Transportation Highway Engineering Conference February 24, 2015

Similar documents
Dynamic Hard Shoulder Running

Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018

Facility Conditions.

2016 Congestion Report

Moving Operations. Introduction by. National Traffic Management & Work Zone Safety Conference March 2009

Metropolitan Freeway System 2013 Congestion Report

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

METRO Orange Line BRT American Boulevard Station Options

Heavy Truck Conflicts at Expressway On-Ramps Part 1

Case Study STREAMS SMART MOTORWAYS

Chapter 6. CEE 320 Anne Goodchild. Spring 2008 CEE 320

Recent Transportation Projects

JCE 4600 Basic Freeway Segments

STH 60 Northern Reliever Route Feasibility Study Report

NICTI Alternatives Analysis

Roy Hulli, P.Eng. and. Fernando Chua. Intelligent Transportation Systems Ministry of Transportation Ontario

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

IMPROVEMENT CONCEPTS

Sepulveda Pass Corridor Systems Planning Study

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

Proposed Project I 35 Improvements from SH 195 to I 10

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Diverging Diamond & Roundabouts: How to Keep on Trucking Along. Meredith K Cebelak, PhD, PE & Michael A Flatt, PE

Connected Vehicles. V2X technology.

D-25 Speed Advisory System

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Horizontal Sight Distance Considerations Freeway and Interchange Reconstruction

May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes

FREQUENTLY ASKED QUESTIONS

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

Introduction and Background Study Purpose

EXCEPTION TO STANDARDS REPORT

Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Median Barriers in North Carolina -- Long Term Evaluation. Safety Evaluation Group Traffic Safety Systems Management Section

NET TOLL REVENUE REINVESTMENT GRANT PROGRAM. South Bay Service Council

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

Wichita TMC Support- Monthly Incident Report for July 2018

Section 6H.01 Typical Applications

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

CTA Blue Line Study Area

Variable Speed Limit Pilot Project in BC

US 70 Corridor Planning for the Future

FREQUENTLY ASKED QUESTIONS

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12

Wichita TMC Support- Monthly Incident Report for June 2018

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

DRAFT INDOT ITS Strategic Plan

Slow Down! Why speed is important in realizing your Vision Zero goals and how to achieve the speeds you need

Current Corridor Characteristics. MN 62 Corridor Performance

Traffic Data Services: reporting and data analytics using cellular data

Purpose and Need Report

OR 217 Active Traffic Management

TRAFFIC OPERATIONS AND ITS. Built It, Renew It and Operate It

Summary of the Alcoa Highway Redevelopment Project

Task Force Meeting January 15, 2009

TOLL TRUCKWAYS: Increasing Productivity and Safety in Goods Movement. By Robert W. Poole, Jr., and Peter Samuel

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS

Expanding Capacity for the Northeast Corridor The Gateway Program

Troost Corridor Transit Study

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

State Avenue Corridor Bus Rapid Transit (BRT)

Technical Feasibility Report

5. OPPORTUNITIES AND NEXT STEPS

Harlem Avenue between 63 rd and 65 th

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Arkansas State Highway and Transportation Department. ASCE Conference Wyndham Hotel North Little Rock Thursday, October 16, 2014

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

Metropolitan Freeway System 2007 Congestion Report

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements

TxDOT TRAFFIC INCIDENT MANAGEMENT UPDATE. ITS Texas 2016

Intelligent Vehicle Systems

Commercial Vehicle Pre-Clearance and Compliance Best Practices. RANDY HANSON International Road Dynamics

Brent Spence Bridge Design Exceptions - Alternative I

Wichita TMC Support- Monthly Incident Report for December 2017

5G V2X. The automotive use-case for 5G. Dino Flore 5GAA Director General

PERFORMANCE ACTIVITY 603 SIGNS

Final Series of Public Meetings

Existing CTA Blue Line: From Clinton Station to Forest Park Station IDOT Expansion Alternative: Forest Park Station to Mannheim Road

Activity-Travel Behavior Impacts of Driverless Cars

MDOT Tow Plow USAGES AND EFFECTIVENESS FOR RIGHT OF WAY SNOW CLEARING

Diagram 1 - Shoulder Assistance

Connected Vehicles and Emergency Responder Technologies

Eco-Signal Operations Concept of Operations

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Green Line Long-Term Investments

CONNECTED AND AUTONOMOUS VEHICLES TYLER SVITAK CONNECTED AND AUTONOMOUS TECH PROGRAM MANAGER CDOT INTELLIGENT TRANPSORTATION SYSTEMS (ITS)

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

An Introduction to Automated Vehicles

Where will. BRT run? BRT will serve 20 stations along the line, connecting to bus routes and serving major destinations. How often will service run?

