Reduction of Vehicle Noise at Lower Speeds Due to Quieter Pavement. By Paul R Donavan
|
|
- Bethanie Simpson
- 5 years ago
- Views:
Transcription
1 Reduction of Vehicle Noise at Lower Speeds Due to Quieter Pavement By Paul R Donavan
2 Project Description To Quarry Noise complaints along Pt. San Pedro Road in Marin County, CA Quarry traffic along 4 mile road to freeway Primary issue heavy duty trucks To Freeway
3 Project Description Evaluate quieter pavement on a ½ mile test section prior to repaving 4 miles Traffic includes light vehicle, heavy and medium trucks Operating conditions near quarry entrance: Cruise Acceleration (away from quarry entrance) Deceleration (approaching quarry entrance) 35 mph posted speed limit
4 Noise Abatement Issues At lower speeds, vehicle noise has lower contribution of tire noise Under acceleration, even lower contribution of tire noise Danish experience with thin porous layers at lower speed: 2.9 db reduction for light vehicles (37 mph) 1.2 db reduction for heavy trucks (35 mph)
5 REMELS Database Average Pavement Sound Pressure Level, dba Cars Non-Accel Hvy Trk Non-Accel Cars Interupted/Grade Hvy Trk Interupted/Grade Tire Noise ~ 40Log(V) Vehicle Speed, mph
6 REMELS Database ~1.6 db ~4.6 db ~2.1 db
7 REMELS Database ~0.6 db ~1.3 db ~0.9 db
8 Measurements To Quarry Statistical Isolated Pass-by 10 minute Leq & traffic counts On-Board Sound Intensity at 35 mph To Freeway
9 SIP Measurements 37 ft 25 ft Trucks at Cruise or Deceleration (Eastbound) Trucks Accelerating (Westbound)
10 Pavement OLD DGAC New OGAC New OGAC design same as porous pavement used on US 101 (Reported July 2013) Smaller maximum aggregate size ⅜ on Pt San Pedro Road ½ on US thick overlay
11 Measurement Details Pre-Overlay October 24 & 25, 2013, 8 to 11 am both days Mid/upper 50 s F, calm wind OBSI on the 24 th sampled on 6 segments Post-Overlay February 25, 2014, 9 am to 2 pm Mid/upper 50 s F, occasional wind 6 to max of 8 mph parallel to roadway OBSI on January 31, 2014 at 58 F
12 105 OBSI Results Avg Pre Avg Post dba 90 OBSI Level, dba /3 Octave Band Center Frequency, Hz
13 10 Minute L eq Levels
14 Comparison of L eq Results Somewhat lower truck volumes for postoverlay measurements Comparison constructed from 10 minute intervals with the same truck count Light vehicle counts were the same for pre- & post-overlay measurements Average difference: 5.0 db
15 Light Vehicles - Westbound Post Overlay Pre Overlay Maximum Pass-by Level, dba At 39 mph, average diffence is: = 9.5 db Vehicle Speed, mph
16 Heavy Trucks - Eastbound Post Overlay Pre Overlay Maximum Pass-by Level, dba At 30 mph, average diffence is: = 5.1 db Vehicle Speed, mph
17 Heavy Trucks - Westbound Post Overlay Pre Overlay Maximum Pass-by Level, dba At 26 mph, average diffence is: = 3.1 db Vehicle Speed, mph
18 Pre- & Post-Overlay Pre-Overlay Post-Overlay 3.5 db OBSI Sound Intensity Level, dba db db db 5.1 db 5.2 db db Light Vehicle - EB Light Vehicle - WB Heavy Trucks - EB Heavy Trucks - WB Medium Trucks - EB Medium Trucks - WB OBSI
19 US 101 Noise Reductions - Porous Pre Rehab Post Rehab OBSI Sound Intensity Level, dba Wayside 5 ft Wayside 10 ft OBSI Southbound
20 Overall Sound Level, dba US 101 Noise Reductions Non Porous Site A (Pre-Habilitation) & Site B (Post-Repaving) Old Pavement New OGAC Pavement db 8.4 db db 99.2 Gap Closure (Project Pre & Post-Repaving) db db Wayside 5 ft Wayside 10 ft OBSI Wayside Above Wall OBSI
21 SIP & OBSI Comparison Light Vehicles WB 105 Post Overlay Pre Overlay 95 OBSI Levels 85 Sound Level, dba Westbound Pass-by Levels (25 ft) /3 Octave Band Center Frequency, Hz 10000
