Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Similar documents
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

CT Consultants, Inc.

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Steese Rd - Curb & Sidewalk Improvement

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Maine Turnpike Authority

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

Federal Project No.: OC-095-1(348)

Project Book Worksheet for Cost Estimation

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

Federal Project No.: STP-5128(388)

MoDOT 2016 UNIT BID PRICES Northwest District

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

Federal Project No.: HSIP-5A27(567)

Maine Turnpike Authority

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

Maine Turnpike Authority

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

Maine Turnpike Authority

Maine Turnpike Authority

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

Maine Turnpike Authority

DESCRIPTION QUANTITY PRICE TOTAL

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

Maine Turnpike Authority

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

Licensed Class C Virginia Contractor No.

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

ADDENDUM No. 1 Prospective Bidders

STREET IMPROVEMENTS PROPOSAL BID ITEMS

Federal Project No.: NHPP-967-7(083)

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

Federal Project No.: NHFP-081-1(346)

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

METRO Magnolia Transit Center - Bid Tab

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

Macomb County Department of Roads Bid Comparison

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

Items Unit Quantity Unit Price Total Unit Price Total

Federal Project No.: STP-5A27(380), STP-5A27(381)

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

Wentzville Parkway South Phase 2 & 2A

The Tulalip Tribes of Washington

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

PAGE 1 of 18 WEIGHTED AVERAGE

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Riverside County Transportation Department Summary of Bids

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

County of Los Angeles Department of Public Works BID SUMMARY

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

STANDARD DRAWING INDEX

Schedule of Pay Items

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

Bid Tabulation City of Coralville RE-BID Coral Ridge Ave, Phase II - Oakdale Blvd to Forevergreen Rd City of Coralville, IA Engineer's OPC

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

COST ESTIMATES: Curb-Running

800 Access Control, R/W Use Permits and Drive Design

CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

Oaks Commerce Center

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

Riverside County Transportation Department Summary of Bids

2011 LOCAL STREET IMPROVEMENTS

Transcription:

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016 Contract Awarded To: KARVO PAVING COMPANY Award Amount: $20,538,253.95 Engineer's Estimate: $19,230,000.00 Bidder 1 KARVO PAVING COMPANY 4524 HUDSON DR STOW, OH 44224-1702 Bid $20,538,253.95 Bidder 3 ANTHONY ALLEGA CEMENT CONTRACTOR INC 5585 CANAL RD Cuyahoga VALLEY VIEW, OH 44125 Bid $20,912,070.92 Bidder 2 KOKOSING CONSTRUCTION COMPANY INC 886 MC KINLEY AVE Franklin COLUMBUS, OH 43222 Bid $20,757,842.20 Bidder 4 GREAT LAKES CONSTRUCTION CO 2608 GREAT LAKES WAY Medina HINCKLEY, OH 44233 Bid $21,581,335.77 140123 - Page 1

Ref #1 201E11000 CLEARING AND GRUBBING (WT: 01), (LUMP SUM) Awd $100,000.00 $100,000.00 2 $50,000.00 $50,000.00 3 $121,388.00 $121,388.00 4 $77,000.00 $77,000.00 Ref #2 202E20010 HEADWALL REMOVED (WT: NR), (4 EACH) Awd $350.00 $1,400.00 2 $225.00 $900.00 3 $268.80 $1,075.20 4 $75.00 $300.00 Ref #3 202E23000 PAVEMENT REMOVED (WT: NR), (76501 SY) Awd $7.00 $535,507.00 2 $10.00 $765,010.00 3 $17.37 $1,328,822.37 4 $8.00 $612,008.00 Ref #4 202E23010 PAVEMENT REMOVED, ASPHALT (WT: NR), (9799 SY) Awd $5.65 $55,364.35 2 $10.00 $97,990.00 3 $19.20 $188,140.80 4 $4.50 $44,095.50 Ref #5 202E30000 WALK REMOVED (WT: NR), (8652 SF) Awd $0.55 $4,758.60 2 $2.00 $17,304.00 3 $0.88 $7,613.76 4 $0.75 $6,489.00 Ref #6 202E30500 CONCRETE MEDIAN REMOVED (WT: NR), (55 FT) Awd $8.00 $440.00 2 $8.00 $440.00 3 $5.85 $321.75 4 $13.00 $715.00 Ref #7 202E30700 CONCRETE BARRIER REMOVED (WT: NR), (2263 FT) Awd $15.50 $35,076.50 2 $18.00 $40,734.00 3 $5.95 $13,464.85 4 $13.00 $29,419.00 Ref #8 202E30800 TRAFFIC ISLAND REMOVED (WT: NR), (213 SY) Awd $11.00 $2,343.00 2 $10.00 $2,130.00 3 $9.41 $2,004.33 4 $16.00 $3,408.00 Ref #9 202E32000 CURB REMOVED (WT: NR), (910 FT) Awd $3.00 $2,730.00 2 $4.00 $3,640.00 3 $3.74 $3,403.40 4 $2.00 $1,820.00 Ref #10 202E32500 CURB AND GUTTER REMOVED (WT: NR), (19631 FT) Awd $3.00 $58,893.00 2 $4.00 $78,524.00 3 $4.25 $83,431.75 4 $1.75 $34,354.25 140123 - Page 2

Ref #11 202E32800 CONCRETE SLOPE PROTECTION REMOVED (WT: NR), (1 SY) Awd $400.00 $400.00 2 $200.00 $200.00 3 $642.96 $642.96 4 $120.00 $120.00 Ref #12 202E35100 PIPE REMOVED, 24" AND UNDER (WT: NR), (7641 FT) Awd $22.00 $168,102.00 2 $15.00 $114,615.00 3 $17.67 $135,016.47 4 $12.00 $91,692.00 Ref #13 202E35200 PIPE REMOVED, OVER 24" (WT: NR), (239 FT) Awd $35.00 $8,365.00 2 $25.00 $5,975.00 3 $27.90 $6,668.10 4 $32.00 $7,648.00 Ref #14 202E38000 GUARDRAIL REMOVED (WT: NR), (10123 FT) Awd $1.20 $12,147.60 2 $1.20 $12,147.60 3 $1.34 $13,564.82 4 $1.20 $12,147.60 Ref #15 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN (WT: NR), (732 FT) Awd $1.50 $1,098.00 2 $1.50 $1,098.00 3 $1.68 $1,229.76 4 $1.50 $1,098.00 Ref #16 202E53100 MAILBOX REMOVED (WT: NR), (1 EACH) Awd $12.00 $12.00 2 $35.00 $35.00 3 $76.79 $76.79 4 $110.00 $110.00 Ref #17 202E58000 MANHOLE REMOVED (WT: NR), (18 EACH) Awd $600.00 $10,800.00 2 $500.00 $9,000.00 3 $1,078.27 $19,408.86 4 $800.00 $14,400.00 Ref #18 202E58100 CATCH BASIN REMOVED (WT: NR), (86 EACH) Awd $350.00 $30,100.00 2 $500.00 $43,000.00 3 $719.68 $61,892.48 4 $650.00 $55,900.00 Ref #19 202E58200 INLET REMOVED (WT: NR), (1 EACH) Awd $720.00 $720.00 2 $225.00 $225.00 3 $1,829.54 $1,829.54 4 $450.00 $450.00 Ref #21 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (WT: NR), (500 FT) Awd $7.50 $3,750.00 2 $18.00 $9,000.00 3 $20.16 $10,080.00 4 $15.00 $7,500.00 140123 - Page 3

Ref #22 202E75000 FENCE REMOVED (WT: NR), (2446 FT) Awd $1.85 $4,525.10 2 $1.85 $4,525.10 3 $2.07 $5,063.22 4 $1.85 $4,525.10 Ref #23 202E75250 GATE REMOVED (WT: NR), (1 EACH) Awd $95.00 $95.00 2 $95.00 $95.00 3 $106.40 $106.40 4 $95.00 $95.00 Ref #24 202E98100 REMOVAL MISC.: IMPACT ATTENUATOR (WT: NR), (3 EACH) Awd $115.00 $345.00 2 $115.00 $345.00 3 $128.80 $386.40 4 $200.00 $600.00 Ref #25 203E10000 EXCAVATION (WT: 04), (103460 CY) Awd $13.00 $1,344,980.00 2 $17.50 $1,810,550.00 3 $6.75 $698,355.00 4 $14.50 $1,500,170.00 Ref #26 203E20000 EMBANKMENT (WT: 04), (18939 CY) Awd $3.85 $72,915.15 2 $3.00 $56,817.00 3 $8.72 $165,148.08 4 $10.00 $189,390.00 Ref #27 204E10000 SUBGRADE COMPACTION (WT: 04), (33585 SY) Awd $1.00 $33,585.00 2 $2.50 $83,962.50 3 $0.64 $21,494.40 4 $1.20 $40,302.00 Ref #28 204E13000 EXCAVATION OF SUBGRADE (WT: 04), (11137 CY) Awd $10.00 $111,370.00 2 $15.00 $167,055.00 3 $17.73 $197,459.01 4 $15.00 $167,055.00 Ref #29 204E30000 GRANULAR MATERIAL, TYPE A (WT: 04), (11137 CY) Awd $35.00 $389,795.00 2 $30.00 $334,110.00 3 $36.94 $411,400.78 4 $21.00 $233,877.00 Ref #30 204E30010 GRANULAR MATERIAL, TYPE B (WT: 04), (1125 CY) Awd $42.50 $47,812.50 2 $35.00 $39,375.00 3 $40.27 $45,303.75 4 $28.00 $31,500.00 Ref #31 204E45000 PROOF ROLLING (WT: 04), (63 HOUR) Awd $150.00 $9,450.00 2 $150.00 $9,450.00 3 $297.57 $18,746.91 4 $300.00 $18,900.00 140123 - Page 4

