Sub Regional RTEP Committee Mid-Atlantic

Similar documents
Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic

Transmission Expansion Advisory Committee (TEAC) Recommendations to the PJM Board

Subregional RTEP Committee Mid-Atlantic Area. September 9, 2008

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic

Pennsylvania State Report

Reliability Analysis Update

Sub-Regional RTEP Committee PJM South

Transmission Expansion Advisory Committee

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study

Sub Regional RTEP Committee South

Falcon-Midway 115 kv Line Uprate Project Report

100 MW Wind Generation Project

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

Generation Deactivation Notification Update

Market Efficiency Update

Reliability Analysis Update

New Jersey State Report

Market Efficiency Update

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

Chapter 7 - Appendix A

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee South

Illinois State Report

Transmission Expansion Advisory Committee. Reliability Analysis Update

Sub Regional RTEP Committee - Southern. August 19, 2011

New Services Queue Network Upgrades

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC Solution Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Expansion Advisory Committee

System Impact Study Report

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION

MILLIGAN SOLAR PROJECT

Reliability Analysis Update

MTEP13 SPM #2- Central Region. March 25, 2013

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Sub Regional RTEP Committee Western Region ATSI

Transmission Expansion Advisory Committee

CUSTOMER/ TWIN ARROWS PROJECT

Market Efficiency RTEP Proposal Window

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Market Efficiency Update

Appendix B. Summary of Changes to the Year Assessment

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Reliability Analysis Update

APPENDIX E: Project Need and Description

Market Efficiency Update

Black Hills Project Summary

SERTP rd Quarter Meeting

APPENDIX E: Project Need and Description

Feasibility Study Report

PJM Regional Transmission Expansion Planning (RTEP) Process

Q0044 interconnection at

Key to Status Fields in the Project List

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

PJM SRTEP Meeting Questions Pertaining to Proposed Projects & Scopes AEP: Ambler Ridge:

Reliability Analysis Update. TEAC Meeting August 20, 2008

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Sub Regional RTEP Committee - Western. October 21, 2009

Reliability Analysis Update

SERTP rd Quarter Meeting

Designated Entity Pre-Qualification Materials. Exelon Corporation

Feasibility Study Report

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

MTEP14 South SPM #2. MISO Texas Project Information. April 7, 2014

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Sub Regional RTEP Committee PJM West

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES

SPP Notification to Construct

Maddox Creek to Southwest Lima 345kV New Transmission Line November 15, 2016

Market Efficiency RTEP Proposal Window

TRANSMISSION PLANNING CRITERIA

FTR Modeling Enhancements for Future Transmission Expansions

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

PG&E s 2012 Request Window Proposals

Sub Regional RTEP Committee - Southern

SPP Notification to Construct

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Manual 3: Transmission Operations Updates Version 52

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

DFO STATEMENT OF NEED REPORT

Feasibility Study Report

Generator Interconnection System Impact Study For

Appendix D Black Hills Project Summary

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

Transcription:

Sub Regional RTEP Committee Mid-Atlantic November 04, 2013

2013 RTEP Baseline Analysis Update 11/04/2013

AE Transmission Zone Cost Change for B2354 Install second 230/69kV transformer and 230kV circuit breaker at Churchtown substation (b2354) Previous $ 3.5 M New $ 8.6 M Expected IS Date: 6/1/2015 3

Scope Change for B2220: Previous Scope: Install four 115 kv breakers at Chestnut Hill. New Scope: Install two 115 kv breakers at Chestnut Hill and remove sag limitations on the Pumphrey - Frederick Rd 115kV circuits 110527 and 110528 to obtain a 125 0 C rating (161/210 MVA). $ 6.4 M Expected IS Date: 6/1/2017 BGE Transmission Zone 4

