California Independent. System Operator. Market Overview and Design Construct

Similar documents
Operating Procedure. EIR (webregistry) (POR/POD dropdown) AZPS NGILAN_5_N034 North Gila 500 NRTHGILA500 NRTHGILA500 NORTHGILA500_ITC

Memorandum. This is a status report only. No Board action is required.

SDG&E Valley-Rainbow Project

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

Decision on the ISO Transmission Plan

TRANSMISSION CONTROL AGREEMENT APPENDIX A. Facilities and Entitlements

Memorandum. This is a status report only. No Board Action is required. Executive Summary

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Moenkopi) Scheduling at Willow Beach. Operating Procedure

TransWest Express AC and DC Project Comprehensive Progress Report (CPR) 3,000 MW DC and 1,500 MW AC WECC Phase 1 Analysis

Wheeling Access Charges

WHEELING CHARGES. Ali Miremadi (916)

DMM 2017 Q4 Report Highlights

Market Highlights 1 (February 22 March 7)

APPENDIX G: Contingencies on the ISO System that may Impact Adjacent Systems

Ancillary Services. Horace Horton Senior Market Trainer, Market Training, NYISO. New York Market Orientation Course (NYMOC)

Frequently Asked Questions New Tagging Requirements

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

SDG&E High Voltage DC WECC Path 46 Rating Increase Comprehensive Progress Report

Electricity Reliability Council of Texas (ERCOT)

Western Area Power Administration Sierra Nevada Region

Ancillary Services. Horace Horton. Market Overview Course. Senior Market Trainer, Market Training, NYISO. March 8, Rensselaer, NY 12144

Flexible Ramping Product Technical Workshop

WestConnect TTC/ATC Workshop. Joint CCPG-SSPG-SWAT Meeting NOVEMBER 16, 2017

Market Highlights 1 (February 8 February 21)

Electricity Reliability Council of Texas (ERCOT)

California ISO. Q Report on Market Issues and Performance. December 8, Department of Market Monitoring

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

APPENDIX F: Project Need and Description

Merger of the generator interconnection processes of Valley Electric and the ISO;

October 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

Overview of ISO New England and the New England Wholesale Power Markets

Western Area Power Administration Sierra Nevada Region

Supplement to ISO Transmission Plan. Harry Allen-Eldorado Project Description and Functional Specifications

Background Information

DSM and benefits for the cross-border market integration. Milan Vukasovic and Florian Pink UMM: Market Management

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

for DRECP Alternatives

Decision on Merced Irrigation District Transition Agreement

THE TRES AMIGAS PROJECT

Convergence bidding. RUC tier 1 obligation uplift ISO PUBLIC 2015 CAISO

TransWest Express Project

Silicon Valley Power TAC Presentation Overview 8/28/2017

Electric Generation Workpapers Jeff Huang SDG&E/SoCalGas 2013 TCAP

NEU Electric and Natural Gas Price Update

ERCOT Overview. Paul Wattles Senior Analyst, Market Design & Development. Solar Energy Industries Association July 11, 2012

Module 7 : Power System Structures. Lecture 33 : Structure of a Deregulated Industry. Objectives. Overview of A Deregulated Industry

Fuel Charges in Reference Levels

TRANSMISSION CONTROL AGREEMENT APPENDIX D. Master Definitions Supplement

APS and Regional Transmission Systems Overview

North Gila Generator Interconnection

Arizona Energy Consortium Conference

Essential Reliability Services From PV Plants

S-PPC. Product Brief. Power Plant Controller Solutions for Energy Storage Systems

Q217 Generator Interconnection Project

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid

XIII Seminario Repsol YPF - Harvard

BEFORE THE PUBLIC UTILITIES COMMISSION OF NEVADA. Investigation regarding the Energy Choice ) Initiative ) Docket No )

PARKING LOT QUESTIONS FROM TRAINING PDR REGISTRATION AND FULL MARKET TRAINING MODULES

ISO Transmission Plan February 2, 2015 APPENDIX H: Contingencies on the ISO System that may Impact Adjacent Systems

Department of Market Quality and Renewable Integration November 2016

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

Non-BM Balancing Services Volumes and Expenditure

WESTERN EIM BENEFITS REPORT Second Quarter 2018

STORAGE IN IRELAND- AN OVERVIEW. IWEA Autumn Conference October 11 th 2018 Bernice Doyle Chair IWEA Storage Committee

Southern California Edison

Full Network Model Scope for FNM DB59

November 11, 2016 Patra, Greece

The Role of the ISO/RTO in Today s Electric Grid

Grid Energy Storage: Policies

The difference of the wholesale electricity market and operational methods in Japan, the United States and Europe

