Shortage

Similar documents
प वर स स टम ऑपर शन क प र शन स समट ड (भ रत रक र क उद यम)

Shortage

Shortage

Shortage

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

Determination of Average Pooled Purchase Cost for FY

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Future Power Supply Scenario

Agenda Note for 29 th meeting of the Standing Committee on Power System Planning of Northern Region

Subject: Project No MW wind farm at Village Badabagh, District Jaisalmer, Rajasthan.

No.1/9/06-SP&PA/ Dated: As per List enclosed-

POWER SYSTEM OPERATION CORPORATION LIMITED NATIONAL LOAD DESPATCH CENTRE B-9, QUTUB INSTITUTIONAL AREA NEW DELHI

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Thereafter, the agenda items were taken up.

भ त क Government of India ववद य त म त र लय Ministry of Power उत त क ष त र य ववद य त वमवत Northern Regional Power Committee. -sd-

Evacuation system from Chamera III HEP (231 MW).

Standing Committee on Power System Planning in Northern Region

I. Operational Feedback from NLDC:

8.Director(Operation) Delhi Transco Ltd. Shakti Sadan,Kotla Marg, New Delhi (Fax )

MD, PTCUL welcomed the participants and expressed his happiness for the opportunity of holding the meeting of the Standing Committee in Uttrakhand.

BSES. Date 4" May 231C. Ref RA/ /01/N 19

Overview of Indian Power Sector. February 29, 2008

Power evacuation system for RAPP Generating Units No. 5,6 (2x220 MW) and 7,8 (2x700 MW).

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Indian Power System Framework

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

The Electric Power System

HVDC Systems in India

Minutes of meeting held on at SLDC, Conference Hall at 03.00PM to discuss about High Voltage problems existing in the Grid.

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

1. Operational Feedback on Transmission Constraint: January 2015 & October Description of the. Antecedent constraints Conditions

Government of India Central Electricity Authority SP&PA Division R.K. Puram, New Delhi

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

वव षय: उतर क त क वव द त पण र ल य जन पर सथ य सवमवत क 40 व ब ठक क क यरव त

List of Addresses. 1. Sh. V.Ramakrishna Member(Power system),cea, Sewa Bhawan, R.K. Puram, New Delhi 66

OPERATION & MAINTENANCE OF HVDC STATION

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen

List of the participants is enclosed at Annexure I.

No. 1/9/SP&PA-2013 / Dated:

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

SOLUTIONS FOR LARGE POWER SYSTEM INTERCONNECTIONS. V. Sitnikov D. Povh, D. Retzmann E. Teltsch

Petition for Determination of Average Pooled Purchase Cost for FY

S.No. Proposed Transmission System for Power Evacuation Scheme of Solar Power Projects in Rajasthan

Dietmar Retzmann From Blackout towards a Smart Grid more Reliability and Flexibility with Power Electronics

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region

भ रतसरक र Government of India व द य तम त र लय Ministry of Power उत तरक ष त र यव द य तसवमवत Northern Regional Power Committee

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

POWER MAP OF EASTERN REGION Addtional Power Export to Bangladesh ALIPURDUAR - AGRA HVDC : 2000MW High Hydro - NER Surplus - Base Case

Role of System Operator in a Vibrant Power Market & Smart Grid

A Qualitative analysis of Power System Blackouts -Northern Grid Case Study

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

No. NRPC/OPR/107/01/2016/ Dated: फ स द श /FAX MESSAGE

No. उ. क ष. व. स./प रच लन/106/01/2017/ द न क: स व म : प रच लन समन वय उपसममत क सदस य To: Members of OCC

Comparative Analysis of Grid Failures in Recent World History

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT

Use of Advanced Solutions for UHV Transmission

Government Of India Ministry of Power Central Electricity Authority New Delhi

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

Annexure. Technical Details Package 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

List of Grid Disturbances above 10 MW. Page 1 of 8

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

FREQUENCY RESPONSE CHARACTER- ISTICS OF AN INTERCONNECTED POWER SYSTEM - A CASE STUDY OF REGIONAL GRIDS IN INDIA

Transmission Line Survey

Executive Summary on Power Sector. Jul-18

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

No.: NERPC/COM/CC_Min/2016/ Dated: 13 th January 2017

Report. the feasibility of

Generation Projection (July Sep 2017)