Ref #32 204E50000 GEOTEXTILE FABRIC (WT: 07), (33410 SY) Awd $1.05 $35,080.50 2 $0.50 $16,705.00 3 $1.19 $39,757.90 4 $0.65 $21,716.50 Ref #33 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (WT: 13), (29903 SY) Awd $1.25 $37,378.75 2 $2.30 $68,776.90 3 $2.58 $77,149.74 4 $1.40 $41,864.20 Ref #34 255E20000 FULL DEPTH PAVEMENT SAWING (WT: 15), (1381 FT) Awd $1.25 $1,726.25 2 $1.50 $2,071.50 3 $3.77 $5,206.37 4 $1.45 $2,002.45 Ref #35 606E15050 GUARDRAIL, TYPE MGS (WT: 36), (2125 FT) Awd $13.20 $28,050.00 2 $13.20 $28,050.00 3 $14.78 $31,407.50 4 $13.20 $28,050.00 Ref #36 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING (WT: 36), (25 FT) Awd $21.20 $530.00 2 $21.20 $530.00 3 $23.74 $593.50 4 $21.20 $530.00 Ref #37 606E15400 MGS GUARDRAIL, TYPE 8 (WT: 36), (125 FT) Awd $18.80 $2,350.00 2 $18.80 $2,350.00 3 $21.06 $2,632.50 4 $18.80 $2,350.00 Ref #38 606E17500 POST END ANCHOR (OR CONCRETE BLOCK END ANCHOR) (WT, (1 EACH) Awd $895.00 $895.00 2 $895.00 $895.00 3 $1,002.40 $1,002.40 4 $895.00 $895.00 Ref #39 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (WT: 36), (9 EACH) Awd $1,820.00 $16,380.00 2 $1,820.00 $16,380.00 3 $2,038.40 $18,345.60 4 $1,820.00 $16,380.00 Ref #40 606E27820 ANCHOR ASSEMBLY, MGS TYPE T (WT: 36), (9 EACH) Awd $780.00 $7,020.00 2 $780.00 $7,020.00 3 $873.60 $7,862.40 4 $780.00 $7,020.00 Ref #41 606E35050 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 (WT: 36), (5 EACH) Awd $1,920.00 $9,600.00 2 $1,920.00 $9,600.00 3 $2,150.40 $10,752.00 4 $1,920.00 $9,600.00 140123 - Page 5

Ref #42 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL) (55 MPH/, (11 EACH) Awd $15,150.00 $166,650.00 2 $15,150.00 $166,650.00 3 $16,968.00 $186,648.00 4 $16,000.00 $176,000.00 Ref #43 607E23000 FENCE, TYPE CLT (WT: 37), (2311 FT) Awd $14.00 $32,354.00 2 $13.90 $32,122.90 3 $15.57 $35,982.27 4 $13.90 $32,122.90 Ref #44 608E10000 4" CONCRETE WALK (WT: 38), (23831 SF) Awd $3.50 $83,408.50 2 $4.00 $95,324.00 3 $3.40 $81,025.40 4 $4.00 $95,324.00 Ref #45 608E52110 CURB RAMP, TYPE A1 (WT: 38), (17 EACH) Awd $585.00 $9,945.00 2 $200.00 $3,400.00 3 $1,427.73 $24,271.41 4 $760.00 $12,920.00 Ref #46 608E52170 CURB RAMP, TYPE D (WT: 38), (1 EACH) Awd $550.00 $550.00 2 $450.00 $450.00 3 $1,593.65 $1,593.65 4 $800.00 $800.00 Ref #47 622E10060 CONCRETE BARRIER, SINGLE SLOPE, TYPE B (WT: 38), (134 FT) Awd $132.00 $17,688.00 2 $80.00 $10,720.00 3 $100.16 $13,421.44 4 $48.00 $6,432.00 Ref #48 622E10100 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1 (WT: 38), (651 FT) Awd $78.00 $50,778.00 2 $60.00 $39,060.00 3 $73.30 $47,718.30 4 $52.50 $34,177.50 Ref #49 622E10120 CONCRETE BARRIER, SINGLE SLOPE, TYPE C (WT: 38), (5106.25 FT) Awd $65.00 $331,906.25 2 $40.00 $204,250.00 3 $56.72 $289,626.50 4 $60.00 $306,375.00 Ref #50 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D (WT: 38), (611 FT) Awd $122.00 $74,542.00 2 $45.00 $27,495.00 3 $58.97 $36,030.67 4 $42.00 $25,662.00 Ref #51 622E10200 BARRIER TRANSITION (WT: 38), (1 EACH) Awd $3,500.00 $3,500.00 2 $1,000.00 $1,000.00 3 $971.06 $971.06 4 $4,650.00 $4,650.00 140123 - Page 6

Ref #52 622E24850 CONCRETE BARRIER END SECTION, TYPE B1 (WT: 38), (11 EACH) Awd $5,600.00 $61,600.00 2 $5,000.00 $55,000.00 3 $3,384.44 $37,228.84 4 $7,200.00 $79,200.00 Ref #53 622E25000 CONCRETE BARRIER END SECTION, TYPE D (WT: 38), (5 EACH) Awd $3,900.00 $19,500.00 2 $2,000.00 $10,000.00 3 $2,039.94 $10,199.70 4 $3,750.00 $18,750.00 Ref #54 623E38500 MONUMENT ASSEMBLY (WT: NR), (24 EACH) Awd $775.00 $18,600.00 2 $500.00 $12,000.00 3 $1,133.83 $27,211.92 4 $500.00 $12,000.00 Ref #55 623E40520 RIGHT-OF-WAY MONUMENT (WT: NR), (37 EACH) Awd $75.00 $2,775.00 2 $30.00 $1,110.00 3 $489.93 $18,127.41 4 $170.00 $6,290.00 Ref #56 626E00100 BARRIER REFLECTOR (WT: NR), (191 EACH) Awd $6.40 $1,222.40 2 $6.40 $1,222.40 3 $7.17 $1,369.47 4 $6.40 $1,222.40 Ref #57 690E50000 SPECIAL - MAILBOX SUPPORT (WT: NR), (1 EACH) Awd $125.00 $125.00 2 $175.00 $175.00 3 $148.23 $148.23 4 $125.00 $125.00 Ref #58 690E71000 SPECIAL - ASBESTOS ABATEMENT, GREY BOLT COVER MATE, (LUMP SUM) Awd $8,500.00 $8,500.00 2 $4,500.00 $4,500.00 3 $5,040.00 $5,040.00 4 $850.00 $850.00 Ref #400 622E25008 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE, (12 EACH) Awd $2,800.00 $33,600.00 2 $2,000.00 $24,000.00 3 $1,916.57 $22,998.84 4 $3,700.00 $44,400.00 Section 1 - ROADWAY - Totals Awd $4,103,134.45 2 $4,599,109.90 3 $4,597,862.96 4 $4,174,797.40 Ref #59 659E00100 SOIL ANALYSIS TEST (WT: NR), (2 EACH) Awd $100.00 $200.00 2 $25.00 $50.00 3 $112.00 $224.00 4 $100.00 $200.00 140123 - Page 7

Ref #60 659E00300 TOPSOIL (WT: 46), (11123 CY) Awd $22.50 $250,267.50 2 $9.50 $105,668.50 3 $12.32 $137,035.36 4 $22.50 $250,267.50 Ref #61 659E00511 SEEDING AND MULCHING, CLASS 2, AS PER PLAN (WT: 46, (1335 SY) Awd $0.60 $801.00 2 $0.32 $427.20 3 $0.67 $894.45 4 $0.60 $801.00 Ref #62 659E10000 SEEDING AND MULCHING (WT: 46), (98918 SY) Awd $0.63 $62,318.34 2 $0.36 $35,610.48 3 $0.71 $70,231.78 4 $0.63 $62,318.34 Ref #63 659E14000 REPAIR SEEDING AND MULCHING (WT: 46), (5010 SY) Awd $0.63 $3,156.30 2 $0.20 $1,002.00 3 $0.71 $3,557.10 4 $0.63 $3,156.30 Ref #64 659E15000 INTER-SEEDING (WT: 46), (5010 SY) Awd $0.01 $50.10 2 $0.15 $751.50 3 $0.01 $50.10 4 $0.01 $50.10 Ref #65 659E20000 COMMERCIAL FERTILIZER (WT: 46), (14 TON) Awd $700.00 $9,800.00 2 $450.00 $6,300.00 3 $784.00 $10,976.00 4 $700.00 $9,800.00 Ref #66 659E31000 LIME (WT: 46), (19 ACRE) Awd $0.05 $0.95 2 $10.00 $190.00 3 $0.01 $0.19 4 $5.00 $95.00 Ref #67 659E35000 WATER (WT: 46), (555 MGAL) Awd $0.01 $5.55 2 $0.01 $5.55 3 $0.01 $5.55 4 $0.50 $277.50 Ref #68 659E40000 MOWING (WT: 46), (225 MSF) Awd $3.00 $675.00 2 $6.00 $1,350.00 3 $3.36 $756.00 4 $3.00 $675.00 Ref #69 832E15000 STORM WATER POLLUTION PREVENTION PLAN (WT: NR), (LUMP SUM) Awd $35,000.00 $35,000.00 2 $7,500.00 $7,500.00 3 $33,919.20 $33,919.20 4 $5,000.00 $5,000.00 140123 - Page 8

Ref #70 832E30000 EROSION CONTROL (WT: 08), (24000 EACH) Awd $1.00 $24,000.00 2 $1.00 $24,000.00 3 $1.00 $24,000.00 4 $1.00 $24,000.00 Section 2 - EROSION CONTROL - Totals Awd $386,274.74 2 $182,855.23 3 $281,649.73 4 $356,640.74 Ref #73 511E46610 CLASS QC1 CONCRETE, HEADWALL (WT: 35), (0.2 CY) Awd $5,800.00 $1,160.00 2 $2,000.00 $400.00 3 $3,052.00 $610.40 4 $3,500.00 $700.00 Ref #74 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 (WT: 35), (7 SY) Awd $220.00 $1,540.00 2 $180.00 $1,260.00 3 $169.65 $1,187.55 4 $250.00 $1,750.00 Ref #75 602E20000 CONCRETE MASONRY (WT: 35), (4.8 CY) Awd $1,500.00 $7,200.00 2 $800.00 $3,840.00 3 $1,357.00 $6,513.60 4 $1,700.00 $8,160.00 Ref #76 605E11100 6" SHALLOW PIPE UNDERDRAINS (WT: 35), (63780 FT) Awd $6.85 $436,893.00 2 $7.50 $478,350.00 3 $9.04 $576,571.20 4 $8.40 $535,752.00 Ref #77 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS (WT: 35), (1483 FT) Awd $17.00 $25,211.00 2 $10.00 $14,830.00 3 $9.09 $13,480.47 4 $8.00 $11,864.00 Ref #78 611E00406 4" CONDUIT, TYPE F (WT: 35), (200 FT) Awd $8.00 $1,600.00 2 $6.00 $1,200.00 3 $14.08 $2,816.00 4 $20.00 $4,000.00 Ref #79 611E00900 6" CONDUIT, TYPE B (WT: 35), (508 FT) Awd $20.00 $10,160.00 2 $12.00 $6,096.00 3 $21.42 $10,881.36 4 $30.00 $15,240.00 Ref #80 611E01100 6" CONDUIT, TYPE C (WT: 35), (500 FT) Awd $10.00 $5,000.00 2 $10.00 $5,000.00 3 $20.35 $10,175.00 4 $25.00 $12,500.00 140123 - Page 9

