TABLE OF CONTENTS INSTALLATION & OPERATING INSTRUCTION MANUAL FOR MODEL PRC-- POWER ROLLER CONVEYOR

Similar documents
INSTRUCTION MANUAL FOR MODEL PRC POWER ROLLER CONVEYOR

SKATE WHEEL CONVEYOR

TABLE OF CONTENTS INSTALLATION & OPERATING INSTRUCTION MANUAL FOR MODEL SBC SLAT BELT CONVEYOR SYSTEM 1. GENERAL INSTALLATION 3

INSTRUCTION MANUAL FOR MODEL TAC - TRAY ACCUMULATOR CONVEYOR SYSTEM MONORAIL STYLE

TRAY ACCUMULATOR CONVEYOR SYSTEM

Aerowerks Toll Free :

OPERATOR MANUAL Combo Belt Conveyor

750 Series Press Conveyor Installation and Maintenance Manual

450 Series Belt Driven Live Roller Curve Conveyor Installation and Maintenance Manual

INSTALLATION AND MAINTENANCE MANUAL DRAG CHAIN CONVEYOR MODEL DC-60

COOKSON OWNER'S MANUAL

FTFR Maintenance and Parts Manual SQ-1 FLOOR TRUSS FINISH ROLLER. Operators Manual

SLAT BELT CONVEYOR SYSTEM

IMPORTANT INSTRUCTIONS FOR OPERATION & MAINTENANCE OF

RolsplicerTM. Maintenance Manual And Illustrated Parts List

TECH HANDBOOK CHAIN DRIVEN LIVE ROLLERS 192CDLR.251CDLR.297CDLR.3530CDLR

DARMAN. ENDURA II Cloth Towel Cabinet Product Guide. Manufacturing Company, Inc Lincoln Ave., Utica, NY 13502

POWER GEAR SLIDE-OUT MANUAL

KLAISLER MANUFACTURING CORPORATION

4", 8", 12", 18", 24" Belt Conveyor Specifications

Flip - Up Conveyor. for 10" BeltVeyors OWNER'S MANUAL (12/00)

GANTRY ROLLER MANUAL MODELS: G14-24 G14-18 GR14-24 G2640 VOLUME 1, EDITION

Vertical Stacking System for both Floor and Roof Lines. SQ-1 INTELLIGENT STACKERS. Operators Manual

INSTALLATION INSTRUCTIONS

H-2034, H-2035 SHRINK TUNNEL

INSTALLATION AND OPERATING MANUAL

Pacific Conveyors Ltd INSTALLATION AND MAINTENANCE MANUAL MODEL 914SB BAGGAGE CONVEYORS

Gantry System for both Floor and Roof Truss Lines SQ-1 INTELLIGENT GANTRY. Operators Manual

TABLE OF CONTENTS DESCRIPTION. Safety Instructions & Safety Sign Locations Operating Instructions Assembly Instructions...

Outload Trough Roller Conveyor

Installation and Set Up Instructions

INSTALLATION AND OPERATING

INSTALLATION AND OPERATING MANUAL

443 / M440 Series Lineshaft Driven Live Roller Conveyor Installation and Maintenance Manual

CRD610 Automatic Fitting Inserter

MENTOR INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS (800)

CORE BREAKER MODEL 690 & 930 OPERATOR'S MANUAL AND PARTS BOOK

CRD600 Automatic Fitting Inserter

APCO CSV-1600 SURGE CHECK VALVE

Adjustable Angled Incline Conveyor Owners Manual with Operating Instructions

WARRANTY REGISTRATION AND POLICY

DynaCon Instruction Manual

Operator s Manual. Nitro 1000 Nitro 1000X. Nitro 750 Nitro 750X. September REV0

MY-TE. OPERATION and MAINTENANCE. Winch and Hoist. Provided by: Model AC 36B OF MAX AC VOLT AC

Airflo MANUFACTURING CO., INC.

