Bid Tabulation City of Coralville RE-BID Coral Ridge Ave, Phase II - Oakdale Blvd to Forevergreen Rd City of Coralville, IA Engineer's OPC

Similar documents
DESCRIPTION QUANTITY PRICE TOTAL

ENGINEERING & ENVIRONMENTAL

Project Book Worksheet for Cost Estimation

Steese Rd - Curb & Sidewalk Improvement

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

METRO Magnolia Transit Center - Bid Tab

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

STREET IMPROVEMENTS PROPOSAL BID ITEMS

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Oaks Commerce Center

MoDOT 2016 UNIT BID PRICES Northwest District

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

CT Consultants, Inc.

Maine Turnpike Authority

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

Maine Turnpike Authority

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

Maine Turnpike Authority

Patton Hill Road (Four Inch Main), Project No

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Maine Turnpike Authority

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

Maine Turnpike Authority

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

CITY OF STANDARD SPECIFICATIONS

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

STANDARD DRAWING INDEX

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

Wentzville Parkway South Phase 2 & 2A

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Licensed Class C Virginia Contractor No.

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Macomb County Department of Roads Bid Comparison

CENTER LINE GROUND LINE EXISTING MANHOLE TRUE SCALE SEWER LINES & MANHOLES GAS WATER CULVERT PERMANENT REFERENCE MONUMENT P.R.M.

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Federal Project No.: STP-5128(388)

Federal Project No.: OC-095-1(348)

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

City of West Branch. Office of the City Administrator

Maine Turnpike Authority

Maine Turnpike Authority

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

VIEW ONLY - NOT FOR BIDDING

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

COST ESTIMATES: Curb-Running

CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

Federal Project No.: HSIP-5A27(567)

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

ADDENDUM NO. 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18

City of Grand Island Tuesday, February 13, 2018 Council Session

EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

Artist Rendering. Design-Build Project for. Route 29 Solutions. Albemarle County, Virginia Contract ID No. C DB80

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

County of Los Angeles Department of Public Works BID SUMMARY

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

SAN ANTONIO WATER SYSTEM

2011 LOCAL STREET IMPROVEMENTS

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

Federal Project No.: STP-5A27(380), STP-5A27(381)

County of Los Angeles Department of Public Works BID SUMMARY

L1.0 DEMOLITION EXISTING CONDITIONS/ DEMOLITION NOTES EXISTING

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications.

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

CENTENNIAL PARK EXPANSION

Transcription:

