Manual 3: Transmission Operations Updates Version 52

Similar documents
Manual 3: Transmission Operations Updates Version 52

Transmission Expansion Advisory Committee

Illinois State Report

Generation Deactivation Notification Update

Transmission Expansion Advisory Committee Meeting 2014 Market Efficiency Analysis

Market Efficiency Update

Transmission Expansion Advisory Committee. Reliability Analysis Update

Market Efficiency Update

Market Efficiency RTEP Proposal Window

Sub Regional RTEP Committee Mid-Atlantic

EXCEPTIONS TO RELIABILITY RULES REVISION 4 MAY 8, 2015

Transmission Expansion Advisory Committee (TEAC) Recommendations to the PJM Board

EXCEPTIONS TO NYSRC RELIABILITY RULES

EXCEPTIONS TO RELIABILITY RULES Revision 11 February 9, 2018

Transmission Expansion Advisory Committee

Sub Regional RTEP Committee - Southern. August 19, 2011

100 MW Wind Generation Project

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

Market Efficiency RTEP Proposal Window

Facilities Study for Alberta to US Available Transfer Capability

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

EXCEPTIONS TO RELIABILITY RULES Revision 10 August 11, 2017

TRANSMISSION PLANNING CRITERIA

Sub-Regional RTEP Committee PJM South

Transmission Expansion Advisory Committee Meeting. April 23, 2008

2015 WDC Disturbance and Protection Standards Overview

Sub Regional RTEP Committee Mid-Atlantic

New Services Queue Network Upgrades

VACAR STABILITY STUDY OF PROJECTED 2014/2015 WINTER PEAK LOAD CONDITIONS

ATTACHMENT Y STUDY REPORT

Supplemental Report on the NCTPC Collaborative Transmission Plan

South Dakota 890 Study

Transmission Expansion Advisory Committee

Market Efficiency Update

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks

Sub Regional RTEP Committee Mid-Atlantic

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Reliability Analysis Update

SUMMARY OF NYISO INTERFACE LIMITS AND OPERATING STUDIES

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

2013 PJM BASELINE RELIABILITY ASSESSMENT

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION

System Impact Study Report

2018 PJM BASELINE RELIABILITY ASSESSMENT

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

APPENDIX F: Project Need and Description

CIL/CEL Values and Study Timeline

Distributed Solar Generation in the Long-Term Load Forecast

LOCAL TRANSMISSION PLAN

Reliability Analysis Update

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

Transmission Expansion Advisory Committee

Hurricane Sandy. Preparations, Response & Recovery. Wes Yeomans Vice President Operations Management Committee Meeting November 2, 2012

The Long-Range Transmission Plan

Merchant Transmission Interconnection PJM Impact Study Report. PJM Merchant Transmission Request Queue Position X3-028.

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Reliable Integration of Inverter-Based DER

1. Administrative Items... SPP. 2. Stakeholder Web-Presentation... ABB

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Reliability Analysis Update

Notice to Registered Entities of SPP RE 2015 Reporting Requirements Schedule

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Smart Grid Automation and Centralized FISR

Southwest Power Pool, Inc TPL Stability Study. MAINTAINED BY SOUTHWEST POWER POOL ENIGINEERING GROUP Modeling Group

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study

Texas A&M Microgrid and Electrical System Study. Cushing Memorial Library & Archives

Interconnection Feasibility Study Report GIP-222-FEAS-R3

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

Transmission Expansion Advisory Committee

August 14, 2003 Blackout

Brad Roberts. & Jeff Palermo KEMA High Plains Transmission Summit Topeka Lawrence, Kansas November 3, 2009

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES

Consulting Agreement Study. Completed for Transmission Customer

Surry Skiffes Creek Whealton Modeling and Alternatives Analysis Review

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-369-FEAS-R1

Designated Entity Pre-Qualification Materials. Exelon Corporation

VACAR 2015 SUMMER PEAK RELIABILITY STUDY

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Sub Regional RTEP Committee - Western. October 21, 2009

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Sub Regional RTEP Committee - Southern

Breakout Session 1 Report-out presentations

NYISO Operating Study Winter A report from the New York Independent System Operator

Distributed Solar Generation Update

Black Hills Project Summary

COORDINATED SYSTEM CONGESTED FLOWGATE STUDY SCOPE MISO, PJM, SPP AND TVA January 2010

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

National Grid s 2018 Local Transmission Plan

DFO STATEMENT OF NEED REPORT

The Evolution of System Protection Schemes for the Sarawak Power System By Victor Wong Sarawak Energy Berhad Presented at PQSynergy 2012, Sarawak

Sub Regional RTEP Committee Mid-Atlantic

SSF Section Location of Change SSF Issue Change(s) Comments Chapter Part B All Multiple Formatting, spelling and minor Changes applied -

Pacific Gas and Electric Company s Revised 2015 Annual Progress

National Grid s 2017 Local Transmission Plan

Transcription:

Manual 3: Transmission Operations Updates Version 52 Yuri Smolanitsky Sr. Engineer, Transmission Operations

Review Timeline Manual First Reads: October 4 th SOS Joint November 2 nd SOS-T (Section 5 only) October 10 th OC October 11 th MIC (Info Only) October 12 th PC (Info Only) October 26 th MRC 2

