APPENDIX G PH NEUTRALIZATION SYSTEM TECHNICAL MEMORANDUM

Similar documents
VSPS PACKAGE BOOSTER SYSTEM (END SUCTION PUMP DESIGN) FEATURES T Y P E

DETAILED EQUIPMENT SPECIFICATION MHC SERIES WATER SOFTENERS

CHEM-FEED. Engineered Skid Systems. ProSeries. by Blue-White Ind.

Model Q45H/ Residual Chlorine Monitor...

Let s keep it simple. Electronic Valves

SECTION 1000 ENGINEERING SPECIFICATION: AIR STRIPPER (REMOVABLE TRAY)

GRUNDFOS PRODUCT GUIDE DMH. Dosing pumps

DETAILED EQUIPMENT SPECIFICATION MR SERIES WATER SOFTENERS

ICL Three Pump Controller

Auxiliary Equipment. Option #397-12A Single Remote Pumping Unit (with Standard Pump & Motor) Duplex Remote Pumping Unit Option #397-12B

earth safe DEF Systems for Critical Power

TOWN OF FRIDAY HARBOR, WASHINGTON PAGE 1

Multiple vacuum pumps and associated equipment ASME air receiver NEMA 12 multiplex control panel

1000 Series Neptune Booster Systems. Flows to: 20,000+ GPM Heads to: 700+ PSI Temperatures to: 250 F

Cleaning Systems Inc. 2 P Rev:03

SERIES COOLING TOWER SINGLE-CELL UP TO 1500HRT COOLING CAPACITY

The Combustex Pilot Pro 800 Pilot Burner Assembly with Ignition & Flame Failure Monitor

Vission 20/20 micro-controller. Operation and service manual

Updated: October 2012

SPECIFICATIONS EFFLUENT/SUMP DUPLEX SYSTEM ZOELLER SUBMERSIBLE DEWATERING OR EFFLUENT PUMPS

Multiple vacuum pumps and associated equipment ASME air receiver NEMA 12 multiplex control panel

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

SPECIFICATIONS SEWAGE/SUMP DUPLEX SYSTEM ZOELLER COMPANY SUBMERSIBLE SEWAGE OR DEWATERING PUMPS

Advantage-D. Operating Instructions and Maintenance Manual. Central Vacuum Systems (Expandable/Modular Models) (Ver.

Polymer Makedown Systems

September 22, 2016 To: All Contractors Re: Boiler Back-Up Fuel Tank System Renovation. Dear Sir:

BOILER PM & INSPECTION

The Vario motor-driven pump series from ProMinent Adaptable to a wide range of applications VARIO METERING PUMP

pneumatic outflow control

BALLINA WEST INTERIM UPGRADE DAF EFFLUENT TREATMENT PLANT

BATTERY WASH CABINETS, WASH STATIONS, RECIRCULATION/NEUTRALIZATION SYSTEM

HINDUSTAN PETROLEUM CORPORATION LIMITED MUMBAI REFINERY DHT PROJECT SULPHUR BLOCK PART V SECTION 3.3

of Fire Pump Assemblies

LACT MEASUREMENT. Total Head = Or PSI = S.G. 2.31

DETAILED EQUIPMENT SPECIFICATION MRO-4 SERIES REVERSE OSMOSIS SYSTEMS

SPECIFICATIONS SEWAGE/SUMP DUPLEX SYSTEM ZOELLER COMPANY SUBMERSIBLE SEWAGE OR DEWATERING PUMPS

SECTION H3 TRAYMASTER SERIES DEAERATORS

WELDING POSITIONER S OPERATION MANUAL CWP40

DPT TARGET TYPE FLOWMETERS

AMERICAN RECIRCULATING SAND FILTER SYSTEMS

DETAILED EQUIPMENT SPECIFICATION MDAS SERIES DEALKALIZERS

TotalPac 3 Firecyle III Wet pipe Remote controlled system

SECTION H4 BOILERMATE DEAERATORS

Models UP1/2/3/4/5/6/7 Universal pneumatic rotary actuators. Measurement made easy. High performance actuators for precision damper control

MPD Manifold 4-1/ psi with Integrated Control System

CH5000 Heat Recovery Ventilator

AQUIS Foam System. Installation, Operation, and Maintenance Instructions AQUIS 1.5, AQUIS 3.0, and AQUIS 6.0

GE Energy. The Becker * DNGP: Fail-Safe Protection for Your Gas Pipeline

Typical Machine Tool Coolant Purification Unit Installation and Operating Manual Note: MSR provides a custom manual for every application

ROGERS MACHINERY COMPANY, INC

MPD Manifold 4 x psi with Integrated Control System and Coriolis Flowmeter

.2 Section Waste Management and Disposal..5 Section Thermometers and Pressure Gauges Piping Systems.

ProMinent. ProMinent D4a Metering Pumps with built-in proportional controllers

FILTERS DOUBLE LENGTH, DUPLEX DOUBLE LENGTH, SIMPLEX SINGLE LENGTH, SIMPLEX SINGLE LENGTH, DUPLEX

SPECIFICATIONS EFFLUENT/SUMP SIMPLEX SYSTEM ZOELLER SUBMERSIBLE DEWATERING OR EFFLUENT PUMPS

digital flow meters BW Digi-Meter F-1000

TotalPac 3 Deluge system Pneumatic release

North American 1177D-EP2 Control Valves for Air and Exhaust

MDP 1000 OPERATING INSTRUCTIONS PUMP MDP 1000 OPERATING INSTRUCTIONS

Allen-Bradley Parts. CENTERLINE 2500 Motor Control Centers Installing, Joining and Splicing Columns. Installation Instructions. Catalog Number 2500

SAMPLE SPECIFICATIONS

UNDERGROUND STORAGE TANK INSPECTION CHECKLIST

Material of construction. Inner shell material: Polyethylene. Available inlets: See chart. Operating parameters. Maximum operating pressure: 150 psi

CT SEPARATOR SYSTEM OPERATION & MAINTENANCE MANUAL

Our vision is to be the first choice in the needs of our customers that we see as business partners and to serve without sacrificing quality.