2013 Operations Statistics Report Triangle Expressway Fourth Quarter

4.0 TIER 2 ALTERNATIVES

Florida s Turnpike Enterprise. Incident Management Program for All Levels & Specialty Towing & Roadside Repair (STARR)

THE CITY OF CHATTANOOGA SMART TRANSPORTATION SYSTEMS

Transit Access Study

Transcription:

Transportation Highway Engineering Conference February 24, 2015

Today s Agenda Move Illinois status Jane Addams Memorial (I-90) Rebuilding and Widening Project Building a 21 st century corridor Incorporating Intelligent Transportation Systems (ITS) Installing smart corridor elements Implementing active traffic management (ATM) Connected vehicles 2

Move Illinois Program TAKE CARE OF EXISTING SYSTEM NEEDS JANE ADDAMS MEMORIAL TOLLWAY $2.5 billion ELGIN O HARE WESTERN ACCESS $3.4 billion I-294/I-57 INTERCHANGE $719 million ILLINOIS ROUTE 53/120 PROJECT OTHER EMERGING PROJECTS 3

I-90 Rebuilding and Widening Project 4

Building a 21 st Century Corridor Flexible infrastructure to incorporate smart features 5

ITS Elements on the Western Segment Weather station DMS Type 2 (8) DMS Type 1 (2) 6 HDTV camera, traffic sensors and equipment shelter every mile (34) Redundant IT, power distribution/its/leased fiber (median and off shoulder)

ITS Elements on the Eastern Segment Potential Future Active Traffic Management Area 2016 Active Traffic Management Area Western Segment Eastern Segment Smart Corridor Smarter 7

Integrated Power and Distribution Center Shelter provides power and communication Roadway lighting Cameras Dynamic message signs (DMS) Vehicle detection system Active traffic management (ATM) equipment Tolling equipment (if needed) 8

Installing Smart Corridor Elements Upgraded and expanded roadway camera system Traffic sensors Microwave vehicle detection system (mainline) Queue detection application (ramps) New weather stations Upgraded dynamic message signs Weigh-in-motion 9

Roadway Camera System 11 cameras evaluated in three stages Stage one: paper analysis vs. seven criteria Stage two: Traffic and Incident Management System integration Stage three: hands on video quality 10

Microwave Vehicle Detection System Non-intrusive to the pavement Highly accurate and reliable (volume and speed) Mounted with little or no offset ease of calibration and setup Continuous data during construction Low susceptibility to electromagnetic interference Compatible with existing systems Interchangeable 11

Queue Detection Criteria Signal at ramp terminal Terminal to mainline is less than 2,000 feet or plaza to mainline is less than 1,000 feet Local major traffic generator 2030 ramp is LOS E Alignment does not provide clear line of sight Location Barrington Road Meacham Road Lee Street Traffic Generator New Park & Rides; Hoffman Estates businesses, etc. Schaumburg Convention Center O Hare International Airport and cargo facilities; Rosemont businesses 12

Remote Weather Information System Field data processing unit 30-foot lattice tower Air temperature/humidity sensor Precipitation/visibility sensor Subsurface temperature probe Approach (or departure) non-intrusive laser pavement sensor Bridge deck non-intrusive laser pavement sensor 13

8 Dynamic Message Signs (DMS) 11 DMS Type 2A (9C) 26 East Lane Control Signs 4 4 East 8 DMS Type 2 (18C) West 6 29 5 8 DMS Type 1 (21C) East and West East 14

Weigh-in-motion Using performance specification Using bending plate technology per current success Illinois Route 31 Beverly Road Illinois Route 59 Barrington Road Meacham Road Arlington Heights Road Elmhurst Road Lee Street 15

What is Active Traffic Management (ATM)? Overhead gantries placed every half mile that provide real-time information to alert drivers to: Nature and status of traffic incidents ahead Ability to drive in the shoulder lanes Advisory speeds Proposed alternate routes Real-time lane closures and traffic pattern changes Helps facilitate the flow of cars to allow emergency vehicles to safely navigate the roadways and reach the incident scene more quickly 16

Concept of Operations Scenarios Weather Minor incident Traffic enforcement Major incident Full closure Congestion Stationary work zone Rolling work zone Car fire Disabled vehicle Partial system failure Prior Ice/ Plowing Storm Arrives Cleared 17

Why Kennedy Expressway to Barrington Road? Randall Road Illinois Route 31 Illinois Route 25 Beverly Road Illinois Route 59 Barrington Road Roselle Road Meacham Road Illinois Route 53/I-290 Arlington Heights Road Elmhurst Road Lee Street Park & Ride location Congested areas 18

How Will We Implement ATM? Overhead gantries every half mile Lane control sign over every lane Use of lane 0 for bus on shoulder DMS Type 2 every 2nd gantry (1 mile) Lane 0 (inside shoulder) is preferential lane Equipment shelter every mile Decision sight distance 900 feet x Lane 0 Stall ahead. Merge left and slow down 19

Accommodating State Police and Maintenance Police safe havens in turn-arounds in median 20 Illinois Route 31 Illinois Route 25 Beverly Road Illinois Route 59 Bartlett Road 10 crash investigation sites Crash investigation sites Barrington Road Roselle Road Meacham Road Arlington Heights Road Elmhurst Road Lee Street

ATM Benefits Improves mobility 3 to 7 percent increase in average throughput during congested periods (Europe) 3 to 22 percent increase in overall capacity (Europe) Enhances roadway safety 3 to 30 percent decrease in primary incidents (11 percent - WashDOT) 40 to 50 percent decrease in secondary incidents Integrates transit Provides reliable transit travel times Accommodates transit options 21

22 Thank You