TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 NOVEMBER 2015

Similar documents
MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

Power System Operating Incident Report Trip of Red Cliffs Horsham and Red Cliffs-Wemen Kerang 220 kv transmission lines on 15 January 2014

POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012

Power System Operating Incident Report Trip of Murray Lower Tumut No kv Transmission Line at Murray End Only on 18 November 2013

POWER SYSTEM OPERATING INCIDENT REPORT: TRIP OF 837 TARONG MT. ENGLAND 275 KV LINE AND MT. ENGLAND NO KV BUSBAR ON 30 OCTOBER 2011

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

POWER SYSTEM OPERATING INCIDENT REPORT LIGHTNING STRIKES IN TASMANIA AND PACIFIC ALUMINIUM POTLINE LOAD REDUCTIONS 21 MARCH 2013

POWER SYSTEM INCIDENT REPORT: OVERLOAD OF WAUBRA- HORSHAM 220 KV TRANSMISSION LINE AND INSECURE OPERATION OF THE SYSTEM ON 13 DECEMBER 2012

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF B 220 KV BUSBAR AT GEORGE TOWN ON 27 NOVEMBER 2012.

POWER SYSTEM OPERATING INCIDENT REPORT MULTIPLE CONTINGENCY EVENT IN NORTH WEST TASMANIA ON 6 APRIL 2012

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010

POWER SYSTEM INCIDENT REPORT NORTHERN POWER STATION STABILISER OUTAGE APRIL AND MAY 2010

SOUTH AUSTRALIAN HISTORICAL MARKET INFORMATION REPORT SOUTH AUSTRALIAN ADVISORY FUNCTIONS

ELECTRICITY TRANSMISSION USE OF SYSTEM PRICES - 1 JULY 2014 TO 30 JUNE 2015

REGIONAL VICTORIAN THERMAL CAPACITY UPGRADE RIT-T PROJECT ASSESSMENT CONCLUSION REPORT

South Australia Victoria (Heywood) Interconnector Upgrade. RIT-T: Project Specification Consultation Report

Guideline for Parallel Grid Exit Point Connection 28/10/2010

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By

SOUTH AUSTRALIAN HISTORICAL MARKET INFORMATION REPORT SOUTH AUSTRALIAN ADVISORY FUNCTIONS

Jemena Electricity Networks (Vic) Ltd

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

XXXXX. Kokish River Hydroelectric Project. Interconnection Facilities Study and Project Plan

Final Capacity Auction Results 2018/2019 T-1 Capacity Auction. Date 26/01/2018 Version 1.0

Distributed Energy Resources

Final Capacity Auction Results 2019/2020 T-1 Capacity Auction. Date 01/02/2019 Document: FCAR1920T-1 Version 1.0

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Energy Regulation : Australian Experience. Engr.Khondkar Abdus Saleque

Revenue Stacking in the NEM

Electricity Networks. Empowering your energy future. Tom Langstaff- Network Planning. 21 March 2018

Case Study on On EHV Circuit Breaker Flashover NTPC-SINGRAULI

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

Copyright and Disclaimer

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

Information Bulletin. Fire Pump Battery Failures. Version 1.1 Approved for release August 2011

Eyre Peninsula electricity supply options investigation

Louisville Gas and Electric Company

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

Bald Hill on track to start lithium concentrate production this quarter

Header. Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations. RT Balhannah and Uraidla - Final Draft Page 1 of 8

Jemena Electricity Networks (Vic) Ltd

TRANSMISSION PLANNING CRITERIA

Eyre Peninsula Electricity Supply Options

ELECTRICITY TRANSMISSION USE OF SYSTEM PRICES 1 JULY 2016 TO 30 JUNE 2017

XXXX. Skookum Creek Power Project. Interconnection System Impact Study

NYISO Tariffs. New York Independent System Operator, Inc. Document Generated On: 2/27/2013

