1.11 $175,921.68 6 $1.05 $166,412.40 Ref #170 511E21523 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS, (419 CY) Awd $550.00 $230,450.00 2 $685.00 $287,015.00 3 $700.00 $293,300.00 4 $975.00 $408,525.00 5 $770.00 $322,630.00 6 $1,200.00 $502,800.00 Ref #171 511E44113 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD, (310 CY) Awd $600.00 $186,000.00 2 $500.00 $155,000.00 3 $535.00 $165,850.00 4 $688.00 $213,280.00 5 $500.00 $155,000.00 6 $850.00 $263,500.00 Ref #172 511E46013 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL, (321 CY) Awd $775.00 $248,775.00 2 $525.00 $168,525.00 3 $685.00 $219,885.00 4 $965.00 $309,765.00 5 $800.00 $256,800.00 6 $900.00 $288,900.00 170607 - Page 27

Ref #173 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (350 CY) Awd $325.00 $113,750.00 2 $250.00 $87,500.00 3 $375.00 $131,250.00 4 $300.00 $105,000.00 5 $330.00 $115,500.00 6 $300.00 $105,000.00 Ref #174 511E71200 CONCRETE, MISC.: MOLDED BRICK SURFACE, (530 SF) Awd $11.00 $5,830.00 2 $25.00 $13,250.00 3 $25.00 $13,250.00 4 $25.00 $13,250.00 5 $40.00 $21,200.00 6 $35.00 $18,550.00 Ref #175 511E71200 CONCRETE, MISC.: STAINING CONCRETE SURFACES, (530 SF) Awd $13.00 $6,890.00 2 $14.00 $7,420.00 3 $6.25 $3,312.50 4 $10.00 $5,300.00 5 $14.00 $7,420.00 6 $13.99 $7,414.70 Ref #176 511E81300 CONCRETE, MISC.: MOCKUP, MOLDED BRICK SURFACE, (3 EACH) Awd $1,000.00 $3,000.00 2 $1,000.00 $3,000.00 3 $1,200.00 $3,600.00 4 $1,500.00 $4,500.00 5 $2,500.00 $7,500.00 6 $250.00 $750.00 Ref #177 512E10051 SEALING OF CONCRETE SURFACES (NON-EPOXY), AS PER P, (59 SY) Awd $9.00 $531.00 2 $25.00 $1,475.00 3 $10.00 $590.00 4 $6.00 $354.00 5 $50.00 $2,950.00 6 $10.42 $614.78 Ref #178 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS, (1380 SY) Awd $22.00 $30,360.00 2 $15.00 $20,700.00 3 $15.00 $20,700.00 4 $18.00 $24,840.00 5 $20.00 $27,600.00 6 $23.96 $33,064.80 Ref #179 512E33000 TYPE 2 WATERPROOFING, (90 SY) Awd $18.00 $1,620.00 2 $40.00 $3,600.00 3 $30.00 $2,700.00 4 $30.00 $2,700.00 5 $25.00 $2,250.00 6 $30.00 $2,700.00 170607 - Page 28

Ref #180 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4, (595800 LB) Awd $1.36 $810,288.00 2 $1.30 $774,540.00 3 $1.50 $893,700.00 4 $1.43 $851,994.00 5 $1.85 $1,102,230.00 6 $1.50 $893,700.00 Ref #181 513E20000 WELDED STUD SHEAR CONNECTORS, (1746 EACH) Awd $3.00 $5,238.00 2 $3.00 $5,238.00 3 $3.00 $5,238.00 4 $3.00 $5,238.00 5 $3.20 $5,587.20 6 $5.50 $9,603.00 Ref #182 514E00300 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (LUMP SUM) Awd $204,000.00 $204,000.00 2 $160,000.00 $160,000.00 3 $174,000.00 $174,000.00 4 $195,000.00 $195,000.00 5 $195,000.00 $195,000.00 6 $177,551.02 $177,551.02 Ref #183 514E00401 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (LUMP SUM) Awd $48,000.00 $48,000.00 2 $160,000.00 $160,000.00 3 $70,000.00 $70,000.00 4 $90,000.00 $90,000.00 5 $46,500.00 $46,500.00 6 $71,428.57 $71,428.57 Ref #184 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (20 SF) Awd $3.40 $68.00 2 $10.00 $200.00 3 $5.00 $100.00 4 $3.00 $60.00 5 $12.00 $240.00 6 $4.00 $80.00 Ref #185 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (375 SF) Awd $5.75 $2,156.25 2 $10.00 $3,750.00 3 $6.50 $2,437.50 4 $2.00 $750.00 5 $14.00 $5,250.00 6 $5.00 $1,875.00 Ref #186 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (266 SF) Awd $7.25 $1,928.50 2 $12.00 $3,192.00 3 $9.00 $2,394.00 4 $4.00 $1,064.00 5 $14.00 $3,724.00 6 $7.50 $1,995.00 170607 - Page 29