22 CTIM & OBSI Comparison US 101 Traffic 110 New OGAC Aug 2012 Old DGAC Jun OBSI Levels 90 Sound Level, dba CTIM Levels /3 Octave Band Center Frequency, Hz 10000
23 Sound Propagation Tests Subtract sound pressure level from average sound intensity level to calculate difference Measure sound pressure at 25 & 50 ft Measure average sound intensity over face of the loudspeaker
24 Added Attenuation for Propagation over Porous Pavement Relative to Non-Porous
25 Noise Reduction for SIP & OBSI Light Vehicle Pass-by OBSI Sound Level Difference, db /3 Octave Band Center Frequency, Hz
26 SIP & OBSI Comparison Heavy Trucks Cruise 110 Post Overlay Pre Overlay OBSI Levels Sound Level, dba Eastbound Pass-by Levels (37 ft) /3 Octave Band Center Frequency, Hz 10000
27 SIP & OBSI Comparison Heavy Trucks Accel 110 Post Overlay Pre Overlay 100 Sound Level, dba OBSI Levels Westbound Pass-by Levels (25 ft) /3 Octave Band Center Frequency, Hz 10000
28 Conclusions Significant noise reductions with new OGAC: 9.2 db light vehicle at 40 mph cruise (vs. 4.6 db) 5.1 db heavy trucks at 30 mph cruise & decelerating (vs. 1.4 db) 3.1 db heavy trucks at 26 mph accelerating (vs. <<1 db) Larger reduction than expected due to: Tire noise source level reduction Added sound propagation attenuation due to porosity Overlay applied to remaining 3½ miles
29 Thank You
Reduction of vehicle noise at lower speeds due to a porous open-graded asphalt pavement
Reduction of vehicle noise at lower speeds due to a porous open-graded asphalt pavement Paul Donavan 1 1 Illingworth & Rodkin, Inc., USA ABSTRACT Vehicle noise measurements were made on an arterial roadway
More informationBeyond the Specifications: Best Practices for OBSI Measurement
Beyond the Specifications: Best Practices for OBSI Measurement Dana M. Lodico, PE Lodico Acoustics LLC TRB 89 th Annual Meeting Washington D.C. January 10, 2010 Topics Results of OBSI parameter testing
More informationUse of the ASTM SRTT for Standardized OBSI Measurement
Use of the ASTM SRTT for Standardized OBSI Measurement OBSI Workshop TRB 89 th Annual Meeting Paul R. Donavan Illingworth & Rodkin, Inc. US Standard Test Tire Migration Goodyear Aquatred 3 P205/70R15 UniRoyal
More informationMeasurement of Tire/Pavement Noise
Measurement of Tire/Pavement Noise 34 Hot Mix Asphalt Technology JANUARY/FEBRUARY 2005 Sound caused by transportation systems is the number one noise complaint. Figure 1 Wayside measurements Research in
More informationProject Location. I-80 Toll Plaza at I-480/I-80 Interchange, Lorain County, Ohio
Geoffrey Pratt - Bowlby & Associates, Inc. William Bowlby - Bowlby & Associates, Inc. Kim Burton - Burton Planning Services, LLC Elvin Pinckney - Burton Planning Services, LLC Noel Alcala - Ohio Department
More informationNEWS RELEASE November 8, 2017
NEWS RELEASE November 8, 2017 Contact: Marsha Roa Public Information Manager 909.839.7055 mroa@diamondbarca.gov GRAND AVENUE INTERCHANGE AT SR-57 (ORANGE) AND SR-60 (POMONA) MULTIPLE ROADWAY, RAMP AND
More informationResearch Update Construction Conference Charles Holzschuher, P.E. February 3, Florida Department of Transportation
Research Update 2017 Construction Conference Charles Holzschuher, P.E. February 3, 2017 Laser Based Sensor Evaluation Goals: Evaluate Laser Based Sensors for Profilers Support RN and IRI Smoothness Specifications
More informationMeasurements of the vertical distribution of truck noise sources during highway cruise pass-bys using acoustic beam-forming
Donavan, P. and Rymer, B. Page Measurements of the vertical distribution of truck noise sources during highway cruise pass-bys using acoustic beam-forming Paul R. Donavan, ScD. (Corresponding author) Sr.
