Analysis of Aquawrap for use in Repairing Pipelines with a Dent / Gouge Defect

Similar documents
ASSESSING THE USE OF COMPOSITE MATERIALS IN REPAIRING MECHANICAL DAMAGE IN TRANSMISSION PIPELINES

PIPELINE REPAIR OF CORROSION AND DENTS: A COMPARISON OF COMPOSITE REPAIRS AND STEEL SLEEVES

REPAIR OF DENTS SUBJECTED TO CYCLIC PRESSURE SERVICE USING COMPOSITE MATERIALS

Pipe Support The Fast, Economical Solution for Low Pressure Pipeline Repair

Tex-614-J, Testing Epoxy Materials

Bondstrand 5000/5000C Product Data (Severely Corrosive Industrial Service and Oxidizing Acids)

BLUE ULTRA Pipe & Tubing contains no regrind resin in its manufacture

Submittal Data. Fiberglass Bondstrand 3000A Pipe

SFI SPECIFICATION 28.1 EFFECTIVE: AUGUST 25, 2017 *

for ½" thru 2" 800 lb. Piston Lift Check Valves with Resilient Seat Option

A new approach to the results of internal inspection

NAVSEA REVIEWED ASTM F-718. Chesterton ARC 855N, Ceramic Filled Epoxy Coating

Series 3400 Fiberglass Epoxy Pipe Systems using Key-Lock mechanical joint or Taper/Taper adhesive joint

Operating & Maintenance Manual For Steam Conditioning Valve

Conveyor Belt Repairs Pg 1

Tex-614-J, Testing Epoxy Materials

The World Leader in High Performance Signal Processing Solutions. QMI2569 Conductive Ag Glass Adhesive Qualification Data

MIL-STD-883G METHOD LEAD INTEGRITY

ASME B31.8 INTERPRETATIONS VOLUME 13

Joint Technical Meeting

JCM 101 Universal Clamp Couplings

CERTIFICATE OF ACCREDITATION

PTFE Lined Pipe and Fittings

Submittal Data. Fiberglass Bondstrand 2000 Pipe pe

SHARKBITE INSTALLATION GUIDE

RTM COMPOSITE LUGS FOR HIGH LOAD TRANSFER APPLICATIONS

Innerlynx Type UL Fire Rated 3Hour Fire Stop ADVANCE PRODUCTS & SYSTEMS, INC. ISO-9001 CERTIFIED COMPANY - FM

NAVSEA REVIEWED ASTM F-718. SeaVoyage Copper Free Antifoulant; N51R301 Red, N51B301 Black, N51L301 Blue

Flight Compartment. 1. General

AFG501 ALUMINUM FEMA 361 LOUVER LOUVER TYPE RECOMMENDED SPECIFICATION

Geomembrane Test Methods

PE-HDXc pipes (physically cross-linked polyethylene pipes)

High Pressure Design. Design Temperature F (65.6 C)

DESCRIPTION AND OPERATION

TANZANIA STANDARD MEDC 9 (3861) P 2

Date of Addendum Issue: Effective Addendum Date: Affected Publication: ADDENDUM 2

TOTAL PIPING SOLUTIONS, INC. TRIPLE-TAP

Client Success Story Sheri Baucom Senior Advisor II

Elster Perfection Fitting Certification NPGA Southeastern Conference April Jim Hansen Elster Perfection

Bondstrand 2425 Glassfiber Reinforced Epoxy (GRE) pipe systems for Marine and Offshore services for 25 bar pressure

Style 234 Restrained Flexible Single-Gasket Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date

INSTRUCTIONS FOR CONTINUED AIRWORTHINESS

PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION

R66 SERVICE BULLETIN SB-13

Metallic Casing Spacers/Isolators Designed Especially for Water and Sewer Cased Pipelines.

FITTINGS AND FABRICATIONS DESIGNED AND ENGINEERED HIGH DENSITY POLYETHYLENE PIPE

WXGUARD WIND SEGMENTED LIGHTNING DIVERTER STRIPS INSTALLATION GUIDE.

talon T3 DATA SHEET HOLD THE CABLES. HUG THE RUNG. Talon Products, LLC Conrad Anderson Hammond, Louisiana USA

Commissioning Manual PLATE HEAT EXCHANGER. Customer Name: Serial number: Purchase order number: Project:

Urea Reactor Height Extension to Increase Capacity

3. The working pressure shall be 145 psi and tested to 230 psi.

Tapecoat. Application Guideline

Revision 4 May 23, 2018

Bonstrand PSX L3, PSX L3C, PSX JF and PSX JFC Polysiloxane-phenolic Fire-resistant Fiberglass Pipe and Fittings

Car Company Quality: A Vehicle Test Fit Study of 1,907 Car Company Service Parts

DIVISION: METALS SECTION: STEEL DECKING SECTION: STEEL FLOOR DECKING SECTION: STEEL ROOF DECKING REPORT HOLDER:

SHARKBITE INSTALLATION GUIDE

V-Belt Installation, Maintenance & Storage Installation

BEST MANAGEMENT PRODUCTS, INC. The SNOUT OIL-WATER-DEBRIS SEPARATOR SPECIFICATIONS U.S. Patent # Canadian Patent #

HIGH TEMPERATURE SUSTAINED LOAD TEST ON A COMPRESSION DEAD-END CONNECTOR INSTALLED ON 1020 KCMIL, ACCC/TW DRAKE CONDUCTOR

Cam-Lock 111, 120 Joint Restraints Patent Pending

Baumann 24000C Carbon Steel Little Scotty Control Valve Instructions

Blue Quick Seal Connection

PSI Anti-Corrosion Tape

CLARKSON URETHANE KNIFE GATE VALVES FIGURE SU10R

SP41A B-Pillar. Copyright 1999 Inter-Industry Conference On Auto Collision Repair v.4.0

SECTION FACILITY FUEL - NATURAL GAS PIPING AND SYSTEMS

StarFlex series 5000 Double-Ball Flexible Expansion Joint for the Protection of Water Wastewater, and Industrial Pipelines

Performance Testing of Composite Bearing Materials for Large Hydraulic Cylinders

SFI SPECIFICATION 4.2 EFFECTIVE: OCTOBER 26, 1994*

MODCO TM FIGURE 500 CLOSURE

INSTRUCTION MANUAL. Anchor Darling 1878 Swing Check Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Tilted Disc Check Valve Hydrostatic and Cycle Test Report

Advanced Cooling Technologies, Inc. Low-Cost Radiator for Fission Power Thermal Control NETS Conference

Wire Reinforced Synthetic Rubber Hose Assemblies

DELO-DUOPOX AD895 Multi-purpose 2c epoxy resin, cures at room temperature, medium-viscous, filled

ATMOSPHERIC RELIEF VALVE

CO 2. High Pressure Design. (> 500 psi per API 15HR & 15S) Design Life - 20 years at full rating

SECTION SWING CHECK VALVES

Reliability Test Report

Installation, Operation & Service Manual. PPL Bag Filter Housings. Table of Contents Page No. Eaton Filtration, LLC

SWING CHECK VALVES SERIES 52-SC SERIES 600

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

AUXILIARY COMPONENTS

Smith-Blair OMNI Coupling System Advantages:

FLAT BIO END CAP TEST REPORT

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

INSTALLATION INSTRUCTIONS

SFI SPECIFICATION 15.4 EFFECTIVE: JULY 20, 2010 * PRODUCT: Top Fuel and Funny Car Drag Race Drive Beadlock Wheels

Bondstrand 2000M/7000M Glassfiber Reinforced Epoxy (GRE) pipe systems for marine service

kyin all shapes, sizes and standards

Pre and Post Trip Inspection for School Bus Drivers Video Reference Guide and Test

2 Speed Hydraulic Hand Pump

Talon Products, LLC Conrad Anderson Made in USA. phone: USA. Talon cable cleats rung. In addition. Side-by-Side Installation

PENTAGON PROTECTION USA

Ford Fabricated Steel Products

Val-Matic 3-Way Tapered Plug Valve

SOLID CONSTRUCTION PTFE STEP FACE GASKETS FOR IMPROVED SEALING PERFORMANCE IN MONDI PIPING

INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD

+GF+ CLASS 267. Factory Mutual Approved. HDPE Pipe & Pipe Fittings GEORG FISCHER PIPING SYSTEMS centralplastics.

Transcription:

Analysis of Aquawrap for use in Repairing Pipelines with a Dent / Gouge Defect Procedure and Evaluation of Cycle Test Prepared By Franz Worth, PE April 19, 2005 Air Logistics Corporation F.A.C.S. Group 925 North Todd Avenue Azusa, CA 91702 USA Phone 626-633-0294 Fax 626-633-0791

Test Summary This test is to qualify the Aquawrap material to be used for repairing dents in piping. A section of 12.75 OD pipe was dented and a simulated gouge was ground within the dented area. The pipe was pre-pressurized to 900 psi, which was the calculated MAOP of the pipe when factoring in the wall loss from the gouge. The pipe was then wrapped with Air Logistics Aquawrap G-05 composite material and subjected to a series of three pressure cycling tests. Each test had a duration of 5,000 cycles. The maximum pressure of each of the tests were as follows: first phase to 1,525 psi (MAOP), second phase to 1,800 psi (85% of SMYS), third phase to 2,118 psi (100% SMYS). This test was considered successful as there were no leaks present during any of the test cycles and there was no evidence of damage to the pipe or the composite repair material. Pipe and Defect Details Test End Date: April 19, 2005 Serial # 967594 Test Location: Authorized Testing 2522 Kansas Avenue Riverside, CA 92507 Pipe Details - 12.75 OD 0.250 wall ASTM A53 Grade B Pipe 54,000 SMYS (2,118 psi) 72,000 Ultimate (UTS) (2,824 psi) MAOP 1,525 psi Defect Details - Dent - 11 long (axial length) x 5 wide (circumferentially) Deepest point of dent 0.91 (7.2% of pipe OD) Created with blunt force object and an abrasive tool Dent ground smooth before repair application Gouge - 0.1875 wide 4 long 0.0875 deep (35% of pipe wall thickness) Fig. 1 Top view of dent with gouge. Fig. 2 Angled view of dent with gouge. Fig. 3 Dent ground smooth prior to repair. Wrap Details - 34 Layers of Aquawrap G-05, 24 of linear coverage Fabric weight 24 oz. Nominal Thickness 27 mils Tensile Strength 47,500 psi Tensile Modulus 3.2 e6 psi Tensile Load Per Ply 1,280 psi Compressive Strength 25,000 psi Interlaminar Shear 2,750 psi Page 2 of 5