BGE Transmission Zone Cancel/Replace B1267, B1267.1, B1267.2, and B1267.3 upgrades: The B1267.1 (Construct 115 kv double circuit underground line from existing Cold Spring to Erdman substation) and B1267 (Rebuild existing Erdman 115 kv substation to a dual ring-bus configuration to enable termination of new circuits ) will be canceled and replaced with the following upgrade. New Proposed Solution: Install a tie breaker at Mays Chapel 115 substation. Build a new Camp Small 115 kv station and install 30 MVAR capacitor (B2396). $ 18 M Expected IS Date: 6/1/2018 5

BGE Transmission Zone Cancel B1606.1 and B1606.2 upgrades: The B1606.1 (Moving the station supply connections of the Hazelwood 115/13kV station) and B1606.2 (Installing 115kV tie breakers at Melvale) will be canceled and replaced with B2396 (Install a tie breaker at Mays Chapel 115 substation. Build a new Camp Small 115 kv station and install 30 MVAR capacitor ). 6

N-1-1 Analysis: The Harmony - Chapel St 138 kv circuit is overloaded for several N- 1-1 contingencies. Proposed Solution: Reconductor the Harmony - Chapel St 138 kv circuit (B2395). $ 1.62 M Expected IS Date: 6/1/2018 DPL Transmission Zone 7

PPL Criteria Violation: The Jenkins-Scranton #1 & #2 69kV lines are loaded above 60% of capacity, resulting in a load loss of greater than 120MW for a double-circuit outage of the Jenkins-Scranton #1 & #2 230 kv circuits Proposed Solution: The upgrades are in the following slide. $ 68.6 M Expected IS Date: 11/30/2017 PPL Transmission Zone 8

PPL Transmission Zone Upgrade ID B2406.1 B2406.2 B2406.3 B2406.4 Upgrade Description Expected IS date Estimated Project Cost Rebuild Stanton-Providence 69 kv 2&3 9.5 miles with 795 SCSR 11/30/2017 20.5 Reconductor 7 miles of the Lackawanna-Providence #1 & #2 69 kv with 795 ACSR 11/30/2017 15.1 Rebuild SUB2 Tap 1 (Lackawanna- Scranton 1) 69 kv 1.5 miles 556 ACSR 11/30/2017 1.5 Rebuild SUB2 Tap 2 Lackawanna- Scranton 2) 69 kv 1.6 miles 556 ACSR 11/30/2017 1.6 B2406.5 Create Providence - Scranton 69 kv 1&2, 3.5 miles 795 ACSR 11/30/2017 3.9 B2406.6 Rebuild Providence 69 kv Switchyard 11/30/2017 4 B2406.7 Install 2-10.8 MVAR Caps at EYNO 69 kv 11/30/2017 2 B2406.8 Rebuild Stanton 230 kv yard 11/30/2017 20 9

PPL Canceled Upgrades Upgrade ID Descreption Reason for Cancelation b1767 b1891 b1892 b1897 s0062 s0529 s0531 Install 6 motor-operated disconnect switches at Quarry substation Build a new 230/138 kv Yard at Lackawanna (138 kv conversion from Lackawanna to Jenkins) Rebuild the Throop Taps for 138 kv operation (138 kv Conversion from Lackawanna to Jenkins) Build a new 230/138 kv substation at Jenkins (138 kv Conversion from Lackawanna to Jenkins) Conestoga Substation: Upgrade Relay and Control Equipment Build a new Trumbauersville 69/12 kv substation by tapping the Buxmont - Springfield 69 kv line PPL Transmission Zone Recent analysis showed need for switches has been deferred. A new baseline project will be submitted in the future for Quarry Substation upgrades that will include this switch installation 138kV conversion projects are being changed to a more economical solution of rebuilding existing 69 kv circuits to higher capacity in and around the greater Scranton area 138kV conversion projects are being changed to a more economical solution of rebuilding existing 69 kv circuits to higher capacity in and around the greater Scranton area 138kV conversion projects are being changed to a more economical solution of rebuilding existing 69 kv circuits to higher capacity in and around the greater Scranton area Conestoga Substation is a Distribution substation only and will not need to be presented before the SRRTEP or TEAC This is a duplicate of s0347 which is the 69 kv Tap to the new Trumbauersville Substation Build a new Factoryville 69/12 kv substation by tapping This is a duplicate of s0348 which is the 69 kv Tap to the new the Martins Creek - Nazareth #3 69 kv line Factoryville Substation 10