More informationEvaluation of Grind and Groove (Next Generation Concrete Surface) Pilot Projects in California
November 2012 Research Report: UCPRC-RR-2013-01 Evaluation of Grind and Groove (Next Generation Concrete Surface) Pilot Projects in California Authors: Irwin M. Guada, Arash Rezaei, John T. Harvey, and
More informationNoise and Vibration Measurements for the DCTA Stadler DMU
Noise and Vibration Measurements for the DCTA Stadler DMU TRB ADC40 Transportation-Related Noise and Vibration 2013 Summer Meeting Santa Fe, NM July 31, 2013 David A. Towers, P.E. Principal Engineer Harris
More informationVehicle noise functional performance indicators using tire sound intensity
Vehicle noise functional performance indicators using tire sound intensity Paul Donavan 1 ; Carrie Janello 2 1,2 Illingworth & Rodkin, Inc., USA ABSTRACT Tire noise plays an important role in the noise
More informationEffect of road surfaces on road traffic noise on the public roads of Japan. --An investigation based on tyre/road noise measurement--
Effect of road surfaces on road traffic noise on the public roads of Japan --An investigation based on tyre/road noise measurement-- Hiroshi Koike 1 ; Akiyoshi Ito 2 1,2 Japan Automobile Research Institute,
More informationI-95 Corridor Coalition. I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report North Carolina
I-95 Corridor Coalition I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report North Carolina June 2010 I-95 CORRIDOR COALITION VEHICLE PROBE PROJECT: VALIDATION OF INRIX
More informationWIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT
WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 EAST GRAND FORKS MONTHLY REPORT - JANUARY 2015 WIM Site Location WIM #31 is located on US 2 at mile post 8.0, southeast of
More informationDefinitions of Acoustical Terms
Appendix E Noise Definitions of Acoustical Terms Sound Measurements Decibel (db) A Weighted Decibel (dba) Maximum Sound Level (Lmax) Minimum Sound Level (Lmin) Equivalent Sound Level (Leq) Percentile
More informationBennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017
Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,
More informationProject Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013
Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013 TASK #3 PROCESS TRUCK GPS DATA AND DERIVE PERFORMANCE
More informationRehabilitated PCC Surface Characteristics
Rehabilitated PCC Surface Characteristics Dr. W. James Wilde, P.E. Professor, Minnesota State University Director, Center for Transportation Research and Implementation Mankato, Minnesota Mr. Elliott Dick
More informationSample Validation of Vehicle Probe Data Using Bluetooth Traffic Monitoring Technology
Sample Validation of Vehicle Probe Data Using Bluetooth Traffic Monitoring Technology Data taken from the Northern Section of I-49 (Capitol Beltway) on June 17, 28 The I-9 Corridor Coalition is a partnership
More informationI-95 Corridor Coalition. I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report Virginia
I-95 Corridor Coalition I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report Virginia June 2009 I-95 CORRIDOR COALITION VEHICLE PROBE PROJECT: VALIDATION OF INRIX DATA
More informationI-95 Corridor Coalition. I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report Virginia
I-95 Corridor Coalition I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report Virginia February 2010 I-95 CORRIDOR COALITION VEHICLE PROBE PROJECT: VALIDATION OF INRIX
More informationThe INDOT Friction Testing Program: Calibration, Testing, Data Management, and Application
The INDOT Friction Testing Program: Calibration, Testing, Data Management, and Application Shuo Li, Ph.D., P.E. Transportation Research Engineer Phone: 765.463.1521 Email: sli@indot.in.gov Office of Research
More informationSouthern Windsor County 2016 Traffic Count Program Summary April 2017
Southern Windsor County 2016 Traffic Count Program Summary April 2017 The Southern Windsor County Regional Planning Commission (the RPC ) has been monitoring traffic at 19 locations throughout the southern
More informationWIM #37 was operational for the entire month of September Volume was computed using all monthly data.
SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains
More informationNCHRP Project 1-44: Measuring Tire-Pavement Noise at the Source APPENDIX C. Results of Test Parameter Evaluation
NCHRP Project 1-44: Measuring Tire-Pavement Noise at the Source APPENDIX C Results of Test Parameter Evaluation Introduction As a portion of the overall research work, an examination of test variables
More informationDecember Wilmington School & Residence Sound Attenuation Program. Report #3: Noise Contour Development Methodology Report
December 2013 Wilmington School & Residence Sound Attenuation Program Report #3: Noise Contour Development Methodology Report Wilmington School & Residence Sound Attenuation Program Report #3: Noise
More informationFigure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd
Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the
More informationEvaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)
Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline
More informationProject Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013
MnDOT Contract No. 998 Work Order No.47 213 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/3/213 TASK #4:
More informationAPPENDIX D NOISE IMPACT ASSESSMENT
APPENDIX D NOISE IMPACT ASSESSMENT AURORA ACOUSTICAL CONSULTANTS Inc. 745 Warren Drive East Aurora, New York 14052 716-655-2200 info@auroraacoustical.com NOISE IMPACT ASSESSMENT OF NIGHTTIME PARKING LOT
More informationAVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE
AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No
More informationBenefit-Cost Analysis Technical Memo
I-40 Douglas Boulevard Interchange Reconstruction and Related Widening Oklahoma County, OKLAHOMA INFRA Grant Application Benefit-Cost Analysis Technical Memo November 2017 Submitted by: Oklahoma Department
More informationAttachment E3 Vibration Technical Memorandum
Attachment E3 Technical Memorandum 77 South Bedford Street Burlington, MA 01803 T 781.229.0707 F 781.229.7939 E jross@hmmh.com W www.hmmh.com TECHNICAL MEMORANDUM To: Alisa Swank, CH2M HILL Jodi Ketelsen,
More informationEvaluation of Rumbler, Preformed Rumble Strip
Report Title Report Date: 2002 Evaluation of Rumbler, Preformed Rumble Strip Principle Investigator Vendor Name and Address Name Horowitz, Alan Swarco Industries Affiliation Univ of Wisconsin, Milwaukee
More informationCHANGE LIST for MDOT Traffic and Safety Geometric Design Guides. May 23, 2017: The following update was made to the web site.
CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides Note: Located at https://mdotjboss.state.mi.us/tssd/tssdhome.htm May 23, 2017: The following update was made to the web site. GEO-650-D Flares
More informationMN Roads Low Volume Road Testing to Validate the Purdue TPTA Textures and Predicted Joint Effects
AMERICAN CONCRETE PAVEMENT ASSOCIATION MN Roads Low Volume Road Testing to Validate the Purdue TPTA Textures and Predicted Joint Effects Workplan Prepared by Larry Scofield American Concrete Pavement Association
More informationSignal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St.