Ref #81 611E01400 6" CONDUIT, TYPE E (WT: 35), (500 FT) Awd $8.00 $4,000.00 2 $7.00 $3,500.00 3 $20.35 $10,175.00 4 $20.00 $10,000.00 Ref #82 611E01500 6" CONDUIT, TYPE F (WT: 35), (2386 FT) Awd $15.00 $35,790.00 2 $7.00 $16,702.00 3 $18.73 $44,689.78 4 $16.00 $38,176.00 Ref #83 611E02000 8" CONDUIT, TYPE C (WT: 35), (24 FT) Awd $50.00 $1,200.00 2 $62.00 $1,488.00 3 $94.92 $2,278.08 4 $100.00 $2,400.00 Ref #84 611E04400 12" CONDUIT, TYPE B (WT: 35), (1515 FT) Awd $70.00 $106,050.00 2 $75.00 $113,625.00 3 $66.50 $100,747.50 4 $70.00 $106,050.00 Ref #85 611E04600 12" CONDUIT, TYPE C (WT: 35), (590 FT) Awd $46.00 $27,140.00 2 $85.00 $50,150.00 3 $54.60 $32,214.00 4 $60.00 $35,400.00 Ref #86 611E05900 15" CONDUIT, TYPE B (WT: 35), (935 FT) Awd $135.00 $126,225.00 2 $110.00 $102,850.00 3 $62.57 $58,502.95 4 $80.00 $74,800.00 Ref #87 611E06100 15" CONDUIT, TYPE C (WT: 35), (77 FT) Awd $90.00 $6,930.00 2 $70.00 $5,390.00 3 $68.80 $5,297.60 4 $80.00 $6,160.00 Ref #88 611E06100 15" CONDUIT, TYPE C, 706.02 (WT: 35), (92 FT) Awd $68.00 $6,256.00 2 $70.00 $6,440.00 3 $69.27 $6,372.84 4 $75.00 $6,900.00 Ref #89 611E07400 18" CONDUIT, TYPE B (WT: 35), (189 FT) Awd $97.00 $18,333.00 2 $119.00 $22,491.00 3 $90.61 $17,125.29 4 $100.00 $18,900.00 Ref #90 611E07400 18" CONDUIT, TYPE B, 706.02 (WT: 35), (8 FT) Awd $265.00 $2,120.00 2 $223.00 $1,784.00 3 $312.34 $2,498.72 4 $200.00 $1,600.00 140123 - Page 10

Ref #91 611E07600 18" CONDUIT, TYPE C (WT: 35), (373 FT) Awd $65.00 $24,245.00 2 $100.00 $37,300.00 3 $71.66 $26,729.18 4 $90.00 $33,570.00 Ref #92 611E08900 21" CONDUIT, TYPE B (WT: 35), (457 FT) Awd $97.00 $44,329.00 2 $137.00 $62,609.00 3 $87.91 $40,174.87 4 $90.00 $41,130.00 Ref #93 611E09100 21" CONDUIT, TYPE C (WT: 35), (16 FT) Awd $250.00 $4,000.00 2 $262.00 $4,192.00 3 $151.91 $2,430.56 4 $200.00 $3,200.00 Ref #94 611E10200 24" CONDUIT, TYPE A (WT: 35), (91 FT) Awd $91.00 $8,281.00 2 $169.00 $15,379.00 3 $92.46 $8,413.86 4 $110.00 $10,010.00 Ref #95 611E10400 24" CONDUIT, TYPE B (WT: 35), (375 FT) Awd $88.00 $33,000.00 2 $124.00 $46,500.00 3 $90.20 $33,825.00 4 $110.00 $41,250.00 Ref #96 611E10400 24" CONDUIT, TYPE B, 706.02 (WT: 35), (17 FT) Awd $415.00 $7,055.00 2 $273.00 $4,641.00 3 $333.78 $5,674.26 4 $250.00 $4,250.00 Ref #97 611E11900 27" CONDUIT, TYPE B (WT: 35), (4 FT) Awd $825.00 $3,300.00 2 $344.00 $1,376.00 3 $463.94 $1,855.76 4 $500.00 $2,000.00 Ref #98 611E12100 27" CONDUIT, TYPE C (WT: 35), (4 FT) Awd $775.00 $3,100.00 2 $344.00 $1,376.00 3 $460.33 $1,841.32 4 $500.00 $2,000.00 Ref #99 611E13400 30" CONDUIT, TYPE B (WT: 35), (8 FT) Awd $420.00 $3,360.00 2 $364.00 $2,912.00 3 $275.08 $2,200.64 4 $400.00 $3,200.00 Ref #100 611E16400 36" CONDUIT, TYPE B (WT: 35), (202 FT) Awd $182.00 $36,764.00 2 $227.00 $45,854.00 3 $179.71 $36,301.42 4 $150.00 $30,300.00 140123 - Page 11

Ref #101 611E16600 36" CONDUIT, TYPE C (WT: 35), (22 FT) Awd $430.00 $9,460.00 2 $384.00 $8,448.00 3 $388.04 $8,536.88 4 $300.00 $6,600.00 Ref #102 611E20900 48" CONDUIT, TYPE B (WT: 35), (16 FT) Awd $565.00 $9,040.00 2 $600.00 $9,600.00 3 $498.06 $7,968.96 4 $525.00 $8,400.00 Ref #103 611E26400 72" CONDUIT, TYPE C (WT: 35), (20 FT) Awd $655.00 $13,100.00 2 $1,000.00 $20,000.00 3 $930.19 $18,603.80 4 $650.00 $13,000.00 Ref #104 611E98150 CATCH BASIN, NO. 3 (WT: 35), (23 EACH) Awd $3,400.00 $78,200.00 2 $2,000.00 $46,000.00 3 $4,251.02 $97,773.46 4 $2,600.00 $59,800.00 Ref #105 611E98180 CATCH BASIN, NO. 3A (WT: 35), (14 EACH) Awd $2,000.00 $28,000.00 2 $2,000.00 $28,000.00 3 $3,249.85 $45,497.90 4 $2,200.00 $30,800.00 Ref #106 611E98370 CATCH BASIN, NO. 6 (WT: 35), (3 EACH) Awd $2,050.00 $6,150.00 2 $3,000.00 $9,000.00 3 $3,217.61 $9,652.83 4 $2,100.00 $6,300.00 Ref #107 611E98470 CATCH BASIN, NO. 2-2B (WT: 35), (6 EACH) Awd $1,100.00 $6,600.00 2 $1,500.00 $9,000.00 3 $1,238.24 $7,429.44 4 $1,500.00 $9,000.00 Ref #108 611E98510 CATCH BASIN, NO. 2-3 (WT: 35), (6 EACH) Awd $1,300.00 $7,800.00 2 $1,800.00 $10,800.00 3 $1,903.27 $11,419.62 4 $1,500.00 $9,000.00 Ref #109 611E98540 CATCH BASIN, NO. 2-4 (WT: 35), (1 EACH) Awd $2,100.00 $2,100.00 2 $2,600.00 $2,600.00 3 $2,356.33 $2,356.33 4 $3,000.00 $3,000.00 Ref #110 611E98630 CATCH BASIN ADJUSTED TO GRADE (WT: 35), (3 EACH) Awd $550.00 $1,650.00 2 $500.00 $1,500.00 3 $898.78 $2,696.34 4 $900.00 $2,700.00 140123 - Page 12

Ref #111 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE (WT: 35), (9 EACH) Awd $855.00 $7,695.00 2 $1,200.00 $10,800.00 3 $1,335.76 $12,021.84 4 $1,000.00 $9,000.00 Ref #112 611E98700 INLET, SIDE DITCH (WT: 35), (1 EACH) Awd $1,000.00 $1,000.00 2 $1,300.00 $1,300.00 3 $1,032.23 $1,032.23 4 $1,500.00 $1,500.00 Ref #115 611E99654 MANHOLE ADJUSTED TO GRADE (WT: 35), (2 EACH) Awd $700.00 $1,400.00 2 $600.00 $1,200.00 3 $898.77 $1,797.54 4 $650.00 $1,300.00 Ref #116 611E99660 MANHOLE RECONSTRUCTED TO GRADE (WT: 35), (8 EACH) Awd $1,100.00 $8,800.00 2 $1,200.00 $9,600.00 3 $2,114.26 $16,914.08 4 $2,000.00 $16,000.00 Ref #117 611E99710 PRECAST REINFORCED CONCRETE OUTLET (WT: 35), (7 EACH) Awd $310.00 $2,170.00 2 $75.00 $525.00 3 $208.73 $1,461.11 4 $600.00 $4,200.00 Ref #401 611E99104 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE C (WT:, (6 EACH) Awd $5,650.00 $33,900.00 2 $8,000.00 $48,000.00 3 $8,365.24 $50,191.44 4 $6,200.00 $37,200.00 Ref #402 611E99574 MANHOLE, NO. 3 (WT: 35), (24 EACH) Awd $3,650.00 $87,600.00 2 $4,800.00 $115,200.00 3 $4,753.19 $114,076.56 4 $3,400.00 $81,600.00 Section 3 - DRAINAGE - Totals Awd $1,294,907.00 2 $1,389,108.00 3 $1,471,014.57 4 $1,360,662.00 Ref #119 206E10500 CEMENT (WT: 07), (2640 TON) Awd $109.00 $287,760.00 2 $106.00 $279,840.00 3 $113.08 $298,531.20 4 $109.00 $287,760.00 Ref #120 206E11000 CURING COAT (WT: 07), (88612 SY) Awd $0.30 $26,583.60 2 $0.24 $21,266.88 3 $0.20 $17,722.40 4 $0.30 $26,583.60 140123 - Page 13