Tender for Consultancy of Grid connected Rooftop Solar PV Power Plant over PGCIL(5MW) & CPRI(800KW) Premises under CAPEX mode

SPECIFICATIONS OF SELF PROPELLED REAPER

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

Renewable Energy Integration- Transmission an Enabler

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Nepal Power Investment Summit Transmission Line Projects

Power Electronics Projects

Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

Sewa Bhawan, R. K. Puram, New Delhi As per List Enclosed-

Transmission System Planning under Uncertainty in Indian Context

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

Draft National Electricity Plan

THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL REFERRED TO ENVIRONMENTAL RESOURCES AND ENERGY, FEBRUARY 6, 2017 AN ACT

BPCL,Bottling Plant, Solapur, Pune, Bhitoni, Verna, Jalgoan, Nagpur, Indore

Bangladesh s Power Sector : At a Glance

The agenda of the meeting has been uploaded on SLDC, Delhi website ( You are requested to make it convenient to attend the meeting

Chapter 4. Electricity Supply and Transmission System. In India, there are five regions namely, Northern Region, North Eastern Region,

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

received 1. Shyang (3 MW)- Completed 2. Tangling (5 MW)- Completed 3. Shaung (interim) (3 MW)--completed 4 Brua (Interim) (9 MW) - Completed

Transcription:

I. Regional Availability/Demand: Evening Peak (20:00 Hrs) MW Off Peak (03:00 Hrs) MW Day Energy (Net MU) Demand Met Shortage Requirement Freq* (Hz) Demand Met Shortage Requirement Freq* (Hz) Demand Met Shortage 55134 1014 56148 49.93 53918 828 54745 49.86 1304.19 28.80 * Half hourly (two 15 minutes block--one block each before and after the designated time) average frequency II. A. 's Load Details (At s periphery) in MUs: Thermal Hydro Gas/Naptha/ Diesal Wind Other (/ Small hydro/ Co-Generation etc.) Total UI [OD:(+ve), UD: (-ve)] Drawal Schedule Actual Drawal UI Consumption Shortages * (Net MU) (Net MU) (Net MU) (Net MU) (MU) Punjab 98.14 14.25 4.16 2.66 119.20 111.16 109.97-1.19 229.17 4.56 Haryana 57.45 0.45 0.15 0.95 58.99 128.84 131.98 3.14 190.97 4.30 Rajasthan 124.07 3.52 10.25 17.03 4.41 159.28 65.84 66.32 0.48 225.60 1.85 Delhi 6.98 22.51 29.49 97.20 97.09-0.11 126.57 UP 208.86 16.20 3.10 6.00 234.16 168.41 171.33 2.92 405.50 6.16 Uttarakhand 23.03 6.60 0.77 30.39 18.15 19.90 1.75 50.29 1.91 HP 13.08 4.09 17.17 7.81 10.88 3.07 28.06 J & K 25.19 25.19 16.71 17.03 0.32 42.22 10.02 Chandigarh 5.65 5.82 0.17 5.82 Total 495.50 92.18 32.63 18.43 17.03 18.11 673.87 619.77 630.32 10.55 1304.19 28.80 * Shortage furnished by the respective constituent.$ Others include UP Co-generation and JK Diesel II. B. 's Demand Met in MWs: Evening Peak (20:00 Hrs) MW Demand Met Shortage UI प वर स स टम ऑपर शन क प र शन स समट ड (भ रत रक र क उद यम) उत तर क ष त र य भ र प र षण क द र CIN: U40105DL2009GOI188682 Power Supply Position in Northern Region for 20.06.2018 Date of Reporting : 21.06.2018 's Control Area Generation (Net MU) Off Peak (03:00 Hrs) MW STOA/PX transaction Demand Met Shortage UI STOA/PX transaction UI/OA/PX [OD/Import: (+ve), UD/Export: (-ve) Punjab 9856 0-208 1427 9058 0 87 1427 10184 23 0 Haryana 8165 25 154 1086 8800 0 239 1796 8800 3 0 Rajasthan 8494 0-253 -100 8860 0 107-66 9886 16 0 Delhi 5141 0 110 32 5412 0 32 184 6204 24 0 UP 18074 520-171 2163 17636 440 220 2558 18236 24 60 Uttarakhand 2066 0 216 5 1624 150-20 111 2124 21 0 HP 1205 0-151 -1510 986 0-85 -1222 1426 11 0 J&K 1876 469-71 -457 1347 238-61 -808 2041 21 510 Chandigarh 256 0-9 -30 195 0 2 0 296 15 0 Total 55134 1014-382 2615 53918 828 520 3979 56683 22 1168 * STOA figures are at sellers boundary & PX figures are at regional boundary. # figures may not be at simultaneous hour. Diversity is 1.04 III. Regional Entities : UI [OG:(+ve), UG: (-ve)] / Inst. Capacity Declared Peak MW Off Peak MW Energy Average Schedule Constituent (Effective) MW Capacity(MW) (Gross) (Gross) (Net MU) Sentout(MW) Net MU A. NTPC Singrauli STPS (5*200+2*500) 2000 1603 1827 1679 39.23 1634 38.47 Rihand I STPS (2*500) 1000 923 1004 994 22.21 925 22.04 Rihand II STPS (2*500) 1000 471 511 509 11.48 478 11.28 Rihand III STPS (2*500) 1000 943 994 1012 22.66 944 22.42 