, IA - 2017 DIVISION 1 - GENERAL 1.01 TRAFFIC CONTROL LS 1 $50,000.00 $50,000.00 $30,000.00 $30,000.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 DIVISION 2 - EARTHWORK 2.01 CLEARING AND GRUBBING UNIT 76 $75.00 $5,700.00 $185.00 $14,060.00 $75.00 $5,700.00 $68.00 $5,168.00 $185.00 $14,060.00 2.02 TOPSOIL, COMPOST-AMENDED (12 INCH DEPTH) IN LANDSCAPE AREAS CY 667 $70.00 $46,690.00 $65.00 $43,355.00 $63.00 $42,021.00 $65.00 $43,355.00 $60.00 $40,020.00 2.03 TOPSOIL, SAND-COMPOST-AMENDED (DEPTH VARIES) IN BIORETENTION CELLS CY 1,490 $60.00 $89,400.00 $65.00 $96,850.00 $60.00 $89,400.00 $65.00 $96,850.00 $60.00 $89,400.00 2.04 TOPSOIL, FURNISH AND SPREAD, OFF-SITE (6 INCH DEPTH) CY 8,653 $25.00 $216,325.00 $12.00 $103,836.00 $12.00 $103,836.00 $12.00 $103,836.00 $12.00 $103,836.00 2.05 EXCAVATION, CLASS 10 CY 60,527 $7.00 $423,689.00 $5.00 $302,635.00 $5.00 $302,635.00 $5.00 $302,635.00 $5.00 $302,635.00 2.06 EXCAVATION, CLASS 20 CY 1,978 $15.00 $29,670.00 $6.75 $13,351.50 $6.75 $13,351.50 $6.75 $13,351.50 $6.75 $13,351.50 2.07 EXCAVATION, BIORETENTION CELL CY 2,234 $15.00 $33,510.00 $7.00 $15,638.00 $7.00 $15,638.00 $7.00 $15,638.00 $6.50 $14,521.00 2.08 SUBGRADE PREPARATION, 12 IN. SY 51,789 $1.50 $77,683.50 $0.50 $25,894.50 $0.50 $25,894.50 $0.50 $25,894.50 $0.50 $25,894.50 2.09 SUBGRADE TREATMENT, GEOGRID (RECTANGULAR TYPE 1) SY 1,112 $6.00 $6,672.00 $2.50 $2,780.00 $2.50 $2,780.00 $2.50 $2,780.00 $2.50 $2,780.00 2.10 SUBBASE, MODIFIED, 6 IN. SY 51,789 $6.00 $310,734.00 $4.00 $207,156.00 $4.00 $207,156.00 $4.00 $207,156.00 $4.00 $207,156.00 2.11 REMOVAL OF KNOWN BOX CULVERT, 6' X 4' RCP LF 51 $50.00 $2,550.00 $119.00 $6,069.00 $30.00 $1,530.00 $119.00 $6,069.00 $100.00 $5,100.00 2.12 REMOVAL OF KNOWN PIPE AND CONDUIT, VARIOUS TYPES LF 1,882 $20.00 $37,640.00 $13.50 $25,407.00 $10.00 $18,820.00 $13.50 $25,407.00 $15.00 $28,230.00 2.13 COMPACTION TESTING LS 1 $5,000.00 $5,000.00 $12,000.00 $12,000.00 $8,000.00 $8,000.00 $8,500.00 $8,500.00 $9,000.00 $9,000.00 DIVISION 3 - TRENCH AND TRENCHLESS CONSTRUCTION 3.01 TRENCH COMPACTION TESTING LS 1 $3,000.00 $3,000.00 $6,000.00 $6,000.00 $14,500.00 $14,500.00 $8,500.00 $8,500.00 $8,000.00 $8,000.00 3.02 GRANULAR BACKFILL TON 1,933 $25.00 $48,325.00 $15.00 $28,995.00 $15.00 $28,995.00 $15.00 $28,995.00 $15.00 $28,995.00 DIVISION 4 - SEWERS AND DRAINS 4.01 SANITARY SEWER GRAVITY MAIN, TRENCHED, PVC TRUSS, 10 IN. LF 174 $95.00 $16,530.00 $172.00 $29,928.00 $100.00 $17,400.00 $61.50 $10,701.00 $195.00 $33,930.00 4.02 STORM SEWER, TRENCHED, RCP, 15 IN. LF 1,805 $50.00 $90,250.00 $49.00 $88,445.00 $50.00 $90,250.00 $47.50 $85,737.50 $54.00 $97,470.00 4.03 STORM SEWER, TRENCHED, RCP, 18 IN. LF 1,192 $55.00 $65,560.00 $47.00 $56,024.00 $62.00 $73,904.00 $47.50 $56,620.00 $65.00 $77,480.00 4.04 STORM SEWER, TRENCHED, RCP, 24 IN. LF 655 $60.00 $39,300.00 $74.00 $48,470.00 $67.00 $43,885.00 $55.50 $36,352.50 $67.00 $43,885.00 4.05 STORM SEWER, TRENCHED, RCP, 30 IN. LF 305 $75.00 $22,875.00 $73.00 $22,265.00 $92.00 $28,060.00 $75.00 $22,875.00 $95.00 $28,975.00 4.06 STORM SEWER, TRENCHED, RCP, 36 IN. LF 295 $90.00 $26,550.00 $94.50 $27,877.50 $135.00 $39,825.00 $97.00 $28,615.00 $117.00 $34,515.00 4.07 STORM SEWER, TRENCHED, CONCRETE ELLIPTICAL PIPE, (30 X 19) IN. LF 68 $94.00 $6,392.00 $73.50 $4,998.00 $95.00 $6,460.00 $81.00 $5,508.00 $75.00 $5,100.00 4.08 STORM SEWER, TRENCHED, CONCRETE ELLIPTICAL PIPE, (38 X 24) IN. LF 31 $120.00 $3,720.00 $94.00 $2,914.00 $110.00 $3,410.00 $100.00 $3,100.00 $125.00 $3,875.00 4.09 STORM SEWER, TRENCHED, PLASTIC, 8 IN. LF 131 $20.00 $2,620.00 $17.00 $2,227.00 $15.00 $1,965.00 $22.50 $2,947.50 $26.00 $3,406.00 4.10 STORM SEWER, TRENCHED, PLASTIC, 15 IN. LF 3,187 $25.00 $79,675.00 $32.00 $101,984.00 $31.00 $98,797.00 $31.00 $98,797.00 $31.00 $98,797.00 4.11 STORM SEWER, TRENCHED, PLASTIC, 18 IN. LF 1,501 $30.00 $45,030.00 $41.50 $62,291.50 $40.00 $60,040.00 $33.00 $49,533.00 $34.00 $51,034.00 4.12 STORM SEWER, TRENCHED, PLASTIC, 30 IN. LF 305 $45.00 $13,725.00 $68.00 $20,740.00 $85.00 $25,925.00 $54.00 $16,470.00 $49.00 $14,945.00 4.13 PIPE APRON, METAL, 15 IN. DIA. EA 2 $250.00 $500.00 $237.00 $474.00 $250.00 $500.00 $325.00 $650.00 $360.00 $720.00 4.14 PIPE APRON, METAL, 18 IN. DIA. EA 0 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 4.15 PIPE APRON, RCP, 24 IN. DIA. EA 3 $2,000.00 $6,000.00 $843.00 $2,529.00 $350.00 $1,050.00 $1,000.00 $3,000.00 $1,900.00 $5,700.00 4.16 PIPE APRON, RCP, 30 IN. DIA. EA 5 $2,250.00 $11,250.00 $955.00 $4,775.00 $650.00 $3,250.00 $1,100.00 $5,500.00 $1,360.00 $6,800.00 4.17 PIPE APRON, RCP, 36 IN. DIA. EA 3 $2,750.00 $8,250.00 $1,196.00 $3,588.00 $1,300.00 $3,900.00 $1,400.00 $4,200.00 $2,000.00 $6,000.00 4.18 PIPE APRON, RCP, ELLIPTICAL (30 X 19) IN. EA 1 $2,000.00 $2,000.00 $792.00 $792.00 $1,000.00 $1,000.00 $950.00 $950.00 $1,500.00 $1,500.00 4.19 PIPE APRON, RCP, ELLIPTICAL WITH HEADWALL (DR-206),(38 X 24) IN. EA 1 $2,500.00 $2,500.00 $984.00 $984.00 $2,600.00 $2,600.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 4.20 FOOTING FOR CONCRETE PIPE APRON, PCC, VARIOUS SIZES EA 11 $500.00 $5,500.00 $502.00 $5,522.00 $500.00 $5,500.00 $1,500.00 $16,500.00 $840.00 $9,240.00 4.21 SUBDRAIN, TYPE 1, LONGITUDINAL, 4 IN. LF 8,901 $9.00 $80,109.00 $7.00 $62,307.00 $6.00 $53,406.00 $5.50 $48,955.50 $7.00 $62,307.00 4.22 SUBDRAIN, TYPE 1, 4 IN., WING WALLS LF 340 $9.00 $3,060.00 $6.50 $2,210.00 $10.00 $3,400.00 $6.50 $2,210.00 $6.50 $2,210.00 4.23 SUBDRAIN, PERFORATED PLASTIC PIPE, 6-IN DIAMETER IN BIORETENTION CELLS LF 2,545 $15.00 $38,175.00 $6.00 $15,270.00 $6.00 $15,270.00 $5.65 $14,379.25 $6.00 $15,270.00 4.24 SUBDRAIN CLEANOUT, PVC, NON-PERFORATED, 6-IN. WITH NYLOPLAST BEEHIVE CASTING EA 29 $600.00 $17,400.00 $600.00 $17,400.00 $350.00 $10,150.00 $700.00 $20,300.00 $600.00 $17,400.00 4.25 SUBDRAIN CLEANOUT, PVC, NON-PERFORATED, 4-IN. EA 33 $350.00 $11,550.00 $500.00 $16,500.00 $350.00 $11,550.00 $550.00 $18,150.00 $500.00 $16,500.00

