TIMING BELT/CHAIN AND SPROCKETS

Similar documents
TIMING BELT/CHAIN AND SPROCKETS INSTALLATION

2002 Dodge Pickup R1500

2001 Dodge Dakota ENGINES 4.7L V8

COVER-FRONT TIMING BELT

2/25/2018 Engine, 4.0l Cylinder Head Removal 2008 Chrysler Town and Country (4.0L) - RT MotoLogic

1992 Mitsubishi 3000GT VR-4

1995 Mitsubishi Montero LS. Ensure timing marks are aligned. Mark timing belt direction of rotation.

REMOVAL & INSTALLATION

Engine, disassembling and

Service and Repair. a. Remove the 2 nuts and 2 upper radiator support. b. Lift out the radiator and cooling fan assembly.

2002 Escape Workshop Manual

1996 Aerostar/Ranger/Explorer

CYLINDER HEAD DESCRIPTION

2001 Toyota MR ENGINES' '1.8L 4-Cylinder

REMOVAL & INSTALLATION

LEFT CYLINDER HEAD Engine, 3.5L/Cylinder Head/Removal

CAMSHAFT TIMING CHAIN, SPROCKET, AND TENSIONER REPLACEMENT

2003 Hyundai Truck Santa Fe V6-3.5L

2001 Chrysler Truck PT Cruiser L4-2.4L VIN B Copyright 2013, ALLDATA Page 1

Timing Belt: Service and Repair

IMING BELT COMPONENTS REMOVAL

Engine, disassembly and

MECHANICAL(H4DOTC DIESEL) > Cylinder Block INSTALLATION 1. After setting the cylinder block to ST, install the crankshaft bearing.

2012 Kia Soul L4 2.0L

1. Remove the crankshaft pulley, engine coolant pump pulley and drive belt. 2. Remove the timing belt cover.

REMOVAL & INSTALLATION

2003 Hyundai Sonata LX

REMOVAL & INSTALLATION

1. Perform fuel pressure release procedure. (Refer to FUEL SYSTEM/FUEL DELIVERY - STANDARD PROCEDURE).


2002 Explorer Sport/Sport Trac Workshop Manual

TIMING BELT AND SPROCKET(S) REMOVAL - TIMING BELT

1996 Aerostar/Ranger/Explorer

1999 Nissan Altima GLE

REMOVAL & INSTALLATION

DrVanos.com Stage II Installation Instructions. Tool rental is available with the purchase of a vanos kit *See website for more info*

REMOVAL & INSTALLATION

Timing Belt: Service and Repair Timing Belt Replacement

Valvetrain, servicing

2000 Nissan Altima SE

CAUTION: When aligning timing marks, always rotate engine by turning the crankshaft. Failure to do so will result in valve and/or piston damage.

1991 Nissan 240SX. 2.4L 4-CYL - VINS [F,M,S] 1991 ENGINES Nissan 2.4L 4-Cylinder

Recommended Installation Procedure (31 MARCH 2010) ATech Timing Belt Tensioner (979004) EA T 20 Valve Longitudinal Engine

2003 Saturn Vue. SATURN 3.0L V6 DOHC - L-Series After VIN & Vue

CAMSHAFT TIMING CHAIN, SPROCK... CAMSHAFT TIMING CHAIN, SPROCKET, AND TENSIONER REPLACEMENT (LE5 OR LE9) (ENGINE MECHANICAL - 2.2L OR 2.

10. SEPARATE COMPRESSOR (a) Remove the nut, 3 bolts compressor stay and compressor. HINT: Hang up the hoses instead of detaching.

ATech Timing Belt Tensioner (979572) VM MOTORI 2.5L Diesel, Common Rail Engine


WARNING: ALWAYS relieve fuel pressure before disconnecting any fuel related component. DO NOT allow fuel to contact engine or electrical components.

Zoom and Print Options

IN-VEHICLE SERVICE. Engine Components

REMOVAL. 1. REMOVE ENGINE UNDER COVER 2. DRAIN ENGINE COOLANT 3. REMOVE RADIATOR ASSEMBLY (See page CO 1 5) 4. REMOVE DRIVE BELT (See page 1) CH

Camshaft Timing Chain, Sprocket, And Tensioner Replacement

M162 ENGINE MECHANICAL

Intake Components 1117

1983 BMW 320i. 1.8L 4-CYL 1983 Engines - 1.8L 4-Cylinder Engines - 1.8L 4-Cylinder

2005 Toyota Truck RAV4 2WD L4 2.4L (2AZ FE)

REMOVAL & INSTALLATION

REMOVAL & INSTALLATION

INSTALLATION LX - CHRYSLER L V6 V.V.T Engine, 3.6L/Valve Timing/CHAIN and SPROCKETS, Timing/Installation