SPD50H/100H. Performance Data SPD100H SPD50H. Wholesale Products Page: Section: Performance Data Dated: April 2002 Supersedes: January 2001

Reliant Series Systems Fuel Tanks DAY TANKS FILTRATION TANKS SPECIALTY TANKS

Fire Water Utility 2002 Training Manual Raw Water Storage Area

AQUATOR Commercial Oil Water Separator Operating, Installation & Maintenance Manual

Series Cantilever Liquid Level Control

SERIES COOLING TOWER SINGLE-CELL UP TO 1500HRT COOLING CAPACITY

Oil & Gas Custody Transfer Data Sheet

bibag V2.0 Technician s Manual Part Number Rev. H

Hamilton 3VO Submittal

Functional Performance Test

AURORA INTELLIBOOST REVOLUTIONARY ADVANCEMENTS IN BOOSTER CONTROLS. Certified to NSF/ANSI 61-G

BAS Construction Checklist

MODEL 7ASX-8 SPECIFICATION

PROCESS INSTRUMENTATION

MULTI CONTROL PROCESS STUDY UNIT. Experimental capabilities

(770) Turning Parts Changers Into TROUBLESHOOTERS!

Appendix. Clearance. Skewed profiles. Application Schematics

Signet 3719 ph/orp Wet-Tap Assembly

LEVEL CONTROL SWITCHES

HYDROMATIC SPD50H/100H SUBMERSIBLE HIGH HEAD, DOUBLE SEAL EFFLUENT

.3 Section Concrete Forms and Accessories: Installation of Anchor Devices, Setting Templates

Rosemount 8750WA Magnetic Flowmeter System For Water and Wastewater Industries

Insertion magnetic inductive flowmeter

F-4600 INLINE ULTRASONIC FLOW METER Installation and Operation Guide

2UZ-FE ENGINE CONTROL SYSTEM SFI SYSTEM

Operators Manual ECO-AIR-IVS Internal Valve Actuation System

An IDEX Water & Wastewater Business. pulsafeeder.com. Mechanical Diaphragm Metering Pump

MT8 Pump. Triplex Metering Pump with Pulse-Free Linear Flow

AQUATOR Commercial Oil Water Separator Operating, Installation & Maintenance Manual

Model DV-5 Deluge Valve, Diaphragm Style, 1-1/2 thru 8 Inch (DN40 thru DN200), Deluge System Electric Actuation

DRAWING SET A M I SN L F S E

TotalPac 3 Deluge, Electric release Remote controlled system

Part III : Technical Specification POS C)

Appendix C. Reclaimed Water System Facility Data Sheets. Appendix C

SECTION ELECTRONIC ACTUATED PRESSURE REDUCING VALVES AND ACCESSORIES

Transcription:

APPENDIX G PH NEUTRALIZATION SYSTEM TECHNICAL MEMORANDUM

BCM Construction Project No.: 151-205 ProDELTA Plus Continuous ph Neutralization System PDP-200-2-SC-G-B-T-AX-4-N4-LR-OCV 9/4/2015 Submitted for Approval 21201 Itasca Street Chatsworth, CA 91311 USA Phone: +1.818.998.3500 Fax: +1.818.998.4939 Web: www.wastech.com

1. Process Description... 3 1.1. Sump Tank (T-SUMP)... 3 1.2. ProDELTA-Plus 200-GPM ph Adjustment System... 3 2. Equipment Description (Sump)... 3 2.1. Transfer Pumps (P1-SUMP, P2-SUMP)... 3 2.2. Mixer (M-SUMP)... 3 2.3. Level Transmitter (LT-SUMP)... 4 2.4. High-High Level Switch (LSHH-SUMP)... 4 2.5. Low-Low Level Switch (LSLL-SUMP)... 4 3. Equipment Description (ph Adjustment System)... 4 3.1. Reaction Tanks (RT-1, RT-2)... 4 3.2. Mixers (M-RT1, M-RT2)... 4 3.3. ph Probes (AE1-RT1, AE2-RT1, AE1-RT2, AE2-RT2)... 5 3.4. Control Valves (AFV1-MPS, AFV2-MPS)... 5 3.5. Discharge ph Probes (AE1-MPS, AE2-MPS)... 5 3.6. Air Compressor (CDA-1)... 6 3.7. Pressure Switch (PS-1)... 6 3.8. High-High Level Switch (LSHH-RT1)... 6 3.9. Flowmeter (FE/FT-MPS)... 6 4. Chemical Delivery System... 6 4.1. Caustic Supply Tank (CT-1)... 6 4.2. Caustic Heating Equipment... 6 4.3. Caustic Metering Pumps (CP-1, CP-2)... 6 4.4. Caustic Tank Level Transmitter (LT-CT1)... 7 4.5. Caustic Tank High-High Level Switch (LSHH-CT1)... 7 4.6. Caustic Fill Pump (P1-CAUSTIC)... 7 4.7. Caustic Fill Tank Low Level (LSL-CAUSTIC)... 7 4.8. Leak Detection Switch (LD-CT1)... 7 4.9. Temperature Sensor (TE1/TT1-CT1)... 7 4.10. Temperature Sensor (TE2/TT2-CT1)... 7 4.11. Acid Supply Tank (AT-1)... 8 4.12. Acid Metering Pumps (AP-1, AP-2)... 8 4.13. Acid Tank Level Transmitter (LT-AT1)... 8 4.14. Acid Tank High-High Level Switch (LSHH-AT1)... 8 4.15. Acid Fill Pump (P1-ACID)... 8 4.16. Acid Fill Tank Low Level (LSL-ACID)... 8 4.17. Leak Detection Switch (LD-AT1)... 8 5. Control System... 8 5.1. Process Control... 8 5.2. Process Monitoring... 9 5.3. Manual Controls... 10 5.4. Digital Data Logger... 10 5.5. Alarm Description... 10 5.6. Silence Button... 11 5.7. Process Switch... 11 5.8. Emergency Stop... 11 5.9. Communication with Facility Management System... 11 Submitted for Approval 9/4/2015 Page 2 of 11