Dadri I STPS (4*210) 840 738 809 819 16.45 686 17.11 Dadri II STPS (2*490) 980 895 916 998 20.72 863 20.94 Unchahar I TPS (2*210) 420 382 380 426 8.79 366 9.04 Unchahar II TPS (2*210) 420 382 406 419 8.81 367 8.90 Unchahar III TPS (1*210) 210 191 195 213 4.38 183 4.43 Unchahar IV TPS(1*500) 500 ISTPP (Jhajjhar) (3*500) 1500 1167 1032 1359 27.38 1141 27.68 Dadri GPS (4*130.19+2*154.51) 830 0 238 289 6.57 274 6.82 Anta GPS (3*88.71+1*153.2) 419 0 213 210 5.42 226 5.52 Auraiya GPS (4*111.19+2*109.30) 663 Dadri (5) 5 1 0 0 0.02 1 0.02 Unchahar (10) 10 2 0 0 0.05 2 0.05 Singrauli (15) 15 3 0 0 0.06 3 0.05 KHEP(4*200) 800 872 862 195 8.15 340 7.50 Sub Total (A) 12612 8572 9387 9122 202 8433 202 B. NPC NAPS (2*220) 440 376 403 414 8.90 371 9.02 RAPS- B (2*220) 440 352 410 400 8.80 367 8.45 RAPS- C (2*220) 440 405 448 448 9.66 403 9.78 Sub Total (B) 1320 1133 1261 1262 27.36 1140 27.25 C. NHPC Chamera I HPS (3*180) 540 534 542 183 5.63 235 5.50 Chamera II HPS (3*100) 300 296 298 300 5.70 237 5.50 Chamera III HPS (3*77) 231 229 229 161 3.99 166 3.84 Bairasuil HPS(3*60) 180 57 120 60 1.55 65 1.36 Salal-HPS (6*115) 690 630 662 690 15.73 655 15.12 Tanakpur-HPS (3*31.4) 94 50 92 48 1.31 54 1.21 Uri-I HPS (4*120) 480 365 357 359 8.89 370 8.76 Uri-II HPS (4*60) 240 238 244 242 5.77 241 5.71 Dhauliganga-HPS (4*70) 280 278 282 142 3.40 142 3.27 Dulhasti-HPS (3*130) 390 385 390 401 9.39 391 9.25 Sewa-II HPS (3*40) 120 125 123 0 0.46 19 0.37 Parbati 3 (4*130) 520 81 481 36 1.87 78 1.94 Kishanganga(3*110) 330 59 112 110 1.48 62 1.41 Sub Total (C ) 4395 3327 3932 2733 65 2716 63 D.SJVNL NJPC (6*250) 1500 1605 1460 1250 26.15 1090 25.57 Rampur HEP (6*68.67) 412 442 412 367 7.59 316 7.13 Sub Total (D) 1912 2047 1872 1617 33.74 1406 32.70 E. THDC Tehri HPS (4*250) 1000 488 491 126 5.40 225 5.32 Koteshwar HPS (4*100) 400 134 303 92 3.32 138 3.22 Sub Total (E) 1400 622 794 218 8.72 364 8.54 F. BBMB Bhakra HPS (2*108+3*126+5*157) 1379 819 1091 661 19.80 825 19.66 Dehar HPS (6*165) 990 443 825 330 10.85 452 10.63 Pong HPS (6*66) 396 109 144 98 2.65 110 2.61 Sub Total (F) 2765 1370 2060 1089 33.30 1387 32.90 G. IPP(s)/JV(s) Allain DuhanganHPS(IPP) (2*96) 192 0 65 67 1.60 67 1.73 Karcham Wangtoo HPS(IPP) (4*250) 1000 0 1000 0 15.12 630 14.66 Malana Stg-II HPS (2*50) 100 0 55 55 0.99 41 0.94 Shree Cement TPS (2*150) 300 0 185 110 3.36 140 3.43 Budhil HPS(IPP) (2*35) 70 0 35 36 0.94 39 1.78 Sainj HPS (IPP) (2*50) 100 0 1.30 Sub Total (G ) 1762 0 1341 267 22.01 917 22.54 H. Total Regional Entities (A-G) 26167 17071 20646 16308 392.70 16363 389.44 Demand Met (MW) and Time(Hrs) UI Net MU 0.76 0.17 0.20 0.24-0.66-0.22-0.25-0.09-0.05-0.30-0.25-0.10 0.01 0.65 0.11-0.12 0.35-0.12 0.11 0.20 0.15 0.19 0.61 0.10 0.06 0.14 0.09-0.07 0.07 1.94 0.58 0.46 1.04 0.08 0.10 0.18 0.14 0.22 0.04 0.40-0.46 0.05-0.07-0.84-0.53 3.26 Shortage (MW)