Ref #187 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (155 FT) Awd $38.00 $5,890.00 2 $24.00 $3,720.00 3 $30.00 $4,650.00 4 $20.00 $3,100.00 5 $35.00 $5,425.00 6 $30.00 $4,650.00 Ref #188 516E41100 1/8" PREFORMED BEARING PAD, (10 EACH) Awd $125.00 $1,250.00 2 $200.00 $2,000.00 3 $250.00 $2,500.00 4 $165.00 $1,650.00 5 $90.00 $900.00 6 $75.00 $750.00 Ref #189 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (84 CY) Awd $78.00 $6,552.00 2 $65.00 $5,460.00 3 $75.00 $6,300.00 4 $65.00 $5,460.00 5 $85.00 $7,140.00 6 $75.00 $6,300.00 Ref #190 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (450 FT) Awd $16.00 $7,200.00 2 $10.00 $4,500.00 3 $12.00 $5,400.00 4 $8.00 $3,600.00 5 $10.00 $4,500.00 6 $8.00 $3,600.00 Ref #191 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (50 FT) Awd $16.00 $800.00 2 $17.00 $850.00 3 $15.00 $750.00 4 $8.00 $400.00 5 $22.00 $1,100.00 6 $15.00 $750.00 Ref #192 518E62600 STRUCTURE DRAINAGE, MISC.: PREFABRICATED GEOCOMPOS, (7238 SF) Awd $1.55 $11,218.90 2 $2.50 $18,095.00 3 $2.50 $18,095.00 4 $1.00 $7,238.00 5 $4.25 $30,761.50 6 $3.00 $21,714.00 Ref #193 523E20000 DYNAMIC LOAD TESTING, (6 EACH) Awd $3,000.00 $18,000.00 2 $7,500.00 $45,000.00 3 $3,500.00 $21,000.00 4 $4,500.00 $27,000.00 5 $3,200.00 $19,200.00 6 $2,500.00 $15,000.00 170607 - Page 30

Ref #194 523E20500 RESTRIKE, (6 EACH) Awd $800.00 $4,800.00 2 $4,000.00 $24,000.00 3 $3,500.00 $21,000.00 4 $2,000.00 $12,000.00 5 $1,200.00 $7,200.00 6 $3,000.00 $18,000.00 Ref #195 526E30001 REINFORCED CONCRETE APPROACH SLABS (T=17"), AS PER, (239 SY) Awd $330.00 $78,870.00 2 $275.00 $65,725.00 3 $300.00 $71,700.00 4 $315.00 $75,285.00 5 $340.00 $81,260.00 6 $400.00 $95,600.00 Ref #196 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (433 FT) Awd $79.00 $34,207.00 2 $70.00 $30,310.00 3 $73.50 $31,825.50 4 $85.00 $36,805.00 5 $72.04 $31,193.32 6 $89.88 $38,918.04 Ref #197 690E71000 SPECIAL - ASBESTOS ABATEMENT, NONE FOUND, (LUMP SUM) Awd $500.00 $500.00 2 $8,000.00 $8,000.00 3 $5,000.00 $5,000.00 4 $5,000.00 $5,000.00 5 $2,000.00 $2,000.00 6 $1,000.00 $1,000.00 Ref #198 869E00100 HIGH LOAD MULTI-ROTATIONAL (HLMR) BEARINGS, (10 EACH) Awd $3,775.00 $37,750.00 2 $3,800.00 $38,000.00 3 $4,500.00 $45,000.00 4 $4,000.00 $40,000.00 5 $4,000.00 $40,000.00 6 $10,000.00 $100,000.00 Section 9 - STRUCTURE OVER 20 FOOT SPAN (CUY-21-1004 - Totals Awd $3,403,711.49 2 $3,215,984.20 3 $3,549,388.70 4 $3,786,872.80 5 $3,700,062.70 6 $3,900,587.85 Ref #199 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $80,000.00 $80,000.00 2 $60,000.00 $60,000.00 3 $43,000.00 $43,000.00 4 $42,000.00 $42,000.00 5 $75,000.00 $75,000.00 6 $40,000.00 $40,000.00 170607 - Page 31