, IA - 2017 4.26 SUBDRAIN OUTLETS AND CONNECTIONS, 4 IN. EA 29 $200.00 $5,800.00 $325.00 $9,425.00 $250.00 $7,250.00 $450.00 $13,050.00 $325.00 $9,425.00 4.27 SUBDRAIN OUTLETS AND CONNECTIONS, 6 IN. EA 27 $240.00 $6,480.00 $325.00 $8,775.00 $250.00 $6,750.00 $450.00 $12,150.00 $325.00 $8,775.00 4.28 BRC SNORKEL INTAKE EA 27 $400.00 $10,800.00 $412.00 $11,124.00 $250.00 $6,750.00 $450.00 $12,150.00 $300.00 $8,100.00 DIVISION 5 - WATER MAINS AND APPURTENANCES 5.01 WATER MAIN, TRENCHED, PVC, 12 IN. LF 1,510 $50.00 $75,500.00 $39.00 $58,890.00 $40.00 $60,400.00 $37.50 $56,625.00 $45.00 $67,950.00 5.02 WATER MAIN, TRENCHED, DIP, 12 IN., WITH VITON GASKETS LF 160 $100.00 $16,000.00 $66.00 $10,560.00 $110.00 $17,600.00 $85.00 $13,600.00 $90.00 $14,400.00 5.03 WATER MAIN, TRENCHED, PVC, 12 IN., WITH STEEL 24 IN. CASING PIPE LF 360 $250.00 $90,000.00 $152.00 $54,720.00 $205.00 $73,800.00 $128.50 $46,260.00 $166.00 $59,760.00 5.04 WATER MAIN, TRENCHED, PVC, 18 IN. LF 465 $60.00 $27,900.00 $56.00 $26,040.00 $69.00 $32,085.00 $68.00 $31,620.00 $70.00 $32,550.00 5.05 WATER MAIN, TRENCHED, DIP, 18 IN., WITH VITON GASKETS LF 80 $120.00 $9,600.00 $149.00 $11,920.00 $200.00 $16,000.00 $131.50 $10,520.00 $197.00 $15,760.00 5.06 WATER MAIN FITTINGS, VARIOUS LBS 2,633 $7.00 $18,431.00 $6.00 $15,798.00 $9.00 $23,697.00 $16.25 $42,786.25 $7.00 $18,431.00 5.07 VALVE, GATE, 12 IN. EA 9 $2,200.00 $19,800.00 $2,130.00 $19,170.00 $2,200.00 $19,800.00 $2,400.00 $21,600.00 $3,110.00 $27,990.00 5.08 FIRE HYDRANT ASSEMBLY EA 8 $5,000.00 $40,000.00 $3,957.00 $31,656.00 $4,450.00 $35,600.00 $4,450.00 $35,600.00 $4,900.00 $39,200.00 5.09 REMOVAL OF FIRE HYDRANT EA 4 $800.00 $3,200.00 $1,046.00 $4,184.00 $500.00 $2,000.00 $1,100.00 $4,400.00 $750.00 $3,000.00 5.10 VALVE BOX REPLACEMENT EA 8 $250.00 $2,000.00 $378.00 $3,024.00 $350.00 $2,800.00 $350.00 $2,800.00 $450.00 $3,600.00 DIVISION 6 - STRUCTURES FOR SANITARY AND STORM SEWERS 6.01 STORM MANHOLE TYPE SW-401, 48 IN. DIA. EA 6 $3,500.00 $21,000.00 $3,100.00 $18,600.00 $3,100.00 $18,600.00 $3,350.00 $20,100.00 $3,900.00 $23,400.00 6.02 STORM MANHOLE TYPE SW-401, 60 IN. DIA. EA 7 $5,000.00 $35,000.00 $4,546.00 $31,822.00 $4,850.00 $33,950.00 $4,850.00 $33,950.00 $5,900.00 $41,300.00 6.03 STORM MANHOLE TYPE SW-401, 72 IN. DIA. EA 3 $6,500.00 $19,500.00 $5,445.00 $16,335.00 $5,800.00 $17,400.00 $5,700.00 $17,100.00 $6,900.00 $20,700.00 6.04 STORM MANHOLE TYPE SW-406, (4 X 4) FT. EA 1 $7,000.00 $7,000.00 $2,700.00 $2,700.00 $3,200.00 $3,200.00 $3,000.00 $3,000.00 $2,500.00 $2,500.00 6.05 STORM MANHOLE TYPE SW-406, (4 X 6) FT. EA 1 $8,000.00 $8,000.00 $3,885.00 $3,885.00 $3,800.00 $3,800.00 $3,850.00 $3,850.00 $3,500.00 $3,500.00 6.06 STORM INTAKE TYPE SW-507 EA 22 $3,500.00 $77,000.00 $3,177.00 $69,894.00 $3,300.00 $72,600.00 $3,500.00 $77,000.00 $2,600.00 $57,200.00 6.07 STORM INTAKE TYPE SW-508 EA 1 $4,000.00 $4,000.00 $3,275.00 $3,275.00 $3,350.00 $3,350.00 $3,800.00 $3,800.00 $3,500.00 $3,500.00 6.08 STORM INTAKE TYPE SW-509 EA 3 $4,500.00 $13,500.00 $4,054.00 $12,162.00 $4,000.00 $12,000.00 $3,800.00 $11,400.00 $4,000.00 $12,000.00 6.09 STORM INTAKE TYPE SW-512, 24 IN. DIA. EA 