REMOVAL & INSTALLATION

Removal Procedure. Remove the timing chain tensioner. 1 of 32 12/17/ :42 AM

IN-VEHICLE REPAIR. Cylinder Head. Special Tool(s) Timing Tool, Crankshaft TDC (T97T-6303-A) or. Special Tool(s) equivalent

11/29/2017 Engine Cooling - Coolant Pump - Removal and Installation 2010 Ford Edge MotoLogic Engine Cooling 2010 Edge, MKX

REMOVAL & INSTALLATION

2005 Chrysler 300 C ENGINE Mechanical - 3.5L - Service Information & Magnum

REMOVAL & INSTALLATION

Valve gear, servicing

1. Disconnect negative battery cable. 2. Remove upper and lower front timing belt covers..

REMOVAL & INSTALLATION

Service and Repair SERVICE POINTS OF REMOVAL. Select Vehicle New TSBs Technician's Reference Mitsubishi 3000GT V6-2972cc 3.

REMOVAL & INSTALLATION

file://c:\program Files\tsocache\OFFICE_5416\SY1~us~en~file=SY131B46.htm~gen~ref...

Recommended Installation Procedure ATech Timing Belt Tensioner DaimlerChrysler PL, PT, JR 2.0L 4-Cyl. Engine (10/27/2003)

Chrysler 2.0L DOHC timing belt procedure REMOVAL

EG 18 ENGINE MECHANICAL TIMING BELT EG5EK 01 COMPONENTS FOR REMOVAL AND INSTALLATION

2012 Kia Soul L4 2.0L

RECOMMENDET INSTALLATION PROCEDURE Timing Belt Tensioner for Aftermarket OPEL 2.0L SOHC, Fam. 2 (Revision date: 04/27/1999)

TIMING BELT REMOVAL - TIMING BELT

Recommended Installation Procedure ATech Timing Belt Tensioner and AUDI 2.0L 4V FSI & TFSI Engine (19 January 2015)

2005 Hyundai Tucson LX. On some models, engine is equipped with a timing belt and timing chain. Inspect timing chain when replacing timing belt.

2002 Crown Victoria/Grand Marquis Workshop Manual

TIMING CHAIN COMPONENTS

2011 > G 1.6 DOHC > Language. [MDPS Type] Loosen the mounting bolts (A) and then, turn the adjusting bolt(b) clockwise in loose tension.

2000 Toyota Truck Tundra. Timing Belt: Service and Repair

Cylinder Head. Special Tool(s) Compressor, Valve Spring (T93P-6565-AR) Heavy Duty Floor Crane or equivalent


2.2L 4-CYL - VIN [S]

2/17/2017 Timing Belt Service and Repair, Removal and Replacement

12/30/2018 Fuel/Ignition Ignition Distributor Removal and Installation Distributors 1997 Dodge RAM Pickup (5.2L V8) - BR MotoLogic

Engine Cylinder Head Installation

TIMING BELT TENSIONER FOR AFTERMARKET RENAULT G8T 2.2L DIESEL ENGINE (Revision date: 06/24/1999)

DISASSEMBLY. SORENTO(BL) > 2004 > G 3.5 DOHC > Engine Mechanical System

REMOVAL & INSTALLATION

1990 Buick Electra Limited

Service and Repair. Material. Timing chain

IN-VEHICLE REPAIR. Engine Front Cover

1999 Honda Accord DX

Engine. Special Tool(s) Compressor, Valve Spring (T97P-6565-AH) Compressor Spacer, Valve Spring (T91P-6565-AH)

2003 Cadillac CTS V6-3.2L VIN N

Transcription:

9-82 ENGINE 4.7L DN TIMING BELT / CHAIN COVER(S) (Continued) Fig. 130 Accessory Drive Belt Tensioner 1 - TENSIONER ASSEMBLY 2 - FASTENER TENSIONER TO FRONT COVER Fig. 132 Timing Chain Cover Fasteners (4) Install the generator (Refer to 8 - ELECTRI- CAL/CHARGING/GENERATOR - INSTALLATION). (5) Install crankshaft damper (Refer to 9 - ENGINE/ENGINE BLOCK/VIBRATION DAMPER - INSTALLATION). (6) Install accessory drive belt tensioner assembly (Refer to 7 - COOLING/ACCESSORY DRIVE/BELT TENSIONERS - INSTALLATION). (7) Install radiator lower hose. (8) Install both heater hoses. (9) Install radiator shroud and viscous fan drive assembly (Refer to 7 - COOLING/ENGINE/FAN DRIVE VISCOUS CLUTCH - INSTALLATION). (10) Fill cooling system (Refer to 7 - COOLING - STANDARD PROCEDURE). (11) Connect the battery negative cable. TIMING BELT/CHAIN AND SPROCKETS Fig. 131 Timing Chain Cover Fasteners INSTALLATION (1) Clean timing chain cover and block surface. Inspect cover gasket and replace as necessary. (2) Install cover and gasket. Tighten fasteners in sequence as shown in (Fig. 132) to 54 N m (40 ft. lbs.). (3) Install the A/C compressor (Refer to 24 - HEAT- ING & AIR CONDITIONING/PLUMBING/A/C COM- PRESSOR - INSTALLATION). REMOVAL (1) Disconnect negative cable from battery. (2) Drain cooling system (Refer to 7 - COOLING - STANDARD PROCEDURE). (3) Remove right and left cylinder head covers (Refer to 9 - ENGINE/CYLINDER HEAD/CYLIN- DER HEAD COVER(S) - REMOVAL). (4) Remove radiator fan shroud. (5) Rotate engine until timing mark on crankshaft damper aligns with TDC mark on timing chain cover (Fig. 133) (#1 cylinder exhaust stroke) and the camshaft sprocket V8 marks are at the 12 o clock position (Fig. 134). (6) Remove power steering pump (Refer to 19 - STEERING/PUMP - REMOVAL).

DN ENGINE 4.7L 9-83 (7) Remove access plugs (2) from left and right cylinder heads for access to chain guide fasteners (Fig. 135). (8) Remove the oil fill housing to gain access to the right side tensioner arm fastener. Fig. 133 Engine Top Dead Center (TDC) Indicator Mark 1 - TIMING CHAIN COVER 2 - CRANKSHAFT TIMING MARKS Fig. 135 Cylinder Head Access Plug Location 1 - RIGHT CYLINDER HEAD ACCESS PLUG 2 - LEFT CYLINDER HEAD ACCESS PLUG 1 - LEFT CYLINDER HEAD 2 - RIGHT CYLINDER HEAD Fig. 134 Camshaft Sprocket V8 Marks

9-84 ENGINE 4.7L DN (9) Remove crankshaft damper (Refer to 9 - ENGINE/ENGINE BLOCK/VIBRATION DAMPER - REMOVAL) and timing chain cover (Refer to 9 - ENGINE/VALVE TIMING/TIMING BELT / CHAIN COVER(S) - REMOVAL). (10) Collapse and pin primary chain tensioner (Fig. 136). Fig. 136 Collapsing And Pinning Primary Chain Tensioner 1 - PRIMARY CHAIN TENSIONER 2 - ADJUSTABLE PLIERS 3 - SPECIAL TOOL 8514 CAUTION: Plate behind left secondary chain tensioner could fall into oil pan. Therefore, cover pan opening. (11) Remove secondary chain tensioners. (12) Remove camshaft position sensor from right cylinder head (Fig. 137). Fig. 137 Camshaft Position Sensor Removal 1 - CRANKSHAFT POSITION SENSOR 2 - CYLINDER HEAD COVER 3 - CAMSHAFT POSITION SENSOR 4 - RIGHT SIDE CYLINDER BLOCK CAUTION: Care should be taken not to damage camshaft target wheel. Do not hold target wheel while loosening or tightening camshaft sprocket. Do not place the target wheel near a magnetic source of any kind. A damaged or magnetized target wheel could cause a vehicle no start condition. CAUTION: Do not forcefully rotate the camshafts or crankshaft independently of each other. Damaging intake valve to piston contact will occur. Ensure negative battery cable is disconnected to guard against accidental starter engagement.