Energy Storage at PG&E

2019 & 2023 Final LCR Study Results San Diego-Imperial Valley non-bulk sub-areas

The Transmission Lay of the Land

Reliability Must-Run Analysis th BTA Presentation. Bob Smith Manager Transmission Planning June 6, 2006

Load Modeling for Power System Studies

Re: Comments on the 12/7/09 Dynamic Transfer Stakeholder Meeting

Impact of Distributed Energy Resources on Transmission System Reliability

Brad Roberts. & Jeff Palermo KEMA High Plains Transmission Summit Topeka Lawrence, Kansas November 3, 2009

Overview of APS U.S.-JORDAN ELECTRIC POWER TRANSMISSION PARTNERSHIP EXECUTIVE EXCHANGE VISIT. Bob Smith

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

C PER. Center for Advanced Power Engineering Research C PER

Valley - Rainbow Interconnection Project Feasibility Study Report

IMM Quarterly Report: Summer 2017

OSIsoft Users Conference

Demand Response Opportunities for Electric Vehicle Charging Stations. April 2014

Wholesale Electric Market Economics

Integration of Power-to-Gas Conversion into Dutch Electricity Ancillary Services Markets

Modeling and Analysis of Value of Advanced Pumped Storage Hydropower in the U.S.

An Industry Perspective On Emerging Electricity Delivery Technologies

Draft Final Proposal For the Design of Proxy Demand Resource (PDR)

EITF Issue 15-A, Application of the Normal Purchases and Normal Sales Scope Exception to Certain Electricity Contracts within Nodal Energy Markets

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Zone 1. Zone 3. Zone 2. PROBLEM 1 (40 points) Fixed Load Auction (No transmission limits considered):

APPENDIX E: Project Need and Description

Energy Storage Interconnection Initiative

Transmission Congestion Contract Settlements

Flexible gas markets for variable renewable generation

Transcription:

California Independent Market Overview and Design Construct Kyle Hoffman 916-608-1127 khoffman@caiso.com

The ISO Vision Preferred Provider of Superior Electric Transmission Services Ensure reliable transmission system operation Ensure open, non-discriminatory transmission access to market participants Facilitate and rely on competitive markets for generation dispatch

Key ISO Roles Schedule Transmission Access Provide Ancillary Services Market Auction Self-Provision Congestion Management Procure balancing energy in real-time Control Area operator duties

California ISO Markets Day Ahead (by Trade Hour): Ancillary Services Congestion Management/Transmission Hour Ahead (each hour): Ancillary Services Congestion Management/Transmission Real Time - Imbalance Energy A/S Energy Bids Supplemental Energy Bids

ISO Market Services Scheduling Services Transmission Access Imbalance Energy Services Ancillary Services

ISO Market Services Power Scheduling Services Generation Load Inter-SC Energy Trades (Bi-laterals) Interchange (Import or Export)

Balanced Energy Schedules Sources = Sinks Imports + Generation = Load + Exports SC-SC trades treated as either imports (receive) or exports (send) for the respective SC s portfolios Schedules = Planned Power Flows However, Real Time Actuals drive Settlements

Scheduling Timeline Day Ahead 1000 1100 1200 1300 Preferred Balanced Schedules & A/S Self Provided or Bids due to ISO Adjusted Schedules & Suggested A/S Published to Scheduling Coordinators Revised Preferred Balanced Schedules & A/S Self Provided or Bids due to ISO Final Schedules & A/S Published to Scheduling Coordinators

Scheduling Timeline Hour Ahead & Real Time 1345 1445 1558 1700 1800 HA Preferred Balanced Schedules & A/S Bids due to ISO for HE 17 HA Preferred Balanced Schedules & A/S Bids due to ISO for HE 18 RT Energy Bids due in from SCs & HE 18 RT Market CLOSES Actual Operating Hour 18 Begins

ISO Market Services Transmission Access New Firm Use (PTO Transmission) Existing Transmission Rights Firm Transmission Rights

Inter-zonal Congestion Management CONG mitigates transmission congestion and establishes a usage charge or toll Uses Adjustment Bids as economic signals to adjust scheduled power flows CONG provides for one iteration in DA for SCs to adjust preferred schedules Power flow adjusted over the entire grid for each SC Portfolio Objective is least cost transmission usage by SC SC portfolios are kept in balance

