Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Similar documents
TERMS AND CONDITIONS

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

Municipality Generator Interconnection Application Single Meter Application Part I

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Legal Considerations Related to Distributed Energy Resources

Please Refer to Attached Sample Form

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

THE PUBLIC SERVICE COMMISSION OF MARYLAND

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Net Metering & Compensation Seminar

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

To complete the process for a net metering interconnection, please follow the steps below:

Umatilla Electric Cooperative Net Metering Rules

To complete the process for a net metering interconnection, please follow the steps below:

Application for Steam Service

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

JEA Distributed Generation Policy Effective April 1, 2018

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

As Introduced. 132nd General Assembly Regular Session S. B. No

NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION

TERMS AND CONDITIONS XXV. NET METERING CUSTOMERS AND SMALL AGRICULTURAL GENERATORS

White River Electric Association, Inc. Net Metering Information & Service Requirements

IGNITION INTERLOCK SERVICE CENTER RENEWAL LICENSE

IGNITION INTERLOCK MANUFACTURER RENEWAL AGREEMENT

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less)

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

PLUG-IN ELECTRIC VEHICLE SUBMETERING PILOT PHASE 2 Multiple Customer-of-Record Enrollment Agreement

Florida Department of Agriculture and Consumer Services Office of Energy NATURAL GAS FUEL FLEET VEHICLE REBATE PROGRAM

Schedule SP SOLAR PURCHASE (Experimental)

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

London Hydro Connection Checklist

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

Schedule Z Additional Information Required for Net Metering Service. Is the Host Customer a: Municipality Other Governmental Entity

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

PSNH INTERCONNECTION REQUEST

Sample Application for Certificate of Public Convenience and Necessity from NC Solar Center

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

To complete the process for a net metering interconnection, please follow the steps below:

Contents. Solar Select TM Frequently Asked Questions

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

24. SOLAR INCENTIVE PROGRAM II

Michigan Renewable Energy Case Study

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

Taxicab and Vehicle for Hire- New Driver Packet

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

2lr1344 CF 2lr1396. Drafted by: Heide Typed by: Rita Stored 02/02/12 Proofread by Checked by By: Senator Pinsky A BILL ENTITLED

Net Metering Service. Customer Information Package

Interconnection and Net Metering Service in Ohio

PLUG-IN ELECTRIC VEHICLE SUBMETERING PILOT PHASE 2 Single Customer-of-Record Enrollment Agreement

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *

Applicant Information All spaces must be filled in. Applications with blank spaces will be rejected.

NEW YORK CITY TAXI AND LIMOUSINE COMMISSION. Notice of Public Hearing and Opportunity to Comment on Proposed Rules

February 13, Docket No. ER ; ER Response to Request for Additional Information

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Duke Energy Carolinas North Carolina Interconnection Request Checklist

Re: California Independent System Operator Corporation

April 6, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Consumer Guidelines for Electric Power Generator Installation and Interconnection

RATE 765 RENEWABLE FEED-IN TARIFF

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65

DRIVER QUALIFICATION FILE CHECKLIST

REVISION NO.: 7 EFFECTIVE: 07/07/16

City Title. . Is System Owner interested in being contacted about energy efficiency opportunities at this site? Title. City. Site Contact.

ATLANTA CLEVELAND DAYTON WASHINGTON, D.C. CINCINNATI

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

(APPLICATIONS WILL NOT BE ACCEPTED WITHOUT ALL PAPERWORK):

MAINE LEMON LAW SUMMARY

Please Refer to Attached Sample Form

Direct Energy Regulated Services

New Hampshire Electric Cooperative s (NHEC) Above the Cap Interconnection (Net Metering) Application Instructions

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less)

Adopted: September 24, 2015 Version: Version 1.0

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

Transcription:

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section 7-207.1 and 7-207.2 APPLICABILITY The Public Service Commission of Maryland ( Commission ) is required, pursuant to the Public Utilities Article of the Annotated Code of Maryland, to grant its approval prior to the construction of a generating station in Maryland. The Public Utilities Article mandates one of two types of authorization 1 prior to commencing the construction of a generation station of greater than 2,000 kw (or equal to or greater than 2,000 kws if generating electricity from a solar photovoltaic system). Large generating stations constructed to serve load in a regional market require a Certificate of Public Convenience and Necessity ( CPCN ) under Public Utilities Articles 7-207 and 7-208. However, Public Utilities Article 7-207.1 provides that certain power generation projects are exempt, as described in this Application, are exempted from the CPCN process. These generators must request Commission approval to construct the generating station through the completion of this Application. Public Utilities Article 7-207.2 adds some additional requirements for solar photovoltaic systems receiving a 7-207.1 waiver. The Application requires that all CPCN exemption and approval requests be signed by legal counsel for the Applicant, an officer of the Applicant, or other person who has the authority to legally bind the Applicant. To facilitate review of an Application, it is recommended that documentation of the signatory authority be submitted with the Application. The Applicant is the person who will construct the proposed generating unit. In addition to Commission approval under Public Utilities Article 7-207.1, an Applicant must also apply for and obtain all necessary air quality permits from the Maryland Department of the Environment, Air and Radiation Management Administration, prior to constructing or operating the generator. Applicants are strongly urged to read the CPCN Exemptions: Frequently Asked Questions (FAQs) that is available through the Commission s web site (http://webapp.psc.state.md.us/intranet/home.cfm) for an explanation of some of the terms in this form. If the Applicant has questions after reading the FAQs section it should contact the Commission's Energy Analysis and Planning Division at 410-767-8085. FILING INSTRUCTIONS 1 The first requires approval with a certificate of public convenience and necessity; the second is the approval and an exemption from the certificate of public convenience and necessity requirement. Last revised: February 26, 2018. i

The following items must be provided with the application to facilitate approval. An incomplete application or omission of any of the items below will not be accepted: The current Application form as posted on the Commission s website; A letter signed by the applicant indicating whether or not an interconnection, maintenance and operation agreement is necessary and therefore filed with the Commission (required when a wholesale sales agreement with the Independent System Operator has been obtained); A Signature (on the Application form) of legal counsel or an authorized representative who has the authority to legally bind the Applicant; A check for the $500 filing fee made payable to the Maryland Public Service Commission; If the Applicant is seeking approval for a generator that is already installed, the Applicant must state, in an attachment or cover letter, why an Approval Application was not filed before the generator(s) was installed. For Type I and II generators, if the Applicant is not participating in a demand response program, please provide an explanation for the lack of participation. For solar photovoltaic generators with a capacity of at least 2 megawatts, a deposit of one percent of total installed costs is required and the application for approval to construct a generating station must be filed at least six months before construction commences. This deposit, in addition to the $500 filing fee, should be submitted by check and made payable to the Maryland Public Service Commission. Provide proof that the applicant has provided notice of the application to the governing body of each county or municipal corporation in which any portion of the generating station is proposed to be constructed; the governing body of each county or municipal corporation within 1 mile of the proposed location of the generating station; each member of the General Assembly representing any part of a county in which any portion of the generating station is proposed to be constructed; and each member of the General Assembly representing any part of each county within 1 mile of the proposed location of the generating station. Mail the original and 17 copies of this Application and required attachments to: David J. Collins Executive Secretary Maryland Public Service Commission William Donald Schaefer Tower 6 Saint Paul Street, 16th Floor Baltimore, MD 21202-6806 Effective Date of Form: February 26, 2018. Last revised: February 26, 2018. ii

APPENDIX A This Application is used to request Commission approval with CPCN exemption if your project falls under any of these three options: (The options below are based on Public Utilities Article 7-207.1. The three options below do not correspond to the four Generator Types on page 2 of this Application.) (1) for generating stations designed primarily to provide on-site generated electricity, 2 the conditions are as follows: (i) the capacity of the generating station does not exceed 70 megawatts; and (ii) electricity that may be exported for sale from the generating station to the electric company's transmission and distribution system ("Electric System ) is sold only on the wholesale market pursuant to an interconnection, operation, and maintenance agreement with the local electric company; 3 or (2) for other generating stations, the conditions are as follows: (i) the capacity of the generating station does not exceed 25 megawatts; (ii) electricity that may be exported for sale from the generating station to the Electric System is sold only on the wholesale market pursuant to an interconnection, operation, and maintenance agreement with the local electric company; and (iii) at least 10% of the electricity generated at the generating station each year is consumed on-site; or (3) for a generating station that produces electricity from wind, the conditions are as follows: (i) the generating station is land-based; (ii) the capacity of the generating station does not exceed 70 megawatts; (iii) the electricity that may be exported for sale from the generating station to the electric system is sold only on the wholesale market pursuant to an interconnection, operation, and maintenance agreement with the local electric company; and (iv) the Commission provides an opportunity for public comment at a public hearing. For wind-powered generation, Public Utilities Article 7-207.1 requires the Commission to hold a public comment hearing in the county and municipal corporation where any portion of the wind-powered generation station will be located, and requires the Applicant to pay for publication of a notice of the hearing for two weeks in a local newspaper. The Commission will contact the Applicant regarding details of the meeting and notice. 2 3 On-site generated electricity is defined in Public Utilities Article 1-101(s) as electricity that: "(1) is not transmitted or distributed over an electric company's transmission or distribution system; or (2) is generated at a facility owned or operated by an electric customer or operated by a designee of the owner who, with the other tenants of the facility, consumes at least 80% of the power generated by the facility each year." Local electric companies may use varying terminology for this Agreement. Last revised: February 26, 2018. 1