DN ENGINE 4.7L 9-85 (13) Remove left and right camshaft sprocket bolts. (14) While holding the left camshaft steel tube with adjustable pliers, (Fig. 138) remove the left camshaft sprocket. Slowly rotate the camshaft approximately 15 degrees clockwise to a neutral position. Fig. 139 Camshaft Rotation Right Side 1 - ADJUSTABLE PLIERS 2 - CAMSHAFT DOWEL Fig. 138 Camshaft Rotation Left Side 1 - CAMSHAFT SPROCKET AND CHAIN 2 - ADJUSTABLE PLIERS 3 - CAMSHAFT (15) While holding the right camshaft steel tube with adjustable pliers, (Fig. 139) remove the right camshaft sprocket. Slowly rotate the camshaft approximately 45 degrees counterclockwise to a neutral position. (16) Remove idler sprocket assembly bolt. (17) Slide the idler sprocket assembly and crank sprocket forward simultaneously to remove the primary and secondary chains. (18) Remove both pivoting tensioner arms and chain guides. (19) Remove chain tensioner. INSPECTION Inspect the following components: Sprockets for excessive tooth wear. Some tooth markings are normal and not a cause for sprocket replacement. Idler sprocket assembly bushing and shaft for excessive wear. Idler sprocket assembly spline joint. The joint should be tight with no backlash or axial movement. Chain guides and tensioner arms. Replace these parts if grooving in plastic face is more than 1 mm (0.039 in.) deep. If plastic face is severely grooved or melted, the tensioner lube jet may be clogged. The tensioner should be replaced. secondary chain tensioner piston and ratcheting device. Inspect for evidence of heavy contact between tensioner piston and tensioner arm. If this condition exist the tensioner and tensioner arm should be replaced. Primary chain tensioner plastic faces. Replace as required (Fig. 140).

9-86 ENGINE 4.7L DN 1 - RIGHT CAMSHAFT SPROCKET AND SECONDARY CHAIN 2 - SECONDARY TIMING CHAIN TENSIONER (LEFT AND RIGHT SIDE NOT COMMON) 3 - SECONDARY TENSIONER ARM 4 - LEFT CAMSHAFT SPROCKET AND SECONDARY CHAIN 5 - CHAIN GUIDE 6 - TWO PLATED LINKS ON RIGHT CAMSHAFT CHAIN Fig. 140 Timing Chain System 7 - PRIMARY CHAIN 8 - IDLER SPROCKET 9 - CRANKSHAFT SPROCKET 10 - PRIMARY CHAIN TENSIONER 11 - TWO PLATED LINKS ON LEFT CAMSHAFT CHAIN 12 - SECONDARY TENSIONER ARM INSTALLATION (1) Using a vise, lightly compress the secondary chain tensioner piston until the piston step is flush with the tensioner body. Using a pin or suitable tool, release ratchet pawl by pulling pawl back against spring force through access hole on side of tensioner. While continuing to hold pawl back, Push ratchet device to approximately 2 mm from the tensioner body. Install Special Tool 8514 lock pin into hole on front of tensioner. Slowly open vise to transfer piston spring force to lock pin (Fig. 141). (2) Position primary chain tensioner over oil pump and insert bolts into lower two holes on tensioner bracket. Tighten bolts to 28 N m (250 in. lbs.). CAUTION: Overtightening the tensioner arm torx bolt can cause severe damage to the cylinder head. Tighten torx bolt to specified torque only. (3) Install right side chain tensioner arm. Apply Mopar Lock N, Seal to torx bolt, tighten bolt to 17 N m (150 in. lbs.). NOTE: The silver bolts retain the guides to the cylinder heads and the black bolts retain the guides to the engine block. (4) Install the left side chain guide. Tighten the bolts to 28 N m (250 in. lbs.). CAUTION: Overtightening the tensioner arm torx bolt can cause severe damage to the cylinder head. Tighten torx bolt to specified torque only. (5) Install left side chain tensioner arm. Apply Mopar Lock N, Seal to torx bolt, tighten bolt to 17 N m (150 in. lbs.). (6) Install the right side chain guide. Tighten the bolts to 28 N m (250 in. lbs.).

DN ENGINE 4.7L 9-87 Fig. 141 Resetting Secondary Chain Tensioners 1 - VISE 2 - INSERT LOCK PIN 3 - RATCHET PAWL 4 - RATCHET 5 - PISTON Fig. 142 Installing Secondary Timing Chains on Idler Sprocket 1 - LOCK ARM 2 - RIGHT CAMSHAFT CHAIN 3 - SECONDARY CHAINS RETAINING PINS (4) 4 - IDLER SPROCKET 5 - LEFT CAMSHAFT CHAIN 6 - SPECIAL TOOL 8515 (7) Install both secondary chains onto the idler sprocket. Align two plated links on the secondary chains to be visible through the two lower openings on the idler sprocket (4 o clock and 8 o clock). Once the secondary timing chains are installed, position special tool 8515 to hold chains in place for installation (Fig. 142). (8) Align primary chain double plated links with the timing mark at 12 o clock on the idler sprocket. Align the primary chain single plated link with the timing mark at 6 o clock on the crankshaft sprocket (Fig. 140). (9) Lubricate idler shaft and bushings with clean engine oil. (10) Install all chains, crankshaft sprocket, and idler sprocket as an assembly (Fig. 143). After guiding both secondary chains through the block and cylinder head openings, affix chains with a elastic strap or the equivalent, This will maintain tension on chains to aid in installation. Fig. 143 Installing Idler Gear, Primary and Secondary Timing Chains 1 - SPECIAL TOOL 8515 2 - PRIMARY CHAIN IDLER SPROCKET 3 - CRANKSHAFT SPROCKET