APCO CRF-100A RUBBER FLAPPER SWING CHECK VALVES

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

Installation and Set Up Instructions

Twin Screw Undercar Conveyor

AgriMetalINC. SELF-PROPELLED GREENS ROLLER MODEL GR-660 OPERATOR'S MANUAL

6-TON DOUBLE LOCKING JACK STANDS OWNER S MANUAL

OWNER/OPERATOR MANUAL. Airmotor effective dia. in. 2.5

AUTOMATIC FOODSERVICE EQUIPMENT. AUTOMATIC ELECTRIC BROILER MODELS 824E & 850E and 624E & 650E. B-Series Broiler OWNER S MANUAL

AUTOMATIC FOODSERVICE EQUIPMENT. AUTOMATIC ELECTRIC BROILER MODELS 952E, 932E and 922E OWNER S MANUAL

FLEETWOOD TRAVEL TRAILER SLIDEOUT SYSTEM OWNER S MANUAL

OPERATOR'S MANUAL W Series Premium Pallet Trucks

Power Float Manifold. Installation and Operations Manual Module 11A

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT DRIVE XBL FANS

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT & DIRECT DRIVE XB, HV, HVA, ADD, DDS, DDP

Best Diversified Products, Inc. Product Manual. BestReach Rigid Belt. Models BRB 230 OS BRB 230 SS BRB 460 OS BRB 460 SS

Advantage Fan 36" and 48"

Bulletin Rev Operator Manual MunchMan II Conveyor

Gantry System for both Floor and Roof Truss Lines SQ-1 INTELLIGENT GANTRY. Operators Manual

11 ½" MODEL SINGLE CHAIN CONVEYOR

3-TON DOUBLE LOCKING JACK STANDS OWNER S MANUAL

Operations & Maintenance Manual DFH-1000 DUCTLESS FUME HOOD

Vidir Machine, Inc. Shelving Carousel Owner s Manual SERVICE

Precision Reel Mowers OPERATOR S MANUAL

DeZURIK 2-24 (50-600mm) KGC ES or HD KNIFE GATE VALVES

ILM16 ILM20 ILM30 ILM12AF ILM16AF ILM20AF ILM30AF

It don t mean a thing If it ain t got the swing

580RK SERVICE GUIDELINES For coupling models: 580 & 580J

1/2-TON MANUAL CHAIN HOIST

3M-MaticTM. 200cc Coder Conveyor. Instructions and Parts List. Important Safety Information. Spare Parts. Type 29700

Incline Drag Conveyor Manual

INSTALLATION AND MAINTENANCE MANUAL TROUGH BELT CONVEYOR MODEL TBOH

( B A L E OR GRAIN) OWNER S MANUAL AND SERVICE PARTS 13C /05

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

Best/Flex ULTRA Gravity Conveyor

STOP. Broadcast Spreader. Operator's Manual. Model No Safety Assembly Operation Maintenance Parts

Universal Anchoring. Serrated Double Bolt Jaw Users Manual. April 2016 by Vehicle Service Group. All rights reserved. CO9722.1

PERFORM THE FOLLOWING SAFETY CHECK DAILY:

ULTRA WEIGHT DISTRIBUTING HITCH SYSTEM INSTALLATION/OPERATION INSTRUCTIONS

Operating Instructions & Parts Manual. Fuel Tank Adapter

PNL-MS Belt Conveyor with Metal Detector

INSTALLATION INSTRUCTIONS FOR MOUNTING HARDWARE KIT F-105K2.5

DeZURIK 2-24 (50-600mm) KGN-RSB BI-DIRECTIONAL CAST STAINLESS STEEL KNIFE GATE VALVES

MOTORIZED FOLDING CAMPER WINCH

450250/ ROOSTER WINCH Installation Manual

Read this entire manual before operation begins.

