Work Package 3 More electrification in Europe: directions from the ELIPTIC transferability exercise

Similar documents
Technological Viability Evaluation. Results from the SWOT Analysis Diego Salzillo Arriaga, Siemens

ELIPTIC - optimising existing electric Public Transport infrastructure Thomas Mourey Polis

ELIPTIC. Planning a charging infrastructure for electric vehicles using Barcelona s rail network Eliptic Project. April EBERSWALDE LONDRES

ELIPTIC results & recommendations

Perception of converted trolleybuses and promotion strategy for trolleybuses in Gdynia

TBC ADMINISTRATIVE MATTERS:

CIVITAS ELIPTIC 3rd Webinar: Experiences from European cities in using electric public transport infrastructure for the charging of other e-vehicles

Technology and future of electric buses

Findings from the Limassol SUMP study

European Bus System of the Future

Zero Emission Urban Bus System: bringing electrification to the heart of the urban bus network

Duration: 04/18 09/20 (30 months) Budget: Funding:

Szeged Final Use Case Report

Positive Energy Roads CALL FOR PROPOSALS

ELIPTIC Final Conference

Labelling Smart Roads DISCUSSION PAPER 4/2015

GEAR 2030 Working Group 1 Project Team 2 'Zero emission vehicles' DRAFT RECOMMENDATIONS

WP 2 ELIPTIC Use Cases Upgrading and/or regenerating electric public transport systems (flywheel, reversible substations)

The deployment of public transport innovation in European cities and regions. Nicolas Hauw, Polis

Investing in the city Lessons from 47 light-rail projects

TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING

What We Heard Report - Metro Line NW LRT

Mobility As A Service: Czech approach to MAAS

Introduction: TROLLEY Optimised energy use for trolleybus systems

ehighway The efficient and cost-effective solution for heavy duty road transport Siemens AG 2014 All rights reserved. siemens.

Respecting the Rules Better Road Safety Enforcement in the European Union. ACEA s Response

RESPONSE TO THE DEPARTMENT FOR TRANSPORT AND DRIVER AND VEHICLE STANDARDS AGENCY S CONSULTATION PAPER

Lead Implementation Partner Smart City Challenge. Revolutionizing Transportation and Achieving Energy Security

SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION

Experiences in the field of electric mobility in Katowice

The Montreal Transit Agency s

The European Bus System of the Future comes to cities across Europe

Presentation of the European Electricity Grid Initiative

CIVITAS FORUM September 29 th Gdynia (PL) CTM Spa Cagliari - Italy

Geneva, 67th SC.2 Session October 2013 High Speed Trains Master Plan

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET

Written Exam Public Transport + Answers

Helsinki Pilot. 1. Background. 2. Challenges st challenge

Electric Vehicles and the Environment (EVE IWG)

Innovation in Transport. Mike Waters

European Bus System of the Future 2

Green Line LRT: Beltline Segment Update April 19, 2017

Tendering Public Charging Infrastructure for Electric Vehicles

Innovation and Transformation of Urban Mobility Role of Smart Demand Responsive Transport (DRT) service

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust

UfM Ministerial Declaration on Energy

Service Quality: Higher Ridership: Very Affordable: Image:

Zero Emission Urban Bus System: bringing electrification to the heart of the urban bus network

TALENT 3 BATTERY TRAIN

Advancing Electric Buses In Metro Vancouver. David Cooper TransLink, Senior Planner, System Planning Vancouver, British Columbia

Measurement and Monitoring CO2 Emissions from HDV UITP input

An Asset Management Plan for Transit And Access Transit Fleet

The future of Public Transport is electric the ebus

Results of the High V.LO-City & HyTRANSIT projects

Market development for green cars. Geneva, 24 April 2012 Andrea Beltramello, Directorate for Science, Technology and Industry, OECD

Strategic Plan

Sofia Urban Transport challenges and strategies

Electrical Energy Engineering Program EEE

Economic and Social Council

Electric mobility: Options for enhancing sustainable local transport in tourist destinations

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

Electric buses Solutions portfolio

RI Power Sector Transformation Con Edison Experiences. May 31 st, 2017

Putting electric buses at the core of public transport

Climate Change. November 29, 2018 Growth Management Policy Board

Recommended Vision for the Downtown Rapid Transit Network

The Midas Touch Guide for Communication Management, Research and Training/ Education Divisions Page 2

Research Brief. Feasibility study into raising and lowering pantographs while trains are in motion. T778 - July Overview. Aims.

