CLIMATE CHANGE AND PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT AVAILABLE FOR PUBLIC REVIEW

Similar documents
BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT (BID)

Printed May 10, 2015 at 5:13

PROPOSED NEW COAL-FIRED POWER STATION IN THE LEPHALALE AREA, LIMPOPO PROVINCE ENVIRONMENTAL IMPACT ASSESSMENT

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

WELLINGTON, NEW ZEALAND. PURSUANT to sections 152, 155(a) and (e) and 158(a)(i) of the Land Transport Act 1998

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

1 Z Bradshaw vs P A Lightheart Parental Rights (Ouerlike Regte) 14469/15

SOUTH AFRICAN NATIONAL STANDARD

GLS CONSULTING ENGINEERING REPORT: DEVELOPMENT ERF 1692, FRANSCHHOEK: CAPACITY ANALYSIS OF THE BULK WATER & SEWER SERVICES

Comments & Response Report Highlands South WEF Grid Connection APPENDIX 3: SITE NOTICE BOARD & POSTERS PLACEMENTS

Joint Operating Procedures for First Nations Consultation on Energy Resource Activities

Bohn to Kettle River Transmission Project

Kettle River Transmission Project

TRAFFIC IMPACT ASSESSMENT

The Role of Nuclear Power

INDUSTRIAL S ERVICES SCOPING REPORT MATIMBA B (MEDUPI) TRANSMISSION INTEGRATION PROJECT

RSPO RSPO NOTIFICATION OF PROPOSED NEW PLANTING

The Waste Electrical and Electronic Equipment Regulations 2013 (as amended) Notification of grant of approval of an authorised treatment facility

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

RSPO RSPO NOTIFICATION OF PROPOSED NEW PLANTING

DEPARTMENT OF TRADE AND INDUSTRY NO APRIL 2016

For personal use only

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By

Explanatory Note to Decision 2013/015/R. Certification Specifications and Acceptable Means of Compliance for Light Sport Aeroplanes ( CS-LSA )

On-street European Standard Parking Award

Alstom in South Africa

Electric Vehicle Charging Incentive Program (EVCIP) Application Form

Alberante BMW & ARC Company profile INTRODUCTION

WELCOME. New Septage Waste Haulage Receiving Station Municipal Class Environmental Assessment (Class EA)

Delivering Energy Systems Solutions

WEEKLY LIST. Office of the Registrar of the KwaZulu/Natal High Court, 301 Church Street, Pietermaritzburg 3201 Tel No.

Slings ASME B Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings. (Revision of ASME B30.

CITY OF SASKATOON ADMINISTRATIVE POLICY

Direct Energy Regulated Services

ASPHALT ROUND 1 PROFICIENCY TESTING PROGRAM. April 2009 REPORT NO. 605 ACKNOWLEDGEMENTS

12 Hugenote Street P.O. Box 2. Reg. 2013/104987/07 Tel: +27 (0) VAT Fax: +27 (0) Web:

committee report General Permitted Development Order SPT response to consultation

SPP Notification to Construct

Auto Alpina Motorrad Wins Again!!!!

Provincial Gazette Provinsiale Koerant

2020 GLOBAL SULPHUR LIMIT HISTORY, CURRENT STATUS, AND THE INTERNATIONAL MARITIME ORGANIZATION S (IMO S) WORK PLAN FOR EFFECTIVE IMPLEMENTATION

Environment and Climate Change Canada Clean Fuel Standard for ISCC Stakeholder Meeting North America

Request for Qualification for Comprehensive Plan Services RFQ#

Regulatory Status and Road Map for Wind Energy in Namibia

Business Profile DESIGNED BY: RIVONINGO ENTERPRISE DEVELOPMENT SOLUTIONS (PTY) LTD

Chirmorie Wind Farm Grid Connection

MINUTES WA Generator Forum (WAGF)