I. Overview Consultant A was retained by the Ohio Department of Transportation to conduct traffic signal timing analyses on approximately one mile of roadway on between the Main Street and the Fourth Street
More informationI-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation. Report for North Carolina (#08) I-240, I-40 and I-26
I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation Report for North Carolina (#08) I-240, I-40 and I-26 Prepared by: Masoud Hamedi, Sanaz Aliari University of Maryland,
More informationInventory Levels - All Prices. Inventory Levels - By Price Range
Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Mar-17 152 108 260 2-Mar-18 109 78 187-28% Inventory Levels - By Price Range 3-Mar-17 2-Mar-18 0-100,000 41 6 100,001-125,000 19 8 125,001-150,000
More information1 TO 2 2 TO 3 3 TO 4 11 TO TO 1
STATION: New York State Department of Transportation Traffic Count Hourly Report Page of ROUTE #: NY ROAD NAME: FROM: RT : END / OLAP COUNTY: Onondaga : Eastbound FACR GROUP: REC. SERIAL #: AP FUNC. CLASS:
More informationInventory Levels - All Prices. Inventory Levels - By Price Range
Inventory Levels - All Prices Idaho Falls Bonneville Total 7-Apr-17 154 111 265 6-Apr-18 113 91 204-23% Inventory Levels - By Price Range 7-Apr-17 6-Apr-18 0-100,000 36 10 100,001-125,000 13 9 125,001-150,000
More informationTable City of Glendora Predicted Vibration Levels for Residential (Category 2) Land Uses
Table 3.11-11. City of Glendora Predicted Vibration Levels for Residential (Category 2) Land Uses Cluster Number 1 Cross Streets Direction Distance (feet) 2 Train Speed (mph) Threshold (VdB) Predicted
More informationOBSI and How it is Being Used in Texas. Presented by: John Wirth from TxDOT At RPUG Conference 10/28/2008
OBSI and How it is Being Used in Texas Presented by: John Wirth from TxDOT At RPUG Conference 10/28/2008 What is OBSI? On-Board Sound Intensity Standard Method of Test for Measurement of Tire/Pavement
More informationInterstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results
NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results
More informationApril 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435
Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:
More informationThe effect of grinding and grooving on the noise generation of Portland Cement Concrete pavement
The effect of grinding and grooving on the noise generation of Portland Cement Concrete pavement T. Wulf, T. Dare and R. Bernhard Purdue Univ., 140 Martin Jischke Dr., Herrick Lab., West Lafayette, IN
More informationI-95 Corridor Coalition
I-95 Corridor Coalition I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Report for New Hampshire (#1) I-89 and I-93 October 2016 I-95 CORRIDOR COALITION VEHICLE PROBE PROJECT VALIDATION
More informationTable of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...
Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...
More informationUPDATE OF THE SWISS SOURCE MODEL FOR ROAD TRAFFIC NOISE
UPDATE OF THE SWISS SOURCE MODEL FOR ROAD TRAFFIC NOISE Francois-Edern ABALLEA, Hervé LISSEK, Stephan UTZ Ecole Polytechnique Fédérale de Lausanne, ELB Station 11, 1015 Lausanne, Switzerland francois.aballea@epfl.ch,
More informationInventory Levels - All Prices. Inventory Levels - By Price Range
Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Nov-17 198 128 326 2-Nov-18 155 134 289-11% Inventory Levels - By Price Range 3-Nov-17 2-Nov-18 0-100,000 17 11 100,001-125,000 15 9 125,001-150,000
More informationRoad vehicle noise reduction by low noise road surfaces in Japan
Road vehicle noise reduction by low noise road surfaces in Japan 1 Integrated noise reduction measures Road vehicle running noise Road vehicle Tyre Pavement Traffic management Integrated Measures Road
More informationMEMORANDUM. Figure 1. Roundabout Interchange under Alternative D
MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis
More informationI-405 Sepulveda Pass Improvements Project
I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half
More informationDevelopment of low noise tyres in EC project SILENCE
Development of low noise tyres in EC project SILENCE E.-U. Saemann Continental AG, Jaedekamp 30, 30419 Hannover, Germany ernst-ulrich.saemann@conti.de 4289 In this paper the results from the development
More informationCotton Belt Corridor Regional Rail
Cotton Belt Corridor Regional Rail Noise and Vibration Test Program for the DCTA Stadler DMU April 14, 14 Final Version Prepared by Harris Miller Miller & Hanson Inc. Prepared for Dallas Area Rapid Transit