9-88 ENGINE 4.7L DN NOTE: It will be necessary to slightly rotate camshafts for sprocket installation. (11) Align left camshaft sprocket L dot to plated link on chain. (12) Align right camshaft sprocket R dot to plated link on chain. CAUTION: Remove excess oil from the camshaft sprocket bolt. Failure to do so can result in overtorque of bolt resulting in bolt failure. (13) Remove Special Tool 8515, then attach both sprockets to camshafts. Remove excess oil from bolts, then Install sprocket bolts, but do not tighten at this time. (14) Verify that all plated links are aligned with the marks on all sprockets and the V8 marks on camshaft sprockets are at the 12 o clock position (Fig. 140). CAUTION: Ensure the plate between the left secondary chain tensioner and block is correctly installed. (15) Install both secondary chain tensioners. Tighten bolts to 28 N m (250 in. lbs.). NOTE: Left and right secondary chain tensioners are not common. (16) Before installing idler sprocket bolt, lubricate washer with oil, and tighten idler sprocket assembly retaining bolt to 34 N m (25 ft. lbs.). (17) Remove all locking pins (3) from tensioners. CAUTION: After pulling locking pins out of each tensioner, DO NOT manually extend the tensioner(s) ratchet. Doing so will over tension the chains, resulting in noise and/or high timing chain loads. (18) Using Special Tool 6958, Spanner with Adaptor Pins 8346, tighten left (Fig. 144) and right (Fig. 145). camshaft sprocket bolts to 122 N m (90 ft. lbs.). Fig. 144 Tightening Left Side Camshaft Sprocket Bolt 1 - TORQUE WRENCH 2 - CAMSHAFT SPROCKET 3 - LEFT CYLINDER HEAD 4 - SPECIAL TOOL 6958 SPANNER WITH ADAPTER PINS 8346 (19) Rotate engine two full revolutions. Verify timing marks are at the follow locations: primary chain idler sprocket dot is at 12 o clock (Fig. 140) primary chain crankshaft sprocket dot is at 6 o clock (Fig. 140) secondary chain camshaft sprockets V8 marks are at 12 o clock (Fig. 140)

DN ENGINE 4.7L 9-89 Fig. 145 Tightening Right Side Camshaft Sprocket Bolt 1 - TORQUE WRENCH 2 - SPECIAL TOOL 6958 WITH ADAPTER PINS 8346 3 - LEFT CAMSHAFT SPROCKET 4 - RIGHT CAMSHAFT SPROCKET (20) Lubricate all three chains with engine oil. (21) After installing all chains, it is recommended that the idler gear end play be checked (Fig. 146). The end play must be within 0.10 0.25 mm (0.004 0.010 in.). If not within specification, the idler gear must be replaced. (22) Install timing chain cover (Refer to 9 - ENGINE/VALVE TIMING/TIMING BELT / CHAIN COVER(S) - INSTALLATION) and crankshaft damper (Refer to 9 - ENGINE/ENGINE BLOCK/VI- BRATION DAMPER - INSTALLATION). (23) Install cylinder head covers (Refer to 9 - ENGINE/CYLINDER HEAD/CYLINDER HEAD COVER(S) - INSTALLATION). Fig. 146 Measuring Idler Gear End Play 1 - IDLER SPROCKET ASSEMBLY 2 - DIAL INDICATOR NOTE: Before installing threaded plug in right cylinder head, the plug must be coated with sealant to prevent leaks. (24) Coat the large threaded access plug with Mopar Thread Sealant with Teflon, then install into the right cylinder head and tighten to 81 N m (60 ft. lbs.) (Fig. 135). (25) Install the oil fill housing. (26) Install access plug in left cylinder head (Fig. 135). (27) Install power steering pump (Refer to 19 - STEERING/PUMP - INSTALLATION). (28) Install radiator fan shroud. (29) Fill cooling system (Refer to 7 - COOLING - STANDARD PROCEDURE). (30) Connect negative cable to battery.