2015 WDC Disturbance and Protection Standards Overview

XXXX. Knob Hill Wind Farm Project. Interconnection System Impact Study

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

B kv Gas-insulated Substations

The Energy Queensland Group Notice of no non-network options

TECHNICAL BRIEF Americas

Distributed resource participation in the Australian National Electricity Market

INTERNATIONAL STANDARD

Distributed Energy Resources Grid Connection Guidelines

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Basic Connection Services Application and Price Guide

User Agreement For Transfer To/From Other Financial Institution (A2A) Transfer Service

100 MW Wind Generation Project

XXXX. Kokish River Hydroelectric Project. Interconnection System Impact Study

SUBSTATION INTERLOCKING SCHEMES

Enquiry Form for Micro and Small Generators 5MW and Less

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Guidelines for connection of generators:

UniSec Maintenance solutions

MMP Investigation of Arthur Kill 2 and 3

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Northeast Wisconsin/Upper Peninsula Separation 11/14/01. Incident Investigation Report

Thank you for the detailed information regarding the Refurbishment Project at Marchwood MTS. This project will facilitate equipment maintainability.

VICTORIAN ANNUAL PLANNING REPORT

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP)

Population Growth Estimates

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

Study Report. McCredie-Overton Transmission Line Right-of-Way Analysis. City of Columbia, Missouri. prepared for the (S49)

Telhio Credit Union Account to Account (A2A) Transfer Service User Agreement

INTELEPOWER CXS SWITCHING SYSTEMS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Grid Tied Limiter User Manual

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Interconnection Feasibility Study

Washington, DC Area Low Voltage Disturbance

Seabrook Substation Reliability Improvement Project

ATTACHMENT A TRANSGRID PROJECT ASSESSMENT REPORTS INDEPENDENT PLANNING REVIEW

GAS METERING CTM DATA REQUIREMENTS

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.

Embedded Generation Guidelines

The outlook for electricity industry restructuring in Australia

Investigation into UK socket-outlets incorporating USB charging points

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

Inland Truck Shortage in North America. February 2018

Specification for 1500V DC Traction Supply WOS 01.E

Company Directive STANDARD TECHNIQUE: SD4O/1. Standard HV Connection Arrangements

PUD ELECTRIC SYSTEM INTERCONNECTION

Managing Electrical Safety on Boats

For personal use only

Transformer Protection

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

15 Nelson-Marlborough Regional Plan

Selective Coordination Requirements

Transcription:

TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 AN AEMO POWER SYSTEM OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICITY MARKET Published: August 2016

IMPORTANT NOTICE Purpose AEMO has prepared this report in accordance with clause 4.8.15(c) of the National Electricity Rules, using information available as at the date of publication, unless otherwise specified. Disclaimer AEMO has made every effort to ensure the quality of the information in this report but cannot guarantee its accuracy or completeness. Any views expressed in this report are those of AEMO unless otherwise stated, and may be based on information given to AEMO by other persons. Accordingly, to the maximum extent permitted by law, AEMO and its officers, employees and consultants involved in the preparation of this report: Copyright make no representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of the information in this report; and are not liable (whether by reason of negligence or otherwise) for any statements or representations in this report, or any omissions from it, or for any use or reliance on the information in it. 2016. Australian Energy Market Operator Limited. The material in this publication may be used in accordance with the copyright permissions on AEMO s website. Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au info@aemo.com.au NEW SOUTH WALES QUEENSLAND SOUTH AUSTRALIA VICTORIA AUSTRALIAN CAPITAL TERRITORY TASMANIA WESTERN AUSTRALIA

