प वर स स टम ऑपर शन क प र शन स समट ड (भ रत रक र क उद यम)

Similar documents
Shortage

Shortage

Shortage

Shortage

Determination of Average Pooled Purchase Cost for FY

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Future Power Supply Scenario

Agenda Note for 29 th meeting of the Standing Committee on Power System Planning of Northern Region

Subject: Project No MW wind farm at Village Badabagh, District Jaisalmer, Rajasthan.

No.1/9/06-SP&PA/ Dated: As per List enclosed-

POWER SYSTEM OPERATION CORPORATION LIMITED NATIONAL LOAD DESPATCH CENTRE B-9, QUTUB INSTITUTIONAL AREA NEW DELHI

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

भ त क Government of India ववद य त म त र लय Ministry of Power उत त क ष त र य ववद य त वमवत Northern Regional Power Committee. -sd-

Thereafter, the agenda items were taken up.

Evacuation system from Chamera III HEP (231 MW).

Standing Committee on Power System Planning in Northern Region

I. Operational Feedback from NLDC:

8.Director(Operation) Delhi Transco Ltd. Shakti Sadan,Kotla Marg, New Delhi (Fax )

BSES. Date 4" May 231C. Ref RA/ /01/N 19

MD, PTCUL welcomed the participants and expressed his happiness for the opportunity of holding the meeting of the Standing Committee in Uttrakhand.

Overview of Indian Power Sector. February 29, 2008

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Indian Power System Framework

Power evacuation system for RAPP Generating Units No. 5,6 (2x220 MW) and 7,8 (2x700 MW).

The Electric Power System

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

HVDC Systems in India

Minutes of meeting held on at SLDC, Conference Hall at 03.00PM to discuss about High Voltage problems existing in the Grid.

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

1. Operational Feedback on Transmission Constraint: January 2015 & October Description of the. Antecedent constraints Conditions

List of Addresses. 1. Sh. V.Ramakrishna Member(Power system),cea, Sewa Bhawan, R.K. Puram, New Delhi 66

Government of India Central Electricity Authority SP&PA Division R.K. Puram, New Delhi

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

OPERATION & MAINTENANCE OF HVDC STATION

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen

वव षय: उतर क त क वव द त पण र ल य जन पर सथ य सवमवत क 40 व ब ठक क क यरव त

List of the participants is enclosed at Annexure I.

No. 1/9/SP&PA-2013 / Dated:

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

SOLUTIONS FOR LARGE POWER SYSTEM INTERCONNECTIONS. V. Sitnikov D. Povh, D. Retzmann E. Teltsch

Petition for Determination of Average Pooled Purchase Cost for FY

S.No. Proposed Transmission System for Power Evacuation Scheme of Solar Power Projects in Rajasthan

Dietmar Retzmann From Blackout towards a Smart Grid more Reliability and Flexibility with Power Electronics

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region

भ रतसरक र Government of India व द य तम त र लय Ministry of Power उत तरक ष त र यव द य तसवमवत Northern Regional Power Committee

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

POWER MAP OF EASTERN REGION Addtional Power Export to Bangladesh ALIPURDUAR - AGRA HVDC : 2000MW High Hydro - NER Surplus - Base Case

Role of System Operator in a Vibrant Power Market & Smart Grid

A Qualitative analysis of Power System Blackouts -Northern Grid Case Study

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

No. NRPC/OPR/107/01/2016/ Dated: फ स द श /FAX MESSAGE

Comparative Analysis of Grid Failures in Recent World History

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT

Use of Advanced Solutions for UHV Transmission

Government Of India Ministry of Power Central Electricity Authority New Delhi

No. उ. क ष. व. स./प रच लन/106/01/2017/ द न क: स व म : प रच लन समन वय उपसममत क सदस य To: Members of OCC

List of Grid Disturbances above 10 MW. Page 1 of 8

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

FREQUENCY RESPONSE CHARACTER- ISTICS OF AN INTERCONNECTED POWER SYSTEM - A CASE STUDY OF REGIONAL GRIDS IN INDIA

Transmission Line Survey

Executive Summary on Power Sector. Jul-18

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

No.: NERPC/COM/CC_Min/2016/ Dated: 13 th January 2017

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

Generation Projection (July Sep 2017)