THIRD DIVISION: COURT NO. 16 at 10H00 am BEFORE THE HONOURABLE MS ACTING JUSTICE DAVIS. 1 African Compass Trading 183 (Pty) Ltd Liquidation 18434/17

SAIREC Panel Discussion

ENGINEERING (EDMS) BPK Reg. Nr. 96/04645/07. Company Profile

Willingdon Substation Decommission

Technical Services Report

welcome to the BC Hydro community open house

Notice of Proposed Amendment Regular update of CS-25

OFFICIAL PROGRAM STANDARDS NOTIFICATION Issued: February 24, 2012

Proposed Rules of The Tennessee Board of Regents State University and Community College System of Tennessee University of Memphis

'9vrjjefwtj\lee &j\iif {fardett

APPENDIX C - AESO PIP SUMMARY

Broken Hill Solar Plant. Community Information Session 9 September 2015

This page is intentionally left blank.

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

DEPARTMENT OF TRANSPORTATION. Commercial Driver s License Standards: Application for Exemption; Isuzu North

Innovation meets Standardization

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

Request for Qualifications. for

ROMPCO 120 ( GTA1 ) 2013 (2013 Q2)

Light Vehicle Ordering Guide. Complete Leasing and Fleet Management Solutions

Decision Blaze Energy Ltd. Application for an Exemption under Section 24 of the Hydro and Electric Energy Act.

Terms of Reference (ToR) Trade & Traceability Standing Committee (T&T SC)

Currant Lake Transmission Project

FOR PROPOSED TOWNSHIPS ESTER PARK X36, X 37 IRENE EXTENSION 193

SULPHUR IN DIESEL FUEL REGULATIONS [FEDERAL]

PUBLIC COMMENTS ON THE SOLAR ACT Request for Comments Issued November 9, 2012 Comments Received by November 23, 2012 TABLE OF CONTENTS

PROPOSAL FOR A LIMOUSINE MINIMUM RATES PILOT PROJECT FEBRUARY 2011

Re: 233 Armstrong Street Residential Condominium Traffic Brief

RFQ Fleet Vehicles. The City of Dawson Creek is requesting quotations for the supply and delivery of:

1 Garden Cities Non-Profit Company (RF) vs The Registrar of Deeds: 9172/18 Cape Town & 2 others Declaratory Order

DEPARTMENT OF TRANSPORTATION. Commercial Driver s License Standards: Application for Exemption; Daimler Trucks North America (Daimler)

Project Scoping Open House Welcome

SERVICE REPORT ELECTRICAL ENGINEERING FOUNDERS HILL REMAINDER ERF 13

Director of Building and Deputy Chief Building Official. 1. North York Community Council approve the request for sign variance at 515 Drewry Avenue.

Southern California Public Power Authority (SCPPA) Request for Information (RFI) Battery Energy Storage System (BESS)

APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP)

General Valuation Roll for the period 2013/14 to 2016/17 for the BERGRIVIER Municipality

Request for Assistance (RFA)

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

HSS Range Horizontal Bearing Assemblies. HSS Range Horizontal Bearing Assemblies

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota


APPROVED CONTRACTORS 2017

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council January 15, 2019

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

Indiana University South Bend Archives

Alberta Electrical Utility Code 2007 Simbiolutions

Commercial Solar Systems

Mobile and Locomotive Cranes

Transcription:

From the desk of Gabriele Wood E-mail: gabriele@savannahsa.com 27 January 2017 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PUBLIC PARTICIPATION PROCESS WATERBERG (THABAMETSI) POWER STATION, NEAR LEPHALALE, LIMPOPO PROVINCE (DEA Ref. No. 14/12/16/3/3/40) CLIMATE CHANGE AND PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT AVAILABLE FOR PUBLIC REVIEW Thabametsi Power Company Proprietary Limited, an Independent Power Producer (IPP) is proposing the construction of a coal-fired power station (the Project ) on the farm Onbelyk 254 LQ near Lephalale in the Limpopo Province. The project is known as the Thabametsi Coal-Fired Power Station. The power station will have a generating capacity of up to 1200MW which is intended to provide baseload electricity for integration into the national grid. The project was authorized by the National Department of Environmental Affairs (DEA) on 25 February 2015 (in terms of the 2010 EIA Regulations). Subsequently, an appeal was lodged on 11 May 2015 by the Centre for Environmental Rights. On 14 September 2015, a decision on the appeal was issued by the Minister of Environmental Affairs. The grounds of the appeal were dismissed, however it was contended that climate change impacts had not been adequately addressed in the EIA and that a palaeontological study is required to be conducted for the proposed project. The scope of work for the above-mentioned studies was presented in a Scope of Work Report. The Scope of Work report was accepted by the DEA on the 16 January 2017. The detailed outcomes of the climate change study, paleontological assessment and resilience assessment conducted as part of the new conditions and requirements of the Environmental Authorization are presented in an assessment report in line with the accepted Scope of Work and additional requirements of the DEA as detailed in their letter dated 16 January 2017. This assessment report is available for a 30-day public review 27 January 2017 to 27 February 2017. The report can be viewed at the following locations:

» Lephalale Local Municipality Public Library (Address: Cnr Joe Slovo Street and Douwater Avenue, Lephalale)» Marapong Community Library (Address: 1456 Setlhora Street, Marapong)» Manketti Lodge, Ferroland Management Offices, Lephalale» AgriSA: Lephalale, Albert Street, Lephalale The report is also available electronically on the website www.savannahsa.com/projects. CD copies of the report may also be requested from Savannah Environmental. Any comments on this report can be submitted, in writing, to: Gabriele Wood of Savannah Environmental Post: PO Box 148, Sunninghill, 2157 Johannesburg Tel: 011 656 3237 Fax: 086 684 0547 Email: gabriele@savannahsa.com www.savannahsa.com Please do not hesitate to contact us should you require additional information and/or clarification regarding the proposed project. Our team welcomes your participation and looks forward to your involvement throughout this process. Kind Regards GABRIELE WOOD PUBLIC PARTICIPATION AND SOCIAL CONSULTANT SAVANNAH ENVIRONMENTAL