Repair Process Prior to the repair, the pipe specimen was taken to Authorized Testing and pre-conditioned. The pipe was hydrostatically pressurized and taken from 0 psi to 900 psi within 7 minutes, and then was held at that pressure for another 7 minutes. The pressure was then relieved and the pipe drained of water. Very little re-rounding of the dent was observed. Refer to Fig. 4 for before and after measurements. The pressure of 900 psi was calculated by figuring what the MAOP would be, given the depth of the wall loss within the dented area. DENT PROFILE 1 DEPTH INCHES 0.8 0.6 0.4 0.2 0 0 2 4 6 8 10 12 14 AXIAL DISTANCE INCHES PRE TEST POST TEST Fig. 4 The pipe was prepared by sandblasting to a NACE II finish and wiped clean with acetone. The dent was filled using TFT Bio-Fix 911 repair epoxy (Fig.5). This high strength filler materia l will act as the load transfer compound between the composite and the steel. The material was allowed to cure, and then contoured to match the profile of the pipe. Again, the pipe was wiped clean with acetone to remove any loose debris that may have accumulated from the contouring process. BP-1 Primer was applied and allowed to become slightly tacky (Fig. 6). Next, the first lift (courses one and two with a total of 18 layers) of Aquawrap G-05 was installed circumferentially around the pipe, with the dent centered within the repair area. Stricture Banding was applied, and the lay-up was then allowed to cure. The duration from the application of the BP-1 to the end of this initial installation was sixty minutes. After two hours of cure time, BP-2 Interlaminar Adhesive was applied, along with the second and final lift (courses one and two with a total of 16 layers) of G-05 fabric. This lift was again installed circumferentially. The final application of Stricture Banding was installed and the lay-up was allowed to completely cure (Fig. 7). The total number of layers of G-05 material applied to the pipe was thirty-four. Refer to the Lay-up Diagram for clarification. Fig. 5 Fig. 6 Fig. 7 Page 3 of 5

Cycle Test Procedure The maximum allowable operation pressure (MAOP) of the undamaged 12 pipe is 1,525 psi, using a.72 design factor, per ASME B31.4. The SMYS pressure for this same pipe is 2,118 psi. We have chosen to design this repair so that the repair system can handle at least 100% of the SMYS pressure. The wrap design was based upon no allowance for the steel in the dent area, using the long term (creep-rupture) strength of the wrap, and a.67 design factor for the composite (in accordance with the pending ASME Post Construction Repair Standard for composite repairs). The initial cycle-test phase consisted of pressurizing the repaired specimen from 200 psi to 1,525 psi (MAOP of pristine pipe) for a minimum of 5,000 cycles. When this was complete, the next phase took the specimen from 200 psi to 1,800 psi (85% of the SMYS) for a minimum of 5,000 cycles. The final phase took the specimen to 2,118.00 psi (100% of the SMYS) for a minimum of 5,000 cycles. The test was performed using ambient temperature water in a warehouse environment. The minimum dwell time in each of the pressure ranges between 90 and 100 percent of the target pressure was not less than 1.2 seconds. Cycle Test Results The specimen was inspected after the first phase of cyclical testing, with no visual damage to the pipe or the repair material. The specimen was checked again after the second phase, and again, no visual damage was found on either the pipe or the repair material. After the final test phase, the specimen was removed from the test apparatus and inspected in greater detail. The specimen survived all three 5,000-cycle tests without any signs of leakage or other failure mechanism. This test was deemed a success. A copy of the test report from Authorized Testing is attached. Page 4 of 5

Lay-up Diagram - Serial #967594 Start Date March 24, 2005 / End Date April 19, 2005 Fig. 8 Finished repair with 34 layers of Aquawrap G-05. 1 st Lift 1 st Course - 9 Layers 8 8 8 1 st Lift 2 nd Course - 9 Layers 12 12 2 nd Lift 1 st Course - 8 Layers 8 8 8 2 nd Lift 2 nd Course - 8 Layers 12 12 Page 5 of 5