Effective Installed I. Entities Average(Sentout Capacity Peak MW Off Peak MW Energy(MU) (MW) MW) Punjab Guru Gobind Singh TPS (Ropar) (6*210) 1260 670 360 11.80 492 Guru Nanak Dev TPS(Bhatinda) (2*110+2*120) Guru Hargobind Singh TPS(L.mbt) (2*210+2*250) Goindwal(GVK) (2*270) Rajpura (2*700) Talwandi Saboo (3*660) 46 920 794 364 14.01 584 540 145 145 3.54 147 1400 1320 1320 31.74 1322 1980 1550 1700 37.05 1544 6560 4479 3889 98.14 4089 1000 504 591 14.25 594 303 0 0 2.66 111 859 0 0 4.16 173 1162 0 0 6.81 284 8722 4983 4480 119.20 4967 Total Punjab Haryana Panipat TPS (2*210+2*250) 920 407 452 10.77 449 DCRTPP (Yamuna nagar) (2*300) 600 528 543 12.47 519 Faridabad GPS (NTPC)(2*137.75+1*156) 432 0 0 0 RGTPP (khedar) (IPP) (2*600) 1200 845 913 19.90 829 Magnum Diesel (IPP) 25 0 0 0 Jhajjar(CLP) (2*660) 1320 600 616 14.31 596 4497 2380 2524 57.45 2394 62 15 28 0.45 19 106 0 0 0.95 40 50 0 0 0.15 6 156 0 0 1.10 46 Total Haryana 4715 2395 2552 58.99 2458 Rajasthan kota TPS (2*110+2*195+3*210) 1240 887 839 23.02 959 suratgarh TPS (6*250) 1500 1094 1126 28.03 1168 Chabra TPS (4*250) 1000 927 787 21.15 881 Chabra TPS (1*660) 66 Dholpur GPS (3*110) 33 Ramgarh GPS(1*37.5 + 1*35.5 +2*37.5 +1*110 +1*50) 271 150 153 3.52 147 RAPS A (NPC) (1*100+1*200) 300 168 168 3.92 163 Barsingsar (NLC) (2*125) 250 177 218 4.79 200 Giral LTPS (2*125) 25 Rajwest LTPS (IPP) (8*135) 1080 944 636 21.20 884 VS LIGNITE LTPS (IPP) (1*135) 135 0 0 0 Kalisindh Thermal(2*600) 1200 561 422 12.73 530 Kawai(Adani) (2*660) 1320 607 539 13.14 548 9536 5515 4888 131.51 5480 55 Wind power 4292 131 1570 17.03 710 102 20 20 0.49 20 1995 24 0 10.25 427 Renewable/Others (Total) 6389 175 1590 27.77 1157 Total Rajasthan 16475 5690 6478 159.28 6637 UP Anpara TPS (3*210+2*500) 1630 1298 1311 32.80 1367 Obra TPS (2*50+2*94+5*200) 1194 532 530 12.50 521 Paricha TPS (2*110+2*220+2*250) 1160 703 714 17.00 708 Panki TPS (2*105) 21 Harduaganj TPS (1*60+1*105+2*250) 665 540 546 12.90 538 Tanda TPS (NTPC) (4*110) 440 381 392 9.06 378 Roza TPS (IPP) (4*300) 1200 969 1001 23.00 958 Anpara-C (IPP) (2*600) 1200 1092 1088 26.10 1088 Bajaj Energy Pvt.Ltd(IPP) TPS (10*45) 450 401 401 8.50 354 Anpara-D(2*500) 1000 914 911 21.70 904 Lalitpur TPS(3*660) 1980 1406 1103 26.10 1088 Bara(3*660) 1980 876 752 19.20 800 13109 9112 8749 208.86 8703 Vishnuparyag HPS (IPP)(4*110) 440 435 435 10.30 429 Alaknanada(4*82.5) 330 83 155 3.50 146 Other Hydro 527 311 3 2.40 100 Cogeneration 1360 250 250 6.00 250 26 0 0 0 472 0 0 3.10 129 498 0 0 3.10 129 Total UP 16264 10191 9592 234.16 9757 Uttarakhand Other Hydro 1250 689 564 23.03 959 Total Gas 450 271 283 6.60 275 127 0 0 0 100 0 0 0.77 32 Small Hydro (< 25 MW) 18 407 0 0 0.77 32 Total Uttarakhand 2107 960 847 30.39 1266 Delhi Rajghat TPS (2*67.5) 135 0 0 0 Delhi Gas Turbine (6x30 + 3x34) 282 101 69 2.20 92 Pragati Gas Turbine (2x104+ 1x122) 330 287 262 6.63 276 Rithala GPS (3*36) 95 0 0 0 Bawana GPS (4*216+2*253) 1370 742 452 13.67 570 Badarpur TPS (NTPC) (3*95+2*210) 705 278 324 6.98 291 2917 1408 1107 29.49 1229 16 41 38 0 2 0 0 0 18 41 38 0 Total Delhi 2935 1449 1145 29.49 1229