Tender for Consultancy of Grid connected Rooftop Solar PV Power Plant over PGCIL(5MW) & CPRI(800KW) Premises under CAPEX mode

SPECIFICATIONS OF SELF PROPELLED REAPER

Annexure. Technical Details Package 1

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

Renewable Energy Integration- Transmission an Enabler

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Report. the feasibility of

Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

Power Electronics Projects

Transmission System Planning under Uncertainty in Indian Context

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1

Draft National Electricity Plan

THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL REFERRED TO ENVIRONMENTAL RESOURCES AND ENERGY, FEBRUARY 6, 2017 AN ACT

BPCL,Bottling Plant, Solapur, Pune, Bhitoni, Verna, Jalgoan, Nagpur, Indore

The agenda of the meeting has been uploaded on SLDC, Delhi website ( You are requested to make it convenient to attend the meeting

Chapter 4. Electricity Supply and Transmission System. In India, there are five regions namely, Northern Region, North Eastern Region,

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

Sewa Bhawan, R. K. Puram, New Delhi As per List Enclosed-

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

Indian Energy Exchange December For Public Use

Delhi-NCR. Ambient Air Quality Data of AIR LABORATORY. For the Month of November, 2017

Effect of Load Variation on Available Transfer Capability

Press Release. Deepawali Monitoring Report: Monitoring of Ambient Air & Noise Monitoring conducted

Transcription:

I. Regional Availability/Demand: Evening Peak (20:00 Hrs) MW Off Peak (03:00 Hrs) MW Day Energy (Net MU) Demand Met Shortage Requirement Freq* (Hz) Demand Met Shortage Requirement Freq* (Hz) Demand Met Shortage 55966 1714 57680 49.90 55926 1032 56958 49.92 1322.73 30.46 * Half hourly (two 15 minutes block--one block each before and after the designated time) average frequency II. A. 's Load Details (At s periphery) in MUs: Thermal Hydro Gas/Naptha/ Diesal Wind Other (/ Small hydro/ Co-Generation etc.) Total UI [OD:(+ve), UD: (-ve)] Drawal Schedule Actual Drawal UI Consumption Shortages * (Net MU) (Net MU) (Net MU) (Net MU) (MU) Punjab 108.29 13.77 4.16 2.66 128.88 113.56 112.76-0.80 241.64 Haryana 59.23 0.46 0.15 0.82 60.66 128.99 132.53 3.54 193.19 0.75 Rajasthan 133.12 3.87 7.04 9.83 4.25 158.21 62.03 67.47 5.44 225.69 10.89 Delhi 6.98 26.17 1.09 34.24 99.73 98.26-1.47 132.50 UP 209.26 19.20 2.80 6.00 237.26 171.72 174.05 2.33 411.31 9.22 Uttarakhand 15.71 6.57 0.67 22.95 18.29 20.68 2.39 43.63 1.43 HP 13.17 3.57 16.74 9.35 12.10 2.75 28.84 J & K 24.33 24.33 16.49 15.56-0.93 39.89 8.17 Chandigarh 5.67 6.04 0.37 6.04 Total 516.89 86.74 36.61 14.82 9.83 18.38 683.28 625.83 639.45 13.62 1322.73 30.46 * Shortage furnished by the respective constituent.$ Others include UP Co-generation and JK Diesel II. B. 's Demand Met in MWs: Evening Peak (20:00 Hrs) MW Demand Met Shortage UI प वर स स टम ऑपर शन क प र शन स समट ड (भ रत रक र क उद यम) उत तर क ष त र य भ र प र षण क द र CIN: U40105DL2009GOI188682 Power Supply Position in Northern Region for 21.06.2018 Date of Reporting : 22.06.2018 's Control Area Generation (Net MU) Off Peak (03:00 Hrs) MW STOA/PX transaction Demand Met Shortage UI STOA/PX transaction UI/OA/PX [OD/Import: (+ve), UD/Export: (-ve) Punjab 10129 160-3 1427 9470 0-47 1675 10553 15 160 Haryana 8284 125 311 1163 8292 623 225 1760 8642 22 143 Rajasthan 8951 102-2 -103 9570 170 354-879 9840 24 411 Delhi 5303 0-84 328 5680 0 113 421 6330 24 0 UP 17878 850-471 2359 18386 0 67 3287 18479 21 1250 Uttarakhand 2035 0 155 96 1873 0 278 240 2035 20 0 HP 1224 0-34 -1638 1077 0 24-1022 1429 13 0 J&K 1908 477 33-516 1355 239-77 -709 2026 21 507 Chandigarh 252 0-24 -10 222 0 17 0 304 15 0 Total 55966 1714-119 3105 55926 1032 954 4772 57510 21 2502 * STOA figures are at sellers boundary & PX figures are at regional boundary. # figures may not be at simultaneous hour. Diversity is 1.04 III. Regional Entities : UI [OG:(+ve), UG: (-ve)] / Inst. Capacity Declared Peak MW Off Peak MW Energy Average Schedule Constituent (Effective) MW Capacity(MW) (Gross) (Gross) (Net MU) Sentout(MW) Net MU A. NTPC Singrauli STPS (5*200+2*500) 2000 1175 1314 1336 29.33 1222 28.19 Rihand I STPS (2*500) 1000 847 1021 816 20.33 847 20.30 Rihand II STPS (2*500) 1000 471 507 502 11.51 479 11.28 Rihand III