Ref #121 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP (WT: 07, (87788 SY) Awd $3.25 $285,311.00 2 $4.25 $373,099.00 3 $3.03 $265,997.64 4 $4.70 $412,603.60 Ref #122 206E15030 CEMENT STABILIZED SUBGRADE, 16 INCHES DEEP (WT: 07, (824 SY) Awd $3.25 $2,678.00 2 $4.93 $4,062.32 3 $6.85 $5,644.40 4 $6.25 $5,150.00 Ref #123 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS (WT, (LUMP SUM) Awd $24,000.00 $24,000.00 2 $23,000.00 $23,000.00 3 $43,680.00 $43,680.00 4 $22,000.00 $22,000.00 Ref #124 301E46000 ASPHALT CONCRETE BASE, PG64-22 (WT: 10), (13 CY) Awd $325.00 $4,225.00 2 $240.00 $3,120.00 3 $190.40 $2,475.20 4 $300.00 $3,900.00 Ref #125 302E46000 ASPHALT CONCRETE BASE, PG64-22 (WT: 10), (565 CY) Awd $124.00 $70,060.00 2 $115.00 $64,975.00 3 $133.28 $75,303.20 4 $110.00 $62,150.00 Ref #126 304E20000 AGGREGATE BASE (WT: 09), (20184 CY) Awd $47.00 $948,648.00 2 $42.00 $847,728.00 3 $48.99 $988,814.16 4 $46.00 $928,464.00 Ref #127 407E20000 SPECIAL - TACK COAT, TRACKLESS TACK, INTERMEDIATE, (5440 GAL) Awd $3.50 $19,040.00 2 $4.50 $24,480.00 3 $5.60 $30,464.00 4 $3.50 $19,040.00 Ref #128 407E20100 SPECIAL - TACK COAT, TRACKLESS TACK, SURFACE COURS, (12301 GAL) Awd $3.50 $43,053.50 2 $4.50 $55,354.50 3 $5.60 $68,885.60 4 $3.50 $43,053.50 Ref #129 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (4170 CY) Awd $171.00 $713,070.00 2 $193.00 $804,810.00 3 $190.40 $793,968.00 4 $170.00 $708,900.00 Ref #130 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE, (6945 CY) Awd $141.00 $979,245.00 2 $153.00 $1,062,585.00 3 $163.52 $1,135,646.40 4 $140.00 $972,300.00 140123 - Page 14

Ref #131 448E46024 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (39 CY) Awd $260.00 $10,140.00 2 $434.00 $16,926.00 3 $248.64 $9,696.96 4 $250.00 $9,750.00 Ref #132 448E48020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (28 CY) Awd $340.00 $9,520.00 2 $595.00 $16,660.00 3 $252.00 $7,056.00 4 $300.00 $8,400.00 Ref #133 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 (WT, (31445 SY) Awd $36.00 $1,132,020.00 2 $42.00 $1,320,690.00 3 $33.51 $1,053,721.95 4 $48.00 $1,509,360.00 Ref #134 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 (WT, (83313 SY) Awd $40.00 $3,332,520.00 2 $43.00 $3,582,459.00 3 $36.61 $3,050,088.93 4 $54.00 $4,498,902.00 Ref #135 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 (WT: 38), (12106 FT) Awd $14.00 $169,484.00 2 $20.00 $242,120.00 3 $20.89 $252,894.34 4 $11.40 $138,008.40 Ref #136 609E24000 CURB, TYPE 4-A (WT: 38), (100 FT) Awd $17.00 $1,700.00 2 $36.00 $3,600.00 3 $16.77 $1,677.00 4 $31.15 $3,115.00 Ref #137 609E26000 CURB, TYPE 6 (WT: 38), (244 FT) Awd $18.00 $4,392.00 2 $26.00 $6,344.00 3 $39.10 $9,540.40 4 $13.00 $3,172.00 Ref #138 609E30000 CURB, TYPE 8 (WT: 38), (1075 FT) Awd $20.00 $21,500.00 2 $26.00 $27,950.00 3 $24.43 $26,262.25 4 $11.50 $12,362.50 Ref #139 609E54000 6" CONCRETE TRAFFIC ISLAND (WT: 38), (24 SY) Awd $85.00 $2,040.00 2 $80.00 $1,920.00 3 $90.92 $2,182.08 4 $50.00 $1,200.00 Ref #140 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE) (WT: NR), (4598 FT) Awd $2.00 $9,196.00 2 $0.89 $4,092.22 3 $1.49 $6,851.02 4 $1.00 $4,598.00 140123 - Page 15

Ref #141 861E10000 GEOGRID FOR SUBGRADE STABILIZATION (WT: 07), (33410 SY) Awd $1.15 $38,421.50 2 $1.00 $33,410.00 3 $1.86 $62,142.60 4 $1.20 $40,092.00 Section 4 - PAVEMENT - Totals Awd $8,134,607.60 2 $8,820,491.92 3 $8,209,245.73 4 $9,720,864.60 Ref #142 638E10201 6" FIRE HYDRANT, AS PER PLAN (WT: 35), (6 EACH) Awd $6,500.00 $39,000.00 2 $6,500.00 $39,000.00 3 $6,255.12 $37,530.72 4 $6,000.00 $36,000.00 Ref #143 638E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE (WT: 3, (1 EACH) Awd $3,000.00 $3,000.00 2 $4,000.00 $4,000.00 3 $5,578.07 $5,578.07 4 $2,500.00 $2,500.00 Ref #144 638E10481 FIRE HYDRANT REMOVED, AS PER PLAN (WT: 35), (6 EACH) Awd $455.00 $2,730.00 2 $1,400.00 $8,400.00 3 $1,694.63 $10,167.78 4 $500.00 $3,000.00 Ref #145 638E10800 VALVE BOX ADJUSTED TO GRADE (WT: 35), (7 EACH) Awd $245.00 $1,715.00 2 $200.00 $1,400.00 3 $258.53 $1,809.71 4 $150.00 $1,050.00 Ref #146 638E10900 SERVICE BOX ADJUSTED TO GRADE (WT: 35), (11 EACH) Awd $100.00 $1,100.00 2 $75.00 $825.00 3 $172.28 $1,895.08 4 $70.00 $770.00 Ref #147 638E98000 WATER WORK, MISC.: 20"X6" TAPPING SLEEVE AND 6" VA, (3 EACH) Awd $22,000.00 $66,000.00 2 $20,000.00 $60,000.00 3 $23,051.25 $69,153.75 4 $25,000.00 $75,000.00 Ref #148 638E98000 WATER WORK, MISC.: WATER MANHOLE ADJUSTED TO GRADE, (3 EACH) Awd $11,000.00 $33,000.00 2 $350.00 $1,050.00 3 $1,029.75 $3,089.25 4 $650.00 $1,950.00 140123 - Page 16

Section 5 - WATER WORK - Totals Awd $146,545.00 2 $114,675.00 3 $129,224.36 4 $120,270.00 Ref #149 611E99654 MANHOLE ADJUSTED TO GRADE (WT: 35), (15 EACH) Awd $575.00 $8,625.00 2 $400.00 $6,000.00 3 $1,161.17 $17,417.55 4 $900.00 $13,500.00 Section 6 - SANITARY SEWER - Totals Awd $8,625.00 2 $6,000.00 3 $17,417.55 4 $13,500.00 Ref #150 202E98000 REMOVAL MISC.: LIGHT POLES, BASES & LIGHTING SYSTE, (LUMP SUM) Awd $8,000.00 $8,000.00 2 $8,000.00 $8,000.00 3 $1,929.13 $1,929.13 4 $2,985.00 $2,985.00 Ref #151 611E00400 4" CONDUIT, TYPE E (WT: 44), (300 FT) Awd $1.80 $540.00 2 $1.80 $540.00 3 $3.48 $1,044.00 4 $7.99 $2,397.00 Ref #152 625E00450 CONNECTION, FUSED PULL APART (WT: 43), (88 EACH) Awd $85.00 $7,480.00 2 $85.00 $7,480.00 3 $73.47 $6,465.36 4 $81.75 $7,194.00 Ref #153 625E00481 CONNECTION, UNFUSED PERMANENT, AS PER PLAN (WT: 43, (66 EACH) Awd $85.00 $5,610.00 2 $85.00 $5,610.00 3 $79.63 $5,255.58 4 $76.50 $5,049.00 Ref #154 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT12B32.5 (WT: 43, (5 EACH) Awd $1,550.00 $7,750.00 2 $1,550.00 $7,750.00 3 $1,900.77 $9,503.85 4 $1,707.60 $8,538.00 Ref #155 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT15B50 (WT: 43), (10 EACH) Awd $2,500.00 $25,000.00 2 $2,500.00 $25,000.00 3 $3,066.00 $30,660.00 4 $2,513.70 $25,137.00 140123 - Page 17

Ref #156 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT20B50 (WT: 43), (24 EACH) Awd $2,200.00 $52,800.00 2 $2,200.00 $52,800.00 3 $3,232.84 $77,588.16 4 $2,724.75 $65,394.00 Ref #157 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN A15B50 (WT: 43), (5 EACH) Awd $2,100.00 $10,500.00 2 $2,100.00 $10,500.00 3 $2,766.68 $13,833.40 4 $2,327.85 $11,639.25 Ref #158 625E13400 LIGHT TOWER, BBBBBB100 (WT: 43), (21 EACH) Awd $12,650.00 $265,650.00 2 $12,650.00 $265,650.00 3 $14,796.20 $310,720.20 4 $12,314.00 $258,594.00 Ref #159 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP (WT: 43), (5 EACH) Awd $1,050.00 $5,250.00 2 $1,050.00 $5,250.00 3 $890.57 $4,452.85 4 $892.50 $4,462.50 Ref #160 625E14200 LIGHT POLE FOUNDATION, 24" X 10' DEEP (WT: 43), (39 EACH) Awd $1,475.00 $57,525.00 2 $1,475.00 $57,525.00 3 $1,268.47 $49,470.33 4 $1,035.00 $40,365.00 Ref #161 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP (WT: 43), (21 EACH) Awd $6,250.00 $131,250.00 2 $6,250.00 $131,250.00 3 $6,694.72 $140,589.12 4 $5,175.00 $108,675.00 Ref #162 625E22900 NO. 1/0 AWG 5000 VOLT DISTRIBUTION CABLE (WT: 43), (3900 FT) Awd $3.95 $15,405.00 2 $3.95 $15,405.00 3 $4.59 $17,901.00 4 $2.94 $11,466.00 Ref #163 625E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE (WT: 43), (32535 FT) Awd $2.52 $81,988.20 2 $2.52 $81,988.20 3 $2.48 $80,686.80 4 $2.12 $68,974.20 Ref #164 625E23300 NO. 2 AWG 5000 VOLT DISTRIBUTION CABLE (WT: 43), (552 FT) Awd $3.00 $1,656.00 2 $3.00 $1,656.00 3 $2.95 $1,628.40 4 $2.31 $1,275.12 Ref #165 625E23400 NO. 10 AWG POLE AND BRACKET CABLE (WT: 43), (6745 FT) Awd $0.70 $4,721.50 2 $0.70 $4,721.50 3 $1.43 $9,645.35 4 $1.36 $9,173.20 140123 - Page 18