1. PROCESS DESCRIPTION 1.1. Sump Tank (T-SUMP) 1.1.1. Industrial wastewater enters the Sump Tank (T-SUMP). The submersible mixer (M-SUMP) continuously stirs the Sump contents to create a homogenous mixture. Transfer Pumps P1-SUMP and P2-SUMP pump the wastewater from the Sump to the ProDELTA-Plus ph Adjustment System based on tank level and operational status of the downstream equipment. 1.2. ProDELTA-Plus 200-GPM ph Adjustment System 1.2.1. Industrial wastewater enters the first Reaction Tank (RT-1) from which the wastewater gravity flows to the second Reaction Tank (RT-2). Each Reaction Tank is equipped with a mixer (agitator) that continuously stirs the wastewater to maintain a homogenous environment within each Reaction Tank. Two (2) ph Probes are installed in each Reaction Tank. The PLC-based control system automatically adjusts the ph within the Reaction Tanks using acid and/or caustic based on the ph readings from the ph Probes. After the wastewater is neutralized in the Reaction Tanks it gravity flows to the Monitoring Pipe Spool (MPS). If the ph in the Monitoring Pipe Spool is within dischargeable limits the wastewater is discharged to the sewer. If the ph is out of range, the wastewater is returned to the Sump for additional treatment. 2. EQUIPMENT DESCRIPTION (SUMP) 2.1. Transfer Pumps (P1-SUMP, P2-SUMP) 2.1.1. Transfer Pumps P1-SUMP and P2-SUMP are submersible pumps that transfer wastewater from the Sump to the ProDELTA-Plus ph Adjustment System. The pumps operate in an alternating lead/lag operation. 2.1.2. Transfer Pumps P1-SUMP and P2-SUMP are each rated for 200 GPM @ 35 TDH. The transfer pumps operate using VFDs (VFD-1, VFD-2) which regulate the speed of the motor to maintain a user-adjustable speed based on the liquid level in the sump. 2.1.3. The PLC-Based Control System automatically alternates between the two transfer pumps (P1-SUMP or P2-SUMP) as the lead pump for each pumping cycle. The Control System will automatically start and stop the lead pump based on the liquid level in the Sump Tank (T-SUMP) measured by the Level Transmitter (LT-SUMP), whenever the Hand-Off-Auto (HOA) switch for each pump is set to AUTO. The operator may also select the lead pump manually. 2.1.4. When the pump HOA switch is set to HAND, the pump will operate regardless of the level measured in the tank. If the pump is left ON, it may run dry, causing damage to the pump. 2.2. Mixer (M-SUMP) 2.2.1. Mixer (M-SUMP) is used to continuously stir the wastewater to maintain a homogenous environment within the Sump Tank. The mixer operates automatically when the Process Switch is ON. Submitted for Approval 9/4/2015 Page 3 of 11

2.3. Level Transmitter (LT-SUMP) 2.3.1. The liquid level in the Sump Tank (T-SUMP) is monitored by a pressure-based Level Transmitter (LT-SUMP) with the following user-adjustable set-points: The Low-Low-1 (LL1) level set-point disables the mixer when the set-point is dry. The Low-Low-2 (LL2) set-point enables the mixer when the set-point is wet. The Low-Low (LL) set-point disables both transfer pumps when the setpoint is dry. The Low-1 (L1) level set-point enables the lead transfer pump at the useradjustable low speed when the set-point is wet. The Low-2 (L2) level set-point enables the lead transfer pump at the useradjustable medium speed when the set-point is wet. The Low-3 (L3) level set-point enables the lead transfer pump at the useradjustable high speed when the set-point is wet. The High (H) level set-point enables both transfer pumps at 100% speed when the set-point is wet. The High-High (HH) level set-point activates an auditory and visual alarm to warn that the tank may overflow and disables the influent permissive signal. 2.4. High-High Level Switch (LSHH-SUMP) 2.4.1. The liquid level in the Sump Tank (T-SUMP) is monitored by a redundant High- High level switch that acts as a backup to the Level Transmitter. When wet, the switch enables both transfer pumps (P1-SUMP, P2-SUMP) at 100% speed, activates an auditory and visual alarm to warn that the tank may overflow and disables the influent permissive signal. 2.5. Low-Low Level Switch (LSLL-SUMP) 2.5.1. The liquid level in the SUMP Tank (T-SUMP) is monitored by a redundant Low- Low level switch that acts as a backup to the Level Transmitter. When dry, the switch disables the sump mixer (M-SUMP) and the submersible transfer pumps (P1-SUMP, P2-SUMP). 3. EQUIPMENT DESCRIPTION (PH ADJUSTMENT SYSTEM) 3.1. Reaction Tanks (RT-1, RT-2) 3.1.1. The Reaction Tanks (RT-1, RT-2) each have a capacity of 1900 gallons and are fabricated from fiberglass. 3.2. Mixers (M-RT1, M-RT2) 3.2.1. Mixers M-RT1 and M-RT2 are used to continuously stir the wastewater to maintain a homogenous environment within the Reaction Tanks. The mixers operate automatically when the Process Switch is ON. 3.2.2. Chemical addition is disabled in a reaction tank if the mixer HOA is placed in HAND/OFF mode or if a motor fault occurs. Submitted for Approval 9/4/2015 Page 4 of 11