401, 430 & 460 Series Belt Driven Live Roller Conveyor Installation and Maintenance Manual

Embedded Rack Slide-out System

OWNER S MANUAL. Sentry & Sentry CT THREE YEAR WARRANTY. Phone: ( ) Fax: (605) SAFETY INSTRUCTIONS

DeZURIK KSV CL150 & CL300 BONNETLESS KNIFE GATE VALVES

JET METER INSTRUCTIONS

INSTALLATION MANUAL Models &

HS583 Sprocket Models- Curtain/Vent Machine

CONTENTS: SPECIFICATIONS 5712BT - 12 TON BENCH TOP HYDRAULIC SHOP PRESS OWNER'S MANUAL

BX4330 Acclaim Tow Bar Operator Manual & Installation Instructions

Installation Instructions

Transcription:

TABLE OF CONTENTS INSTALLATION & OPERATING INSTRUCTION MANUAL FOR MODEL PRC-- POWER ROLLER CONVEYOR 1. INSTALLATION 2 1.1. GENERAL INSTALLATION 2 1.1.1. Building Connections 3 2. OPERATION 3 2.1. GENERAL DESCRIPTION 3 2.2. OPERATION 4 2.2.1. General Instructions 4 3. MAINTENANCE 4 3.1. REPAIR INSTRUCTIONS 4 3.2. CHAIN TAKE-UP 4 3.2.1. Gearmotor Take-up 5 3.2.2. Chain Link Take-up 5 3.3. ELECTRICAL SYSTEM 5 3.4. LUBRICATION 6 3.4.1. Bushings 6 3.4.2. Gearmotor 6 3.5. MAINTENANCE SCHEDULE 6 3.5.1. Daily 6 3.5.2. Monthly 7 3.5.3. Semi-Annually 7 3.6. REPLACING FRAME BUSHINGS 7 3.7. REPLACING GEARMOTOR 7 3.8. REPLACING ROLLER SHAFTS 8 3.9. REPLACING SPROCKETS 9 3.10. TROUBLE SHOOTING POWERED ROLLER CONVEYOR 10 3.11. REPLACEMENT PARTS LIST POWERED ROLLER CONVEYOR 11 4. WARRANTY FOR MODEL PRC - POWERED ROLLER CONVEYOR 13 4.1. WARRANTY PERIOD 13 4.2. WARRANTY COVERAGE 13 4.3. GENERAL 13 1

INSTALLATION & OPERATING INSTRUCTION MANUAL FOR MODEL PRC - POWER ROLLER CONVEYOR SYSTEM The following instructions for installation and maintenance of Model PRC Conveyor System should be carefully read and followed. Any deviation will affect the warranty of this machine. The conveyor unit shall be installed by or under the supervision of Aerowerks personnel or its representatives to validate the warranty. NOTE: A Layout Drawing representing the overall conveyor system, specific to this project is included in this manual. The owners and maintenance personnel should become familiar with this document. 1. INSTALLATION 1.1. GENERAL INSTALLATION Please read the instructions carefully and follow the steps given below for the installation of Model PRC conveyor system. 1. Set and level the machine in place. Seal the joints using silicon-sealing compound. 2. Remove the cover of drive housing. 3. Adjust the length of the chain and make sure that the ends are properly connected 4. Make sure that the key between the gear motor shaft and drive sprocket is removed. 5. Start the motor, check and set the correct direction of rotation. The direction of the rotation is marked on the drive housing. 6. Assemble the drive chain and make sure that it engages the drive, idler and all other plastic sprockets driving the power rollers. Connect the ends of the chain using the link provided. Make sure that the chain engages all the sprockets with sufficient slackness as shown in the Figure-1. This will ensure effective meshing between the chain and the sprocket during the operation. The drive chain around the motor drive and idler sprockets should be tight. 7. Insert the key between the gear motor shaft and the drive sprocket. Secure the key in position with the sets screw. 8. Adjust the chain take up. 2

9. Replace the cover plates on side channels and mount any other auxiliary hardware items. Figure 1.0 Normal Chain Sag Between Plastic Sprockets 1.1.1. BUILDING CONNECTIONS An electrical connection is required at the Main Control Panel. Check the "Layout Drawings" for the specific details of this project. 2. OPERATION 2.1. GENERAL DESCRIPTION The Power Roller Conveyor usually forms an integral part of the scrapping table. Its function is to convey 20 x 20 dish racks to the gravity roller conveyor or directly to the dishwasher. This conveyor has been custom designed to suit your application. Do not use this conveyor to convey items other than 20 x 20 dish racks. 3