Ref #200 108E10000 CPM PROGRESS SCHEDULE, (LUMP SUM) Awd $5,000.00 $5,000.00 2 $5,000.00 $5,000.00 3 $5,000.00 $5,000.00 4 $50,000.00 $50,000.00 5 $5,000.00 $5,000.00 6 $10,000.00 $10,000.00 Ref #201 614E11000 MAINTAINING TRAFFIC, (LUMP SUM) Awd $130,000.00 $130,000.00 2 $150,000.00 $150,000.00 3 $137,500.00 $137,500.00 4 $149,000.00 $149,000.00 5 $185,000.00 $185,000.00 6 $295,000.00 $295,000.00 Ref #202 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN, (22 MNTH) Awd $1,500.00 $33,000.00 2 $2,100.00 $46,200.00 3 $2,500.00 $55,000.00 4 $1,850.00 $40,700.00 5 $2,500.00 $55,000.00 6 $1,000.00 $22,000.00 Ref #203 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM) Awd $30,000.00 $30,000.00 2 $15,000.00 $15,000.00 3 $90,000.00 $90,000.00 4 $50,000.00 $50,000.00 5 $75,000.00 $75,000.00 6 $50,000.00 $50,000.00 Ref #204 624E10000 MOBILIZATION, (LUMP SUM) Awd $200,000.00 $200,000.00 2 $200,000.00 $200,000.00 3 $191,650.00 $191,650.00 4 $200,000.00 $200,000.00 5 $200,000.00 $200,000.00 6 $200,000.00 $200,000.00 Section 10 - INCIDENTALS - Totals Awd $478,000.00 2 $476,200.00 3 $522,150.00 4 $531,700.00 5 $595,000.00 6 $617,000.00 170607 - Page 32

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170621 PID 100913 AUG-SR 501-03.04 Federal Type: TWO LANE RESURFACING Letting Date: 12/14/2017 Completion Date: 6/30/2018 Contract Awarded To: SHELLY COMPANY Award Amount: $682,485.90 Engineer's Estimate: $600,000.00 Bidder 1 SHELLY COMPANY 80 PARK DR BOX 266 Perry THORNVILLE, OH 43076 Bid $682,485.90 170621 - Page 33

Ref #1 202E23500 WEARING COURSE REMOVED, (1601 SY) Awd $6.00 $9,606.00 Ref #2 690E50350 SPECIAL - MAILBOX REMOVED AND RESET, (1 EACH) Awd $200.00 $200.00 Section 1 - ROADWAY - Totals Awd $9,806.00 Ref #3 253E01001 PAVEMENT REPAIR, AS PER PLAN, (1000 SY) Awd $34.00 $34,000.00 Ref #4 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN, (5 CY) Awd $285.00 $1,425.00 Ref #5 407E10000 TACK COAT, (6751 GAL) Awd $2.00 $13,502.00 Ref #6 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (2761 CY) Awd $165.00 $455,565.00 Ref #7 617E10100 COMPACTED AGGREGATE, (294 CY) Awd $56.00 $16,464.00 Ref #8 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE), (8.94 MILE) Awd $805.00 $7,196.70 Ref #9 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, (1/2", (76243 SY) Awd $0.65 $49,557.95 Ref #10 897E02001 PATCHING PLANED SURFACE, AS PER PLAN, (50 SY) Awd $30.00 $1,500.00 Section 2 - PAVEMENT - Totals Awd $579,210.65 Ref #11 621E00100 RPM, (341 EACH) Awd $23.50 $8,013.50 Ref #12 621E54000 RAISED PAVEMENT MARKER REMOVED, (341 EACH) Awd $10.00 $3,410.00 Ref #13 642E00094 EDGE LINE, 6", (9.1 MILE) Awd $625.00 $5,687.50 Ref #14 642E00290 CENTER LINE, (4.55 MILE) Awd $640.00 $2,912.00 Ref #15 644E00500 STOP LINE, (27 FT) Awd $14.75 $398.25 Section 3 - TRAFFIC CONTROL - Totals Awd $20,421.25 Ref #16 614E12460 WORK ZONE MARKING SIGN, (32 EACH) Awd $105.00 $3,360.00 Ref #17 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (9.1 MILE) Awd $680.00 $6,188.00 170621 - Page 34

Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $9,548.00 Ref #18 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $3,500.00 $3,500.00 Ref #19 614E11000 MAINTAINING TRAFFIC, (LUMP SUM) Awd $40,000.00 $40,000.00 Ref #20 624E10000 MOBILIZATION, (LUMP SUM) Awd $20,000.00 $20,000.00 Section 5 - INCIDENTALS - Totals Awd $63,500.00 170621 - Page 35

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170622 PID 94382 CRA-SR-SR 4-00.00 Federal Type: TWO LANE RESURFACING Letting Date: 12/14/2017 Completion Date: 7/1/2018 Contract Awarded To: KOKOSING CONSTRUCTION COMPANY INC Award Amount: $1,066,733.57 Engineer's Estimate: $1,167,000.00 Bidder 1 KOKOSING CONSTRUCTION COMPANY INC 886 MC KINLEY AVE Franklin COLUMBUS, OH 43222 Bid $1,066,733.57 Bidder 2 SHELLY & SANDS INC 1515 HARMON AVE Franklin COLUMBUS, OH 43223 Bid $1,130,445.96 170622 - Page 36

Ref #1 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (13.4 MILE) Awd $1,350.00 $18,090.00 2 $1,300.00 $17,420.00 Ref #2 623E39601 MONUMENT BOX RECONSTRUCTED TO GRADE, AS PER PLAN, (20 EACH) Awd $700.00 $14,000.00 2 $1,150.00 $23,000.00 Ref #3 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (1 EACH) Awd $275.00 $275.00 2 $525.00 $525.00 Section 1 - ROADWAY - Totals Awd $32,365.00 2 $40,945.00 Ref #4 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA, (385 CY) Awd $220.00 $84,700.00 2 $250.00 $96,250.00 Ref #5 253E02000 PAVEMENT REPAIR, (15 CY) Awd $225.00 $3,375.00 2 $400.00 $6,000.00 Ref #6 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50"'), (112566 SY) Awd $0.50 $56,283.00 2 $0.70 $78,796.20 Ref #7 254E01600 PATCHING PLANED SURFACE, (562 SY) Awd $1.25 $702.50 2 $3.00 $1,686.00 Ref #8 407E10000 TACK COAT, (9003 GAL) Awd $1.75 $15,755.25 2 $1.95 $17,555.85 Ref #9 408E10001 PRIME COAT, AS PER PLAN, (9433 GAL) Awd $2.85 $26,884.05 2 $3.40 $32,072.20 Ref #10 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (4690 CY) Awd $118.00 $553,420.00 2 $116.00 $544,040.00 Ref #11 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (197 CY) Awd $118.00 $23,246.00 2 $116.00 $22,852.00 Ref #12 617E10100 COMPACTED AGGREGATE, (1340 CY) Awd $37.00 $49,580.00 2 $32.00 $42,880.00 Ref #13 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE), (13.4 MILE) Awd $740.00 $9,916.00 2 $980.00 $13,132.00 Section 2 - PAVEMENT - Totals Awd $823,861.80 2 $855,264.25 170622 - Page 37