PPL Transmission Zone PPL upgrades Scope changes Upgrade ID Description New Description s0416 New 69 kv Tap to West Hershey 69/13.2 kv substation New 69 kv tap to Cocoa 69/13.2 kv substation b1894 b1896 Rebuild and re-conductor 2.5 miles of the Stanton - Avoca 69 kv line Install 69 kv capacitor at North Stroudsburg 69/12 kv Substation Rebuild and re-conductor 8.1 miles of the Stanton - Avoca 69 kv line Install 138 kv capacitor at North Stroudsburg 138/12 kv Substation s0539 Modify 69 kv tap to convert to modified Twin A operation Lincoln 69-12 kv Substation: Convert to Modified Twin A 11

PPL Transmission Zone PPL upgrades Projected IS date Change Projected IS date Upgrade ID Description OLD NEW s0524 Rebuild approximately 8.5 miles to the new Double Circuit Siegfried- Hauto #1 & #2 138/69kV of the Hauto-Siegfried #1 & #4 and Siegfried- East Palmerton #1 & #2 (East Section) 12/31/2015 12/31/2016 s0525 Rebuild and reconductor approximately 6.9 miles of the Siegfried - East Palmerton #1 & #2 138/69 kv (East Section) 12/31/2015 12/31/2019 s0526 Rebuild and reconductor approximately 15.2 miles of the Hauto - Siegfried #1 & #2 138/69 kv (West Section) 12/31/2015 12/31/2019 12

Basecase Category C : Voltage magnitude and voltage drop violation at Front St., Plainfield and South Second St. for several category C contingencies. Proposed Solution: Install all 69kV lines to interconnect Plainfield, Greenbrook, and Bridgewater stations and establish the 69kV network. Install two 18MVAR capacitors at Plainfield and S. Second St substation. Install a second four (4) breaker 69kV ring bus at Bridgewater Switching Station (B2421). $ 41.94 M Expected IS Date: 6/1/2018 PSEG Transmission Zone 13

Short Circuit Upgrades

The Eddystone 138 kv breakers breakers #205 and #415 are overstressed PECO Transmission Area Significant Driver: Install a second Eddystone 230/138 kv transformer Proposed Solution: Increase the rating of the Eddystone 138kV breakers #205 and #415 (b2222.1 b2222.2) $500 K Required IS Date: 6/1/2017 15

Supplemental 3/1/2013

Supplemental Projects : To serve a new customer. Proposed Solution: Pride substation: Provide 115 kv meter point for AEC on the Somerset - Allegheny 115 kv line(s0639). $ 0.6 M Expected IS Date: 6/1/2014 PenElec Transmission Zone 17

Supplemental Projects : To provide a voltage support due to maintenance outage of the Mountain-Hunlock #1 66kV line and the subsequent loss of the Mountain - Lincoln St. 66kV line. Proposed Solution: Install 15MVAR capacitor at Hunlock 66kV substation (S0637). $ 0.289 M Expected IS Date: 6/1/2014 UGI Transmission Zone 18

Supplemental Projects : Improves physical security to critical sites and to comply with NERC v5 Physical Security. Proposed Solution: Implement physical security to 95 switching and substations (S0643). $ 8.75 M Expected IS Date: 12/31/2016 PSEG Transmission Zone 19

Supplemental Projects : Transmission Hardening Project to improve reliability due to natural disaster. To harden PSE&G s electric system due to the effects of previous severe storm damage to substations. Proposed (S0644). $ 1.276 M Expected IS Date: 12/31/2018 PSEG Transmission Zone 20