1 of 3 27/01/2017 16:47 WATERBERG (THABAMETSI) POWER STATION, NEAR LEPHALALE, LIMPOPO PROVINCE (DEA Ref. No. 14/12/16/3/3/40) - CLIMATE CHANGE AND PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT AVAILABLE FOR PUBLIC REVIEW Sear Forward Assigned to: Teams: Global Project: Thabametsi Coal-fired Power Station From: Gabriele Wood <gabriele@savannahsa.com> To: Cc: Bcc: John Wesson <jnbadmin@wessa.co.za>, Gideon Erasmus <zaagput@hotmail.com>, Mokgadi Makgato <mokgadi.makgato@lephalale.gov.za>, Bob Naidoo <bob.naidoo@lephalale.gov.za>, Mortimer Mannya <mokhoebirs@agric.limpopo.gov.za>, Marlaine Andersen <marlainea@l2b.co.za>, Molaudzi Engelin <angelmol@webmail.co.za>, Robyn Hugo <rhugo@cer.org.za>, JC Dreyer <mjroux@xsinet.co.za>, Hardus Steenekamp <pgsteen@vodamail.co.za>, Pat van Rooyen <maria.nel@exxaro.com>, Kobus De Villiers <zelda@lvp.co.za>, Mariette Ventre <potgieterm@ral.co.za>, Karen Steenkamp <steenkampk@ledet.gov.za>, Zev Green <zev.green@angloamerican.com>, Maila Ledwaba Masetlwa <mokwatlods@mtnloaded.co.za>, A Matukane <matukanea@dwa.gov.za>, Astrid Basson <a3bc@kingsley.co.za>, Kubentheran Nair <nairk@eskom.co.za>, Charity Radipabe <charity.radipabe@lephalale.gov.za>, Krishna Reddy <krishna.reddy@transnet.net>, Hanneline Smit <conservation@birdlife.org.za>, Rico Euripidou <rico@groundwork.org.za>, Tinyiko Malungani <malunganitp@ledet.gov.za>, Filomaine Swanepoel <filomaine.swanepoel@exxaro.com>, Regina Makgata <rmakgata@waterberg.gov.za>, Andy Mcleod <amcleod@resgen.com.au>, Mahlangu <mahlangusi@gmail.com>, Aron Kharivhe <aaron.kharivhe@dmr.gov.za>, Dalene Pitcut <dalene.pitcut@angloamerican.com>, Department of Energy <info@energy.gov.za>, Jo-Anne Thomas <joanne@savannahsa.com>, Langi Malamba <info@langananidevinst.co.za>, TW Papo <livinglettersministries@gmail.com>, John Geeringh <john.geeringh@eskom.co.za>, Moloko Jack Maeko <moloko.maeko@lephalale.gov.za>, Lindiwe Kgomo <lkgomo@waterberg.gov.za>, Johannes Molepo <johannes.molepo@exxaro.com>, Phomozo Thivhafuni <thivhafunipo@ledet.gov.za>, Edith Tukakgomo <edith.tukakgomo@lephalale.gov.za>, Victoria Bota <botav@nra.co.za>, T Malele <maleler@dpw.limpopo.gov.za>, Louis Rossel <louis.rossel@lowveldbus.co.za>, Avhashoni Nicholas Magada <anmagada@ruraldevelopment.gov.za>, Dirk van Alphen <dirkva@nwet.co.za>, Hennie van den Aardweg <haardweg@resgen.com.au>, Boeta Steenekamp <gerhardo@lantic.net>, Thulie Mdluli <tnmdluli@deat.gov.za>, Henri Nieuwoudt <henri.nieuwoudt@angloamerican.com>, Mathemba Makola <mathema@chobe.co.za>, Nicolaas Pienaar <pienaar.nico@gmail.com>, Chris Erasmus <stockpoortand@gmail.com>, Azwihangwisi Mulaudzi <azwihangwisi.mulaudzi@dmr.gov.za>, Joshua Hlapa <joshua.hlapa@lephalale.gov.za>, Wolsey Otto Barnard <wolsey.barnard@energy.gov.za>, Louis Loots <laba@spiderconnect.co.za>, Sam Mabotja <smabotja@waterberg.gov.za>, Emile Marell <marellem@eskom.co.za>, Valerie Cilliers <valerie@noordnuus.co.za>, Louise