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, July 2001 Item 3 (b) of the provisional agenda

The deployment of public transport innovation in European cities and regions. Nicolas Hauw, Polis

MEDIA RELEASE. June 16, 2008 For Immediate Release

ELENA Introduction and Update. European Investment Bank

Fuel Economy: How Will Consumers Respond?

Automatic Electronic Gas Metering Management in Italy

Informal document No. 1

Consumers, Vehicles and Energy Integration (CVEI) project

Status of the review of the General Safety and Pedestrian Safety Regulations

TOWARDS THE ELECTRIFICATION OF PUBLIC TRANSPORT VIA PUBLIC-PRIVATE PARTNERSHIP THE EXAMPLE OF LUXEMBOURG

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Introduction to transmission network characteristics - technical features. Slobodan Markovic EKC Athens,

Powertrain Acceptance & Consumer Engagement Study. Chrysler Powertrain Research March

The ERANET+ «Electromobility» - project

Energy efficiency strategy in public electric transport an implemented practical case of a trollleybus operator in Gdynia

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

GEODE Report: Flexibility in Tomorrow s Energy System DSOs approach

EUROPEAN (E)BUS SCENARIO EUROPE S ZEEUS PROJECT

STAFF REPORT ACTION REQUIRED

Consumers, Vehicles and Energy Integration (CVEI) project

HDV CO2 emission certification 1 st meeting of the Editing board

SOLUTIONS Training Kit Cluster 1: Public Transport.

Grid Stability Analysis for High Penetration Solar Photovoltaics

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Life Needs Power, Hannover Messe, April 24, 2018 The role of smart and strong grids in Europe s energy transition

High Quality Service through Continuous Improvement st Quarter Performance Report

HEV, EV, Diesel Technology ; Indian trends and Role of Government for supporting

Retrofitting unlocks potential

Facilitated Discussion on the Future of the Power Grid

Green emotion Development of a European framework for electromobility

Efficient & Sustainable City Bus Services

Planning of electric bus systems

Transcription:

Work Package 3 More electrification in Europe: directions from the ELIPTIC transferability exercise Maria Vittoria Corazza, Antonio Musso, UNIROMA1 ELIPTIC Final Conference Bremen, April 26-27 th 2018

Evaluation framework Eventually we are here.. In progress + CBA In progress

UNIROMA1 Evaluation steps Task 3.6 TRANSFERABILITY EXERCISE What it is? Hence, is the ability to transfer/adopt in a given city successful measures previously adopted elsewhere, comparable results being achieved Eliptic use cases = origin cities Respondents = target cities

UNIROMA1 Evaluation steps Task 3.6 TRANSFERABILITY EXERCISE Preparation of the methodology (done) Development of the Exercise (close to the end) Analysis of results (in progress) Deliverable 3.6 (in progress)

Preparation of the methodology Task 3.4 Task 3.5 Results from the ELIPTIC Scenarios Results from the SWOT analysis Scientific and grey literature Past Experience (EBSF, Saferbrain, )

Task 3.4 Results from the ELIPTIC Scenarios KPIs ELIPTIC scenario measured either small improvements or no variations in the performance they were associated to For ex. Improvements in the fields of capacity or pax demand ( A7 Oberhausen, A11 Szeged) No performance variation means that ELIPTIC innovations worked well and did not generate problems or delays during the demonstration activities, thus stressing their prospective, smooth, full introduction in the regular service