Ref #14 621E00100 RPM, (443 EACH) Awd $22.50 $9,967.50 2 $22.25 $9,856.75 Ref #15 621E54000 RAISED PAVEMENT MARKER REMOVED, (443 EACH) Awd $2.75 $1,218.25 2 $5.00 $2,215.00 Ref #16 642E00104 EDGE LINE, 6", TYPE 1 (WHITE), (13.4 MILE) Awd $615.00 $8,241.00 2 $621.00 $8,321.40 Ref #17 642E00300 CENTER LINE, TYPE 1, (6.7 MILE) Awd $625.00 $4,187.50 2 $685.00 $4,589.50 Ref #18 644E00500 STOP LINE, (315 FT) Awd $7.00 $2,205.00 2 $9.30 $2,929.50 Ref #19 646E10010 EDGE LINE, 6" (WHITE), (0.04 MILE) Awd $89,500.00 $3,580.00 2 $24,655.00 $986.20 Ref #20 646E10200 CENTER LINE, (0.02 MILE) Awd $89,500.00 $1,790.00 2 $46,655.00 $933.10 Section 3 - TRAFFIC CONTROL - Totals Awd $31,189.25 2 $29,831.45 Ref #21 614E12460 WORK ZONE MARKING SIGN, (46 EACH) Awd $65.00 $2,990.00 2 $65.00 $2,990.00 Ref #22 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (25 CY) Awd $100.00 $2,500.00 2 $250.00 $6,250.00 Ref #23 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (13.4 MILE) Awd $1,330.00 $17,822.00 2 $900.00 $12,060.00 Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $23,312.00 2 $21,300.00 Ref #24 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (10 CY) Awd $1,171.50 $11,715.00 2 $1,171.50 $11,715.00 Ref #25 202E98200 REMOVAL MISC.: STEEL DRIP STRIP, (206 FT) Awd $6.84 $1,409.04 2 $6.84 $1,409.04 Ref #26 511E33310 CLASS QC2 CONCRETE, SUPERSTRUCTURE, (10 CY) Awd $1,639.20 $16,392.00 2 $1,639.20 $16,392.00 170622 - Page 38

Ref #27 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (71 SY) Awd $24.72 $1,755.12 2 $24.72 $1,755.12 Ref #28 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (45 SY) Awd $15.68 $705.60 2 $15.68 $705.60 Ref #29 516E31000 JOINT SEALER, (84 FT) Awd $17.30 $1,453.20 2 $17.30 $1,453.20 Ref #30 519E11100 PATCHING CONCRETE STRUCTURE, (42 SF) Awd $104.65 $4,395.30 2 $104.65 $4,395.30 Section 5 - STRUCTURE REPAIR (CRA-4-0045 SFN 1700030 - Totals Awd $37,825.26 2 $37,825.26 Ref #31 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $4,400.00 $4,400.00 2 $5,500.00 $5,500.00 Ref #32 614E11000 MAINTAINING TRAFFIC, (LUMP SUM) Awd $65,080.26 $65,080.26 2 $87,780.00 $87,780.00 Ref #33 619E16010 FIELD OFFICE, TYPE B, (3 MNTH) Awd $2,500.00 $7,500.00 2 $3,000.00 $9,000.00 Ref #34 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM) Awd $1,200.00 $1,200.00 2 $3,000.00 $3,000.00 Ref #35 624E10000 MOBILIZATION, (LUMP SUM) Awd $40,000.00 $40,000.00 2 $40,000.00 $40,000.00 Section 6 - INCIDENTALS - Totals Awd $118,180.26 2 $145,280.00 170622 - Page 39

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170623 PID 95557 CUY-TOWER CITY BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 12/14/2017 Completion Date: 11/16/2020 Contract Awarded To: GREAT LAKES CONSTRUCTION CO Award Amount: $13,990,872.57 Engineer's Estimate: $10,991,000.00 Bidder 1 GREAT LAKES CONSTRUCTION CO 2608 GREAT LAKES WAY Medina HINCKLEY, OH 44233 Bid $13,990,872.57 Bidder 2 SCHIRMER CONSTRUCTION LLC 31350 INDUSTRIAL PARKWAY Cuyahoga NORTH OLMSTED, OH 44070 Bid $14,681,743.40 170623 - Page 40