HP Baspa HPS (IPP) (3*100) 300 327 248 5.66 236 Malana HPS (IPP) (2*43) 86 54 0 0.87 36 Other Hydro (>25MW) 372 275 296 6.56 273 Small Hydro (< 25 MW) 486 193 176 4.09 171 486 193 176 4.09 171 Total HP 1244 849 721 17.17 716 J & K Baglihar HPS (IPP) (3*150+3*150) 900 883 883 21.19 883 Other Hydro/IPP(including 98 MW Small Hydro) 308 170 174 4.00 167 Gas/Diesel/Others 19 Small Hydro (< 25 MW)Included in Other Hydro Abov 98 0 0 0 98 0 0 0 Total J & K 1398 1053 1057 25.19 1049 Total Control Area Generation 53860 27570 26872 673.87 28078 J. Net Inter Regional Exchange [Import (+ve)/export (-ve)] 10235 11916.73 271.56 11315 Total Regional Availability(Gross) 80027 58451 55096 1338.13 55756 IV. Generation: Regional Entities Hydro Control Area Hydro Total Regional Hydro V. Total Renewable Generation: Regional Entities Renewable Control Area Renewable Total Regional Renewable 12564 10640 5974 167.75 6950 7468 4210 3837 92.18 4319 20032 14850 9810 259.93 11269 30 0 0 6 9214 409 1804 43.64 1818 9244 409 1804 43.78 1824 VI(A). Inter Regional Exchange [Import (+ve)/export (-ve)] [Linkwise] Element Peak(20:00 Hrs) Off Peak(03:00 Hrs Interchange (MW) Energy (MU) Net Energy MW MW Import Export Import Export MU Vindhychal(HVDC B/B) -50-250 50 250 0.47 2.07-1.59 765 KV Gwalior-Agra (D/C) 1850 2213 2431 0 49.05 49.05 400 KV Zerda-Kankroli -238-334 0 455 7.76-7.76 400 KV Zerda-Bhinmal -153-316 0 392 6.48-6.48 220 KV Auraiya-Malanpur 0-42 0 15 0.59-0.59 220 KV Badod-Kota/Morak -41-3 61 86 0.20-0.20 Mundra-Mohindergarh(HVDC Bipole) 2006 1501 2006 0 42.55 42.55 400 KV RAPPC-Sujalpur 189 184 289 0 4.22 4.22 400 KV Vindhyachal-Rihand -944-965 0 968 22.89-22.89 765 kv Phagi-Gwalior (D/C) 679 1195 1313 0 27.12 27.12 +/- 800 kv HVDC Champa-Kurushetra 2500 2500 2500 0 58.86 0 58.86 765KV Orai-Jabalpur 673 893 1046 0 18.34 0 18.34 765KV Orai-Satna 1643 1849 1857 0 41.22 0 41.22 765KV Orai-Gwalior -394-373 0 465 10-9.78 Sub Total WR 7720 8053 241.83 49.77 192.06 400 kv Sasaram - Varanasi 262 168 262 0 4.63 4.63 400 kv Sasaram - Allahabad 109 76 153 139 2.34 2.34 400 KV MZP- GKP (D/C) 280 439 816 0 12.79 12.79 400 KV Patna-Balia(D/C) X 2 539 774 1127 0 19.01 19.01 400 KV B'Sharif-Balia (D/C) 292 271 518 0 9.02 9.02 765 KV Gaya-Balia 352 385 504 0 9.43 9.43 765 KV Gaya-Varanasi (D/C) 56 202 332 0 4.84 4.84 220 KV Pusauli-Sahupuri 200 184 214 0 4.49 4.49 132 KV K'nasa-Sahupuri 0.51-0.51 132 KV Son Ngr-Rihand 0.30-0.30 132 KV Garhwa-Rihand 0.00 765 KV Sasaram - Fatehpur 310 150 310 57 2.70 2.70 400 KV Motihari -GKP (D/C) 8 175 282 196 2.44 2.44 400 kv B'Sharif - Varanasi (D/C) 107 40 284 108 1.86 1.86 +/- 800 KV HVDC Alipurduar-Agra 0 500 500 0 3.81 3.81 Sub Total ER 2515 3364 77.36 0.81 76.55 +/- 800 KV HVDC BiswanathCharialli-Agra 0 500 500 2.95 2.95 Sub Total NER 0 500 2.95 2.95 Total IR Exch 10235 11917 322.14 50.58 271.56 VI(B). Inter Regional Schedule & Actual Exchanges [Import (+ve)/export (-ve)] [Corridor wise] ISGS/LT Schedule (MU) Bilateral Schedule (MU) Power Exchange Shdl (MU) Wheeling (MU) ER Bhutan Total Through ER Through WR Through ER Through WR Through ER Through WR 53.67 1.63 55.30 50.11 29.84-4.72-0.08 Total IR Schedule (MU) Through ER Through WR Inclds Mndra Total Total IR Actual (MU) Through ER(including NER) Through WR Total Through ER (including NER) Through WR Total 99.06 156.27 255.33 79.50 192.06 271.56-19.56 35.79 16.23 VI(C). Inter National Exchange with Nepal [Import (+ve)/export (-ve)] [Linkwise] Element 132 KV Tanakpur - Mahendarnagar Peak(20:00 Hrs) Off Peak(03:00 Hrs Interchange (MW) Energy (MU) Net IR UI (MU) Net Energy MW MW Import Export Import Export MU -22-15 0 29 0 1-0.52 VII. Frequency Profile <-------------------------------------------------- % of Time Frequency --------------------------------------------------> <49.2 <49.7 <49.8 <49.9 <50.0 49.9-50.05 50.05-50.10 50.10-50.20 >50.20 >50.50 1.50 6.20 41.20 86.80 56.40 2.40 0.10 <------------------------- Frequency (Hz) -------------------------> Average Frequency Frequency in 15 Min Block Frequency Variation Std. Dev. MAX MIN Freq Dev Index (% of Time) Freq Time Freq Time Hz Index (Hz) (Hz) 50.11 13.02 49.65 22.34 49.91 4 0.077 50.04 49.71 43.60