Preparation of the methodology Still available @ https://qeurope.eu.qualtr ics.com/jfe/form/sv_2aze OQn0FBFMYx7 Divided into 2 parts: a) General introduction b) Technology concept section At least 2 Technology concepts to be choosen among: Pillar A - Progressive replacement of conventional buses with hybrid trolleybuses Pillar A- Opportunity (re)charging of electric buses Pillar B - Upgrading and/or regenerating electric PT systems, via energy recuperation and or management Pillar C - Multipurpose use of electric PT infrastructure

Preparation of the methodology Divided into 2 parts: a) General introduction

Preparation of the methodology Divided into 2 parts: a) General introduction Sample Questions on General Attitude towards the Electric Technology

Preparation of the methodology Divided into 2 parts: b)technology concept section includes: a short reminder of what has been done in the ELIPTIC use cases where that technological concept was applied/studied requests to : state the priority which will theoretically prompt the transfer to the target city, by ticking on one among the following options: a. productivity of the service, b. customer care, c. environmental reasons, d. quality of the service

Preparation of the methodology Divided into 2 parts: b)technology concept section includes: 2) rate a series of pros and cons associated to that technological concept in case of its transfer to the target city, by ticking on the most appropriate statement, as provided; pros and cons were associated to the following evaluation categories: operations, economy, energy, environment, people and technology

Preparation of the methodology Divided into 2 parts: b)technology concept section includes: 3) rate how much it is likely to theoretically transfer that technological concept according to some KPIs prospective results, again by ticking on the most appropriate statement.

Preparation of the methodology Open to innovate = change, ELIPTIC Scenarios Very likely to keep the status quo = no change, NO ELIPTIC

Preparation of the methodology WEIGHT Simple Multi-Attribute Rating Technique (SMART) method for determining the weights for each respondent and for the group of respondents Weighting and assessing ASSESS ELimination Et Choix Traduisant la REalit e (Elimination and Choice Expressing Reality (ELECTRE) method to approach Multiple-Criteria Decision Analysis

Development of the Exercise Preliminary, slightly shorter session Dec. 2017 - Jan. 2018 Target: NON ELIPTIC Experts Full session Feb 2018, ongoing Target: NON & ELIPTIC Experts (UF Members)

58 respondents involved, worldwide Focus on the Technology concept: Pillar A - Progressive replacement of conventional buses (CB) with hybrid trolleybuses (HT)

1- Attitude towards the Electric Technology: Available options ET is viable in general ET contributes to the environmental safeguard The community asks for more ET-based transit options ET contributes to reduce costs Operations benefit from ET ET helps operators manage the energy requirements in a more balanced way

TRANSFERABILITY EXERCISE Analysis of preliminary results 1- Attitude towards the Electric Technology ELIPTIC NO ELIPTIC/ STATUSQUO ACADEMICIANS PT OPERATORS EXPERTS PT USERS

TRANSFERABILITY EXERCISE Analysis of preliminary results EXPERTS 2- PRIORITY WHICH LEADS TO TRANSFER ACADEMICIANS PT USERS

Analysis of preliminary results 13% 2- PRIORITY WHICH LEADS TO TRANSFER Weight Attribution (Cadiz, Spain) 25% 25% 12% 25% customer care energy efficiency productivity of the service quality of the service environmental conditions Weight Attribution (Pilsen, CZ) 22% 19% 19% 24% 16% customer care energy efficiency productivity of the service quality of the service environmental conditions PT OPERATORS Weight Attribution (Reykjavik, Iceland) Weight Attribution (Copenhagen, DK) customer care Weight Attribution (Rome, Italy) customer care 20% 19% 21% 21% 19% customer care energy efficiency productivity of the service quality of the service environmental conditions 25% 50% 0% 25% energy efficiency productivity of the service quality of the service environmental conditions 3% 17% 33% 30% 17% energy efficiency productivity of the service quality of the service environmental conditions

Transport Operators

Transport Operators 3- KEY DRIVERS TO TRANSFER HYBRID TROLLEYBUSES AND REPLACE CONVENTIONAL BUSES

Transport Operators 3- ACTUAL BARRIERS TO TRANSFER HYBRID TROLLEYBUSES AND REPLACE CONVENTIONAL BUSES

Transport Operators 3- ACTUAL BARRIERS TO TRANSFER HYBRID TROLLEYBUSES AND REPLACE CONVENTIONAL BUSES The most important factor is price for 1 vkm. Of course, bidder can propose performance of services with electric vehicles, but would have no chance to beat bidders with diesel buses, because of, not only the price of e-bus, but also costs of infrastructure. KZK GOP, Katowice

