B.C. MINISTRY OF TRANSPORTATION. Vancouver Island Electrical Services Area - LOCAL AREA SPECIFICATION #1 MOVABLE BRIDGE MAINTENANCE

Similar documents
Expo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015

Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

SUBDISTRICTS LEGAL DESCRIPTIONS DELETED FOR BREVITY. (60.1) WINDOW SIGN means a sign painted or affixed to a window.

Appendix C Preferred Solution

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL

Ambleside Boat Launch Closure. Ramp to Close by December 31, 2016

GENERAL SPECIFICATION FOR WEIGHING OF MATERIALS

Minnesota Department of Transportation (Mn/DOT) Historic Bridge Management Plan

Truss Retrofit to Mitigate Substructure Displacements at I-20 Mississippi River Bridge at Vicksburg

Table of Contents. Chapter 2 Safety Fundamentals for Bridge Inspectors. Methods of Access Introduction

Transit on the New NY Bridge

4.2 Series Station Option Description

UBC Watermain as shown on Sheet 202 : Sub total 97,050

Sample size determination and estimation of ships traffic stream parameters

Probability based Load Rating

New York City Department of Transportation. Notice of Adoption

TABLE OF CONTENTS 1. GENERAL LABOUR COSTS EQUIPMENT COSTS...2

VEHICLE NO.1- Your Vehicle. Began From. License Plate # (Street, Highway, Mile Marker, Terminal or Other Landmark) Near At VEHICLE NO.2.

Waste and Recycling Disposal Service Requirements for New Residential Developments

Issue Date: May 25, 2016 Next Review Date: May 2021 Area: Grains Receiving

Approximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders.

Three Year Engineering Factors, SFY 2017 Report: Overhead Costs per Total Construction Costs

Application for Annual Move Permit

Gasoline/Convenience. Powerful Site Assessment Options for the Gas and Convenience Industry

FEASIBILITY LAND TRANSPORTATION VENTUS ENERGY. from. covering WIND TURBINE EQUIPMENT PORT OF MOUNT MAUNGANUI TO KAIMAI RANGE SITE. for.

Guidelines when working near TasNetworks electrical assets

Over-Dimensional Vehicle Restriction Study for US 129 in TN

STH 60 Northern Reliever Route Feasibility Study Report

Appendix D. List of Existing Structures

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

POWERED INDUSTRIAL TRUCK PROGRAM September 2015

Port Houston Health, Safety, Security, and Environment Policy Document

MIDWAY CITY Municipal Code

Dockless Micromobility Regulatory Framework

Ohio Department of Transportation (ODOT) Rail Transit State Safety Oversight (SSO) Program

The Design-Builder shall meet local road criteria provided by the local governing agencies.

P.S.C. No. 9 - Electricity Consolidated Edison Company First Revised Leaf No. 244 of New York, Inc. Superseding Original Leaf No.

MGM SPRINGFIELD OFF-SITE MITIGATION - 9/25/17 TO 10/6/17 WORK HOURS: 7:00 AM TO 3:30 PM

APPENDIX C. Existing Utilities

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Horseshoe Bay Terminal Open House

LCDOT DETOUR PROCEDURES. and GUIDELINES

Terminal Alternatives

Design Vehicles Over-Length Configurations

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

DART Blue Line Extension. Garland to Rowlett. June 7, 2012

First Defense. Stormwater Treatment System. Operation and Maintenance Manual

Apartment Complex/Gated Communities Mixed Use Buildings Commercial/Industrial Parking Self Storage Maximum Security

MEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply

Introduction of SMART Highway Test Bed and Test Results. Joonsoo Shin Korea Expressway Co.

For Sale Exceptional Manufacturing & Office Facility Gasoline Alley Business Park

THE CITY OF MARION HISTORIC DOWNTOWN STREETSCAPE PLAN DIRECTIONAL SIGNAGE

Gerald Desmond Bridge Replacement Project

Appendix G Aquilla Lake Pool Rise Recreational Resources

Department of Planning and Land Services Development Engineering GATES PERMITTING, DESIGN & INSPECTION GUIDE

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

CONFEDERATION LINE EAST SEGMENT

RESILIENT INFRASTRUCTURE June 1 4, 2016

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Appendix F-1 Description of the Long-Term Alternatives

State of the City s Infrastructure. Topic of the Presentation. Johannesburg DirectorateRoads Agency

STRUCTURE 5A PURPOSE

Flashing Amber Lamp Application, Permit and Device Information

Job Report. Bosphorus Bridge, Turkey

East Allen County Schools Facilities History Calendar Years October 5, 2015

Directions to the PPA Office 508 North Third Street Harrisburg, PA 17101

Dockless Micromobility Regulatory Framework

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

DP World Vancouver Site Orientation Trucking Community April 2015

Permit Type: Extended Drivers Hours of Service (Provincial)

January 2018 PRICE SCHEDULE A 2.0 Vehicular Traffic Control

East Rail Line Update RTD FasTracks Citizens Advisory Committee March 18, 2015

Prevention and Management of Ghost drivers Incidents on Motorways

WILD DUNES COMMUNITY ASSOCIATION STANDARD OPERATING PROCEDURES (SOP)

On-Street Electric Vehicle Charging Stations - Parking Amendments

Section A1. Vehicular Traffic Control. This Price Schedule is effective January 7, Date Page Comment

Section A1. Vehicular Traffic Control. This Price Schedule is effective January 7, Date Page Comment

PUBLIC INFRASTRUCTURE PROJECTS

Speed Limit Bylaw Rangitikei District Council. Including the 2013, and 2014 and 2016 Amendments. 1 Introduction