PART ONE - Type of Generating Station APPENDIX A If none of the following four types of generating station accurately describes the proposed generator or if the Applicant has any questions regarding this Application, please contact the Commission's Energy Planning and Analysis Division at 410-767-8085 for guidance. I. Type I Generator - a generator that (1) will not be synchronized with the local electric system, and (2) will be configured so that there is no export of electricity to the Electric System. Complete PARTS TWO and THREE (A) of this Application. II. Type II Generator - a generator that (1) will be synchronized with the electric system, and (2) must install protection equipment that is designed to prevent exporting electricity to the Electric System. Complete PARTS TWO and THREE (B) of this Application. III. Type III Generator - a generator that (1) will be synchronized with the electric system, and (2) will export electricity for sale on the wholesale electric market. Complete PARTS TWO and THREE (C) of this Application. IV. Type IV Generator - a generator that (1) will be synchronized with the electric system, and (2) will utilize the cease to energize function of a UL 1741 listed inverter to prevent export of power to the area electric power system in the event of a fault on the interconnected utility s grid.. Complete PARTS TWO and THREE (D) of this Application. Last revised: February 26, 2018. 2

APPENDIX A PART TWO - Generation and Installation Information Date: Name of Applicant: Applicant s principal place of business (address for regulatory notice): Street Address: City: State: Zip: Person whom the Commission should contact: Telephone No.: E-mail: Location where this generator will be installed: Street Address: City: State: Zip: Local Electric Company serving installed location: Number of generators: Rated capacity in kw of the generator(s): Manufacturer of the generator(s): Equipment and facilities to be powered by the generator, including time periods, if applicable: Type of fuel: Primary Expected in-service date or date installed: Secondary NOTICE! If the Applicant is seeking approval for a generator that is already installed, the Applicant must state, in an attachment or cover letter, why an Approval Application was not filed before the generator(s) was installed. Combined heat and power system: Yes No Interest in demand response opportunities: 4 Yes No NOTICE! For Type I and II generators, if the Applicant is not participating in a demand response program, please provide an explanation for the lack of participation. 4 Demand response involves allowing your business to earn significant money by periodically operating your generator and/or periodically reducing on-site consumption in exchange for payment. See Appendix A, Customer Opportunities to Earn Revenue from Demand Management below, for more details. Last revised: February 26, 2018. 3

APPENDIX A PART THREE (A) - Type I Generator(s) The Applicant must provide a letter from the local electric company stating that an interconnection, operation, and maintenance agreement ("Agreement") is not necessary for the proposed generator(s). The undersigned certifies that the generator(s) described in PART TWO of this Application: (1) will not be synchronized with the Electric System, and (2) will be configured so that there is no export of electricity to the Electric System. Under penalty of perjury, the undersigned hereby affirms that he or she is legal counsel for the Applicant, an officer of the Applicant, or a person who has the authority to legally bind the Applicant. The undersigned hereby makes this Application for the Applicant and certifies, that based upon personal knowledge, the contents of this Application are true. Name of Applicant By: Signature Date Print Name Title Last revised: February 26, 2018. 4

PART THREE (B) - Type II Generator(s) APPENDIX A The Applicant shall file with the Commission an interconnection, operation, and maintenance agreement ("Agreement") between the generating station and the local electric company. A copy of the Agreement must be attached to this Application. The undersigned certifies that the generator(s) described in PART TWO of this Application: (1) will be installed with equipment designed to synchronize the generator(s) with the Electric System, (2) must install protection equipment that is designed to prevent exporting electricity to the Electric System, and (3) will not be installed prior to filing with the Commission an executed copy of the Agreement. Under penalty of perjury, the undersigned hereby affirms that he or she is legal counsel for the Applicant, an officer of the Applicant, or a person who has the authority to legally bind the Applicant. The undersigned hereby makes this Application for the Applicant and certifies, that based upon personal knowledge, the contents of this Application are true. Name of Applicant By: Signature Date Print Name Title Last revised: February 26, 2018. 5