Transport Operators 3- ACTUAL BARRIERS TO TRANSFER HYBRID TROLLEYBUSES AND REPLACE CONVENTIONAL BUSES Trolleybuses and hybrid trolleybuses are no on the agenda for Movia as there is not an interest from local authorities to invest in a catenary based bus transport system as the local authorities do not like catenaries in the cities. Movia Trafik, Copenhagen We will never have trolley buses with energy from overhead lines. There are no overhead lines in Reykjavik greater area and also the number of inhabitants will never at least for next 50 years bear such an investment as light rails or trolleybus. Stræto bs, Reykjavik

Transport Operators Compulsory to follow green/electric policies Top "Neutral" Counts 2 Top I don t know" Counts Wiring is a constraint 2 Size of batteries limits passenger capacity 2 Demo projects 2 Less noisy means less safe for pedestrians 3 0 0.5 1 1.5 2 2.5 3 3.5

Transport Operators Performance role (KPIs variations) From the results obtained from the aggregated analysis of all transport operators, all of them have given positive feedbacks in all KPIs, that is they are willing to transfer HT given an improvement of up to 5% or even with no improvement. However, only one respondent has answered No, even with an improvement of the associated performance up to 5% regarding the vehicle capital costs.

Experts 3- TOP 15 KEY DRIVERS TO TRANSFER HYBRID TROLLEYBUSES AND REPLACE CONVENTIONAL BUSES

Experts 3- TOP 15 KEY BARRIERS TO TRANSFER HYBRID TROLLEYBUSES AND REPLACE CONVENTIONAL BUSES

Experts Performance role (KPIs variations) Most of the experts believe that ELIPTIC HTs should be implemented, especially when there would be increase in the passenger demand and durability of the vehicles. These two KPIs are considered significant in implementing such technology since the lifetime of a vehicle would define if the electric technology is worth to be transferred, which also affects the decisions on the investments. On the other hand, even if there is a growth or no in the passenger demand, the hybrid- trolleybuses are still worth to be implemented. However, a decrease in passenger demand would be unacceptable.

Academicians 3- TOP 15 KEY DRIVERS TO TRANSFER HYBRID TROLLEYBUSES AND REPLACE CONVENTIONAL BUSES

Academicians 3- TOP 15 KEY BARRIERS TO TRANSFER HYBRID TROLLEYBUSES AND REPLACE CONVENTIONAL BUSES

Academicians Performance role (KPIs variations) Most of the most of the respondents agreed to adopt such technology both with and without improvements. High scores are obtained by: Bus reliability i.e. vehicles arrive on time (Operations); Noise exposure (Environment); Emissions (Environment); Attractiveness (People); and, Usage of clean vehicles (Energy). Thus, with or without improvement, adopting such technology would be worth it to safeguard the environment whilst having quality, attractive, and environmental friendly services..

End Users 3- TOP 15 KEY DRIVERS TO TRANSFER HYBRID TROLLEYBUSES AND REPLACE CONVENTIONAL BUSES

End Users 3- TOP 15 KEY BARRIERS TO TRANSFER HYBRID TROLLEYBUSES AND REPLACE CONVENTIONAL BUSES

End Users Performance role (KPIs variations) Mixed feelings. Some users are not supposing any improvement in regularity and service coverage given that there would be an increase in dwell time due to charging and schedule adjustments. Meanwhile, for the economy, costs are also not expected to raise, whereas an increase in the demand of the electric vehicles for public transportation is to be expected.

To summarize.

To summarize. Data collection on the ELIPTIC User Forum members session is going to end Data will be compared with the findings of the preliminary session and all duly reported in Del. 3.6

Thank you very much! Questions? antonio.musso@uniroma1.it mariavittoria.corazza@uniroma1.it