The low-pressure accumulation principle treats each roller as an individual unit. Hence when the racks get accumulated, the rollers underneath them stop turning where as the remaining rollers will continue to function. 2.2. OPERATION 2.2.1. GENERAL INSTRUCTIONS 1. Turn the MAIN DISCONNECT switch on the main control panel to ON position. 2. Push the green START button marked Rack Conveyor. Some systems may have auxiliary push button stations located in other required areas. 3. To shut down the conveyor, push the red STOP button marked Rack Conveyor. Then turn the MAIN DISCONNECT switch to OFF. Note: Power rollers run at constant speed at low pressure driving force, allowing accumulation to take place without having to stop the conveyor. 3. MAINTENANCE. 3.1. REPAIR INSTRUCTIONS Our Conveyor Systems are built with the highest quality materials to provide a reliable service and trouble free operation. The life of the equipment can be extended by regular maintenance. It is strongly recommended to get the equipment serviced by Aerowerks or its authorized service agent. 3.2. CHAIN TAKE-UP Generally the drive chain does not need any replacement. However, it requires time-totime adjustment to remove the slack developed in the chain due to the tension. This can be accomplished either by moving the gear motor away from its initial position or by removing a few links from the chain. The first method is recommended for the small adjustments where as the second method is ideal choice for the large adjustments. 4

3.2.1. GEAR MOTOR TAKE-UP 1. Disconnect the power to avoid accidental starting. 2. Remove the drive housing cover. 3. Loosen the gear motor mounting bolts and gently lower the gear motor. Since the drive sprocket mounted the motor shaft, lowering the motor reduces the slack in the chain. 4. Tighten the gear motor mounting bolts. 5. Run the system to make sure that the chain take-up is adequate and conveyor operation is smooth. 6. Turn off the power and replace the side covers. 3.2.2. CHAIN LINK TAKE-UP 1. Disconnect the power to avoid accidental starting. 2. Remove the drive housing cover. 3. Disconnect the chain preferably at the location of the removable link. If it is hard to locate this link, use a chain breaker to disconnect at any other link. Estimate the number of links required to be removed to eliminate the slack. 4. Remove the access links from the chain. 5. Reconnect the ends and turn on the power. 6. Run the system to make sure that the chain take-up is adequate and the conveyor operation is smooth. 7. Turn off the power and replace the drive housing cover. 3.3. ELECTRICAL SYSTEM The electrical system control unit contains all relays, starters and other devices required for the operation of conveyor control. There may be some auxiliary start-stop stations in addition to the main control panel. Check the schematic for details. The main control panel is NOT waterproof. Under no circumstances shall the control panel be hosed down with water, during cleaning. 5

All fuses are sized individually for control or power circuit. Refer to electrical wiring schematics when replacing fuses. NOTE: Power roller conveyor does not require any accumulation switches. Conveyor operates as a low-pressure accumulation system that allows rollers to stop and chain to continue running when product is accumulated on the conveyor. 3.4. LUBRICATION 3.4.1. BUSHINGS Lubrication is required on the plastic bushings once every month. Always use the food grade grease. Please follow the steps given below for the lubrication. 1. Shut down the conveyor and disconnect the power at main circuit breaker. 2. Apply the grease to the bushings located on the body of the conveyor and the rollers. 3. Do not over lubricate the bushings to avoid grease build up. 4. Inspect the roller shafts, bushings and sprockets for any damage. In most of the cases, all these parts will have same extent of damage. 3.4.2. GEAR MOTOR Gear motor is an integrated unit of a motor and step down gearbox. The unit has been lubricated for life and no maintenance lubrication is required. 3.5. MAINTENANCE SCHEDULE Our Conveyor Systems are built to the high quality standards to provide a reliable service and trouble free operation. The service life of the equipment can be extended by regular maintenance. It is strongly recommended to get the equipment serviced by Aerowerks or authorized service agents. The following are the recommended maintenance schedule. 3.5.1. DAILY 1. Hose down the conveyor and conveyor beds to clean and remove the foreign materials. The conveyor can be running during a hose down period to expose all the external surfaces of the rollers to the water jet. 6