STPS (2*500) 1000 943 1019 1010 22.78 949 22.62 Dadri I STPS (4*210) 840 769 743 822 17.87 745 18.19 Dadri II STPS (2*490) 980 757 961 996 18.39 766 18.04 Unchahar I TPS (2*210) 420 382 405 406 8.92 372 9.14 Unchahar II TPS (2*210) 420 382 419 428 9.04 377 9.12 Unchahar III TPS (1*210) 210 191 209 213 4.52 188 4.55 Unchahar IV TPS(1*500) 500 ISTPP (Jhajjhar) (3*500) 1500 1000 1053 1055 23.76 990 23.95 Dadri GPS (4*130.19+2*154.51) 830 0 242 309 6.80 283 7.28 Anta GPS (3*88.71+1*153.2) 419 0 235 223 5.39 225 5.73 Auraiya GPS (4*111.19+2*109.30) 663 Dadri (5) 5 1 0 0 0 0.02 Unchahar (10) 10 2 0 0 0 Singrauli (15) 15 2 0 0 0.06 2 KHEP(4*200) 800 872 867 172 9.11 380 8.50 Sub Total (A) 12612 7794 8995 8288 188 7825 187 B. NPC NAPS (2*220) 440 374 398 413 8.83 368 8.98 RAPS- B (2*220) 440 354 399 413 8.67 361 8.50 RAPS- C (2*220) 440 405 447 451 9.63 401 9.78 Sub Total (B) 1320 1133 1244 1277 27.13 1130 27.26 C. NHPC Chamera I HPS (3*180) 540 534 544 0 5.67 236 5.50 Chamera II HPS (3*100) 300 296 300 203 5.28 220 5.20 Chamera III HPS (3*77) 231 229 153 163 3.92 163 3.84 Bairasuil HPS(3*60) 180 56 122 60 1.45 60 1.35 Salal-HPS (6*115) 690 630 660 683 15.82 659 15.12 Tanakpur-HPS (3*31.4) 94 46 51 50 1.30 54 1.11 Uri-I HPS (4*120) 480 410 471 441 10.36 431 9.84 Uri-II HPS (4*60) 240 232 243 241 5.67 236 5.57 Dhauliganga-HPS (4*70) 280 277 287 147 3.50 146 3.39 Dulhasti-HPS (3*130) 390 385 404 403 9.42 392 9.25 Sewa-II HPS (3*40) 120 125 129 0 0.41 17 0.37 Parbati 3 (4*130) 520 70 481 0 1.58 66 1.69 Kishanganga(3*110) 330 65 111 111 1.67 70 1.57 Sub Total (C ) 4395 3357 3955 2502 66 2752 64 D.SJVNL NJPC (6*250) 1500 1605 1504 950 27.86 1161 27.30 Rampur HEP (6*68.67) 412 442 434 295 7.99 333 7.58 Sub Total (D) 1912 2047 1938 1245 35.84 1494 34.88 E. THDC Tehri HPS (4*250) 1000 488 496 0 4.18 174 4.10 Koteshwar HPS (4*100) 400 100 277 102 2.49 104 2.40 Sub Total (E) 1400 588 773 102 6.67 278 6.50 F. BBMB Bhakra HPS (2*108+3*126+5*157) 1379 913 1156 659 21.92 913 21.91 Dehar HPS (6*165) 990 473 825 330 11.44 477 11.36 Pong HPS (6*66) 396 122 144 96 2.99 124 2.94 Sub Total (F) 2765 1509 2125 1085 36.34 1514 36.21 G. IPP(s)/JV(s) Allain DuhanganHPS(IPP) (2*96) 192 0 111 55 1.49 62 1.44 Karcham Wangtoo HPS(IPP) (4*250) 1000 0 1000 0 16.05 669 15.43 Malana Stg-II HPS (2*50) 100 0 55 0 0.90 38 0.85 Shree Cement TPS (2*150) 300 0 202 206 4.89 204 4.97 Budhil HPS(IPP) (2*35) 70 0 35 35 1.11 46 1.78 Sainj HPS (IPP) (2*50) 100 0 1.30 Sub Total (G ) 1762 0 1404 296 24.44 1018 24.47 H. Total Regional Entities (A-G) 26167 16428 20434 14795 384.27 16011 380.13 Demand Met (MW) and Time(Hrs) UI Net MU 1.14 0.03 0.23 0.16-0.32 0.35-0.22 - -0.03-0.19-0.48-0.34-0.02-0.01 0.61 0.79-0.15-0.15-0.13 0.70 0.19 0.52 0.11 0.04-0.11 2.25 0.56 0.41 0.96 0.09 0.01 0.13 0.62 - -0.67-0.03 4.14 Shortage (MW)