Ref #166 625E24314 1-1/2" DUCT CABLE WITH THREE NO. 1/0 AWG 5000 VOLT, (2510 FT) Awd $11.00 $27,610.00 2 $11.00 $27,610.00 3 $11.38 $28,563.80 4 $9.59 $24,070.90 Ref #167 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 5000 VOLT C, (4498 FT) Awd $6.00 $26,988.00 2 $6.00 $26,988.00 3 $5.46 $24,559.08 4 $4.87 $21,905.26 Ref #168 625E24330 1-1/2" DUCT CABLE WITH THREE NO. 2 AWG 5000 VOLT C, (1838 FT) Awd $7.25 $13,325.50 2 $7.25 $13,325.50 3 $7.25 $13,325.50 4 $6.78 $12,461.64 Ref #169 625E24400 DUCT CABLE, MISC.: TURNPIKE MULTI-CONDUCTOR CABLE, (562 FT) Awd $6.75 $3,793.50 2 $6.75 $3,793.50 3 $7.33 $4,119.46 4 $3.89 $2,186.18 Ref #170 625E25400 CONDUIT, 2", 725.04 (WT: 43), (7663 FT) Awd $9.00 $68,967.00 2 $9.00 $68,967.00 3 $7.18 $55,020.34 4 $5.52 $42,299.76 Ref #171 625E25500 CONDUIT, 3", 725.04 (WT: 44), (1825 FT) Awd $14.00 $25,550.00 2 $14.00 $25,550.00 3 $13.66 $24,929.50 4 $10.03 $18,304.75 Ref #172 625E25902 CONDUIT, JACKED OR DRILLED, 725.04: 3" (WT: 43), (436 FT) Awd $37.00 $16,132.00 2 $37.00 $16,132.00 3 $35.45 $15,456.20 4 $26.32 $11,475.52 Ref #173 625E25910 CONDUIT CLEANED AND CABLES REMOVED (WT: 43), (403 FT) Awd $0.20 $80.60 2 $0.20 $80.60 3 $1.62 $652.86 4 $1.79 $721.37 Ref #174 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN (WT: 43), (44 EACH) Awd $275.00 $12,100.00 2 $275.00 $12,100.00 3 $452.77 $19,921.88 4 $256.00 $11,264.00 Ref #175 625E26261 LUMINAIRE, HIGH MAST, AS PER PLAN (WT: 43), (126 EACH) Awd $675.00 $85,050.00 2 $675.00 $85,050.00 3 $756.44 $95,311.44 4 $598.00 $75,348.00 140123 - Page 19

Ref #176 625E29002 TRENCH, 24" DEEP (WT: 44), (18054 FT) Awd $4.00 $72,216.00 2 $4.00 $72,216.00 3 $5.71 $103,088.34 4 $4.50 $81,243.00 Ref #177 625E30700 PULL BOX, 725.08, 18" (WT: 44), (26 EACH) Awd $560.00 $14,560.00 2 $560.00 $14,560.00 3 $576.10 $14,978.60 4 $560.00 $14,560.00 Ref #178 625E30706 PULL BOX, 725.08, 24" (WT: 44), (3 EACH) Awd $730.00 $2,190.00 2 $730.00 $2,190.00 3 $674.76 $2,024.28 4 $664.50 $1,993.50 Ref #179 625E31510 PULL BOX REMOVED (WT: 43), (54 EACH) Awd $75.00 $4,050.00 2 $75.00 $4,050.00 3 $273.95 $14,793.30 4 $296.25 $15,997.50 Ref #180 625E32000 GROUND ROD (WT: 44), (86 EACH) Awd $125.00 $10,750.00 2 $125.00 $10,750.00 3 $152.57 $13,121.02 4 $114.00 $9,804.00 Ref #181 625E34001 POWER SERVICE, AS PER PLAN (WT: 43), (3 EACH) Awd $7,700.00 $23,100.00 2 $7,700.00 $23,100.00 3 $5,581.28 $16,743.84 4 $5,310.00 $15,930.00 Ref #182 625E35011 REMOVE AND REERECT EXISTING LIGHT POLE, AS PER PLA, (3 EACH) Awd $450.00 $1,350.00 2 $450.00 $1,350.00 3 $1,550.36 $4,651.08 4 $1,110.00 $3,330.00 Ref #183 625E39520 PULL BOX CLEANED (WT: 43), (3 EACH) Awd $20.00 $60.00 2 $20.00 $60.00 3 $93.37 $280.11 4 $270.00 $810.00 Ref #184 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING (WT: 43), (LUMP SUM) Awd $62,050.00 $62,050.00 2 $62,050.00 $62,050.00 3 $22,374.45 $22,374.45 4 $13,950.00 $13,950.00 Ref #185 625E75350 LIGHT TOWER REMOVED (WT: NR), (14 EACH) Awd $600.00 $8,400.00 2 $600.00 $8,400.00 3 $969.85 $13,577.90 4 $1,620.00 $22,680.00 140123 - Page 20

Ref #186 625E75401 LIGHT POLE REMOVED, AS PER PLAN (WT: NR), (26 EACH) Awd $85.00 $2,210.00 2 $85.00 $2,210.00 3 $239.60 $6,229.60 4 $270.00 $7,020.00 Ref #187 625E75501 LIGHT POLE FOUNDATION REMOVED, AS PER PLAN (WT: NR, (43 EACH) Awd $50.00 $2,150.00 2 $50.00 $2,150.00 3 $366.45 $15,757.35 4 $270.00 $11,610.00 Ref #188 625E75511 POWER SERVICE REMOVED, AS PER PLAN (WT: NR), (4 EACH) Awd $650.00 $2,600.00 2 $650.00 $2,600.00 3 $547.91 $2,191.64 4 $450.00 $1,800.00 Ref #189 625E75801 DISCONNECT CIRCUIT, AS PER PLAN (WT: NR), (1 EACH) Awd $184.00 $184.00 2 $184.00 $184.00 3 $336.49 $336.49 4 $180.00 $180.00 Section 7 - LIGHTING - Totals Awd $1,166,592.30 2 $1,166,592.30 3 $1,273,381.59 4 $1,052,263.65 Ref #190 620E00500 DELINEATOR, POST MOUNTED (WT: NR), (101 EACH) Awd $35.00 $3,535.00 2 $35.00 $3,535.00 3 $34.44 $3,478.44 4 $30.00 $3,030.00 Ref #191 621E00100 RPM (WT: 41), (798 EACH) Awd $18.26 $14,571.48 2 $18.26 $14,571.48 3 $20.45 $16,319.10 4 $18.26 $14,571.48 Ref #192 621E10010 RPM, LOW PROFILE, WHITE (WT: 41), (49 EACH) Awd $18.26 $894.74 2 $18.26 $894.74 3 $20.45 $1,002.05 4 $18.26 $894.74 Ref #193 621E10020 RPM, LOW PROFILE WHITE/RED (WT: 41), (81 EACH) Awd $18.26 $1,479.06 2 $18.26 $1,479.06 3 $20.45 $1,656.45 4 $18.26 $1,479.06 Ref #194 621E10030 RPM, LOW PROFILE YELLOW/RED (WT: 41), (58 EACH) Awd $18.26 $1,059.08 2 $18.26 $1,059.08 3 $20.45 $1,186.10 4 $18.26 $1,059.08 140123 - Page 21

Ref #195 621E54000 RAISED PAVEMENT MARKER REMOVED (WT: NR), (114 EACH) Awd $8.00 $912.00 2 $15.27 $1,740.78 3 $7.42 $845.88 4 $7.96 $907.44 Ref #196 625E32000 GROUND ROD (WT: 44), (8 EACH) Awd $190.00 $1,520.00 2 $200.00 $1,600.00 3 $176.18 $1,409.44 4 $275.00 $2,200.00 Ref #197 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST (WT: 42), (315 FT) Awd $7.00 $2,205.00 2 $7.00 $2,205.00 3 $8.30 $2,614.50 4 $5.25 $1,653.75 Ref #198 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST (WT: 42), (1099 FT) Awd $8.00 $8,792.00 2 $8.00 $8,792.00 3 $9.49 $10,429.51 4 $5.50 $6,044.50 Ref #199 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST (WT: 42), (248.5 FT) Awd $10.00 $2,485.00 2 $10.00 $2,485.00 3 $11.86 $2,947.21 4 $7.50 $1,863.75 Ref #200 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 (WT:, (91.1 FT) Awd $10.00 $911.00 2 $10.00 $911.00 3 $11.86 $1,080.45 4 $14.00 $1,275.40 Ref #201 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 (WT:, (77 FT) Awd $12.00 $924.00 2 $12.00 $924.00 3 $14.23 $1,095.71 4 $25.50 $1,963.50 Ref #202 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 (WT, (165 FT) Awd $15.50 $2,557.50 2 $15.50 $2,557.50 3 $18.38 $3,032.70 4 $28.00 $4,620.00 Ref #203 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 (WT, (120.3 FT) Awd $15.00 $1,804.50 2 $15.00 $1,804.50 3 $17.79 $2,140.14 4 $17.00 $2,045.10 Ref #204 630E08600 SIGN POST REFLECTOR (WT: 42), (3 EACH) Awd $35.00 $105.00 2 $35.00 $105.00 3 $41.50 $124.50 4 $31.00 $93.00 140123 - Page 22