3.5.2. MONTHLY 1. Inspect and replace any rollers or bushings that are damaged. Lubricate bushings. 3.5.3. SEMI-ANNUALLY 1. Remove the chain guard and inspect the chain tension. The excess slack in the chain shall be removed either by repositioning the motor or removing the chain links. 2. Inspect the sprockets, shafts and bushings for wear. Replace all the worn parts. 3.6. REPLACING FRAME BUSHINGS When replacing the frame bushings, check the shafts, roller bushings and sprockets also for replacement. A new bushing with an old shaft will get damaged very soon. The service technician on site can easily replace the bushings in the body of the conveyor. But the bushings in the individual rollers are difficult to replace. It is recommended to replace complete roller or both of the bushings in the roller. Please refer figure 2 for the assembly details of the roller. Please follow the steps given below to replace the bushings. 1. Disconnect the power from the main circuit breaker to avoid accidental starting. 2. Remove the side access cover to the drive chain. Disconnect the chain preferably at the location of the removable link. 3. Remove the shaft and roller assembly. Remove the old bushings from the frame and replace it with new ones. If new bushing is not able to fit by hand use a softheaded hammer to lightly tap the bushing into its place. The bushing should sit tight within the holes of the frame, without any crack. 4. Check to make sure that the roller is freely rotating. Misalignment in the bushings will not allow the roller to rotate freely. 5. If all the rollers roll freely, assemble the chain by reconnecting the ends. Adjust the chain length if necessary. 6. Turn on the power to the system to make sure that the power rollers are running smooth. 3.7. REPLACING GEAR MOTOR An electrician should do replacement of the gear motor. Before replacing the gear motor, please follow the trouble shooting procedure to determine if the motor is defective. If the gear motor is defective, please contact us with the model number and make of the gear motor. Follow the steps given below to replace the gear motor: 7

1. Turn off the main circuit breaker to disconnect the main power to the conveyor. 2. Remove the side access cover of the drive chain. 3. Release the tension of the chain by adjusting the motor take-up. If it is required to disconnect the chain, remove the connecting link or use a chain breaker to disconnect. 4. Remove the key between the motor shaft and the drive sprocket. Remove the drive sprocket. 5. Remove the mounting bolts and the gear motor. 6. Replace with new gear motor. Turn on the power to check the direction of rotation. 7. If the shaft rotates in the right direction, replace the drive sprocket and the key. 8. Assemble the chain and adjust the motor take-up. 9. Replace the cover and then test run the conveyor. 3.8. REPLACING ROLLER SHAFTS At the time of replacing roller shaft, we must also look at the bushings and the sprockets as well. An old shaft develops burs and jagged edges, which may damage the bushings. Serious operational problems are likely to happen when a roller is used on a new shaft with worn out bushings and sprocket or on an old shaft with new bushings and sprocket. It is necessary to replace new bushings and sprocket along with a new shaft. Please refer to the parts list and contact us with part number and the model number. Follow the steps given below when replacing the roller shaft: 1. Disconnect the power from the main circuit breaker to avoid accidental starting. 2. Remove the side access cover of the drive chain. Disconnect the chain preferably at the location of the removable link. If the link is not found, use a chain breaker to disconnect the chain. 3. Remove the old shaft and the sprocket. Remove the sprocket from shaft. At this point replace the bushing and sprocket if required. 4. Bolt the sprocket to the new shaft and assemble it through the bushings and the roller to the machine. 8