Effective Installed I. Entities Average(Sentout Capacity Peak MW Off Peak MW Energy(MU) (MW) MW) Punjab Guru Gobind Singh TPS (Ropar) (6*210) 1260 840 790 17.41 725 Guru Nanak Dev TPS(Bhatinda) (2*110+2*120) Guru Hargobind Singh TPS(L.mbt) (2*210+2*250) Goindwal(GVK) (2*270) Rajpura (2*700) Talwandi Saboo (3*660) 460 0 0-0.02-1 920 923 787 19.19 800 540 0 0 0.28 12 1400 1320 1320 31.75 1323 1980 1700 1700 39.69 1654 6560 4783 4597 108.29 4512 1000 520 471 13.77 574 303 0 0 2.66 111 859 0 0 4.16 173 1162 0 0 6.81 284 8722 5303 5068 128.88 5370 Total Punjab Haryana Panipat TPS (2*210+2*250) 920 457 452 11.33 472 DCRTPP (Yamuna nagar) (2*300) 600 543 519 12.45 519 Faridabad GPS (NTPC)(2*137.75+1*156) 432 0 0 0 RGTPP (khedar) (IPP) (2*600) 1200 922 905 21.23 884 Magnum Diesel (IPP) 25 0 0 0 Jhajjar(CLP) (2*660) 1320 615 615 14.23 593 4497 2537 2491 59.23 2468 62 13 29 0.46 19 106 0 0 0.82 34 50 0 0 0.15 6 156 0 0 0.97 40 Total Haryana 4715 2550 2520 60.66 2528 Rajasthan kota TPS (2*110+2*195+3*210) 1240 1020 1032 24.35 1014 suratgarh TPS (6*250) 1500 1342 1332 31.84 1327 Chabra TPS (4*250) 1000 921 931 21.74 906 Chabra TPS (1*660) 66 Dholpur GPS (3*110) 33 Ramgarh GPS(1*37.5 + 1*35.5 +2*37.5 +1*110 +1*50) 271 154 153 3.87 161 RAPS A (NPC) (1*100+1*200) 300 168 166 3.91 163 Barsingsar (NLC) (2*125) 250 219 163 4.88 203 Giral LTPS (2*125) 25 Rajwest LTPS (IPP) (8*135) 1080 943 946 22.70 946 VS LIGNITE LTPS (IPP) (1*135) 135 0 0 0 Kalisindh Thermal(2*600) 1200 560 556 13.37 557 Kawai(Adani) (2*660) 1320 598 608 14.25 594 9536 5925 5887 140.90 5871 550 3 0 4 Wind power 4292 128 1173 9.83 410 102 14 14 0.34 14 1995 28 0 7.04 293 Renewable/Others (Total) 6389 170 1187 17.21 717 Total Rajasthan 16475 6098 7074 158.21 6592 UP Anpara TPS (3*210+2*500) 1630 1308 1293 33.60 1400 Obra TPS (2*50+2*94+5*200) 1194 505 537 12.40 517 Paricha TPS (2*110+2*220+2*250) 1160 699 706 16.90 704 Panki TPS (2*105) 21 Harduaganj TPS (1*60+1*105+2*250) 665 535 543 12.90 538 Tanda TPS (NTPC) (4*110) 440 370 392 9.06 378 Roza TPS (IPP) (4*300) 1200 910 912 21.70 904 Anpara-C (IPP) (2*600) 1200 1092 1101 26.20 1092 Bajaj Energy Pvt.Ltd(IPP) TPS (10*45) 450 401 401 9.30 388 Anpara-D(2*500) 1000 909 910 21.80 908 Lalitpur TPS(3*660) 1980 1511 1499 26.20 1092 Bara(3*660) 1980 814 746 19.20 800 13109 9054 9040 209.26 8719 Vishnuparyag HPS (IPP)(4*110) 440 435 435 10.30 429 Alaknanada(4*82.5) 330 81 164 3.50 146 Other Hydro 527 270 287 5.40 225 Cogeneration 1360 250 250 6.00 250 26 0 0 0 472 0 0 2.80 117 498 0 0 2.80 117 Total UP 16264 10090 10176 237.26 9886 Uttarakhand Other Hydro 1250 680 520 15.71 655 Total Gas 450 269 284 6.57 274 127 0 0 0 100 0 0 0.67 28 Small Hydro (< 25 MW) 18 407 0 0 0.67 28 Total Uttarakhand 2107 949 804 22.95 956 Delhi Rajghat TPS (2*67.5) 135 0 0 0 Delhi Gas Turbine (6x30 + 3x34) 282 175 178 3.23 135 Pragati Gas Turbine (2x104+ 1x122) 330 268 267 6.52 272 Rithala GPS (3*36) 95 0 0 0 Bawana GPS (4*216+2*253) 1370 689 611 16.42 684 Badarpur TPS (NTPC) (3*95+2*210) 705 296 310 6.98 291 2917 1427 1365 33.15 1381 16 40 38 1.09 45 2 0 0 0 18 40 38 1.09 45 Total Delhi 2935 1467 1403 34.24 1427