INCIDENT CLASSIFICATIONS Classification Detail Time and date of incident 0844 hrs Thursday 12 November 2015 Region of incident Victoria Affected regions Victoria and South Australia Event type Protection/control system Generation Impact No generator was disconnected or limited as a result of this incident Customer Load Impact No customer load was disconnected as a result of this incident Associated reports Nil ABBREVIATIONS Abbreviation AEMO CB HOTS kv MLRC MW NER RCTS VFRB Term Australian Energy Market Operator Circuit Breaker Horsham Terminal Station Kilovolt Murraylink Red Cliffs (convertor station) Megawatt National Electricity Rules Red Cliffs Terminal Station Very Fast Runback (scheme) Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au info@aemo.com.au NEW SOUTH WALES QUEENSLAND SOUTH AUSTRALIA VICTORIA AUSTRALIAN CAPITAL TERRITORY TASMANIA WESTERN AUSTRALIA

CONTENTS 1. OVERVIEW 5 2. THE INCIDENT 5 3. PARTICIPANT INVESTIGATIONS 6 3.1 AusNet Services investigation 6 3.2 APA Group investigation 6 4. POWER SYSTEM SECURITY 7 4.1 Reclassification 7 5. MARKET INFORMATION 7 6. CONCLUSIONS 8 APPENDIX A. MURRAYLINK INTERCONNECTOR 9 Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au info@aemo.com.au NEW SOUTH WALES QUEENSLAND SOUTH AUSTRALIA VICTORIA AUSTRALIAN CAPITAL TERRITORY TASMANIA WESTERN AUSTRALIA

1. OVERVIEW This report relates to a reviewable operating incident 1 that occurred on Thursday 12 November 2015 that resulted in the unexpected outage of the Murraylink interconnector 2 (Murraylink) between Victoria (VIC) and South Australia (SA) following a transient fault on the Horsham Red Cliffs (HOTS-RCTS) 220 kv transmission line. There was no loss of generation or customer load as a result of this incident. As a reviewable operating incident, AEMO is required to assess power system security over the course of this incident, and assess the adequacy of the provision and response of facilities and services and the appropriateness of actions taken to restore or maintain power system security. 3 AEMO concluded that: 1. The trip and auto-reclose of the HOTS-RCTS 220 kv transmission line trip was a correct operation likely due to lightning. The Murraylink Very Fast Runback (VFRB) scheme operated correctly in response to the line trip. 2. The trip of Murraylink Red Cliffs WT_Q1 CB was due to the loss of auxiliary supplies to the RCTS end of Murraylink. The reason why neither auxiliary supply was selected by the auxiliary supply control system could not be verified. A subsequent upgrade of the auxiliary supply control system has reduced the probability of complete auxiliary power loss in a similar event. 3. The power system was returned to, and then maintained in, a secure operating state during this event. This report is based on information provided by APA Group 4, AusNet Services 5, and AEMO. Australian Eastern Standard Time is used in this report. 2. THE INCIDENT At 0844 hours on Thursday 12 November 2015, the HOTS-RCTS 220kV transmission line in Victoria tripped and auto reclosed. There was lightning activity in the area at the time. The trip of the HOTS-RCTS transmission line correctly triggered the operation of the Murraylink Very Fast Runback (VFRB) Scheme, which reduced Murraylink flow from 134 MW from Victoria to South Australia to 0 MW. Following the VFRB operation, circuit breaker WT_Q1 at the Murraylink Red Cliffs Converter Station (MLRC) tripped resulting in an outage of Murraylink. This was not an expected outcome. Murraylink was returned to service at 0943 hrs on 12 November 2015. No generation or customer load was lost as a result of this incident. 1 See NER clause 4.8.15(a)(1)(i), as the event relates to a non-credible contingency event; and the AEMC Reliability Panel Guidelines for Identifying Reviewable Operating Incidents. 2 Murraylink is a 220 MW direct current interconnector between Red Cliffs in Victoria and Monash in South Australia. 3 See NER clause 4.8.15(b). 4 APA Group is the operator of Murraylink 5 Information provided by AusNet Services has been provided on a without prejudice basis and nothing in this report is intended to constitute, or may be taken by any person as constituting, an admission of fault, liability, wrongdoing, negligence, bad faith or the like on behalf of AusNet Services (or its respective associated companies, businesses, partners, directors, officers or employees). AEMO 2016 5