5 $2,000.00 $10,000.00 $1,090.00 $5,450.00 $1,400.00 $7,000.00 $1,850.00 $9,250.00 $1,200.00 $6,000.00 6.10 STORM INTAKE TYPE SW-513, 5 FT. X 5 FT. EA 1 $3,600.00 $3,600.00 $3,627.00 $3,627.00 $4,600.00 $4,600.00 $4,300.00 $4,300.00 $3,500.00 $3,500.00 6.11 STORM INTAKE TYPE SW-541 EA 2 $5,400.00 $10,800.00 $3,388.00 $6,776.00 $3,900.00 $7,800.00 $6,100.00 $12,200.00 $3,500.00 $7,000.00 6.12 STORM INTAKE TYPE SW-542, EXTENSION EA 2 $2,600.00 $5,200.00 $1,418.00 $2,836.00 $900.00 $1,800.00 $9,000.00 $18,000.00 $1,500.00 $3,000.00 6.13 STORM INTAKE TYPE SW-545 (14' EXTENDED OPENING) EA 1 $10,000.00 $10,000.00 $5,659.00 $5,659.00 $4,700.00 $4,700.00 $7,800.00 $7,800.00 $5,000.00 $5,000.00 6.14 STORM INTAKE, SPECIAL WITH INTEGRAL FOREBAY EA 25 $8,500.00 $212,500.00 $4,126.00 $103,150.00 $6,600.00 $165,000.00 $4,850.00 $121,250.00 $6,000.00 $150,000.00 6.15 MANHOLE ADJUSTMENT, MINOR EA 3 $2,900.00 $8,700.00 $1,235.00 $3,705.00 $300.00 $900.00 $1,500.00 $4,500.00 $1,000.00 $3,000.00 6.16 MANHOLE ADJUSTMENT, MAJOR EA 3 $3,300.00 $9,900.00 $1,625.00 $4,875.00 $3,000.00 $9,000.00 $3,500.00 $10,500.00 $2,000.00 $6,000.00 6.17 REMOVE MANHOLE EA 4 $700.00 $2,800.00 $520.00 $2,080.00 $500.00 $2,000.00 $1,750.00 $7,000.00 $800.00 $3,200.00 6.18 REMOVE INTAKE EA 8 $700.00 $5,600.00 $520.00 $4,160.00 $500.00 $4,000.00 $1,500.00 $12,000.00 $500.00 $4,000.00 DIVISION 7 - STREETS AND RELATED WORK 7.01 PAVEMENT, PCC, 10 IN. SY 46,650 $47.00 $2,192,550.00 $44.20 $2,061,930.00 $44.25 $2,064,262.50 $50.00 $2,332,500.00 $45.00 $2,099,250.00 7.02 PAVEMENT, PCC, MEDIAN, 7 IN. SY 1,298 $90.00 $116,820.00 $50.00 $64,900.00 $50.00 $64,900.00 $70.00 $90,860.00 $69.00 $89,562.00 7.03 PCC PAVEMENT SAMPLES AND TESTING LS 1 $2,500.00 $2,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00 $2,500.00 $2,500.00 7.04 PAVEMENT, HMA, TEMPORARY, 8 IN. SY 1,090 $40.00 $43,600.00 $40.85 $44,526.50 $40.85 $44,526.50 $40.85 $44,526.50 41 $44,690.00 7.05 HMA PAVEMENT SAMPLES AND TESTING LS 1 $1,500.00 $1,500.00 $815.00 $815.00 $815.00 $815.00 $815.00 $815.00 $815.00 $815.00 7.06 REMOVAL OF SIDEWALK SY 628 $10.00 $6,280.00 $5.00 $3,140.00 $5.00 $3,140.00 $5.00 $3,140.00 $5.00 $3,140.00 7.07 SHARED USE PATH, PCC, 5 IN. SY 6,417 $31.00 $198,927.00 $25.50 $163,633.50 $25.50 $163,633.50 $28.00 $179,676.00 $30.00 $192,510.00 7.08 SPECIAL SUBGRADE PREPARATION FOR SHARED USE PATH SY 8,738 $3.00 $26,214.00 $1.00 $8,738.00 $1.00 $8,738.00 $1.00 $8,738.00 $1.00 $8,738.00 7.09 SIDEWALK, PCC, 4 IN. SY 58 $20.00 $1,160.00 $30.00 $1,740.00 $30.00 $1,740.00 $115.00 $6,670.00 $75.00 $4,350.00 7.10 SIDEWALK, PCC, 7 IN. SY 1,468 $70.00 $102,760.00 $46.85 $68,775.80 $52.50 $77,070.00 $70.00 $102,760.00 $70.00 $102,760.00 7.11 SIDEWALK, PCC, 12 IN. SY 178 $100.00 $17,800.00 $74.00 $13,172.00 $74.00 $13,172.00 $189.00 $33,642.00 $151.00 $26,878.00 7.12 CONCRETE PAVERS WITH 4" MODIFIED SUBBASE, TYPE 1 SY 1,783 $130.00 $231,790.00 $92.00 $164,036.00 $88.67 $158,098.61 $92.00 $164,036.00 $89.00 $158,687.00 7.13 CONCRETE PAVERS WITH 4" MODIFIED SUBBASE, TYPE 2A/2B SY 764 $130.00 $99,320.00 $63.00 $48,132.00 $88.60 $67,690.40 $63.00 $48,132.00 $89.00 $67,996.00