HP Baspa HPS (IPP) (3*100) 300 263 333 5.81 242 Malana HPS (IPP) (2*43) 86 56 0 0.80 33 Other Hydro (>25MW) 372 279 269 6.55 273 Small Hydro (< 25 MW) 486 152 145 3.57 149 486 152 145 3.57 149 Total HP 1244 749 746 16.74 697 J & K Baglihar HPS (IPP) (3*150+3*150) 900 884 884 20.33 847 Other Hydro/IPP(including 98 MW Small Hydro) 308 170 174 4.00 167 Gas/Diesel/Others 19 Small Hydro (< 25 MW)Included in Other Hydro Above 98 0 0 0 98 0 0 0 Total J & K 1398 1054 1058 24.33 1014 Total Control Area Generation 53860 28261 28849 683.28 28470 J. Net Inter Regional Exchange [Import (+ve)/export (-ve)] 13036 14736.75 279.75 11656 Total Regional Availability(Gross) 80027 61731 58381 1347.30 56138 IV. Generation: Regional Entities Hydro Control Area Hydro Total Regional Hydro V. Total Renewable Generation: Regional Entities Renewable Control Area Renewable Total Regional Renewable 12564 10824 5161 173.56 7186 7468 4074 3994 86.74 4065 20032 14898 9155 260.30 11250 30 0 0 0.06 2 9214 362 1370 33.12 1380 9244 362 1370 33.18 1382 VI(A). Inter Regional Exchange [Import (+ve)/export (-ve)] [Linkwise] Element Peak(20:00 Hrs) Off Peak(03:00 Hrs Interchange (MW) Energy (MU) Net Energy MW MW Import Export Import Export MU Vindhychal(HVDC B/B) 250 250 250 50 5.48 0.09 5.39 765 KV Gwalior-Agra (D/C) 2204 2654 2654 0 55.24 55.24 400 KV Zerda-Kankroli -184-237 0 354 5.69-5.69 400 KV Zerda-Bhinmal -96-239 1 322 4.30-4.30 220 KV Auraiya-Malanpur 39 60 0 4 0.81-0.81 220 KV Badod-Kota/Morak -18 13 79 41 0.57 0.57 Mundra-Mohindergarh(HVDC Bipole) 2003 2002 2005 0 48.38 48.38 400 KV RAPPC-Sujalpur 310 217 310 0 5.84 5.84 400 KV Vindhyachal-Rihand 970 958 0 970 22.91-22.91 765 kv Phagi-Gwalior (D/C) 844 1243 1335 0 27.84 27.84 +/- 800 kv HVDC Champa-Kurushetra 1500 1500 1500 0 32.29 0 32.29 765KV Orai-Jabalpur 986 1346 1346 0 25.84 0 25.84 765KV Orai-Satna 1709 1811 1811 0 41.73 0 41.73 765KV Orai-Gwalior 361 386 0 438 9-9.41 Sub Total WR 10878 11965 243.20 43.20 20 400 kv Sasaram - Varanasi 264 232 264 0 5.68 5.68 400 kv Sasaram - Allahabad 108 142 170 0 3.30 3.30 400 KV MZP- GKP (D/C) 360 572 768 0 13.72 13.72 400 KV Patna-Balia(D/C) X 2 624 900 1047 0 20.41 20.41 400 KV B'Sharif-Balia (D/C) 406 524 556 0 12.03 12.03 765 KV Gaya-Balia 488 602 608 0 12.63 12.63 765 KV Gaya-Varanasi (D/C) -140-331 367 0 6.46 6.46 220 KV Pusauli-Sahupuri 194 200 208 0 4.52 4.52 132 KV K'nasa-Sahupuri 0.54-0.54 132 KV Son Ngr-Rihand 0.40-0.40 132 KV Garhwa-Rihand 0.00 765 KV Sasaram - Fatehpur -265-115 11 265 2.70-2.70 400 KV Motihari -GKP (D/C) 44 185 191 0 2.10 2.10 400 kv B'Sharif - Varanasi (D/C) 75-139 236 99 2.54 2.54 +/- 800 KV HVDC Alipurduar-Agra 0.00 Sub Total ER 2158 2772 83.39 3.64 79.75 +/- 800 KV HVDC BiswanathCharialli-Agra.00 Sub Total NER 0 0 Total IR Exch 13036 14737 326.59 46.84 279.75 VI(B). Inter Regional Schedule & Actual Exchanges [Import (+ve)/export (-ve)] [Corridor wise] ISGS/LT Schedule (MU) Bilateral Schedule (MU) Power Exchange Shdl (MU) Wheeling (MU) ER Bhutan Total Through ER Through WR Through ER Through WR Through ER Through WR 54.00 1.97 55.97 52.77 35.26 1.08 1.64 Total IR Schedule (MU) Through ER Through WR Inclds Mndra Total Total IR Actual (MU) Through ER(including NER) Through WR Total Through ER (including NER) Through WR Total 107.85 162.49 270.34 79.75 20 279.75-28.10 37.51 9.41 VI(C). Inter National Exchange with Nepal [Import (+ve)/export (-ve)] [Linkwise] Element 132 KV Tanakpur - Mahendarnagar Peak(20:00 Hrs) Off Peak(03:00 Hrs Interchange (MW) Energy (MU) Net IR UI (MU) Net Energy MW MW Import Export Import Export MU -28-17 0-29 0-1 0.53 VII. Frequency Profile <-------------------------------------------------- % of Time Frequency --------------------------------------------------> <49.2 <49.7 <49.8 <49.9 <50.0 49.9-5 5-5 5-50.20 >50.20 >50.50 3.80 33.10 75.80 62.00 4.80 0.20 <------------------------- Frequency (Hz) -------------------------> Average Frequency Frequency in 15 Min Block Frequency Variation Std. Dev. MAX MIN Freq Dev Index (% of Time) Freq Time Freq Time Hz Index (Hz) (Hz) 50.12 16.24 49.72 2.14 49.94 0.097 0.075 50.07 49.80 38.00