The New Woodrow Wilson Bridge Span Drive Machinery and Traffic Gates Jeffrey D. Keyt, PE Parsons

STATE OF NEW HAMPSHIRE Inter-Department Communication

January 2018 PRICE SCHEDULE A 2.0 Vehicular Traffic Control

Characterization of Combined Use of County Road Segment

APPENDIX 3 EXTRACTS FROM THE NEW ZEALAND ELECTRICAL CODE OF PRACTICE FOR ELECTRICAL SAFE DISTANCES (NZECP 34:2001)

SEPULVEDA PASS CORRIDOR

Revision #: 14.4 Document #: Page: 1 of 5 Title: Mobile Aerial Work Platforms

Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal

Confederation Line West Alignment Improvement. September 21, 2016

Gisborne District Traffic and Parking Bylaw DOCS_n144966

Pre Proposal Meeting Hold Bay 4 Reconstruction and Reconfiguration. July 10, 2018

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

Port Hacking cable crossing project Community engagement and feedback summary August 2016

Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018

BRIDGEBY BURLEIGH LAW, P.E. Bringing Back the Big Four. An unused railroad truss bridge is reinvented as a new pedestrian gateway over the Ohio River.

For personal use only

EMERGING REQUIREMENTS

Transcription:

1. OBJECTIVE B.C. MINISTRY OF TRANSPORTATION Vancouver Island Electrical Services Area - LOCAL AREA SPECIFICATION #1 MOVABLE BRIDGE MAINTENANCE 17 th Street Bridge (lift span, at Courtenay) To ensure safe and reliable service to highway users. 2. GENERAL PERFORMANCE SPECIFICATIONS 2.1 Routine Maintenance Services All services for this Local Area Specification are Routine. There is 1 Movable Bridge (Bridge) in this Service Area: 17th Street Bridge (lift span, at Courtenay). The Contractor must perform Bridge systems maintenance of all Bridge electrical, electronic, communications and related mechanical equipment in accordance with this Local Area Specification, including Appendix 1 to the LAS entitled Clarification of Responsibilities. Bridge electrical, electronic, communications, and motor equipment includes, but is not limited to, all equipment associated with the lift span operations including PLC equipment, wireless communication links, traffic signals and controllers, hard wired electric motors, gate motors and associated circuitry and warning devices, street lighting, bridge up warning signs and all other equipment connected to or controlled from the Bridge power services. 2.2 Additional Services August 2005 Page 1

3. DETAILED PERFORMANCE SPECIFICATIONS 3.1 Routine Maintenance Services The Contractor must: a) notify the Province of any failure of electrical components of the Movable Bridge if the Bridge cannot be fully opened or fully closed; b) maintain, repair and replace electrical and mechanical components of the Movable Bridge that are unsafe or have the potential to become unsafe for Highway Users; c) maintain and repair the related electrical equipment as required to ensure the safe and efficient operation of the swing or lift mechanisms; d) maintain and repair electrical equipment (including overhead lighting, traffic and/or lane control signals, signage or directional lighting) as required to ensure proper operation. Note: If it is estimated by the Contractor and confirmed by the Province that at any particular time, the cost of materials, per repair incident, for the Movable Bridge or associated components, exceeds $1,000, the Ministry will re-imburse above the first $1,000. 3.1.1 Performance Time Frames The Contractor must: a) immediately report any seizures or failure of electrical or associated mechanical components of a Movable Bridge to the Province and immediately commence repairs; b) immediately, from the time the deficiency was detected by or reported to the Contractor, perform maintenance, repairs and replacement of electrical components of the Movable Bridge. August 2005 Page 2

3.2 Additional Services 3.2.1 Performance Time Frames 3.3 Materials Refer to the Introduction to the Specifications (Schedule 7). 4. WARRANTY DEFINITION A Movable Bridge is defined as a Bridge of any type having one or more spans capable of being raised, turned, lifted or slid from its normal vehicular and/or pedestrian service location to provide for the passage of vessels. The movements of the Superstructure may be produced either manually or by engine power. August 2005 Page 3

APPENDIX 1 17 th Street Bridge Clarification of Responsibilities General RAYLEC all household lighting which includes light switches, fluorescent lights and receptacles, area heaters, and all Emergency lighting components (boxes, batteries & lights) through out complex. Chamber Electrical Room top west room RAYLEC all electrical switches and panels Basement West Room RAYLEC none Cylinder Chamber RAYLEC 2 limit switches on side wall and 3 lights EMCON hydraulic control switch next to cylinders & connected electrical cables Basement East Room RAYLEC none EMCON sump pump Mechanical Room (top east room) RAYLEC heater, 2 large switch panels and 3 electric motors only EMCON hydraulic components connected to ends of electric motor shafts; hydraulic switch controls & connected electrical cables; emergency diesel/gas motor & connected electrical cables, emergency operating board & connected electrical cables; hydraulic tank oil heater intercom. Pier RAYLEC limit switches @ ends of span (4), navigation lights on dolphins (6) and navigation lights at end of stringers of span (2) (for when the bridge is in the air) August 2005 Page 4

Control Tower RAYLEC ALL ELECTRICAL AND HEATERS EMCON aeronometer & intercom Gates RAYLEC all electrical including light on arms, motors (6), south kiosk EMCON hydraulics Signals RAYLEC 2 signals (type F tables) & poles, 3 bridge up warning signs & poles, 2 warning bells and lights on signal poles, South Kiosk. August 2005 Page 5