HUMB (Inactive) Network Model Sutter Plant SUTR SF (Inactive) NW2 Cascade Cascade Humboldt Standford LLNL Trac Tesla Cap Jack SMUD NW TID NW1 Malin PA CI R. Mt Ctnw d SF Los Banos (PATH Oakdale NP15 LADWP NW3 Plumas-Sierra Gold Hill Bellota ZP26 Summit Gates LA1 - Sylmar LA2 - McCullough LA3 - Inyo LA4 - Victorville Nob Nob LA7 - Adelanto (Mona, IPPDC, Gonder, M ktplace, Mead500, Westwing, McCllugh) SR2 SR3 Midw ay (PATH 26) Vincent Sylmar SR5 Silver Peak Silverpk SP15 NV3 Inyo Victvl IID IID-SCE II1 IID-SDGE II2 MX Eldorado Mccullgh CFE NP15 MEX SUTR NEV Laughlin 500 Laughlin 69 Laughlin Merchant Merchant Imperial Valley Tijuanna NV4 SMUD PGAE COTP Tesla AZ2 Eldorado 4 Corners Moenkopi Palo Verde N. Gila (PV) N.GilaBK4 Mead Blyth Parker Tracy Los Banos AZ3 LLNL Palo Verde ARZ N. Gila (BK4) Mead Blyth Parker Effective 12/1/2005 Cap Jack Olinda Round Mt Cottonwd SMUD Cottonwdp SMUD Westley Rancho TID Oakdale LC3 Lake Stdfd AZ5 LC1 LC Malin Bellota Gold Hill Stdfd Oakdale WALC

ISO Market Services Balancing Energy Services A/S Energy Supplemental Energy Ancillary Services (A/S) AGC Regulation Operating Reserves

Real Time Market for Balancing Energy -RTMA Energy Bids submitted from Generators, Curtailable Loads, and Interchange; - Supplemental Energy bids, and - A/S Energy bids (Non-AGC Regulation) RTMA Dispatches RT energy on a 5 minute basis which is used by Settlements, to calculate the 10- Minute Interval Zonal Settlement Price, Instructed energy is settled at the resource specific 10- minute price Uninstructed deviations are settled at the Real Time Market zonal 10-minute average ex-post price.

RT Balancing Energy Service 50000 SAMPLE LOAD COMPARISON 45000 40000 35000 30000 25000 20000 DA SC's LOAD SCHEDS HA SC's LOAD SCHEDS ACTUAL LOAD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Market O perations HOUR

Real Time Energy Market (RTMA) Regulation AGC Control RTMA STACKS Spinning Non-Spinning Replacement Supplemental Energy* Energy Bids Imbalance Energy Economic Dispatch $/MWh Inc Dec * Supplemental Energy Bids RT Energy Only - No Capacity component Accepted up to 62 minutes before the hour

Ancillary Services are reserve generation, load or import capacity, on Standby, available to be dispatched as Energy in response to Real Time system contingencies or to provide Balancing Energy. ANCILLARY SERVICES ENERGY

ISO Market Services FREQ. TIE (MW) Regulation ACE ANCILLARY SERVICES SYSTEM GENERATOR Spinning Reserve SYSTEM GENERATOR Non-Spinning Reserve SYSTEM GENERATOR Black Start Q (MVAR) P (MW) GENERATOR Voltage Support V (P.U. ) P (MW) SYSTEM + - Replacement Reserve Operating Reserve Replacement Reserve Energy

ISO Scheduling, Metering and Settlement Process SCs Schedule Power Flows and Submit A/S Market Participation Bids - by Trade Hour in Day Ahead (DA) and Hour Ahead (HA) timeframes ISO Conducts DA & HA Ancillary Services and Congestion Market Auctions ISO Runs Real Time (RTMA) Balancing Energy Market REAL TIME / Operating Hour SCs/ISO Read Resource Meters (Actuals) for each Operating/Trade Hour ISO Settles Market & Administrative Charges- Ancillary Services, Imbalance Energy, Congestion, Wheeling, GMC

A/S Capacity vs Real Time Energy Settlement Fundamentals Capacity settlements and Imbalance Energy settlements are separate and distinct A/S payments are for Reserved Generation Capacity and are settled for each Market, DA and HA (24/Day). Energy is settled as either Instructed or Uninstructed Deviations in Real Time, from Scheduled Power Flows ISO Real Time Energy market is a real time balancing service distinct from commodity Forward Energy Markets

ISO Settlement Fundamentals Market Settlements by Charge Type category are revenue neutral Charges are either Due SC or Due ISO and can be + or - Administrative Charges = 15 Unbundled Grid Management Charges (GMC) Settlements are by Trade Hour & 10 Minute Energy Settlement Interval Settlement = Billable Quantity (BQ) x Unit Price

Questions? California Independent