3.3. ph Probes (AE1-RT1, AE2-RT1, AE1-RT2, AE2-RT2) 3.3.1. ph Probes AE1-RT1, AE2-RT1, AE1-RT2 and AE2-RT2 measure the ph of the solution in the Reaction Tanks (RT-1, RT-2). Transmitters AT-1, AT-2, AT-3, and AT-4 receive signals from the ph Probes. 3.3.2. The PLC-based control system starts and stops the chemical metering pumps as needed to adjust the measured ph in each Reaction Tank. The Control System adjusts the rate of delivery of the chemical metering pumps, depending on the deviation from the target set-point (i.e. the metering pump operates at a reduced delivery rate for a small deviation and at an increased delivery rate for a large deviation). Chemical addition is disabled in a Reaction Tank in case of a ph transmitter or mixer fault. 3.3.3. The ph control set-points are user-adjustable for each Reaction Tank. The system will adjust the gains of the ph loops based on the flow rate through the system. The factory settings are noted below. These may be changed after system commissioning to adjust to actual operating conditions. 3.3.4. Reaction Tank RT-1 settings: CP-1 operates when ph < 6.25 AP-1 operates when ph > 8.75 3.3.5. Reaction Tank RT-2 settings: CP-2 operates when ph < 6.25 AP-2 operates when ph > 8.75 3.3.6. In each reaction tank, one ph Probe will be online (user-defined) and control ph adjustment and alarms. The other will be on stand-by and serve as a deviation monitor for the online ph Probe. If the ph measurements from the two probes drift apart by a user-defined value an alarm will be activated. If the measurements drift apart beyond a second user-adjustable value, chemical addition to the corresponding Reaction Tank will be disabled. In the event that the online ph Probe experiences a fault condition, the stand-by ph Probe will automatically assume online status. 3.4. Control Valves (AFV1-MPS, AFV2-MPS) 3.4.1. Control Valves AFV1-MPS and AFV2-MPS are pneumatically actuated twoway valves that direct the flow of wastewater to the sewer and to the Sump for additional treatment. When the ph of the wastewater inside the Monitoring Pipe Spool (MPS) is within dischargeable limits the valves are energized and open to the sewer. When the ph of the wastewater is outside dischargeable limits, the valves are then de-energized and open to the Sump for additional treatment. 3.5. Discharge ph Probes (AE1-MPS, AE2-MPS) 3.5.1. ph Probes AE1-MPS and AE2-MPS measure the ph of the wastewater in the monitoring pipe spool installed on the discharge piping of the system. Transmitters AT-5 and AT-6 receive signals from the ph probes. 3.5.2. In the monitoring pipe spool, one ph Probe will be online (user-defined) and control ph related alarms and system responses. The other will be on stand-by and serve as a deviation monitor for the online ph Probe. If the ph Submitted for Approval 9/4/2015 Page 5 of 11

measurements from the two probes drift apart by a user-defined value an alarm will be activated. If the measurements drift apart beyond a second useradjustable value the system will disable discharge to the sewer. In the event that the online ph Probe experiences a fault condition, the stand-by ph Probe will automatically assume online status. 3.6. Air Compressor (CDA-1) 3.6.1. Air Compressor CDA-1 supplies clean dry air to Pumps P1-CAUSTIC and P1- ACID and pneumatic control valves AFV1-MPS and AFV2-MPS. 3.7. Pressure Switch (PS-1) 3.7.1. A Pressure Switch (PS-1) is installed on the CDA supply line to confirm CDA pressure is available to the system. If low pressure is detected by the Pressure Switch an auditory and visual alarm is activated. 3.8. High-High Level Switch (LSHH-RT1) 3.8.1. The liquid level in the first Reaction Tank (RT-1) is monitored by a single-point level switch. When wet, the switch activates an auditory and visual alarm to warn that the tank may overflow and disables the Sump Transfer Pumps. 3.9. Flowmeter (FE/FT-MPS) 3.9.1. Flowmeter FE-MPS is a magnetic flowmeter that measures the flow rate of wastewater discharged from the system. The system uses the position switch feedback from the control valves on the discharge to monitor whether the system effluent is discharged to the sewer or recirculated to the sump for additional treatment. Both the total flow to the sump and the total flow to the sewer are data-logged via the HMI s integral Data Logger. 4. CHEMICAL DELIVERY SYSTEM 4.1. Caustic Supply Tank (CT-1) 4.1.1. Caustic Supply Tank CT-1 has a capacity of 150 gallons and is a fabricated triple-welded polypropylene tank. 4.1.2. Tank CT-1 is double contained. 4.2. Caustic Heating Equipment 4.2.1. Caustic Cabinet Heater H1-CT1 is a blanket heater installed in the Caustic Metering Pump cabinet to prevent the caustic in the metering pumps from freezing. The heating set-point is user-adjustable 4.2.2. Caustic Tank Heater H2-CT1 is a submersible heater that is installed to prevent the caustic from freezing. The heating set-point is user-adjustable. 4.2.3. Caustic Heat Trace Cable H3-CT1 is installed on the caustic injection tubing double containment piping to prevent the caustic in the injection lines from freezing. The heating set-point is user-adjustable. 4.3. Caustic Metering Pumps (CP-1, CP-2) 4.3.1. The Caustic Metering Pumps deliver caustic to the Reaction Tanks according to the control set-points described in Section 3. Submitted for Approval 9/4/2015 Page 6 of 11