, IA - 2017 7.14 CONCRETE PAVERS WITH 4" MODIFIED SUBBASE, TYPE 4A/4B SY 201 $195.00 $39,195.00 $76.00 $15,276.00 $86.16 $17,318.16 $76.00 $15,276.00 $87.00 $17,487.00 7.15 CONCRETE PAVERS WITH CONCRETE BASE, TYPE 3 SY 299 $130.00 $38,870.00 $138.95 $41,546.05 $134.00 $40,066.00 $102.00 $30,498.00 $200.00 $59,800.00 7.16 DETECTABLE WARNING, PCC PAVER SF 434 $40.00 $17,360.00 $26.00 $11,284.00 $24.80 $10,763.20 $38.25 $16,600.50 $92.25 $40,036.50 7.17 DETECTABLE WARNING, CAST IRON SF 12 $47.00 $564.00 $35.00 $420.00 $35.00 $420.00 $35.00 $420.00 $50.00 $600.00 7.18 FULL DEPTH PATCHES, 10 IN. SY 6 $115.00 $690.00 $150.00 $900.00 $150.00 $900.00 $200.00 $1,200.00 $225.00 $1,350.00 7.19 PAVEMENT REMOVAL SY 24,166 $7.00 $169,162.00 $4.00 $96,664.00 $4.00 $96,664.00 $4.00 $96,664.00 $4.00 $96,664.00 DIVISION 8 - PERMANENT TRAFFIC CONTROL 8.01 TRAFFIC SIGNAL, OAKDALE BLVD INTERSECTION LS 1 $240,000.00 $240,000.00 $192,561.00 $192,561.00 $273,681.05 $273,681.05 $183,561.00 $183,561.00 $336,111.00 $336,111.00 8.02 TRAFFIC SIGNAL, UNIVERSITY PKWY INTERSECTION LS 1 $235,000.00 $235,000.00 $186,921.00 $186,921.00 $212,273.20 $212,273.20 $186,921.00 $186,921.00 $245,000.00 $245,000.00 8.03 TRAFFIC SIGNAL, WHEATON RD INTERSECTION LS 1 $215,000.00 $215,000.00 $188,899.00 $188,899.00 $196,570.33 $196,570.33 $188,899.00 $188,899.00 $240,000.00 $240,000.00 8.04 TRAFFIC SIGNAL, FOREVERGREEN RD INTERSECTION LS 1 $280,000.00 $280,000.00 $268,170.00 $268,170.00 $297,126.01 $297,126.01 $268,170.00 $268,170.00 $250,000.00 $250,000.00 8.05 TEMPORARY TRAFFIC SIGNAL LS 1 $20,000.00 $20,000.00 $44,000.00 $44,000.00 $18,673.00 $18,673.00 $44,000.00 $44,000.00 $110,000.00 $110,000.00 8.06 TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC CABLE LF 1,142 $25.00 $28,550.00 $5.35 $6,109.70 $7.00 $7,994.00 $5.35 $6,109.70 $2.00 $2,284.00 8.07 PAINTED PAVEMENT MARKINGS, DURABLE LF 20,781 $5.50 $114,295.50 $0.28 $5,818.68 $0.28 $5,818.68 $0.28 $5,818.68 $0.30 $6,234.30 8.08 PERMANENT TAPE MARKINGS, INTERSECTION LF 1,205 $2.50 $3,012.50 $3.00 $3,615.00 $3.00 $3,615.00 $3.00 $3,615.00 $3.00 $3,615.00 8.09 PAINTED SYMBOLS AND LEGENDS, INTERSECTION EA 91 $160.00 $14,560.00 $275.00 $25,025.00 $275.00 $25,025.00 $275.00 $25,025.00 $275.00 $25,025.00 8.10 PAVEMENT MARKINGS REMOVED STA 18.1 $300.00 $5,430.00 $100.00 $1,810.00 $100.00 $1,810.00 $100.00 $1,810.00 $100.00 $1,810.00 8.11 GROOVES CUT FOR PAVEMENT MARKINGS LF 21,986 $5.50 $120,923.00 $0.50 $10,993.00 $0.50 $10,993.00 $0.50 $10,993.00 $0.50 $10,993.00 8.12 GROOVES CUT FOR SYMBOLS AND LEGENDS EA 91 $150.00 $13,650.00 $100.00 $9,100.00 $100.00 $9,100.00 $100.00 $9,100.00 $100.00 $9,100.00 8.13 PERFORATED SQUARE STEEL TUBE POSTS EA 55 $140.00 $7,700.00 $140.00 $7,700.00 $140.00 $7,700.00 $140.00 $7,700.00 $140.00 $7,700.00 8.14 SIGNS, SHEET ALUMINUM SF 495 $10.00 $4,950.00 $16.00 $7,920.00 $16.00 $7,920.00 $16.00 $7,920.00 $16.00 $7,920.00 8.15 SIGN REMOVAL EA 13 $150.00 $1,950.00 $50.00 $650.00 $50.00 $650.00 $50.00 $650.00 $50.00 $650.00 DIVISION 9 - SITE WORK AND LANDSCAPING 9.01 SEEDING, FERTILIZING, AND MULCHING FOR HYDRAULIC SEEDING (SUDAS TYPE 1) AC 9.49 $3,600.00 $34,164.00 $3,000.00 $28,470.00 $3,000.00 $28,470.00 $3,000.00 $28,470.00 $3,000.00 $28,470.00 9.02 SEEDING, FERTILIZING, AND MULCHING FOR HYDRAULIC SEEDING (SUDAS TYPE 4) AC 11.50 $1,900.00 $21,850.00 $2,400.00 $27,600.00 $2,400.00 $27,600.00 $2,400.00 $27,600.00 $2,400.00 $27,600.00 9.03 SOD SQ 402 $45.00 $18,090.00 $48.00 $19,296.00 $48.00 $19,296.00 $48.00 $19,296.00 $48.00 $19,296.00 9.04 PLANTS WITH WARRANTY, TREE: ACER PLATANOIDES 'CRIMSON SENTRY' - CRIMSON EA 3 SENTRY NORWAY MAPLE $800.00 $2,400.00 $350.00 $1,050.00 $342.68 $1,028.04 $350.00 $1,050.00 $343.00 $1,029.00 9.05 PLANTS WITH WARRANTY, TREE: BETULA NIGRA - RIVER BIRCH EA 0 $800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9.06 PLANTS WITH WARRANTY, TREE: CRATAEGUS CRUS-GALLI VAR. INERMIS - THORNLESS EA 21 COCKSPUR HAWTHORN $650.00 $13,650.00 $275.00 $5,775.00 $259.56 $5,450.76 $275.00 $5,775.00 $260.00 $5,460.00 9.07 PLANTS WITH WARRANTY, TREE: MALUS 'PRAIRIEFIRE'- PRAIRIEFIRE CRABAPPLE EA 14 $650.00 $9,100.00 $275.00 $3,850.00 $259.56 $3,633.84 $275.00 $3,850.00 $260.00 $3,640.00 9.08 PLANTS WITH WARRANTY, TREE: PICEA PUNGENS F. GLAUCA - COLORADO BLUE SPRUCE EA 12 $800.00 $9,600.00 $350.00 $4,200.00 $396.50 $4,758.00 $350.00 $4,200.00 $400.00 $4,800.00 9.09 PLANTS WITH WARRANTY, TREE: PINUS STROBUS - WHITE PINE EA 8 $800.00 $6,400.00 $350.00 $2,800.00 $386.70 $3,093.60 $350.00 $2,800.00 $400.00 $3,200.00 9.10 PLANTS WITH WARRANTY, TREE: QUERCUS MACROCARPA - BUR OAK EA 9 $800.00 $7,200.00 $425.00 $3,825.00 $415.28 $3,737.52 $425.00 $3,825.00 $415.28 $3,737.52 9.11 PLANTS WITH WARRANTY, SHRUB: CORNUS SERICEA 'ISANTI'- REDOSIER DOGWOOD EA 50 $75.00 $3,750.00 $35.00 $1,750.00 $39.25 $1,962.50 $35.00 $1,750.00 $39.25 $1,962.50 9.12 PLANTS WITH WARRANTY, SHRUB: HYDRANGEA PANICULATA 'JANE'- LITTLE LIME EA 55 HYDRANGEA $75.00 $4,125.00 $50.00 $2,750.00 $44.95 $2,472.25 $50.00 $2,750.00 $44.95 $2,472.25 9.13 PLANTS WITH WARRANTY, SHRUB: JUNIPERUS CHINENSIS 'GOLD LACE' - GOLD LACE EA 162 JUNIPER $75.00 $12,150.00 $40.00 $6,480.00 $47.60 $7,711.20 $40.00 $6,480.00 $47.60 $7,711.20