PART THREE (C) - Type III Generator(s) I. LOCAL ELECTRIC COMPANY APPENDIX A 1. The Applicant shall file with the Commission as an attachment to this Application an interconnection, operation, and maintenance Agreement ("Agreement") between the generating station and the local electric company. II. EXPORT OF ELECTRICITY 1. The Applicant (excluding generating stations that produce electricity from wind) must include a statement describing how it intends to comply with the statutory requirements: (i) (ii) that at least 80% of the electricity generated by the generating station whose capacity does not exceed 70 megawatts-will be consumed on-site each year; or that at least 10% of the electricity generated at the generating station whose capacity does not exceed 25 megawatts will be consumed on-site each year; or 2. The Applicant shall file with the Commission as an attachment to this Application an Interconnection Service Agreement 5 ("Service Agreement") between the generating station, the Independent System Operator, 6 and the local electric company. 3. Provide the Independent System Operator interconnection queue designation, if applicable. PJM Queue: III. OTHER The undersigned certifies that the generator described in PART TWO of this Application: (1) will be installed with equipment to synchronize the generator with the Electric System; (2) will not be installed prior to filing with the Commission a copy of an executed Agreement; (3) will not be operated prior to filing with the Commission a copy of an executed Service Agreement; and 5 Includes the rights and obligations of the generation owner and the independent system operator. 6 The organization that holds a FERC-approved tariff for the interconnection of generators. Last revised: February 26, 2018. 6

APPENDIX A (4) will not begin to export electricity to the Electric System unless the Commission has been notified two weeks in advance. In addition, the undersigned (excluding generating stations that produce electricity from wind) agrees to comply with requirement I.1(i) or I.1(ii) in this section, and further agrees to submit an annual statement to the Commission describing compliance with requirement I.1(i) or I.1.(ii). 7 The undersigned agrees to comply with all applicable requirements of the Independent System Operator. Under penalty of perjury, the undersigned hereby affirms that he or she is legal counsel for the Applicant, an officer of the Applicant, or a person who has the authority to legally bind the Applicant. The undersigned hereby makes this Application and certifies, that based upon personal knowledge, the contents of this Application are true. Name of Applicant By: Signature Date Print Name Title 7 The Applicant shall file the annual compliance statement no later than March 1. Last revised: February 26, 2018. 7

PART THREE (D) - Type IV Generator(s) APPENDIX A The Applicant shall file with the Commission as an attachment to this Application an interconnection, operation, and maintenance Agreement ("Agreement"), between the generating station and the local electric company. The undersigned certifies that the generator(s) described in PART TWO of this Application: (1) will be installed with equipment designed to synchronize the generator(s) with the Electric System, and (2) will utilize the cease to energize function of a UL 1741 listed inverter to prevent export of power to the area Electric System in the event of a fault on the interconnected utility s grid. (3) will not be installed prior to filing with the Commission an executed copy of the Agreement. Under penalty of perjury, the undersigned hereby affirms that he or she is legal counsel for the Applicant, an officer of the Applicant, or a person who has the authority to legally bind the Applicant. The undersigned hereby makes this Application for the Applicant and certifies, that based upon personal knowledge, the contents of this Application are true. Name of Applicant By: Signature Date Print Name Title Last revised: February 26, 2018. 8

APPENDIX A Customer Opportunities to Earn Revenue from Demand Management Customers with the ability to reduce the amount of electricity consumed from the electric grid can earn revenue and save on utility bills. Reductions can come from reducing the actual amount of electricity consumed and/or utilizing your on-site generator to offset electricity otherwise consumed from the grid. PJM Interconnection, the regional grid operator for Maryland, offers several programs that pay customers to participate in demand management. There are two basic types of demand management programs: Demand Response and Energy Efficiency Capacity. Demand Response is the willingness to reduce grid consumption during specific times in response to requests from PJM. PJM is willing to pay customers to respond to protect grid reliability or when electricity is expensive. There are two common forms of Demand Response: Emergency Demand Response - Under this program, customers agree to reduce grid consumption at certain times during a grid emergency. Once enrolled, it is mandatory to reduce grid consumption when a PJM system emergency is declared. Grid emergencies are relatively infrequent and typically last for a few hours. PJM pays customers based upon a customer s predetermined commitment for an emergency situation. Economic Demand Response This is a voluntary program in which customers can reduce demand during periods when electricity is expensive to produce. Under this program, PJM pays customers not to consume energy when it would be more expensive to dispatch higher cost electricity plants. Energy Efficiency Capacity involves customers agreeing to install energy efficiency measures in order to avoid the need for additional electricity generation in the future. When many customers commit to conservation in this way, PJM defers capacity purchases from traditional sources. PJM pays customers to make energy efficiency improvements, which helps defray the customer s cost of energy efficiency investments. In order to participate in a PJM demand management program, a customer typically enrolls through an agent called a Curtailment Service Provider ( CSP ). CSPs work with customers to identify demand management potential, enroll customers with PJM, and handle payment arrangements to customers. CSPs may also assist customers by installing advanced meters and technology devices which facilitate participation further by automating or simplifying participation. A list of PJM CSPs can be found at the following: http://pjm.com/markets-and-operations/demand-response/csps.aspx. Last revised: February 26, 2018. 9