2 of 3 27/01/2017 16:47 Dries Basson <dries.basson@gmail.com>, Maylene Broderick <broderickms@ledet.gov.za>, Jaco Wolmarans <jaco.wolmarans@exxaro.com>, Penny-Jane Cooke <pcooke@greenpeace.org>, Shelly Lizzo <shelley.lizzio@angloamerican.com>, K Lithole <litholek@sac.limpopo.gov.za>, Jacques du Plessis <jacques.duplessis@sasol.com>, Selekane Phahladira <selekanep@daff.gov.za>, Francisca Fynaut <bescon007@gmail.com>, Leonard Sole <leonard.sole@lephalale.gov.za>, Patrick Motela <lalene.mojela@yahoo.com>, Dawie Smit <dawie.smit@angloamerican.com>, S Snyders <stef.snyders@exxaro.com>, Ian Hall <ian.hall@angloamerican.com>, J.T Ramphago <ramphagoj@dwaf.gov.za>, Frans Mabotja <frans.mabotja@lephalale.gov.za>, MM Komape <komapem@dwa.gov.za>, Nakedi Maake <nakedi.maake@gmail.com>, Susara Maria Gouws <coengouws@gmail.com>, Nicole Loser <nloser@cer.org.za>, Johan Koekemoer <johan.koekemoer@angloamerican.com>, Nnana Manamela <palmero@coghsta.limpopo.gov.za>, Dawid van der Walt <dawid.vanderwalt@angloamerican.com>, Nokukhanya Khumalo <nkhumalo@sahra.org.za>, Thomas Tau <ttau@resgen.com.au>, Thoko Buthelezi <thokob@daff.gov.za>, Nakkie Maartens <nakkie.maartens@lephalale.gov.za>, Marius Fuls <marius.fuls@exxaro.com>, Catharina Alletha Erasmus <gidoen.erasmus@vodamail.co.za>, Jurie Delport <jurie.delport@exxaro.com>, C C van Wyk <radie@euseraffie.co.za>, Eben Badenhorst <eben.badenhorst@lephalale.gov.za>, Francois van der Berg <agrilephalale@vodamail.co.za>, Stanley Koenaite <skoenaite@waterberg.gov.za>, Lephalale Local Municipality <munic@lephalale.gov.za>, Ria Wells <ria@mogolpos.co.za>, Dominique Doyle <dominique@earthlife.org.za>, Melita Steele <melita.steele@greenpeace.org>, Mashudu Marubini <mashuduma@daff.gov.za>, Sambulo Mnguni <sambulom@nda.agric.za>, BirdLife South Africa <info@birdlife.org.za>, Julian Eslait <julian.eslait@angloamerican.com>, Gwen Mahuma <gwendolynm@casteel.co.za>, Wolfie Jahn <wolfie.jahn@exxaro.com>, Cliffe Delaporte <cliff.delaporte@angloamerican.com>, Johan Lourens <jp.lourens@angloamerican.com> Subject: WATERBERG (THABAMETSI) POWER STATION, NEAR LEPHALALE, LIMPOPO PROVINCE (DEA Ref. No. 14/12/16/3/3/40) - CLIMATE CHANGE AND PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT AVAILABLE FOR PUBLIC REVIEW Body: Thabametsi Power Company Proprietary Limited, an Independent Power Producer (IPP) is proposing the construction of a coal-fired power station (the Project ) on the farm Onbelyk 254 LQ near Lephalale in the Limpopo Province. The project is known as the Thabametsi Coal-Fired Power Station. The power station will have a generating capacity of up to 1200MW which is intended to provide baseload electricity for integration into the national grid. The project was authorized by the National Department of Environmental Affairs (DEA) on 25 February 2015 (in terms of the 2010 EIA Regulations). Subsequently, an appeal was lodged on 11 May 2015 by the Centre for Environmental Rights. On 14 September 2015, a decision on the appeal was issued by the Minister of Environmental Affairs. The grounds of the appeal were dismissed, however it was contended that climate change impacts had not been adequately addressed in the EIA and that a palaeontological study is required to be conducted for the proposed project. The scope of work for the above-mentioned studies was presented in a Scope of Work Report. The Scope of Work report was accepted by the DEA on the 16 January 2017. The detailed outcomes of the climate change study, paleontological assessment and resilience assessment conducted as part of the new conditions and requirements of the Environmental Authorization are presented in an assessment report in line with the accepted Scope of Work

3 of 3 27/01/2017 16:47 February 2017. Please refer to the attached notification letter for further information in this regard. Kind regards, Mrs Gabriele Wood Public Participation and Social Consultant Savannah Environmental (Pty) Ltd Tel: 27 11 656 3237 Fax: 086 684 0547 Email: gabriele@savannahsa.com www.savannahsa.com Show Plain Text Attachments: Thabametsi Notification Letter CCIA 27.01.2017.pdf Projects Create (1-1 of 1) Name Assigned To Start Date: End Date: Thabametsi Coal-fired Power Gabriele 01/03/2012 31/07/2013 edit Attachments Subject Contact Last Modified (1-1 of 1) Thabametsi Notification Letter CCIA 27.01.2017.pdf 27/01/2017 16.47 edit Activities Accounts Contacts Email Stakeholders Users Print Back to top