Ref #205 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION (WT: 42), (22 EACH) Awd $200.00 $4,400.00 2 $200.00 $4,400.00 3 $237.17 $5,217.74 4 $335.00 $7,370.00 Ref #206 630E20800 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 8 (WT, (2 EACH) Awd $16,150.00 $32,300.00 2 $16,150.00 $32,300.00 3 $19,151.68 $38,303.36 4 $14,550.00 $29,100.00 Ref #207 630E21000 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 10 (W, (2 EACH) Awd $17,000.00 $34,000.00 2 $17,000.00 $34,000.00 3 $20,159.66 $40,319.32 4 $19,900.00 $39,800.00 Ref #208 630E45500 OVERHEAD SIGN SUPPORT, TYPE TC-7.65, DESIGN 8 (WT:, (2 EACH) Awd $35,500.00 $71,000.00 2 $35,500.00 $71,000.00 3 $42,098.12 $84,196.24 4 $32,750.00 $65,500.00 Ref #209 630E75000 SIGN ATTACHMENT ASSEMBLY (WT: 42), (1 EACH) Awd $495.00 $495.00 2 $495.00 $495.00 3 $587.00 $587.00 4 $70.00 $70.00 Ref #210 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED (WT: 42), (23 EACH) Awd $75.00 $1,725.00 2 $75.00 $1,725.00 3 $88.94 $2,045.62 4 $90.00 $2,070.00 Ref #211 630E79610 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED (WT: 42), (13 EACH) Awd $1,520.00 $19,760.00 2 $1,520.00 $19,760.00 3 $1,802.51 $23,432.63 4 $1,270.00 $16,510.00 Ref #212 630E80100 SIGN, FLAT SHEET (WT: 42), (1132 SF) Awd $12.00 $13,584.00 2 $12.00 $13,584.00 3 $14.23 $16,108.36 4 $12.75 $14,433.00 Ref #213 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET (WT: 42), (970 SF) Awd $10.00 $9,700.00 2 $10.00 $9,700.00 3 $11.86 $11,504.20 4 $17.00 $16,490.00 Ref #214 630E80224 SIGN, OVERHEAD EXTRUSHEET (WT: 42), (1868 SF) Awd $13.00 $24,284.00 2 $13.00 $24,284.00 3 $15.42 $28,804.56 4 $17.00 $31,756.00 140123 - Page 23

Ref #215 630E82000 SIGN BACKING ASSEMBLY (WT: 42), (6 EACH) Awd $95.00 $570.00 2 $95.00 $570.00 3 $112.66 $675.96 4 $60.00 $360.00 Ref #216 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (22 EACH) Awd $300.00 $6,600.00 2 $300.00 $6,600.00 3 $355.76 $7,826.72 4 $485.00 $10,670.00 Ref #217 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION (WT: 42), (8 EACH) Awd $3,450.00 $27,600.00 2 $3,841.25 $30,730.00 3 $4,091.23 $32,729.84 4 $3,580.00 $28,640.00 Ref #218 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL (WT: N, (158 EACH) Awd $10.00 $1,580.00 2 $10.00 $1,580.00 3 $11.86 $1,873.88 4 $11.00 $1,738.00 Ref #219 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL, (19 EACH) Awd $95.00 $1,805.00 2 $95.00 $1,805.00 3 $112.66 $2,140.54 4 $100.00 $1,900.00 Ref #220 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (154 EACH) Awd $10.00 $1,540.00 2 $10.00 $1,540.00 3 $11.86 $1,826.44 4 $15.00 $2,310.00 Ref #221 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT, (52 EACH) Awd $120.00 $6,240.00 2 $120.00 $6,240.00 3 $142.30 $7,399.60 4 $115.00 $5,980.00 Ref #222 630E86310 REMOVAL OF STRUCTURE MOUNTED SIGN AND DISPOSAL (WT, (3 EACH) Awd $150.00 $450.00 2 $150.00 $450.00 3 $177.88 $533.64 4 $225.00 $675.00 Ref #223 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL (WT:, (28 EACH) Awd $140.00 $3,920.00 2 $140.00 $3,920.00 3 $166.02 $4,648.56 4 $150.00 $4,200.00 Ref #224 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL (WT: NR), (38 EACH) Awd $25.00 $950.00 2 $25.00 $950.00 3 $29.65 $1,126.70 4 $20.00 $760.00 140123 - Page 24

Ref #225 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL (WT:, (6 EACH) Awd $1,220.00 $7,320.00 2 $1,220.00 $7,320.00 3 $1,446.75 $8,680.50 4 $1,500.00 $9,000.00 Ref #226 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (2 EACH) Awd $1,220.00 $2,440.00 2 $1,220.00 $2,440.00 3 $1,446.76 $2,893.52 4 $1,055.00 $2,110.00 Ref #227 630E97700 SIGNING, MISC.: REMOVAL OF PRIVATE SIGNS WITHIN TH, (6 EACH) Awd $300.00 $1,800.00 2 $300.00 $1,800.00 3 $355.76 $2,134.56 4 $50.00 $300.00 Ref #228 646E10000 EDGE LINE, 4" (WT: 45), (4.33 MILE) Awd $2,250.00 $9,742.50 2 $1,976.00 $8,556.08 3 $2,520.00 $10,911.60 4 $1,976.00 $8,556.08 Ref #229 646E10010 EDGE LINE, 6" (WT: 45), (3.81 MILE) Awd $2,475.00 $9,429.75 2 $2,849.00 $10,854.69 3 $2,772.00 $10,561.32 4 $2,949.00 $11,235.69 Ref #230 646E10100 LANE LINE, 4" (WT: 45), (4.97 MILE) Awd $950.00 $4,721.50 2 $1,400.00 $6,958.00 3 $1,064.00 $5,288.08 4 $1,400.00 $6,958.00 Ref #231 646E10110 LANE LINE, 6" (WT: 45), (0.71 MILE) Awd $1,100.00 $781.00 2 $1,900.00 $1,349.00 3 $1,232.00 $874.72 4 $1,900.00 $1,349.00 Ref #232 646E10200 CENTER LINE (WT: 45), (1.78 MILE) Awd $4,800.00 $8,544.00 2 $3,784.00 $6,735.52 3 $5,376.00 $9,569.28 4 $3,784.00 $6,735.52 Ref #233 646E10300 CHANNELIZING LINE, 8" (WT: 45), (8598 FT) Awd $1.60 $13,756.80 2 $1.38 $11,865.24 3 $1.79 $15,390.42 4 $1.43 $12,295.14 Ref #234 646E10310 CHANNELIZING LINE, 12" (WT: 45), (4429 FT) Awd $1.95 $8,636.55 2 $1.97 $8,725.13 3 $2.18 $9,655.22 4 $1.97 $8,725.13 140123 - Page 25

Ref #235 646E10400 STOP LINE (WT: 45), (1251 FT) Awd $10.00 $12,510.00 2 $9.00 $11,259.00 3 $11.20 $14,011.20 4 $9.70 $12,134.70 Ref #236 646E10500 CROSSWALK LINE (WT: 45), (1020 FT) Awd $4.50 $4,590.00 2 $4.00 $4,080.00 3 $5.04 $5,140.80 4 $4.00 $4,080.00 Ref #237 646E10600 TRANSVERSE/DIAGONAL LINE (WT: 45), (937 FT) Awd $5.75 $5,387.75 2 $5.30 $4,966.10 3 $6.44 $6,034.28 4 $5.30 $4,966.10 Ref #238 646E10800 ISLAND MARKING (WT: 45), (48 SF) Awd $4.00 $192.00 2 $5.00 $240.00 3 $4.48 $215.04 4 $5.00 $240.00 Ref #239 646E20300 LANE ARROW (WT: 45), (200 EACH) Awd $125.00 $25,000.00 2 $137.00 $27,400.00 3 $140.00 $28,000.00 4 $137.00 $27,400.00 Ref #240 646E50100 REMOVAL OF PAVEMENT MARKING (WT: 45), (1577 FT) Awd $0.80 $1,261.60 2 $0.80 $1,261.60 3 $0.90 $1,419.30 4 $1.96 $3,090.92 Section 8 - TRAFFIC CONTROL - Totals Awd $422,371.81 2 $426,107.50 3 $491,442.93 4 $443,209.08 Ref #241 611E00400 4" CONDUIT, TYPE E (WT: 44), (600 FT) Awd $1.80 $1,080.00 2 $1.80 $1,080.00 3 $3.48 $2,088.00 4 $7.99 $4,794.00 Ref #242 625E25408 CONDUIT, 2", 725.051 (WT: 44), (4530 FT) Awd $4.00 $18,120.00 2 $4.00 $18,120.00 3 $2.49 $11,279.70 4 $1.62 $7,338.60 Ref #243 625E25500 CONDUIT, 3", 725.04 (WT: 44), (532 FT) Awd $14.00 $7,448.00 2 $14.00 $7,448.00 3 $13.84 $7,362.88 4 $10.03 $5,335.96 140123 - Page 26