See Appendix A for a power system diagram illustrating the Murraylink interconnector. This event is being investigated because it involved the tripping of two transmission elements, which as a simultaneous disruptive event, is classified under the NER as a non-credible contingency event 6 3. PARTICIPANT INVESTIGATIONS 3.1 AusNet Services investigation AusNet Services, the Transmission Network Service Provider (TNSP) for Victoria, investigated this incident and provided the following information. On 12 November 2015 at 0844 hrs the HOTS-RCTS 220 kv transmission line tripped due to a transient two phases to earth fault. The fault was cleared within the mandated clearance times. 7 Following the trip, the line successfully auto-reclosed. This operation was in accordance with system design. The line was patrolled on 15 November 2015 and no cause for the fault was found. Lightning, rain, and high winds were reported in the area at the time of the incident. Following the trip and auto-reclose of the HOTS-RCTS line, the Murraylink Very Fast Runback (VFRB) scheme operated to reduce the flow on the Murraylink interconnector. This is an expected outcome for a trip of the HOTS-RCTS line. The operation of the VFRB did not directly result in the trip of Murraylink. Around six seconds after the trip and reclose of the HOTS-RCTS 220kV transmission line, the WT_Q1 circuit breaker at the Red Cliffs end of Murraylink interconnector opened, resulting in Murraylink being unavailable. 3.2 APA Group investigation APA Group, the owner of Murraylink investigated the trip of the WT_Q1 circuit breaker and found that this incident was due to the loss of auxiliary supplies to the circuit breaker cooling system. This cooling system relies on two alternative 22 kv power supplies: A primary supply from the tertiary winding of the 220/165kV transformer. A secondary supply from the 22 kv distribution network. If the primary supply is unavailable, there is an automatic changeover to the secondary supply. If neither supply is available the circuit breaker is automatically opened following a low flow trip issued by the cooling control system approximately 10 seconds after power is lost. The reason for the loss of auxiliary power supplies is believed to be under-voltage in both auxiliary supplies however this could not be confirmed by APA. At the time of the incident there were reports of lightning in the vicinity of Red Cliffs, which may have affected the availability or quality of the auxiliary equipment power supply. APA Group have subsequently upgraded the older relay logic auxiliary supply control system with a current ABB programmable logic controller. This controller will select the best auxiliary supply to operate on and will not disconnect both supplies regardless of the voltage quality. This modification will reduce the likelihood of an auxiliary controller failure and ensure the cooling pumps continue to operate until the pump circuit breaker trips. This modification has introduced improved reliability and this 6 NER clause 4.2.3(e). 7 NER Clause S5.1a.8 AEMO 2016 6