VIII(A). Voltage profile 400 kv Voltage Voltage (in % of Time) Voltage Level (kv) Deviatio Voltage(KV) Time Voltage (KV) Time <380 kv <390 kv >420 kv >430 kv n Index Rihand 400 404 01:24 399 09:55 0.0 0.0 0.0 0.0 0.0 Gorakhpur 400 414 07:01 391 20:16 0.0 0.0 0.0 0.0 0.0 Bareilly(PG)400kV 400 407 06:00 386 01:24 0.0 0.1 0.0 0.0 0.0 Kanpur 400 412 07:00 400 20:08 0.0 0.0 0.0 0.0 0.0 Dadri 400 411 06:00 398 14:24 0.0 0.0 0.0 0.0 0.0 Ballabhgarh 400 409 06:01 395 11:10 0.0 0.0 0.0 0.0 0.0 Bawana 400 410 06:00 396 00:23 0.0 0.0 0.0 0.0 0.0 Bassi 400 413 18:17 394 00:35 0.0 0.0 0.0 0.0 0.0 Hissar 400 406 07:01 394 09:58 0.0 0.0 0.0 0.0 0.0 Moga 400 405 06:01 394 11:08 0.0 0.0 0.0 0.0 0.0 Abdullapur 400 411 06:01 396 00:51 0.0 0.0 0.0 0.0 0.0 Nalagarh 400 409 04:21 394 14:29 0.0 0.0 0.0 0.0 0.0 Kishenpur 400 406 04:00 399 10:42 0.0 0.0 0.0 0.0 0.0 Wagoora 400 402 01:24 391 20:26 0.0 0.0 0.0 0.0 0.0 Amritsar 400 404 06:01 393 12:35 0.0 0.0 0.0 0.0 0.0 Kashipur 400 402 00:00 402 00:00 0.0 0.0 0.0 0.0 0.0 Hamirpur 400 400 05:17 389 10:46 0.0 0.4 0.0 0.0 0.0 Rishikesh 400 408 06:01 388 20:10 0.0 0.6 0.0 0.0 0.0 VIII(B). Voltage profile 765 kv Voltage Voltage (in % of Time) Voltage Level (kv) Deviatio Voltage(KV) Time Voltage (KV) Time <728 kv <742 kv >800 kv >820 kv n Index Fatehpur 765 777 07:06 744 20:10 0.0 0.0 0.0 0.0 0.0 Balia 765 778 07:06 747 20:11 0.0 0.0 0.0 0.0 0.0 Moga 765 783 06:03 761 00:38 0.0 0.0 0.0 0.0 0.0 Agra 765 784 18:17 758 00:38 0.0 0.0 0.0 0.0 0.0 Bhiwani 765 786 06:01 763 10:28 0.0 0.0 0.0 0.0 0.0 Unnao 765 764 07:00 617 15:15 0.0 4.9 0.0 0.0 0.0 Lucknow 765 778 07:00 747 20:10 0.0 0.0 0.0 0.0 0.0 Meerut 765 788 06:01 761 00:36 0.0 0.0 0.0 0.0 0.0 Jhatikara 765 782 07:02 755 11:10 0.0 0.0 0.0 0.0 0.0 Bareilly 765 kv 765 778 06:02 748 20:10 0.0 0.0 0.0 0.0 0.0 Anta 765 787 18:23 744 01:28 0.0 0.0 0.0 0.0 0.0 Phagi 765 790 18:16 755 01:28 0.0 0.0 0.0 0.0 0.0 Note : "0" in Max / Min Col -> Telemetry Outage IX. Reservior Parameters: Name of Parameters Present Parameters Last Year Last day Reservior FRL (m) MDDL (m) Level (m) Energy (MU) Level (m) Energy (MU) Inflow (m 3 /s) Usage (m 3 /s) Bhakra 513.59 445.62 459.00 121.49 476.75 387.82 433.59 909.90 Pong 426.72 384.05 390.99 67.89 392.75 93.10 23.81 253.18 Tehri 829.79 740.04 740.80 4.65 742.65 12.49 160.42 155.00 Koteshwar 612.50 598.50 610.66 4.95 610.57 4.74 