, IA - 2017 Streb Construction Horsfield Construction 9.14 PLANTS WITH WARRANTY, SHRUB: RHUS AROMATICA 'GRO-LOW'- GRO-LOW FRAGRANT EA 310 SUMAC $75.00 $23,250.00 $35.00 $10,850.00 $37.10 $11,501.00 $35.00 $10,850.00 $37.10 $11,501.00 9.15 PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: CALAMAGROSTIS X EA 366 ACUTIFLORA 'KARL FOERSTER' - FEATHER REED GRASS $30.00 $10,980.00 $10.00 $3,660.00 $11.80 $4,318.80 $10.00 $3,660.00 $11.80 $4,318.80 9.16 PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: HEMEROCALLIS 'STELLA DE EA 1,444 ORO' - STELLA DE ORO DAYLILY $30.00 $43,320.00 $10.00 $14,440.00 $11.60 $16,750.40 $10.00 $14,440.00 $11.60 $16,750.40 9.17 PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: MISCANTHUS SINENSIS EA 418 'PURPURASCENS'- PURPLE MAIDEN GRASS $30.00 $12,540.00 $10.00 $4,180.00 $11.90 $4,974.20 $10.00 $4,180.00 $11.90 $4,974.20 9.18 PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: NEPETA X FAASSENII EA 153 'NOVANEPJUN'- JUNIOR WALKER CATMINT $30.00 $4,590.00 $10.00 $1,530.00 $12.05 $1,843.65 $10.00 $1,530.00 $12.05 $1,843.65 9.19 PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: SPOROBOLUS EA 170 HETEROLIEPIS - PRAIRIE DROPSEED $30.00 $5,100.00 $10.00 $1,700.00 $12.35 $2,099.50 $10.00 $1,700.00 $12.35 $2,099.50 EA 329 9.20 PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: SEDUM SPECTABILE 'AUTUMN FIRE' - AUTUMN FIRE SEDUM $30.00 $9,870.00 $10.00 $3,290.00 $11.90 $3,915.10 $10.00 $3,290.00 $11.90 $3,915.10 9.21 SWPPP MANAGEMENT LS 1 $15,000.00 $15,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 9.22 FILTER SOCK, 12 INCH DIAMETER MULCH, INSTALLATION OF DEVICE LF 22,500 $2.50 $56,250.00 $1.75 $39,375.00 $1.75 $39,375.00 $1.75 $39,375.00 $1.75 $39,375.00 9.23 FILTER SOCK, 12 INCH DIAMETER MULCH, REMOVAL OF SEDIMENT LF 22,500 $0.50 $11,250.00 $0.05 $1,125.00 $0.05 $1,125.00 $0.05 $1,125.00 $0.05 $1,125.00 9.24 FILTER SOCK, 12 INCH DIAMETER MULCH, REMOVAL OF DEVICE LF 22,500 $0.50 $11,250.00 $0.35 $7,875.00 $0.35 $7,875.00 $0.35 $7,875.00 $0.35 $7,875.00 9.25 TEMPORARY ROLLED EROSION CONTROL PRODUCT, TYPE 1C SY 8,400 $3.00 $25,200.00 $1.20 $10,080.00 $1.20 $10,080.00 $1.20 $10,080.00 $1.20 $10,080.00 9.26 RIP RAP, CLASS D REVETMENT TONS 147 $50.00 $7,350.00 $48.00 $7,056.00 $50.00 $7,350.00 $48.00 $7,056.00 $40.00 $5,880.00 9.27 SILT FENCE OR SILT FENCE DITCH CHECK, INSTALLATION OF DEVICE LF 15,600 $2.00 $31,200.00 $1.50 $23,400.00 $1.50 $23,400.00 $1.50 $23,400.00 $1.50 $23,400.00 9.28 SILT FENCE OR SILT FENCE DITCH CHECK, REMOVAL OF SEDIMENT LF 15,600 $2.00 $31,200.00 $0.25 $3,900.00 $0.25 $3,900.00 $0.25 $3,900.00 $0.25 $3,900.00 9.29 SILT FENCE OR SILT FENCE DITCH CHECK, REMOVAL OF DEVICE LF 15,600 $1.00 $15,600.00 $0.10 $1,560.00 $0.10 $1,560.00 $0.10 $1,560.00 $0.10 $1,560.00 9.30 STABILIZED CONSTRUCTION ENTRANCE SY 670 $15.00 $10,050.00 $11.00 $7,370.00 $11.00 $7,370.00 $11.00 $7,370.00 $11.00 $7,370.00 9.31 INLET PROTECTION DEVICE, FILTER SOCK, SURFACE-APPLIED EA 84 $175.00 $14,700.00 $110.00 $9,240.00 $110.00 $9,240.00 $110.00 $9,240.00 $110.00 $9,240.00 9.32 INLET PROTECTION DEVICE, MAINTENANCE EA 84 $100.00 $8,400.00 $5.00 $420.00 $5.00 $420.00 $5.00 $420.00 $5.00 $420.00 9.33 REMOVAL AND REINSTALLATION OF EXISTING FENCE LF 4,673 $10.00 $46,730.00 $6.75 $31,542.75 $6.75 $31,542.75 $5.00 $23,365.00 $6.75 $31,542.75 9.34 PLANTER FOREBAY STONE (CLEAN COBBLE STONE, 2-6 IN. DIA., WASHED) TON 40 $300.00 $12,000.00 $320.00 $12,800.00 $150.00 $6,000.00 $90.00 $3,600.00 $70.00 $2,800.00 9.35 STORAGE AGGREGATE, IDOT 4115 "#57 CLEAN" (BIORETENTION CELLS) TON 1,126 $38.00 $42,788.00 $25.00 $28,150.00 $25.00 $28,150.00 $25.00 $28,150.00 $25.00 $28,150.00 9.36 FILTER AGGREGATE, IDOT 4125 "3/8 INCH CLEAN" (BIORETENTION CELLS) TON 282 $40.00 $11,280.00 $30.00 $8,460.00 $30.00 $8,460.00 $30.00 $8,460.00 $30.00 $8,460.00 9.37 PRE-VEGETATED NON-TURF SOD MATTING SF 16,077 $5.00 $80,385.00 $7.16 $115,111.32 $7.16 $115,111.32 $7.16 $115,111.32 $8.00 $128,616.00 9.38 NORTH LIBERTY SEATWALL WITH COLUMNS - 14' LONG (WEST SIDE) EA 2 $20,000.00 $40,000.00 $19,425.00 $38,850.00 $19,425.00 $38,850.00 $19,425.00 $38,850.00 $34,000.00 $68,000.00 9.39 NORTH LIBERTY SEATWALL WITH COLUMNS - 16' LONG (EAST SIDE) EA 2 $22,000.00 $44,000.00 $19,775.00 $39,550.00 $19,775.00 $39,550.00 $19,775.00 $39,550.00 $35,200.00 $70,400.00 9.40 CORALVILLE MASONRY COLUMNS EA 4 $7,500.00 $30,000.00 $7,750.00 $31,000.00 $7,750.00 $31,000.00 $7,750.00 $31,000.00 $11,500.00 $46,000.00 9.41 3 FT. X 3 FT. X 2 FT. LIMESTONE BLOCKS EA 53 $1,750.00 $92,750.00 $1,950.00 $103,350.00 $1,840.50 $97,546.50 $1,950.00 $103,350.00 $1,850.00 $98,050.00 9.42 LIMESTONE SLAB (OUTCROPPING AT BIKE NODE) EA 16 $500.00 $8,000.00 $435.00 $6,960.00 $299.67 $4,794.72 $435.00 $6,960.00 $300.00 $4,800.00 9.43 NYLOPLAST INLET STRUCTURE (18 INCH) EA 25 $1,800.00 $45,000.00 $1,478.00 $36,950.00 $1,400.00 $35,000.00 $1,478.00 $36,950.00 $2,000.00 $50,000.00 9.44 NYLOPLAST DISSIMILAR MATERIALS, SPECIAL CONNECTION EA 29 $400.00 $11,600.00 $281.00 $8,149.00 $350.00 $10,150.00 $281.00 $8,149.00 $310.00 $8,990.00 DIVISION 11 - MISCELLANEOUS 11.01 CONSTRUCTION SURVEY LS 1 $40,000.00 $40,000.00 $43,500.00 $43,500.00 $43,500.00 $43,500.00 $39,650.00 $39,650.00 $43,500.00 $43,500.00 11.02 MONUMENT PRESERVATION AND REPLACEMENT LS 1 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $3,600.00 $3,600.00 $5,000.00 $5,000.00 11.03 MOBILIZATION LS 1 $180,000.00 $180,000.00 $398,000.00 $398,000.00 $233,600.00 $233,600.00 $315,000.00 $315,000.00 $575,000.00 $575,000.00 11.04 CONCRETE WASHOUT LS 1 $1,000.00 $1,000.00 $2,500.00 $2,500.00 $2,400.00 $2,400.00 $5,500.00 $5,500.00 $400.00 $400.00 11.05 UTILITY DUCTS LF 906 $5.00 $4,530.00 $10.00 $9,060.00 $9.00 $8,154.00 $10.00 $9,060.00 $11.00 $9,966.00 11.06 PRECAST REINFORCED CONCRETE BOX CULVERT, 14 FT. X 10 FT. LF 99.5 $1,400.00 $139,300.00 $1,100.00 $109,450.00 $1,100.00 $109,450.00 $1,100.00 $109,450.00 $1,100.00 $109,450.00 11.07 STRUCTURAL CONCRETE, WING WALLS CY 188.8 $600.00 $113,280.00 $700.00 $132,160.00 $700.00 $132,160.00 $700.00 $132,160.00 $700.00 $132,160.00