improvement will significantly reduce the likelihood of a WT-Q1 CB protection system trip under the same circumstances. APA have also identified that the same problem exists with the auxiliary supplies at the Berri converter station. Given the success of the Red Cliffs modifications, APA will upgrade the auxiliary supply control system in the same manner at Berri by the end of 2016. 4. POWER SYSTEM SECURITY AEMO is responsible for power system security in the NEM. This means AEMO is required to operate the power system in a secure operating state and return the power system to a secure state following a contingency event. This section assesses how AEMO managed power system security over the course of this incident. 8 At 0850 hrs, around six minutes after the operation of the Murraylink VFRB scheme, AEMO invoked constraint set I-ML_ZERO. 9 This limit on Murraylink resulted in two constraint equations 10 associated with a planned outage of one of the South East - Tailem Bend 275kV transmission lines violating for a single dispatch interval. The power system was returned to a secure operating state by 0855 hrs, an acceptable 11 minutes after the event occurred. AEMO is required to return the power system to a secure state within thirty minutes following a contingency event. 11 4.1 Reclassification After Murraylink had been returned to service, AEMO, in accordance with clause 4.2.3A of the National Electricity Rules, assessed whether or not to reclassify the event as a credible contingency event. For this incident, AEMO was not satisfied that the cause had been identified and therefore was not satisfied that the incident was unlikely to reoccur. As a result, AEMO reclassified the simultaneous trip of the HOTS-RCTS line and Murraylink as a credible contingency event at 1034 hrs on 12 November. The reclassification was cancelled on 15 August 2016. 5. MARKET INFORMATION AEMO is required by the NER and operating procedures to inform the market about incidents as they progress. This section assesses how AEMO informed the market 12 over the course of this incident. For this incident, AEMO was required to inform the market on the following matters: 1. The occurrence of a non-credible contingency event - notify within two hours of the event. 13 AEMO issued Market Notice 50501 at 0928 hrs, 44 minutes after the event. 2. Constraints invoked with interconnector terms on the LHS. 8 AEMO is responsible for power system security in the NEM and is required to operate the power system in a secure operating state (NER Clause 4.2.4 (a)). AEMO must thereby ensure that the power system is maintained in, or returned to, a secure operating state following a contingency event. 9 Limits flow on Murraylink to zero in both directions. 10 V::S_SETB_SETB & V^^S_SETB_SETB transient and voltage stability limits with a single South East-Tailem Bend line out of service. 11 AEMO is required to return the power system to a secure state within thirty minutes following a contingency event - NER Clause 4.2.6 (b) 12 AEMO generally informs the market about operating incidents as the progress by issuing Market Notices see AEMO website at: http://www.aemo.com.au/market-notices. 13 AEMO is required to notify the Market of a non-credible contingency event within two hours of the event - AEMO, Power System Security Guidelines, Section 10.3 AEMO 2016 7

AEMO issued Market Notice 50497 at 0853 hrs, nine minutes after the event to advise that constraint set I-ML_ZERO had been invoked. 3. Reclassification of a non-credible contingency event 14 - AEMO is required to advise the market as soon as practicable. AEMO issued Market Notice 50503 at 1034 hrs, 51 minutes after Murraylink was returned to service, to advise the market that the trip of the HOTS-RCTS line and Murraylink WT-Q1 circuit breaker was a credible contingency. AEMO issued Market Notice 54738 on 15 August 2016 to advise that the reclassification had been cancelled. Over the course of this incident AEMO issued appropriate, timely and sufficiently detailed market information. 6. CONCLUSIONS AEMO has assessed this incident in accordance with clause 4.8.15(b) of the NER. In particular, AEMO has assessed the adequacy of the provision and response of facilities or services, and the appropriateness of actions taken to restore or maintain power system security. AEMO concluded that: 1. The trip and auto-reclose of the HOTS to RCTS 220 kv transmission line trip was a correct operation likely due to lightning. The Murraylink Very Fast Runback (VFRB) scheme operated correctly in response to the line trip. 2. The trip of Murraylink Red Cliffs WT_Q1 CB was due to the loss of auxiliary supplies to the RCTS end of Murraylink. The reason why neither auxiliary supply was selected by the auxiliary supply control system could not be verified. A subsequent upgrade of the auxiliary supply control system has reduced the probability of complete auxiliary power loss in a similar event. 3. The power system was returned to, and then maintained in a secure operating state during this event. 14 AEMO is required to notify the Market as it becomes aware of new and material information NER Clause 4.2.3A(d) AEMO 2016 8

APPENDIX A. MURRAYLINK INTERCONNECTOR MURRAYLINK (MLNK_B) MURRAYLINK (MLRC) CB WT_Q1 4 11 12 13 11 12 13 MONASH (Part) 220 kv Busbar, line 132 kv Busbar, line Out of service Busbar, line Closed CB Open CB Closed Isolator Open Isolator RED CLIFFS (Part) AEMO 2016 9