5. Reconnect the chain and adjust the chain take-up, if required. 6. Turn on the power and test run the machine. 7. If the operation is satisfactory, turn off the power and replace the side panels. 3.9. REPLACING SPROCKETS At the time of replacing the sprockets, check the shafts and the bushings. The sprocket can be easily replaced on site by a service technician. Follow the steps given below when replacing the sprockets: 1. Disconnect the power from the main circuit breaker to avoid accidental starting. 2. Remove side access cover of the drive chain. Disconnect the chain preferably at the removable chain link. If the link is not found use a chain breaker to disconnect the chain. 3. Remove the old shaft and the sprocket assembly. Remove the bolt fastening the sprocket to the shaft. Replace the bushings if required. 4. Bolt the sprocket to the new shaft and assemble it through the bushings and the roller to the machine. 5. Assemble the chain and adjust the chain take up if necessary. 6. Turn on the power and test run the conveyor. 7. If the operation is satisfactory, turn off the power and replace the side panels. 9

3.10. TROUBLE SHOOTING POWERED ROLLER CONVEYOR PROBLEM MECHANICAL Empty racks do not move on the power roller conveyor Individual rollers do not turn Start button pushed but system does not work PROBABLE CAUSE The power roller system requires some amount of load on the rollers to develop driving force to rotate with the shaft, which is driven by the sprocket. The load on the roller due to the empty rack may not create enough driving force. Refuse jammed at the ends of the roller. Bushings at end of the roller and the body frame are worn out. Power supply is not available Fuse in the main control panel has blown. SOLUTION Convey the fully or partially loaded racks. This problem is most common for a new system. Clean the ends Inspect the bushings and replace them. It is recommended to replace the stainless steel shaft along with the worn out bushings. Generally nylon sprocket and the shaft wear out at the same time. Therefore it may be feasible to replace the shaft, sprocket and bushing assembly at the same time. Make sure that the power supply is available to the system Replace the fuse. If the fuse blows again, check the chain track to make sure that nothing is struck the chain and causing the overload to the motor. NOTE: If you continue to experience problems, please notify Aerowerks as soon as possible. 10

3.11. REPLACEMENT PARTS LIST POWERED ROLLER CONVEYOR 11

PART No DESCRIPTION QTY UNIT COST TOTAL PRC 1 Drive Housing Cover PRC 2 Side Cover PRC 3 Power Roller Chain #50 S/S PRC 4 UHMW Wear Strip PRC 5 Nylon Sprocket PRC 6 Mushroom Bearing PRC 7 Roller Bearing PRC 8 S/S Roller PRC 8A S/S Roller w/bearings PRC 9 S/S Shaft PRC 10 Snub Sprocket complete Assembly PRC 11 S/S Tube Spacer PRC 12 Drive Sprocket PRC 13 Gear Motor Mounting Plate and Clips w/hardware PRC 14 Gear Motor PRC 15 Gear Motor Housing Telephone: (905) 844-9449 Fax: (905) 844-0042 web: www.aero-werks.com 12

4. WARRANTY FOR MODEL PRC - POWERED ROLLER CONVEYOR 4.1. WARRANTY PERIOD Aerowerks warrants its products to the original purchaser against the defects in material and workmanship, under normal use and service for a period of one year after the date of installation. 4.2. WARRANTY COVERAGE The obligation of Aerowerks under this warranty is to repair or replace any defects in the equipment. All the services covered under the warranty will be provided by Aerowerks during the regular working hours. All claims against this warranty must be made in writing. Equipment must be serviced either by technicians of Aerowerks or agents authorized by Aerowerks. All warranty parts will be shipped to the client via ground transportation. The following items are not covered under this warranty: Normal wears on parts including sprockets, rollers, shafts, bushings. Equipment damage due to the power surges or overloads trips. Aerowerks is not liable for any faulty installation, damage, mechanical and electrical failure caused by unauthorized alteration, misuse or abuse of the equipment. 4.3. GENERAL Liability or obligation in connection with the products of Aerowerks other than those covered in this warranty by any other person's assumption is not authorized by Aerowerks. This warranty is limited to the customers of United States and Canada. Telephone: (905) 844-9449 Fax: (905) 844-0042 web: www aero-werks com 13