, IA - 2017 11.08 REINFORCING STEEL, WING WALLS LBS 0 $2.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11.09 CONCRETE BARRIER, BA-102, MODIFIED LF 32 $200.00 $6,400.00 $262.00 $8,384.00 $262.00 $8,384.00 $262.00 $8,384.00 $262.00 $8,384.00 11.10 CONCRETE BARRIER RAIL, BA-107 EA 2 $2,000.00 $4,000.00 $3,400.00 $6,800.00 $3,400.00 $6,800.00 $3,400.00 $6,800.00 $3,400.00 $6,800.00 11.11 STEEL BEAM GUARDRAIL END ANCHOR, BOLTED EA 2 $250.00 $500.00 $200.00 $400.00 $400.00 $800.00 $200.00 $400.00 $400.00 $800.00 11.12 STEEL BEAM GUARDRAIL BARRIER TRANSITION SECTION, BA-201 EA 2 $1,900.00 $3,800.00 $1,700.00 $3,400.00 $2,600.00 $5,200.00 $1,700.00 $3,400.00 $2,600.00 $5,200.00 11.13 STEEL BEAM GUARDRAIL LF 237.5 $22.00 $5,225.00 $15.00 $3,562.50 $28.00 $6,650.00 $15.00 $3,562.50 $28.00 $6,650.00 11.14 STEEL BEAM GUARDRAIL TANGENT END TERMINAL, BA-205 EA 2 $2,300.00 $4,600.00 $2,300.00 $4,600.00 $3,000.00 $6,000.00 $2,300.00 $4,600.00 $3,000.00 $6,000.00 11.15 ORNAMENTAL RAILING LF 910 $165.00 $150,150.00 $174.50 $158,795.00 $157.00 $142,870.00 $95.00 $86,450.00 $175.00 $159,250.00 11.16 FIBER OPTIC DUCTS LF 699 $7.00 $4,893.00 $5.35 $3,739.65 $7.00 $4,893.00 $5.35 $3,739.65 $9.00 $6,291.00 11.17 LIGHTING INSTALLATIONS, L1 EA 28 $5,500.00 $154,000.00 $6,497.00 $181,916.00 $5,050.00 $141,400.00 $6,497.00 $181,916.00 $5,630.00 $157,640.00 11.18 LIGHTING INSTALLATIONS, L1A EA 5 $5,500.00 $27,500.00 $6,497.00 $32,485.00 $5,050.00 $25,250.00 $6,497.00 $32,485.00 $5,500.00 $27,500.00 11.19 LIGHTING INSTALLATIONS, L2 EA 49 $4,800.00 $235,200.00 $5,786.00 $283,514.00 $5,025.00 $246,225.00 $5,786.00 $283,514.00 $5,450.00 $267,050.00 11.20 LIGHTING INSTALLATIONS, L2A EA 3 $5,000.00 $15,000.00 $5,786.00 $17,358.00 $4,975.00 $14,925.00 $5,786.00 $17,358.00 $5,450.00 $16,350.00 11.21 LIGHTING INSTALLATIONS, L3 EA 12 $750.00 $9,000.00 $570.00 $6,840.00 $1,000.00 $12,000.00 $570.00 $6,840.00 $500.00 $6,000.00 11.22 LIGHTING INSTALLATIONS, L3A EA 3 $500.00 $1,500.00 $325.00 $975.00 $250.00 $750.00 $325.00 $975.00 $200.00 $600.00 11.23 LIGHTING INSTALLATIONS, L3B EA 1 $1,000.00 $1,000.00 $1,150.00 $1,150.00 $1,500.00 $1,500.00 $1,150.00 $1,150.00 $2,128.00 $2,128.00 11.24 LIGHTING INSTALLATIONS, L4 EA 4 $2,300.00 $9,200.00 $2,140.00 $8,560.00 $2,950.00 $11,800.00 $2,140.00 $8,560.00 $2,700.00 $10,800.00 11.25 LIGHTING INSTALLATIONS, TL1 EA 7 $800.00 $5,600.00 $1,670.00 $11,690.00 $1,350.00 $9,450.00 $1,670.00 $11,690.00 $1,250.00 $8,750.00 11.26 ELECTRICAL CIRCUITS LF 12,716 $9.00 $114,444.00 $7.08 $90,029.28 $12.49 $158,822.84 $7.08 $90,029.28 $11.00 $139,876.00 11.27 LIGHTING CONTROLLER LC2, LC3, LC4 EA 3 $15,000.00 $45,000.00 $27,494.00 $82,482.00 $19,530.00 $58,590.00 $27,494.00 $82,482.00 $19,000.00 $57,000.00 11.28 LIGHTING CONTROLLER LC5 EA 1 $17,000.00 $17,000.00 $21,485.00 $21,485.00 $19,530.00 $19,530.00 $21,845.00 $21,845.00 $19,000.00 $19,000.00 11.29 HANDHOLES EA 40 $750.00 $30,000.00 $444.63 $17,785.20 $350.00 $14,000.00 $444.63 $17,785.20 $600.00 $24,000.00 11.30 GALVANIZED RIGID CONDUIT LF 110 $3.00 $330.00 $13.00 $1,430.00 $20.00 $2,200.00 $13.00 $1,430.00 $12.00 $1,320.00 11.31 PROJECT MANAGEMENT LS 1 $10,000.00 $10,000.00 $150,000.00 $150,000.00 $160,000.00 $160,000.00 $30,000.00 $30,000.00 $125,000.00 $125,000.00 SUBTOTAL 1: BASE BID (ITEMS 1.01-11.31) $9,678,367.50 $8,397,560.93 $8,411,123.63 $8,511,501.83 $9,249,714.67