Review Timeline Manual Second Reads/Endorsements: November 2 nd SOS Joint December 7 th SOS-T (Section 5 only) November 7 th OC December 7 th MRC December 8 th Implementation Date 3

Overview of changes Periodic Review. Revise SPS designation to either RAS or to Scheme. Section 1.7 Updated PJM transition dates to revised RAS definition. Section 3.9 Added NERC TPL standard references for stability analysis criteria. Section 3.9.1 Removed reference to out of Management Control for stability restrictions. 4

Section 5 Updated/added/removed various operating procedures as needed. Overview of changes Attachment E Added FE-South Elko 230/138 kv transformer sectionalizing schemes with effective dates of February 1 st, 2018. Attachment E Added PPL Jenkins #1 230/69 kv transformer sectionalizing schemes with effective dates of February 1 st, 2018. Attachment E Removed PPL Alburtis #1 500/230 kv sectionalizing scheme. 5

Manual-3 Section 5 Detailed changes on Section 5 can be reviewed on the M03 secure page: http:///documents/manuals/private-m03.aspx Specific questions on Section 5 changes can be sent to M03_Change@pjm.com. 6

Periodic Review. Appendix: Manual-3: Throughout and Sections 1-4 Revise SPS designation to either RAS or to Scheme. Section 1.7 Updated PJM transition dates to revised RAS definition. Section 2.1.1 Added exception language for thermal rating separation between Emergency and Load Dump ratings. Section 3.11 Added notification language for the Generator Voltage Schedules updates. Section 3.12 Updated Reactive Reserve Check language. 7

Appendix: Manual-3: Throughout and Sections 1-4 Section 3.5.3 Added Montgomery and Damascus 230 kv capacitors to bulk electric system capacitors operation and removed Black Oak, Meadow Brook and Doubs #2 capacitors. Section 3.9 Added NERC TPL standard references for stability analysis criteria. Section 3.9.1 Removed reference to out of Management Control for stability restrictions. 8

Appendix: Manual-3 Section 5: RTO ISONE NYISO MISO Updated the Automatic Remedial Action Scheme (RAS) operating criteria section. Updated the NPIR voltage limit table. Removed PJM/NY-ISO PAR micro processor operation. Updated oscillation mitigation procedure. Updated procedure types throughout in various procedure table listings. 9

Appendix: Manual 3-Section 5: AEP, BGE and ComEd AEP: Updated Rockport operating procedure. BGE: Updated Mt. Washington RAS procedure. ComEd: Updated Kincaid stability trip scheme procedure. ComEd: Updated Powerton stability trip scheme procedure. ComEd: Updated Quad Cities and Cordova limitations procedure. ComEd: Updated University Park North Energy Center stability trip scheme procedure. 10

Appendix: Manual-3 Section 5: ComEd ComEd: Updated Elgin Energy Center stability bus tie scheme procedure ComEd: Updated Dresden Unit 2 trip scheme procedure. ComEd: Updated East Frankfort #83 345/138 kv transformer scheme procedure. ComEd: Updated Wolfs transformer #81 345/138 kv transformer scheme procedure. 11

Appendix: Manual 3-Section 5: Dayton, DLCO and Dominion Dayton: Updated Darby plant procedure. DLCO: Removed Crescent 345/138 kv transformer relief procedure. Dominion: Updated Clover generation shed scheme procedure*. Dominion: Updated Bath County-Valley stability RAS procedure*. Dominion: Updated Carolina RAS procedure*. *Note this is a name change only. 12

Appendix: Manual 3-Section 5: FE-East, -West, -South FE-East: Removed Yards Creek SPS procedure (tentative date 12/31/2017) FE-East: Updated Warren-Falconer procedure by removing SPS designation (note this is a name change only). FE-East: Updated East Sayre-North Waverly procedure by removing SPS designation (note this is a name change only). FE-East: Updated Seneca s pumping procedure. FE-West: Updated Mansfield reclosing procedure. FE-South: Removed Willow Island area thermal overload procedure. 13

Appendix: Manual 3-Section 5: FE-South and PECO FE-South: Added West Moreland / Ronco / South Bend stability procedure. FE-South: Added Squab Hollow SVC procedure. FE-South: Updated Belmont RAS procedure. PECO: Updated the Peach Bottom transformer outage procedure 14

Appendix: Manual-3 Attachment A AEP: Removed Rockport Fast Valving SPS. COMED: Removed Aurora SPS. FE-East: Removed Warren-Falconer SPS. FE-East: Removed East Sayre-North Waverly SPS. FE-East: Removed Yards Creek SPS (tentative date 12/31/2017). Modified RAS/SPS descriptions and reorganized list into two tables, one table for RAS and second table for non-redundant schemes. 15

Appendix: Manual-3 Attachment E Added FE-South Elko 230/138 kv transformer sectionalizing schemes with effective dates of February 1 st, 2018. Added PPL Jenkins #1 230/69 kv transformer sectionalizing schemes with effective dates of February 1 st, 2018. Removed PPL Alburtis #1 500/230 kv sectionalizing scheme. 16