155.00 164.60 Chamera-I 76 748.75 751.96 158.28 153.89 Rihand 268.22 252.98 RPS 352.80 343.81 Jawahar Sagar 298.70 295.78 RSD 527.91 487.91 502.59 4.53 513.79 7.79 144.53 218.20 * NA: Not Available X(A). Short-Term Open Access Details: Off- Peak Hours (03:00 Hrs) Peak Hours (20:00 Hrs) Day Energy (MU) Bilateral (MW) IEX (MW) PXIL (MW) Bilateral (MW) IEX (MW) PXIL (MW) Bilateral (MU) IEX / PXIL (MU) Total (MU) Punjab 1675 0 0 1427 0 0 38.90 38.90 Delhi 1167-746 0 1075-747 0 28.58-13.35 15.23 Haryana 1759 1 0 1616-453 0 32.77-3.57 29.20 HP -1290 268 0-1387 -251 0-26.95 2.34-24.61 J&K -1094 385 0-1094 578 0-26.25 15.55-10.70 CHD 0 0 0 0-10 0 Rajasthan -52-827 0-52 -51 0-1.25-3.25-4.50 UP 2199 1087 0 1903 456 0 47.57 4.20 51.77 Uttarakhand -139 378 0-139 234 0-3.33 6.19 2.86 Total 4225 547 0 3349-244 0 90.04 8.28 98.32 X(B). Short-Term Open Access Details: Bilateral (MW) IEX (MW) PXIL (MW) Punjab 1675 1427 0 0 0 0 Delhi 1277 1066 0-1314 0 0 Haryana 1759 1042 305-705 0 0 HP -907-1489 482-251 0 0 J&K -1094-1094 789-4 0 0 CHD 0 0 63-30 0 0 Rajasthan -52-52 20-975 0 0 UP 2233 1848 1272-407 0 0 Uttarakhand -138-139 437 4 0 0 XI. System Reliability Indices(Violation of TTC and ATC): (i)%age of times N-1 Criteria was violated in the inter - regional corridors WR 3.82% ER % Simultaneous 0.35% (ii)%age of times ATC violated on the inter-regional corridors WR 30.56% ER % Simultaneous 14.58% (iii)%age of times Angular Difference on Important Buses was beyond permissible limits(40 deg.)

Rihand - Dadri % XII. Zero Crossing Violations No. of violations( 8 in a day) number of continuous blocks without sign change Punjab 2 15 Haryana 2 16 Rajasthan 4 24 Delhi 4 42 UP 1 18 Uttarakhand 5 26 HP 6 72 J & K 2 29 Chandigarh 6 75 XIII.System Constraints: XIV. Grid Disturbance / Any Other Significant Event: XV. Weather Conditions For 21.06.2018 : XVI. Synchronisation of new generating units : XVII. Synchronisation of new 220 / 400 / 765 KV lines and energising of bus / /substation : XVIII. Tripping of lines in pooling stations : XIX. Complete generation loss in a generating station : Note: Data(regarding drawal,generation, shortage, inter-regional flows and reservoir levels)of the constituents filled in the report are as per last furnished data by the respective state/constituent to NRLDC. Report for : 21.06.2018 प र प रभ र अभभय त / SHIFT CHARGE ENGINEER