Ref #244 625E25504 CONDUIT, 3", 725.051 (WT: 44), (397 FT) Awd $5.50 $2,183.50 2 $5.50 $2,183.50 3 $4.25 $1,687.25 4 $2.61 $1,036.17 Ref #245 625E25900 CONDUIT, JACKED OR DRILLED, 3" (WT: 44), (165 FT) Awd $25.00 $4,125.00 2 $25.00 $4,125.00 3 $35.63 $5,878.95 4 $26.32 $4,342.80 Ref #246 625E29002 TRENCH, 24" DEEP (WT: 44), (5624 FT) Awd $4.00 $22,496.00 2 $4.00 $22,496.00 3 $5.71 $32,113.04 4 $4.95 $27,838.80 Ref #247 625E30700 PULL BOX, 725.08, 18" (WT: 44), (2 EACH) Awd $560.00 $1,120.00 2 $560.00 $1,120.00 3 $588.43 $1,176.86 4 $559.50 $1,119.00 Ref #248 625E30706 PULL BOX, 725.08, 24" (WT: 44), (1 EACH) Awd $730.00 $730.00 2 $730.00 $730.00 3 $680.93 $680.93 4 $664.50 $664.50 Ref #249 625E31600 PULL BOX, MISC.: 725.08, 32" ROUND CONCRETE (WT: 4, (35 EACH) Awd $1,850.00 $64,750.00 2 $1,850.00 $64,750.00 3 $1,335.42 $46,739.70 4 $1,000.50 $35,017.50 Ref #250 625E32000 GROUND ROD (WT: 44), (25 EACH) Awd $125.00 $3,125.00 2 $125.00 $3,125.00 3 $152.57 $3,814.25 4 $114.00 $2,850.00 Ref #251 630E75000 SIGN ATTACHMENT ASSEMBLY (WT: 42), (16 EACH) Awd $180.00 $2,880.00 2 $180.00 $2,880.00 3 $213.46 $3,415.36 4 $247.00 $3,952.00 Ref #252 630E80100 SIGN, FLAT SHEET (WT: 42), (42 SF) Awd $14.00 $588.00 2 $14.00 $588.00 3 $16.60 $697.20 4 $13.00 $546.00 Ref #253 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL (WT:, (1 EACH) Awd $150.00 $150.00 2 $150.00 $150.00 3 $177.88 $177.88 4 $135.00 $135.00 140123 - Page 27

Ref #254 632E05007 VEHICULAR SIGNAL HEAD, (LED), BLACK, 3-SECTION, 12, (51 EACH) Awd $700.00 $35,700.00 2 $700.00 $35,700.00 3 $692.37 $35,310.87 4 $790.50 $40,315.50 Ref #255 632E05087 VEHICULAR SIGNAL HEAD, (LED), BLACK, 5-SECTION, 12, (10 EACH) Awd $1,000.00 $10,000.00 2 $1,000.00 $10,000.00 3 $1,272.53 $12,725.30 4 $1,195.00 $11,950.00 Ref #256 632E20731 PEDESTRIAN SIGNAL HEAD (LED), (COUNTDOWN), TYPE D, (6 EACH) Awd $545.00 $3,270.00 2 $545.00 $3,270.00 3 $421.94 $2,531.64 4 $588.00 $3,528.00 Ref #257 632E25000 COVERING OF VEHICULAR SIGNAL HEAD (WT: 44), (54 EACH) Awd $65.00 $3,510.00 2 $65.00 $3,510.00 3 $37.88 $2,045.52 4 $30.15 $1,628.10 Ref #258 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD (WT: 44), (6 EACH) Awd $45.00 $270.00 2 $45.00 $270.00 3 $23.61 $141.66 4 $30.15 $180.90 Ref #259 632E26000 PEDESTRIAN PUSHBUTTON (WT: 44), (6 EACH) Awd $160.00 $960.00 2 $160.00 $960.00 3 $138.48 $830.88 4 $201.15 $1,206.90 Ref #260 632E30400 MESSENGER WIRE, 7 STRAND, 1/2" DIAMETER WITH ACCES, (1763 FT) Awd $14.00 $24,682.00 2 $14.00 $24,682.00 3 $8.30 $14,632.90 4 $5.82 $10,260.66 Ref #261 632E30600 TETHER WIRE, WITH ACCESSORIES (WT: 44), (1763 FT) Awd $14.00 $24,682.00 2 $14.00 $24,682.00 3 $7.07 $12,464.41 4 $5.44 $9,590.72 Ref #262 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG (WT: 44), (8864 FT) Awd $2.60 $23,046.40 2 $2.60 $23,046.40 3 $2.02 $17,905.28 4 $2.14 $18,968.96 Ref #263 632E64000 STRAIN POLE FOUNDATION (WT: 44), (16 EACH) Awd $4,400.00 $70,400.00 2 $4,400.00 $70,400.00 3 $2,644.41 $42,310.56 4 $2,250.00 $36,000.00 140123 - Page 28

Ref #264 632E64010 SIGNAL SUPPORT FOUNDATION (WT: 44), (4 EACH) Awd $3,350.00 $13,400.00 2 $3,350.00 $13,400.00 3 $2,644.41 $10,577.64 4 $2,302.50 $9,210.00 Ref #265 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG (WT: 44), (265 FT) Awd $2.00 $530.00 2 $2.00 $530.00 3 $2.45 $649.25 4 $2.87 $760.55 Ref #266 632E69500 SERVICE CABLE, 2 CONDUCTOR, NO. 6 AWG (WT: 44), (490 FT) Awd $2.00 $980.00 2 $2.00 $980.00 3 $2.45 $1,200.50 4 $2.87 $1,406.30 Ref #267 632E70001 POWER SERVICE, AS PER PLAN (WT: 44), (5 EACH) Awd $1,650.00 $8,250.00 2 $1,650.00 $8,250.00 3 $1,738.86 $8,694.30 4 $1,762.50 $8,812.50 Ref #268 632E80202 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 2 (WT: 44), (1 EACH) Awd $3,150.00 $3,150.00 2 $3,150.00 $3,150.00 3 $4,557.69 $4,557.69 4 $3,801.00 $3,801.00 Ref #269 632E80402 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 4 (WT: 44), (1 EACH) Awd $5,300.00 $5,300.00 2 $5,300.00 $5,300.00 3 $6,569.63 $6,569.63 4 $5,376.00 $5,376.00 Ref #270 632E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11 (WT: 44), (1 EACH) Awd $6,500.00 $6,500.00 2 $6,500.00 $6,500.00 3 $7,537.72 $7,537.72 4 $6,380.25 $6,380.25 Ref #271 632E80602 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 12 (WT: 44), (1 EACH) Awd $7,000.00 $7,000.00 2 $7,000.00 $7,000.00 3 $8,344.78 $8,344.78 4 $6,929.40 $6,929.40 Ref #272 632E83200 STRAIN POLE, TYPE TC-81.10, DESIGN 12 (WT: 44), (4 EACH) Awd $5,800.00 $23,200.00 2 $5,800.00 $23,200.00 3 $7,693.64 $30,774.56 4 $5,835.00 $23,340.00 Ref #273 632E83300 STRAIN POLE, TYPE TC-81.10, DESIGN 13 (WT: 44), (12 EACH) Awd $10,100.00 $121,200.00 2 $10,100.00 $121,200.00 3 $13,013.47 $156,161.64 4 $10,360.15 $124,321.80 140123 - Page 29

Ref #274 632E89250 POLE ENTRANCE FITTING (WT: 44), (17 EACH) Awd $100.00 $1,700.00 2 $100.00 $1,700.00 3 $341.78 $5,810.26 4 $232.50 $3,952.50 Ref #275 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION (WT: 44), (4 EACH) Awd $750.00 $3,000.00 2 $750.00 $3,000.00 3 $2,684.94 $10,739.76 4 $3,600.00 $14,400.00 Ref #276 632E90103 REMOVAL OF TRAFFIC SIGNAL INSTALLATION FOR STORAGE, (4 EACH) Awd $250.00 $1,000.00 2 $250.00 $1,000.00 3 $2,746.60 $10,986.40 4 $4,050.00 $16,200.00 Ref #277 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (6 EACH) Awd $19,750.00 $118,500.00 2 $19,750.00 $118,500.00 3 $24,728.17 $148,369.02 4 $21,390.00 $128,340.00 Ref #278 633E67000 CABINET RISER (WT: 44), (5 EACH) Awd $665.00 $3,325.00 2 $665.00 $3,325.00 3 $828.03 $4,140.15 4 $702.00 $3,510.00 Ref #279 633E67100 CABINET FOUNDATION (WT: 44), (5 EACH) Awd $2,300.00 $11,500.00 2 $2,300.00 $11,500.00 3 $1,819.91 $9,099.55 4 $1,367.00 $6,835.00 Ref #280 633E67201 CONTROLLER WORK PAD, AS PER PLAN (WT: 44), (6 EACH) Awd $160.00 $960.00 2 $160.00 $960.00 3 $509.15 $3,054.90 4 $390.00 $2,340.00 Ref #281 633E68000 REMOTE MONITORING STATION (WT: 44), (1 EACH) Awd $7,700.00 $7,700.00 2 $7,700.00 $7,700.00 3 $12,766.95 $12,766.95 4 $11,700.00 $11,700.00 Ref #282 633E68510 COMMUNICATIONS (WT: 44), (2 EACH) Awd $1,500.00 $3,000.00 2 $1,500.00 $3,000.00 3 $2,011.94 $4,023.88 4 $1,835.00 $3,670.00 Ref #283 633E72000 TRAINING (WT: 44), (LUMP SUM) Awd $1,000.00 $1,000.00 2 $1,000.00 $1,000.00 3 $4,110.79 $4,110.79 4 $3,500.00 $3,500.00 140123 - Page 30

Ref #284 633E72501 SYSTEM ANALYSIS, AS PER PLAN (WT: 44), (LUMP SUM) Awd $11,850.00 $11,850.00 2 $11,850.00 $11,850.00 3 $39,639.77 $39,639.77 4 $33,750.00 $33,750.00 Ref #285 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS, (6 EACH) Awd $3,600.00 $21,600.00 2 $3,600.00 $21,600.00 3 $4,722.42 $28,334.52 4 $4,237.00 $25,422.00 Ref #286 633E99000 CONTROLLER ITEM, MISC.: STOP BAR DETECTION RADAR (, (6 EACH) Awd $5,200.00 $31,200.00 2 $5,200.00 $31,200.00 3 $6,775.76 $40,654.56 4 $8,490.00 $50,940.00 Ref #287 804E20000 FIBER OPTIC CABLE, 18 FIBER (WT: 44), (16536 FT) Awd $2.50 $41,340.00 2 $2.50 $41,340.00 3 $2.00 $33,072.00 4 $1.84 $30,426.24 Ref #288 804E33001 FIBER OPTIC PATCH CORD, 4 FIBER, AS PER PLAN (WT:, (12 EACH) Awd $400.00 $4,800.00 2 $400.00 $4,800.00 3 $50.66 $607.92 4 $54.75 $657.00 Ref #289 804E34013 TERMINATION PANEL, 12 FIBER, AS PER PLAN (NEMA CAB, (10 EACH) Awd $500.00 $5,000.00 2 $500.00 $5,000.00 3 $914.08 $9,140.80 4 $903.30 $9,033.00 Ref #290 804E37501 FIBER OPTIC CONNECTOR, AS PER PLAN (WT: 44), (120 EACH) Awd $90.00 $10,800.00 2 $90.00 $10,800.00 3 $27.48 $3,297.60 4 $43.77 $5,252.40 Ref #291 804E37701 FIBER OPTIC CABLE TESTING, AS PER PLAN (WT: 44), (LUMP SUM) Awd $1,000.00 $1,000.00 2 $1,000.00 $1,000.00 3 $1,039.37 $1,039.37 4 $772.50 $772.50 Ref #292 804E38000 FIBER OPTIC CABLE MODEM, AS PER PLAN, (ETHERNET SW, (6 EACH) Awd $2,100.00 $12,600.00 2 $2,100.00 $12,600.00 3 $3,048.81 $18,292.86 4 $3,442.50 $20,655.00 Section 9 - TRAFFIC SIGNALS - Totals Awd $806,700.90 2 $806,700.90 3 $880,259.79 4 $790,293.51 140123 - Page 31