4.3.2. The Caustic Metering Pumps are each rated for 20 GPH @ 30 PSI. 4.4. Caustic Tank Level Transmitter (LT-CT1) 4.4.1. A level transmitter (LT-CT1) is installed in the Caustic Supply Tank with the following user-adjustable set-points: The Low (L) level set-point activates an auditory and visual alarm to warn that the caustic level is low. The High (H) level set-point disables the Caustic Fill Pump when the setpoint is wet. The High-High (HH) level set-point activates an auditory and visual alarm to warn that the tank may overflow. 4.5. Caustic Tank High-High Level Switch (LSHH-CT1) 4.5.1. An ultrasonic level switch (LSHH-CT1) is installed in the Caustic Supply Tank to monitor the Caustic Tank level during filling. If High-High level is detected, the system will stop filling the Caustic Supply Tank and activate an auditory and visual alarm to warn that the tank may overflow. 4.6. Caustic Fill Pump (P1-CAUSTIC) 4.6.1. The Caustic Fill Pump is an air operated diaphragm pump that delivers caustic to the Caustic Supply Tank CT-1. 4.6.2. The Caustic Fill Pump is rated for 8 GPM @ 90 TDH. 4.7. Caustic Fill Tank Low Level (LSL-CAUSTIC) 4.7.1. An ultrasonic level switch (LSL-CAUSTIC) is installed in the Caustic Fill Tank to warn when the caustic level is low. If Low level is detected, the Caustic Fill Pump (P1-CAUSTIC) will be disabled and an auditory and visual alarm will be activated. 4.8. Leak Detection Switch (LD-CT1) 4.8.1. A leak detection switch is installed in the secondary containment of the Caustic Supply Tank to monitor the presence of liquid resulting from primary tank failure or overflow. 4.9. Temperature Sensor (TE1/TT1-CT1) 4.9.1. Temperature sensor TE1/TT1-CT1 is installed inside the caustic supply tank to monitor the temperature of the caustic solution. If the temperature of the caustic solution drops below the user-adjustable temperature setting the submersible heater will be enabled. 4.10. Temperature Sensor (TE2/TT2-CT1) 4.10.1. Temperature sensor TE2/TT2-CT1 is installed on the caustic supply line to monitor the ambient temperature around the caustic supply line. If the temperature of the supply line drops below the user-adjustable temperature setting the heat trace cable will be enabled. Submitted for Approval 9/4/2015 Page 7 of 11

4.11. Acid Supply Tank (AT-1) 4.11.1. Acid supply tank AT-1 has a capacity of 150 gallons and is fabricated triplewelded polypropylene tank. 4.11.2. Tank AT-1 is double contained. 4.12. Acid Metering Pumps (AP-1, AP-2) 4.12.1. The Acid Metering Pumps deliver acid to the Reaction Tanks according to the control set-points described in Section 3. 4.12.2. The Acid Metering Pumps are each rated for 20 GPH @ 30 PSI. 4.13. Acid Tank Level Transmitter (LT-AT1) 4.13.1. A level transmitter (LT-AT1) is installed in the Acid Supply Tank with the following user-adjustable set-points: The Low (L) level set-point activates an auditory and visual alarm to warn that the acid level is low. The High (H) level set-point disables the Acid Fill Pump when the set-point is wet. The High-High (HH) level set-point activates an auditory and visual alarm to warn that the tank may overflow. 4.14. Acid Tank High-High Level Switch (LSHH-AT1) 4.14.1. An ultrasonic level switch (LSHH-AT1) is installed in the Acid Supply Tank to monitor the Acid Tank level during filling. If High-High level is detected, the system will stop filling the Acid Supply Tank and activate an auditory and visual alarm to warn that the tank may overflow. 4.15. Acid Fill Pump (P1-ACID) 4.15.1. The Acid Fill Pump is an air operated diaphragm pump that delivers Acid to the Acid Supply Tank AT-1. 4.15.2. The Acid Fill Pump is rated for 8 GPM @ 90 TDH. 4.16. Acid Fill Tank Low Level (LSL-ACID) 4.16.1. An ultrasonic level switch (LSL-ACID) is installed in the Acid Fill Tank to warn when the Acid level is low. If Low level is detected, the Acid Fill Pump (P1- ACID) will be disabled and an auditory and visual alarm will be activated. 4.17. Leak Detection Switch (LD-AT1) 4.17.1. A leak detection switch is installed in the secondary containment of the Acid Supply Tank to monitor the presence of liquid resulting from primary tank failure or overflow. 5. CONTROL SYSTEM 5.1. Process Control 5.1.1. The control panel contains a PLC-based Control System that provides operation of the equipment listed below: Submitted for Approval 9/4/2015 Page 8 of 11

Caustic Fill Pump (P1-CAUSTIC) Acid Fill Pump (P1-ACID) Caustic Metering Pumps (CP-1, CP-2) Acid Metering Pumps (AP-1, AP-2) Discharge Control Valves (ABV1-MPS, ABV2-MPS) Caustic Heaters (H1-CT1, H2-CT1, H3-CT1) Tank Mixers (M-RT1, M-RT2) Sump Mixer (M-SUMP) Sump Transfer Pumps (P1-SUMP, P2-SUMP) 5.2. Process Monitoring 5.2.1. The PLC-based Control System monitors the operating parameters and equipment status listed below: Status of the Reaction Tank Mixers (Hand/Off/Auto and On/Off for M-RT1, M-RT2) Status of the Reaction Tank High-High Level Switch (Wet/Dry status of LSHH-RT1) ph measured in the Reaction Tanks (AE1-RT1, AE2-RT1, AE1-RT2, AE2- RT2) ph measured in the discharge pipe spool (AE1-MPS. AE2-MPS) Flow measured in the discharge pipe spool (FE-MPS) Status of the Caustic Metering Pumps (Hand/Off/Auto, On/Off, and %Output for CP-1, CP-2) Status of the Acid Metering Pumps (Hand/Off/Auto, On/Off, and %Output for AP-1, AP-2) Status of the Discharge Control Valves (AFV1-MPS, AFV2-MPS) Level indication for the Caustic Storage Tank (Wet/Dry status of LSHH- CT1, % level for LT-CT1) Level indication for the Caustic Fill Tank (Wet/Dry status of LSL-CAUSTIC) Temperature measured in caustic tank (TE1-CT1) Ambient temperature measured at caustic supply line (TE2-CT1) Status of Caustic Metering Pump Cabinet Blanket Heater (On/Off for HT1-CT1) Status of Caustic Tank Submersible Heater (On/Off and % Output for HT2-CT1) Status of Caustic Supply Line Heat Trace Cable (On/Off for HT3- CT1) Level indication for the Acid Storage Tank (Wet/Dry status of LSHH-AT1, % level for LT-AT1) Level indication for the Acid Fill Tank (Wet/Dry status of LSL-ACID) Submitted for Approval 9/4/2015 Page 9 of 11