VIII(A). Voltage profile 400 kv Voltage Voltage (in % of Time) Voltage Level (kv) Deviatio Voltage(KV) Time Voltage (KV) Time <380 kv <390 kv >420 kv >430 kv n Index Rihand 400 403 13:00 399 0:13 0.0 0.0 0.0 0.0 0.0 Gorakhpur 400 409 17:31 391 10:48 0.0 0.0 0.0 0.0 0.0 Bareilly(PG)400kV 400 407 6:32 393 9:25 0.0 0.0 0.0 0.0 0.0 Kanpur 400 410 5:02 400 10:49 0.0 0.0 0.0 0.0 0.0 Dadri 400 409 7:39 397 11:11 0.0 0.0 0.0 0.0 0.0 Ballabhgarh 400 409 6:01 394 11:11 0.0 0.0 0.0 0.0 0.0 Bawana 400 406 6:02 394 11:49 0.0 0.0 0.0 0.0 0.0 Bassi 400 410 18:29 395 0:09 0.0 0.0 0.0 0.0 0.0 Hissar 400 403 6:01 391 2:12 0.0 0.0 0.0 0.0 0.0 Moga 400 402 13:01 392 9:46 0.0 0.0 0.0 0.0 0.0 Abdullapur 400 404 5:59 395 10:30 0.0 0.0 0.0 0.0 0.0 Nalagarh 400 407 6:04 396 10:35 0.0 0.0 0.0 0.0 0.0 Kishenpur 400 407 5:01 399 10:30 0.0 0.0 0.0 0.0 0.0 Wagoora 400 402 2:39 390 9:42 0.0 0.0 0.0 0.0 0.0 Amritsar 400 403 6:01 392 10:27 0.0 0.0 0.0 0.0 0.0 Kashipur 400 402 0:00 402 0:00 0.0 0.0 0.0 0.0 0.0 Hamirpur 400 401 0:00 390 9:43 0.0 0.0 0.0 0.0 0.0 Rishikesh 400 404 6:02 388 10:34 0.0 0.9 0.0 0.0 0.0 VIII(B). Voltage profile 765 kv Voltage Voltage (in % of Time) Voltage Level (kv) Deviatio Voltage(KV) Time Voltage (KV) Time <728 kv <742 kv >800 kv >820 kv n Index Fatehpur 765 773 8:01 750 10:51 0.0 0.0 0.0 0.0 0.0 Balia 765 770 16:12 743 10:50 0.0 0.0 0.0 0.0 0.0 Moga 765 775 13:03 751 10:34 0.0 0.0 0.0 0.0 0.0 Agra 765 781 18:46 754 11:13 0.0 0.0 0.0 0.0 0.0 Bhiwani 765 780 5:03 759 10:31 0.0 0.0 0.0 0.0 0.0 Unnao 765 761 6:01 743 10:49 0.0 0.0 0.0 0.0 0.0 Lucknow 765 771 7:02 749 10:50 0.0 0.0 0.0 0.0 0.0 Meerut 765 785 7:01 757 10:34 0.0 0.0 0.0 0.0 0.0 Jhatikara 765 778 5:04 752 11:10 0.0 0.0 0.0 0.0 0.0 Bareilly 765 kv 765 776 7:00 751 10:34 0.0 0.0 0.0 0.0 0.0 Anta 765 784 18:49 766 9:57 0.0 0.0 0.0 0.0 0.0 Phagi 765 788 18:39 764 11:13 0.0 0.0 0.0 0.0 0.0 Note : "0" in Max / Min Col -> Telemetry Outage IX. Reservior Parameters: Name of Parameters Present Parameters Last Year Last day Reservior FRL (m) MDDL (m) Level (m) Energy (MU) Level (m) Energy (MU) Inflow (m 3 /s) Usage (m 3 /s) Bhakra 513.59 445.62 459.86 131.68 476.74 387.82 424.98 808.42 Pong 426.72 384.05 391.21 67.89 392.25 84.61 38.17 225.54 Tehri 829.79 740.04 741.00 4.65 742.25 10.57 151.72 199.00 Koteshwar 612.50 598.50 611.00 4.95 610.36 4.69 199.00 219.51 Chamera-I 76 748.75 751.91 177.21 152.58 