Ref #298 AA2 633E67300 PREEMPTION (SONEM) ALTERNATE BID (WT: 44), (1 EACH) Awd $1,165.00 $1,165.00 2 $1,165.00 $1,165.00 3 $1,334.54 $1,334.54 4 $2,000.00 $2,000.00 Ref #299 AA2 633E67310 PREEMPTION RECEIVING UNIT(SONEM 2000 - ALTERNATE B, (24 EACH) Awd $630.00 $15,120.00 2 $630.00 $15,120.00 3 $629.83 $15,115.92 4 $1,000.00 $24,000.00 Ref #300 AA2 633E67320 PREEMPTION DETECTOR CABLE (TRAFFIC SYSTEMS, LLC. -, (5112 FT) Awd $1.85 $9,457.20 2 $1.85 $9,457.20 3 $1.59 $8,128.08 4 $2.00 $10,224.00 Ref #301 AA2 633E67350 PREEMPTION PHASE SELECTOR (SONEM 2000 - ALTERNATE, (6 EACH) Awd $3,150.00 $18,900.00 2 $3,150.00 $18,900.00 3 $3,370.26 $20,221.56 4 $4,000.00 $24,000.00 Ref #302 AA2 633E67401 PREEMPTION CONFIRMATION LIGHT, AS PER PLAN(LED) (T, (21 EACH) Awd $450.00 $9,450.00 2 $450.00 $9,450.00 3 $414.02 $8,694.42 4 $600.00 $12,600.00 Ref #304 AB2 633E99000 CONTROLLER ITEM, MISC.:NIVERSAL TRAFFIC MANAGEMENT, (15 EACH) Awd $5,400.00 $81,000.00 2 $5,400.00 $81,000.00 3 $6,909.65 $103,644.75 4 $6,000.00 $90,000.00 Section 10 - TRAFFIC SIGNALS (ALTERNATES) - Totals Awd $135,092.20 2 $135,092.20 3 $157,139.27 4 $162,824.00 Ref #305 661E20041 DECIDUOUS SHRUB, 2' HEIGHT, AS PER PLAN (WT: 46), (147 EACH) Awd $60.00 $8,820.00 2 $90.00 $13,230.00 3 $67.20 $9,878.40 4 $60.00 $8,820.00 Ref #306 662E31000 LANDSCAPE WATERING (WT: 46), (588 GAL) Awd $2.00 $1,176.00 2 $0.25 $147.00 3 $2.24 $1,317.12 4 $2.00 $1,176.00 140123 - Page 32

Section 11 - LANDSCAPING - Totals Awd $9,996.00 2 $13,377.00 3 $11,195.52 4 $9,996.00 Ref #307 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B (WT: NR), (100 CY) Awd $65.00 $6,500.00 2 $50.00 $5,000.00 3 $112.52 $11,252.00 4 $50.00 $5,000.00 Ref #308 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C (WT: NR), (100 CY) Awd $65.00 $6,500.00 2 $60.00 $6,000.00 3 $105.31 $10,531.00 4 $55.00 $5,500.00 Ref #309 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (240 HOUR) Awd $60.00 $14,400.00 2 $65.00 $15,600.00 3 $90.40 $21,696.00 4 $60.00 $14,400.00 Ref #310 614E11500 WORKSITE TRAFFIC SUPERVISOR (WT: 39), (12 MNTH) Awd $1,000.00 $12,000.00 2 $6,000.00 $72,000.00 3 $10,040.61 $120,487.32 4 $3,000.00 $36,000.00 Ref #311 614E11620 LINEAR DELINEATION (WT: 39), (1000 FT) Awd $2.40 $2,400.00 2 $0.40 $400.00 3 $0.39 $390.00 4 $1.20 $1,200.00 Ref #312 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) (WT: 3, (29 EACH) Awd $1,845.00 $53,505.00 2 $1,500.00 $43,500.00 3 $1,152.78 $33,430.62 4 $1,635.00 $47,415.00 Ref #313 614E12440 WORK ZONE SIGN SUPPORT (WT: 39), (50 EACH) Awd $175.00 $8,750.00 2 $150.00 $7,500.00 3 $92.44 $4,622.00 4 $32.00 $1,600.00 Ref #314 614E12460 WORK ZONE MARKING SIGN (WT: 39), (50 EACH) Awd $100.00 $5,000.00 2 $120.00 $6,000.00 3 $120.44 $6,022.00 4 $63.00 $3,150.00 Ref #315 614E12500 REPLACEMENT SIGN (WT: 39), (100 EACH) Awd $100.00 $10,000.00 2 $220.00 $22,000.00 3 $120.44 $12,044.00 4 $55.00 $5,500.00 140123 - Page 33

Ref #316 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC (WT: 10), (200 CY) Awd $275.00 $55,000.00 2 $300.00 $60,000.00 3 $336.08 $67,216.00 4 $300.00 $60,000.00 Ref #317 614E13300 BARRIER REFLECTOR, TYPE B (WT: NR), (797 EACH) Awd $7.50 $5,977.50 2 $5.00 $3,985.00 3 $4.76 $3,793.72 4 $5.30 $4,224.10 Ref #318 614E13360 OBJECT MARKER, TWO WAY (WT: NR), (797 EACH) Awd $7.50 $5,977.50 2 $12.00 $9,564.00 3 $8.51 $6,782.47 4 $12.00 $9,564.00 Ref #319 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN (WT:, (840 DAY) Awd $30.00 $25,200.00 2 $20.00 $16,800.00 3 $29.51 $24,788.40 4 $18.00 $15,120.00 Ref #320 614E20200 WORK ZONE LANE LINE, CLASS I, 740.06, TYPE I (WT:, (6.46 MILE) Awd $1,800.00 $11,628.00 2 $1,800.00 $11,628.00 3 $2,016.00 $13,023.36 4 $1,450.00 $9,367.00 Ref #321 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I (WT, (2.1 MILE) Awd $9,500.00 $19,950.00 2 $9,500.00 $19,950.00 3 $10,640.00 $22,344.00 4 $9,700.00 $20,370.00 Ref #322 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I (WT:, (22.85 MILE) Awd $4,800.00 $109,680.00 2 $4,800.00 $109,680.00 3 $5,376.00 $122,841.60 4 $4,550.00 $103,967.50 Ref #323 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 740.06, TYPE, (9365 FT) Awd $1.80 $16,857.00 2 $1.80 $16,857.00 3 $2.02 $18,917.30 4 $1.60 $14,984.00 Ref #324 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I (WT, (3072 FT) Awd $2.00 $6,144.00 2 $2.00 $6,144.00 3 $2.24 $6,881.28 4 $1.25 $3,840.00 Ref #325 614E26000 WORK ZONE STOP LINE, CLASS I (WT: 39), (726 FT) Awd $3.50 $2,541.00 2 $3.50 $2,541.00 3 $3.92 $2,845.92 4 $4.00 $2,904.00 140123 - Page 34

Ref #326 614E30000 WORK ZONE ARROW, CLASS I (WT: 39), (36 EACH) Awd $75.00 $2,700.00 2 $75.00 $2,700.00 3 $84.00 $3,024.00 4 $100.00 $3,600.00 Ref #327 615E10000 ROADS FOR MAINTAINING TRAFFIC (WT: 06), (LUMP SUM) Awd $250,000.00 $250,000.00 2 $100,000.00 $100,000.00 3 $159,951.20 $159,951.20 4 $65,000.00 $65,000.00 Ref #328 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B (WT: 10), (8469.6 SY) Awd $22.00 $186,331.20 2 $40.00 $338,784.00 3 $26.30 $222,750.48 4 $30.00 $254,088.00 Ref #329 616E10000 WATER (WT: NR), (100 MGAL) Awd $10.00 $1,000.00 2 $45.00 $4,500.00 3 $140.46 $14,046.00 4 $50.00 $5,000.00 Ref #330 622E41011 PORTABLE BARRIER, 50", AS PER PLAN (WT: 39), (37442 FT) Awd $9.75 $365,059.50 2 $8.00 $299,536.00 3 $12.08 $452,299.36 4 $13.50 $505,467.00 Ref #331 630E97700 SIGNING, MISC.: REGULATORY SIGN FOR MAINTAINING TR, (12 EACH) Awd $250.00 $3,000.00 2 $175.00 $2,100.00 3 $74.15 $889.80 4 $115.00 $1,380.00 Ref #332 632E25000 COVERING OF VEHICULAR SIGNAL HEAD (WT: 44), (8 EACH) Awd $65.00 $520.00 2 $65.00 $520.00 3 $37.88 $303.04 4 $100.00 $800.00 Ref #333 642E30000 REMOVAL OF PAVEMENT MARKING (WT: NR), (126521 FT) Awd $0.45 $56,934.45 2 $0.45 $56,934.45 3 $0.50 $63,260.50 4 $0.39 $49,343.19 Ref #334 642E30020 REMOVAL OF PAVEMENT MARKING (WT: 45), (37 EACH) Awd $85.00 $3,145.00 2 $85.00 $3,145.00 3 $95.20 $3,522.40 4 $70.00 $2,590.00 Section 12 - MAINTENANCE OF TRAFFIC - Totals Awd $1,246,700.15 2 $1,243,368.45 3 $1,429,955.77 4 $1,251,373.79 140123 - Page 35