Status of the Caustic Leak Detection Switch (Wet/Dry status of LD-CT1) Status of the Acid Leak Detection Switch (Wet/Dry status of LD-AT1) Status of system air pressure (Ok/Not Ok status of PS-1) Level indication for the Sump (% level for LT-SUMP and Wet/Dry status of operational set-points, Wet/Dry status of LSLL-SUMP, LSHH-SUMP) Status of the Sump Transfer Pumps (Hand/Off/Auto and On/Off for P1- SUMP, P2-SUMP) 5.3. Manual Controls Status of the Sump Mixer (Hand/Off/Auto and On/Off for M-SUMP) 5.3.1. Manual controls are provided for the system equipment to allow for equipment maintenance, control loop tuning and troubleshooting. Under normal operations, all controls are to be set to AUTO. The following manual controls are provided: Process On/Off switch to place the Control System in AUTO Hand/Off to start and stop the Reaction Tank Mixers (M-RT1, M-RT2) Hand/Off to start and stop the Sump Mixer (M-SUMP) Hand/Off to start and stop the Sump Transfer Pumps (P1-SUMP, P2- SUMP) Hand/Off to start and stop the Caustic Fill Pump (P1-CAUSTIC) Hand/Off to start and stop the Acid Fill Pump (P1-ACID) Hand/Off to start and stop the Caustic Metering Pumps (CP-1, CP-2) Hand/Off to start and stop the Acid Metering Pumps (AP-1, AP-2) Auto/Off to start and stop the Caustic Tank Heater (H1-CT1) Auto/Off to start and stop the Caustic Cabinet Blanket Heater (H2-CT1) Auto/Off to start and stop the Caustic Heat Trace Cable (H3-CT1) Open/Close of the Discharge Control Valves (AFV1-MPS, AFV2-MPS) Hand/Off to start and stop the Air Compressor (CDA-1) 5.4. Digital Data Logger 5.4.1. The HMI integral data logger records the following: ph within the discharge piping measured by ph Sensor AE1-MPS or AE2- MPS Flow Rate to the sewer measured by Flowmeter FE-MPS Total Flow to the sewer measured by Flowmeter FE-MPS 5.5. Alarm Description 5.5.1. Refer to the System Response and Interlock Matrix for audible alarm annunciator and visual alarm beacon activation at the Control Panel. Submitted for Approval 9/4/2015 Page 10 of 11

5.6. Silence Button 5.6.1. There is a SILENCE button on the Control Panel that will turn off the audible alarm annunciator. Pressing this button will not reset the alarm condition that initiated the alarm. Alarms are reset automatically or manually, depending on the specific type of alarm. 5.7. Process Switch 5.7.1. The Control Panel is equipped with a Process On/Off switch to place the Control System in AUTO. When the switch is placed in the Off position all automated functions of the system will be disabled. Power to the instrumentation will remain energized and they will continue to function. Certain alarms are suppressed when the Process Switch is in the Off position (refer to the System Response and Interlock Matrix for more details). 5.8. Emergency Stop 5.8.1. The Control Panel is equipped with an emergency stop button (E-STOP). In the event of system emergency, pressing this mushroom-style button will deenergize all power or devices with potential energy (e.g. those controlled with compressed dry air). Power to the instrumentation will remain energized and they will continue to function. Treatment of wastewater will be disabled when the E-STOP button is pressed. To reset the E-STOP button, pull on it to the full-out position. 5.9. Communication with Facility Management System 5.9.1. The Control Panel is equipped with the dry contacts, inputs, and communications listed below. Refer to the System Response and Interlock Matrix for more details. One (1) Common Alarm Dry Contact: Energized when no alarms are present. De-energized in case of an alarm. One (1) Influent Permissive Dry Contact: De-energized when the Process Switch is off, the E-Stop is pushed in, or the Run Permissive is not enabled. Energized under normal operating conditions. One (1) ph Out of Range Dry Contact: De-energized when ph in the discharge pipe spool (AE1-MPS or AE2-MPS) is out of range. One (1) Run Permissive Input: Facility is required to close contact to enable treatment system. Two (2) Analog Flow Inputs One (1) Communication Connection via Ethernet I/P END OF PROCESS & EQUIPMENT DESCRIPTION Submitted for Approval 9/4/2015 Page 11 of 11