Rihand 268.22 252.98 RPS 352.80 343.81 Jawahar Sagar 298.70 295.78 RSD 527.91 487.91 502.78 4.64 513.57 7.25 194.01 133.44 * NA: Not Available X(A). Short-Term Open Access Details: Off- Peak Hours (03:00 Hrs) Peak Hours (20:00 Hrs) Day Energy (MU) Bilateral (MW) IEX (MW) PXIL (MW) Bilateral (MW) IEX (MW) PXIL (MW) Bilateral (MU) IEX / PXIL (MU) Total (MU) Punjab 1427 0 0 1427 0 0 34.25 34.25 Delhi 1135-950 0 1042-1011 0 27.73-19.33 8.40 Haryana 1795 1 0 1661-574 0 33.54-1.43 32.11 HP -1484 262 0-1336 -174 0-29.94 3.31-26.63 J&K -1094 286 0-1094 637 0-26.25 14.99-11.26 CHD 0 0 0 0-30 0 0.25 0.25 Rajasthan -52-14 0-52 -48 0-1.25 0.80-0.45 UP 2199 358 0 1914 248 0 47.42-3.12 44.30 Uttarakhand -139 249 0-139 144 0-3.33 3.92 0.59 Total 3787 192 0 3424-809 0 82.17-0.61 81.56 X(B). Short-Term Open Access Details: Bilateral (MW) IEX (MW) PXIL (MW) Punjab 1427 1427 0 0 0 0 Delhi 1237 1026-332 -1452 0 0 Haryana 1795 1161 295-617 0 0 HP -1050-1486 499-216 0 0 J&K -1094-1094 789 242 0 0 CHD 0 0 59-40 0 0 Rajasthan -52-52 973-950 0 0 UP 2221 1858 429-907 0 0 Uttarakhand -138-139 298 4 0 0 XI. System Reliability Indices(Violation of TTC and ATC): (i)%age of times N-1 Criteria was violated in the inter - regional corridors WR % ER % Simultaneous % (ii)%age of times ATC violated on the inter-regional corridors WR % ER % Simultaneous % (iii)%age of times Angular Difference on Important Buses was beyond permissible limits(40 deg.)

Rihand - Dadri % XII. Zero Crossing Violations No. of violations( 8 in a day) number of continuous blocks without sign change Punjab 1 13 Haryana 1 19 Rajasthan 2 15 Delhi 2 36 UP 2 19 Uttarakhand 3 21 HP 5 49 J & K 2 29 Chandigarh 6 43 XIII.System Constraints: XIV. Grid Disturbance / Any Other Significant Event: XV. Weather Conditions For 20.06.2018 : XVI. Synchronisation of new generating units : XVII. Synchronisation of new 220 / 400 / 765 KV lines and energising of bus / /substation : 1. 413 Bay first time charged at 400KV Dhanonda S/S on 20.06.2018 @ 17:40Hrs. XVIII. Tripping of lines in pooling stations : XIX. Complete generation loss in a generating station : Note: Data(regarding drawal,generation, shortage, inter-regional flows and reservoir levels)of the constituents filled in the report are as per last furnished data by the respective state/constituent to NRLDC. Report for : 20.06.2018 प र प रभ र असभय त / SHIFT CHARGE ENGINEER