, IA - 2017 A.01 TOPSOIL, FURNISH AND SPREAD, OFFSITE (6 INCH DEPTH) CY -200 $25.00 -$5,000.00 $12.00 -$2,400.00 $12.00 -$2,400.00 $12.00 -$2,400.00 $12.00 -$2,400.00 A.02 SUBGRADE PREPARATION, 12 IN. SY 1,178 $1.50 $1,767.00 $0.50 $589.00 $0.50 $589.00 $0.50 $589.00 $0.50 $589.00 A.03 SUBBASE, MODIFIED, 6 IN. SY 1,178 $6.00 $7,068.00 $4.25 $5,006.50 $4.25 $5,006.50 $4.25 $5,006.50 $4.25 $5,006.50 A.04 PAVEMENT, PCC, 10 IN. SY 1,178 $47.00 $55,366.00 $44.20 $52,067.60 $44.25 $52,126.50 $50.00 $58,900.00 $49.00 $57,722.00-0.24 A.05 SEEDING, FERTILIZING, AND MULCHING FOR HYDRAULIC SEEDING (SUDAS TYPE 1) AC $3,600.00 -$864.00 $3,000.00 -$720.00 $3,000.00 -$720.00 $3,000.00 -$720.00 $3,000.00 -$720.00 A.06 SEEDING, FERTILIZING, AND MULCHING FOR HYDRAULIC SEEDING (SUDAS TYPE 4) AC -0.24 $1,900.00 -$456.00 $2,400.00 -$576.00 $2,400.00 -$576.00 $2,400.00 -$576.00 $2,400.00 -$576.00 SUBTOTAL 2: ALTERNATE A (ITEMS A.01 - A.06) $57,881.00 $53,967.10 $54,026.00 $60,799.50 $59,621.50 TOTAL BID: SUM OF SUBTOTAL 1 & SUBTOTAL 2 $9,736,248.50 $8,451,528.03 $8,465,149.63 $8,572,301.33 $9,309,336.17