DISCHARGE TO SEWER 6" FLANGE OUT OF COMPLIANCE TO SUMP 6" FLANGE PLAN VIEW 30 in SUBMITTED FOR APPROVAL BY WASTECH CONTROLS & ENGINEERING, INC. PLEASE REVIEW, SIGN & RETURN ONE (1) COPY APPROVED AS IS APPROVED AS NOTED REVISE AS NOTED AND RESUBMIT 168 in RECOMMENED CLEARANCE FOR MAINTENANCE AND CALIBRATION SIGNATURE SIGNATURE WASTEWATER INLET 6" FLANGE REQUIRED CLEARANCE FOR HIGH VOLTAGE ELECTRICAL EQUIPMENT PLEASE RETURN DRAWING TO WASTECH CONTROLS & ENGINEERING, INC. BY 87 1/4 in WASTEWATER INLET 6" FLANGE RT-1 RT-2 371 in 42 in ELECTRICAL PANEL 92 1/2 in HEADROOM REQUIRED FOR REMOVING MIXER MOTOR 101 in 185 in NOTES: 1. MATERIALS OF CONSTRUCTION: A) CHEMICAL TANKS TO BE FABRICATED FROM 3/4" THICK WHITE POLYPROPYLENE. B) ALL OTHER TANKS TO BE FRP. C) SKID TO BE ASTM A36/A500 STEEL EPOXY-COATED BLUE. D) ALL PIPING AND FITTINGS TO BE CPVC SCH 80. E) PNEUMATIC TUBING TO BE STAINLESS STEEL. F) HARDWARE TO BE 18-8 SS. G) ELECTRICAL CONDUIT TO BE PVC. 2. ALL SURFACES TO BE SEALED WITH EPDM GASKET. 3. SOME SUPPORTS NOT SHOWN FOR CLARITY. ANCHOR BOLTS TO BE SPECIFIED AND SUPPLIED BY OTHERS. 4. INSTALLATION, INTERCONNECTING PIPING AND WIRING SUPPLIED AND INSTALLED BY OTHERS. INSTALLER TO PROVIDE ADEQUATE VENTILATION TO THE TANKS. 5. APPROXIMATE EQUIPMENT WEIGHTS: i) SKID DRY WEIGHT: 10200 LBS ii) SKID OPERATING WEIGHT: 45700 LBS iii) SKID MAXIMUM WEIGHT: 50200 LBS iv) MIXER MOTOR W/ GEARBOX: 180 LBS EACH 300 in FRONT ELEVATION VIEW 96 in 103 1/2 in SIDE ELEVATION VIEW REV. : BY: DESCRIPTION 1 09/17/2015 MF SUBMITTED FOR APPROVAL 0 09/03/2015 MF DRAFT APPROVALS 158 1/4 in 118 in MAXIMUM SHIPPING HEIGHT CT-1 AT-1 OUT OF COMPLIANCE TO SUMP 6" FLANGE DISCHARGE TO SEWER 6" FLANGE 147 in DRAWN BY: PROJECT ENG.: SS PROPRIETARY INFORMATION ENGINEERING MANAGER: MF JH C 2014 WASTECH CONTROLS & ENGINEERING, INC. 08/24/2015 THIS DRAWING AND ALL INFORMATION HEREON IS THE PROPERTY OF WASTECH CONTROLS & ENGINEERING INC. ANY COPYING, REPRODUCTION OR UNAUTHORIZED USE WITHOUT WRITTEN CONSENT IS PROHIBITED. 52 in 300 in 314 1/2 in 34 1/4 in 48 3/4 in REAR ELEVATION VIEW 21201 Itasca Street, Chatsworth, California 91311-4922 Tel: (818) 998-3500 Fax: (818) 998-4939 TITLE: BMC CONSTRUCTION REVISION PDP 200 GPM NEUTRALIZATION SYSTEM LAYOUT 1 SIZE DWG. NO. B 151205-MG-001 SCALE: NTS SHEET: 1 OF 1

SUBMITTED FOR APPROVAL N4 AT-1 AT-2 REAR ISOMETRIC VIEW BY WASTECH CONTROLS & ENGINEERING, INC. PLEASE REVIEW, SIGN & RETURN ONE (1) COPY AP-1 AP-2 APPROVED AS IS APPROVED AS NOTED CP-1 CP-2 H1-CT1 TT1-CT1 TE1-CT1 AT-3 AT-4 REVISE AS NOTED AND RESUBMIT SIGNATURE SIGNATURE LT-CT1 8" VIEWPORT (2 PLACES) ACID INJECTION BOX (2 PLACES) N11 M-RT2 CAUSTIC INJECTION BOX (2 PLACES) N12 M-RT1 LSHH-CT1 CAUSTIC LINE TEMP CONTROLLERS (3 PLACES) JB-8 LD-CT1 N5 JB-7 LD-AT1 N3 N5 LT-AT1 LSHH-AT1 N1 / N2 H2-CT1 N13 CAUSTIC INJECTION LINE TO BE HEAT-TRACED AND INSULATED TT2-CT1 TE2-CT1 24" MANWAY (2 PLACES) AFV1-MPS N13 N10 N9 AFV2-MPS FT-MPS FE-MPS AE2-MPS AE1-MPS N14 AT-5 AT-6 PLEASE RETURN DRAWING TO WASTECH CONTROLS & ENGINEERING, INC. BY NOZZLE SCHEDULE NOZZLE DESCRIPTION QTY SERVICE N1 1/2" FNPT 2 CHEMICAL INLET N2 2" FNPT 2 DOUBLE CONTAINMENT N3 2" FNPT 2 VENT N4 2" FNPT 2 VENT N5 1" FNPT 2 DRAIN N6 3/8" FNPT 1 CDA TO P1-CAUSTIC N7 3/8" FNPT 1 CDA TO P1-ACID N8 6" FLANGE 1 WASTEWATER INLET N9 6" FLANGE 1 EFFLUENT TO SEWER N10 6" FLANGE 1 OUT-OF-SPEC RETURN N11 8" FLANGE 2 SPARE N12 6" FLANGE 2 VENT N13 2" FLANGE 2 DRAIN N14 2" FNPT 1 DRAIN NOTES: 1. MATERIALS OF CONSTRUCTION: A) CHEMICAL TANKS TO BE FABRICATED FROM 3/4" THICK WHITE POLYPROPYLENE. B) ALL OTHER TANKS TO BE FRP. C) SKID TO BE ASTM A36/A500 STEEL EPOXY-COATED BLUE. D) ALL PIPING AND FITTINGS TO BE CPVC SCH 80. E) PNEUMATIC TUBING TO BE STAINLESS STEEL. F) HARDWARE TO BE 18-8 SS. G) ELECTRICAL CONDUIT TO BE PVC. 2. ALL SURFACES TO BE SEALED WITH EPDM GASKET. 3. SOME SUPPORTS NOT SHOWN FOR CLARITY. ANCHOR BOLTS TO BE SPECIFIED AND SUPPLIED BY OTHERS. 4. INSTALLATION, INTERCONNECTING PIPING AND WIRING SUPPLIED AND INSTALLED BY OTHERS. INSTALLER TO PROVIDE ADEQUATE VENTILATION TO THE TANKS. 5. APPROXIMATE EQUIPMENT WEIGHTS: i) SKID DRY WEIGHT: 10200 LBS ii) SKID OPERATING WEIGHT: 45700 LBS iii) SKID MAXIMUM WEIGHT: 50200 LBS iv) MIXER MOTOR W/ GEARBOX: 180 LBS EACH REV. : BY: DESCRIPTION RT-2 N8 N11 RT-1 N12 N3 N1 / N2 PS-1 SV-MPS 0 09/17/2015 MF SUBMITTED FOR APPROVAL APPROVALS DRAWN BY: PROJECT ENG.: SS PROPRIETARY INFORMATION ENGINEERING MANAGER: MF JH C 2014 WASTECH CONTROLS & ENGINEERING, INC. 08/24/2015 THIS DRAWING AND ALL INFORMATION HEREON IS THE PROPERTY OF WASTECH CONTROLS & ENGINEERING INC. ANY COPYING, REPRODUCTION OR UNAUTHORIZED USE WITHOUT WRITTEN CONSENT IS PROHIBITED. FRONT ISOMETRIC VIEW ELECTRICAL PANELS N6 N7 SV1-AT1 SV1-CT1 CDA-1 21201 Itasca Street, Chatsworth, California 91311-4922 Tel: (818) 998-3500 Fax: (818) 998-4939 TITLE: BMC CONSTRUCTION REVISION PDP 200 GPM NEUTRALIZATION SYSTEM MECHANICAL GENERAL ARRANGEMENT 0 SIZE DWG. NO. B 151205-MG-101 SCALE: NTS SHEET: 1 OF 2