Ref #1 202E23500 WEARING COURSE REMOVED, (1820 SY) Awd $8.75 $15,925.00 2 $16.00 $29,120.00 Ref #2 611E99820 SPECIAL - MISCELLANEOUS METAL, (10000 LB) Awd $7.50 $75,000.00 2 $1.00 $10,000.00 Section 1 - ROADWAY - Totals Awd $90,925.00 2 $39,120.00 Ref #3 407E10000 TACK COAT, (150 GAL) Awd $2.65 $397.50 2 $15.00 $2,250.00 Ref #4 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (63 CY) Awd $310.00 $19,530.00 2 $425.00 $26,775.00 Ref #5 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (89 CY) Awd $280.00 $24,920.00 2 $375.00 $33,375.00 Ref #6 609E54001 6" CONCRETE TRAFFIC ISLAND, AS PER PLAN, (102 SY) Awd $143.37 $14,623.74 2 $160.00 $16,320.00 Section 2 - PAVEMENT - Totals Awd $59,471.24 2 $78,720.00 Ref #7 630E02101 GROUND MOUNTED SUPPORT, NO. 2 POST, AS PER PLAN, (156 FT) Awd $32.00 $4,992.00 2 $32.00 $4,992.00 Ref #8 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN, (89.5 FT) Awd $37.00 $3,311.50 2 $37.00 $3,311.50 Ref #9 630E08004 ONE WAY SUPPORT, NO. 3 POST, (2 FT) Awd $300.00 $600.00 2 $300.00 $600.00 Ref #10 630E08600 SIGN POST REFLECTOR, (8 EACH) Awd $55.00 $440.00 2 $55.00 $440.00 Ref #11 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (13 EACH) Awd $75.00 $975.00 2 $75.00 $975.00 Ref #12 630E80100 SIGN, FLAT SHEET, (164 SF) Awd $15.00 $2,460.00 2 $15.00 $2,460.00 Ref #13 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (46 EACH) Awd $25.00 $1,150.00 2 $25.00 $1,150.00 170623 - Page 41

Ref #14 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (10 EACH) Awd $75.00 $750.00 2 $75.00 $750.00 Ref #15 630E86003 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (23 EACH) Awd $55.00 $1,265.00 2 $55.00 $1,265.00 Ref #16 630E86275 REMOVAL OF GROUND MOUNTED PIPE SUPPORT AND REERECT, (3 EACH) Awd $125.00 $375.00 2 $125.00 $375.00 Ref #17 630E97700 SIGNING, MISC.:PARKING METER POST, (23 EACH) Awd $350.00 $8,050.00 2 $350.00 $8,050.00 Ref #18 646E10000 EDGE LINE, 4", (0.13 MILE) Awd $4,200.00 $546.00 2 $4,200.00 $546.00 Ref #19 646E10100 LANE LINE, 4", (1.59 MILE) Awd $2,300.00 $3,657.00 2 $2,300.00 $3,657.00 Ref #20 646E10200 CENTER LINE, (0.71 MILE) Awd $7,500.00 $5,325.00 2 $7,500.00 $5,325.00 Ref #21 646E10300 CHANNELIZING LINE, 8", (1364 FT) Awd $1.95 $2,659.80 2 $1.95 $2,659.80 Ref #22 646E10301 CHANNELIZING LINE, 8", AS PER PLAN, (2364 FT) Awd $2.50 $5,910.00 2 $2.50 $5,910.00 Ref #23 646E10400 STOP LINE, (473 FT) Awd $13.00 $6,149.00 2 $13.00 $6,149.00 Ref #24 646E10500 CROSSWALK LINE, (931 FT) Awd $6.50 $6,051.50 2 $6.50 $6,051.50 Ref #25 646E10501 CROSSWALK LINE, AS PER PLAN, (1975 FT) Awd $12.75 $25,181.25 2 $12.75 $25,181.25 Ref #26 646E10600 TRANSVERSE/DIAGONAL LINE, (244 FT) Awd $10.00 $2,440.00 2 $10.00 $2,440.00 Ref #27 646E20300 LANE ARROW, (66 EACH) Awd $175.00 $11,550.00 2 $175.00 $11,550.00 Ref #28 646E20502 DOTTED LINE, 4", (486 FT) Awd $5.00 $2,430.00 2 $5.00 $2,430.00 Ref #29 809E69101 STOP-BAR RADAR DETECTION, AS PER PLAN, (1 EACH) Awd $9,500.00 $9,500.00 2 $11,500.00 $11,500.00 170623 - Page 42