178 7/8 in (TIE-DOWN) 110 5/8 in (TIE-DOWN) SUBMITTED FOR APPROVAL BY WASTECH CONTROLS & ENGINEERING, INC. PLEASE REVIEW, SIGN & RETURN ONE (1) COPY APPROVED AS IS APPROVED AS NOTED 7/8 in THRU (SEE NOTE 3) 5 1/4 in N11 N12 N11 N12 N4 N4 A 1 1/2 in THRU REVISE AS NOTED AND RESUBMIT SIGNATURE SIGNATURE 5 1/4 in 85 1/2 in (TIE-DOWN) PLEASE RETURN DRAWING TO WASTECH CONTROLS & ENGINEERING, INC. 4 in BY NOZZLE SCHEDULE DETAIL A TIE-DOWN (QTY: 6) 8" VIEWPORT (2 PLACES) AE2-RT2 AE1-RT2 AE2-RT1 LSHH-RT1 N3 N1 / N2 N3 N1 / N2 AE1-RT1 5 3/8 in DETAIL B RIGGING HOLE (QTY: 4) NOZZLE DESCRIPTION QTY SERVICE N1 1/2" FNPT 2 CHEMICAL INLET N2 2" FNPT 2 DOUBLE CONTAINMENT N3 2" FNPT 2 VENT N4 1" FNPT 2 VENT N5 1" FNPT 2 DRAIN N6 3/8" FNPT 1 CDA TO P1-CAUSTIC N7 3/8" FNPT 1 CDA TO P1-ACID N8 6" FLANGE 1 WASTEWATER INLET N9 6" FLANGE 1 EFFLUENT TO SEWER N10 6" FLANGE 1 OUT-OF-SPEC RETURN N11 8" FLANGE 2 SPARE N12 6" FLANGE 2 VENT N13 2" FLANGE 2 DRAIN N14 2" FNPT 1 DRAIN HEADROOM REQUIRED FOR REMOVING MIXER MOTOR 118 in MAX SHIPPING HEIGHT N10 48 3/4 in N9 64 in 185 in 87 1/4 in WASTECH RECOMMENDS INSTALLING A PLATFORM OR STAND TO CALIBRATE THESE PH SENSORS PLAN VIEW N8 N6 N7 158 1/4 in NOTES: 1. MATERIALS OF CONSTRUCTION: A) CHEMICAL TANKS TO BE FABRICATED FROM 3/4" THICK WHITE POLYPROPYLENE. B) ALL OTHER TANKS TO BE FRP. C) SKID TO BE ASTM A36/A500 STEEL EPOXY-COATED BLUE. D) ALL PIPING AND FITTINGS TO BE CPVC SCH 80. E) PNEUMATIC TUBING TO BE STAINLESS STEEL. F) HARDWARE TO BE 18-8 SS. G) ELECTRICAL CONDUIT TO BE PVC. 2. ALL SURFACES TO BE SEALED WITH EPDM GASKET. 3. SOME SUPPORTS NOT SHOWN FOR CLARITY. ANCHOR BOLTS TO BE SPECIFIED AND SUPPLIED BY OTHERS. 4. INSTALLATION, INTERCONNECTING PIPING AND WIRING SUPPLIED AND INSTALLED BY OTHERS. INSTALLER TO PROVIDE ADEQUATE VENTILATION TO THE TANKS. 5. APPROXIMATE EQUIPMENT WEIGHTS: i) SKID DRY WEIGHT: 10200 LBS ii) SKID OPERATING WEIGHT: 45700 LBS iii) SKID MAXIMUM WEIGHT: 50200 LBS iv) MIXER MOTOR W/ GEARBOX: 180 LBS EACH REV. : BY: DESCRIPTION 0 09/17/2015 MF SUBMITTED FOR APPROVAL APPROVALS DRAWN BY: PROJECT ENG.: SS PROPRIETARY INFORMATION ENGINEERING MANAGER: MF JH 08/24/2015 34 1/4 in 4 in TYP 32 in TYP 96 in 12 in TYP N14 122 in (32) in 122 in 300 in B 20 in (32) in 103 1/2 in 20 in C 2014 WASTECH CONTROLS & ENGINEERING, INC. THIS DRAWING AND ALL INFORMATION HEREON IS THE PROPERTY OF WASTECH CONTROLS & ENGINEERING INC. ANY COPYING, REPRODUCTION OR UNAUTHORIZED USE WITHOUT WRITTEN CONSENT IS PROHIBITED. LEFT ELEVATION VIEW 314 1/2 in FRONT ELEVATION VIEW SIDE ELEVATION VIEW 21201 Itasca Street, Chatsworth, California 91311-4922 Tel: (818) 998-3500 Fax: (818) 998-4939 TITLE: BMC CONSTRUCTION REVISION PDP 200 GPM NEUTRALIZATION SYSTEM MECHANICAL GENERAL ARRANGEMENT 0 SIZE DWG. NO. B 151205-MG-102 SCALE: NTS SHEET: 2 OF 2