More informationEvaluation of Renton Ramp Meters on I-405
Evaluation of Renton Ramp Meters on I-405 From the SE 8 th St. Interchange in Bellevue to the SR 167 Interchange in Renton January 2000 By Hien Trinh Edited by Jason Gibbens Northwest Region Traffic Systems
More information3-D Laser Data Collection and Analysis of Road Surface Texture
3-D Laser Data Collection and Analysis of Road Surface Texture Humaira Zahir, Mustaque Hossain, Rick Miller ROAD PROFILE USERS GROUP MEETING, 2015 RALEIGH, NC Presentation Organization - Introduction -
More informationCLEARWATER POLICE DEPARTMENT. Traffic Safety Improvement Program July 1, 2012 to June 30, 2014
CLEARWATER POLICE DEPARTMENT Traffic Safety Improvement Program July 1, 2012 to June 30, 2014 Red Light Cameras were installed at two intersections to help reduce the number of red light running crashes
More informationTRB WEBINAR PROGRAM. Highway Rumble Strips: Approaches to Balancing Public Safety and Community Noise. Tuesday, March 28, :00-3:30 PM ET
TRB WEBINAR PROGRAM Highway Rumble Strips: Approaches to Balancing Public Safety and Community Noise Tuesday, March 28, 2017 2:00-3:30 PM ET The Transportation Research Board has met the standards and
More informationEXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No
EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270
More informationAutomated Bus Announcement Update Transportation Accessibility Advisory Committee January 6, 2016
Automated Bus Announcement Update Transportation Accessibility Advisory Committee January 6, 2016 Jason Podany Metro Transit 1 Implementation Summary 2012 - Announcements Implemented on Routes 10, 17,
More informationInterstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output
NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical
More informationEvaluation of the Rolling Wheel Deflectometer (RWD) in Louisiana. John Ashley Horne Dr. Mostafa A Elseifi
Evaluation of the Rolling Wheel Deflectometer (RWD) in Louisiana John Ashley Horne Dr. Mostafa A Elseifi Introduction Louisiana uses the Falling-Weight Deflectometer (FWD) for project level testing Limitations
More informationPortland-Milwaukie Light Rail Project Johnson Creek Boulevard
Portland-Milwaukie Light Rail Project Johnson Creek Boulevard EXISTING AND FUTURE OPERATIONS AND POTENTIAL MITIGATIONS Presented by Alan Snook DKS Associates October 12, 2009 1 AGENDA Traffic 101 Study
More informationShirk Road at State Route 198 Interchange Analysis Tulare County, California
Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project
More informationThe major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:
3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown
More informationTransportation & Traffic Engineering
Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family
More informationAppendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project
Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationImpact of Environment-Friendly Tires on Pavement Damage
Impact of Environment-Friendly Tires on Pavement Damage Hao Wang, PhD Assistant Professor, Dept. of CEE Rutgers, the State University of New Jersey The 14th Annual NJDOT Research Showcase 10/18/2012 Acknowledgement
More informationTransverse Pavement Markings for Speed Control and Accident Reduction
Transportation Kentucky Transportation Center Research Report University of Kentucky Year 1980 Transverse Pavement Markings for Speed Control and Accident Reduction Kenneth R. Agent Kentucky Department
More informationDECEMBER 15-18, 1997 ADELAIDE, SOUTH AUSTRALIA. Y. K. Tso and R. G. Juniper
FIFTH INTERNATIONAL CONGRESS ON SOUND AND VIBRATION DECEMBER 15-18, 1997 ADELAIDE, SOUTH AUSTRALIA Invited Paper A STUDY OF THE TRANSMISSION OF NOISE AND VIBRATION IN AN ALUMINIUM MOTOR VESSEL Y. K. Tso
More informationTECHNICAL MEMORANDUM
1 U-Link: Comparison of Permanent Vibration DATE: November 19, 2015 TECHNICAL MEMORANDUM TO: FROM: SUBJECT: Andy Casillas University of Washington Shankar Rajaram Sound Transit U-Link: Comparison of Permanent
More informationEXPERIMENTAL PROJECTS
EXPERIMENTAL PROJECTS LICHTWEIGHT AGCREGATE SPIIIILE TIEATIENT Report Number DEPARTMENTAL INFORMATJON EXCHANGE STATE AND DEPARTMENT PUBLIC OF HIGHWAYS TRANSPORTATION 612-1 Test Sections of H.M.A.C. (Class
More informationAppendix H: Construction Impacts H-2 Transportation
Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction
More informationLAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS
LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...
More informationMILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND
MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,
More informationEVALUATING SPEED DIFFERENCES BETWEEN PASSENGER VEHICLES AND HEAVY TRUCKS FOR TRANSPORTATION-RELATED EMISSIONS MODELING
EVALUATING SPEED DIFFERENCES BETWEEN PASSENGER VEHICLES AND HEAVY TRUCKS FOR TRANSPORTATION-RELATED EMISSIONS MODELING DTFH61-03-P-00336 Sponsored by the Transportation Environmental Research Program,
More informationHigh Friction Surfaces and Other Innovative Pavement Surface Treatments for Reduced Highway Noise
High Friction Surfaces and Other Innovative Pavement Surface Treatments for Reduced Highway Noise Bebe Resendez The Transtec Group, Inc. July 20-23, 2008 ADC40 Summer Meeting Key West, Florida What are
More informationFIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas
Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK Gene
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationDate: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis
Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.
More informationPole Mounted Speed Display Pilot Program Study. January, 2016
Pole Mounted Speed Display Pilot Program Study January, 2016 The Prince William County Department of Transportation (PWC DOT) began researching the use of pole mounted speed displays (PMSDs) during the
More informationEXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.
EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and
More informationCharacterization of Combined Use of County Road Segment
Department of Public Works Inyo County, California Characterization of Combined Use of County Road Segment Segment Name: _Lone Pine No. 1_ Purpose: Which of the following does the combined-use segment
More informationUsing the MOVES Model to Do a Project Level PM Air Quality Analysis 2010 TRB Environment and Energy Research Conference Raleigh, North Carolina
Using the MOVES Model to Do a Project Level PM Air Quality Analysis 2010 TRB Environment and Energy Research Conference Raleigh, North Carolina Michael Claggett FHWA Resource Center June 7, 2010 Overview
More informationI-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation
I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation Report for Georgia (#03) I-75 Prepared by: Masoud Hamedi, Sanaz Aliari, Sara Zahedian University of Maryland, College
More informationTIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:
TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive
More informationImplementation and Thickness Optimization of Perpetual Pavements in Ohio
Implementation and Thickness Optimization of Perpetual Pavements in Ohio OTEC 2015 Issam Khoury, PhD, PE Russ College of Engineering and Technology Ohio University, Athens, Ohio Outline Background prior
More informationReducing Energy Consumption and Emissions Through Congestion Management
Reducing Energy Consumption and Emissions Through Congestion Management Kanok Boriboonsomsin University of California Riverside The Transportation - Land Use - Environment Connection UCLA Conference Center
More informationST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE:
ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: TRAVEL DEMAND FORECASTS May 12, 2005 Prepared for Minnesota
More informationSound attenuators. Sound attenuators, Sound attenuating louvres. Sound attenuators. Rectangular sound attenuators DZ-2, DZ-3
, Sound attenuating louvres Rectangular sound attenuators DZ-2, DZ-3 Application are designed to attenuate noises of fans and air-conditioning devices in ventilation and air-conditioning installations.
More informationRTE. 1 at RTE. 637 & RTE. 639
INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.
More informationLower River Floodplain Restoration and Levee/Towne Road Re-Alignment Noise Analysis
Lower River Floodplain Restoration and Levee/Towne Road Re-Alignment Noise Analysis This project is not anticipated to create additional noise beyond the current background levels. Although Towne Road
More informationEffect of Speed Monitoring Displays on Entry Ramp Speeds at Rural Freeway Interchanges
Effect of Speed Monitoring Displays on Entry Ramp Speeds at Rural Freeway Interchanges Geza Pesti Mid-America Transportation Center University of Nebraska-Lincoln W348 Nebraska Hall Lincoln, NE 68588-0530
More informationExisting Traffic Conditions
May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California
More informationEvaluation of Accuracy and Precision of Highway Speed Deflection Devices
Evaluation of Accuracy and Precision of Highway Speed Deflection Devices Gonzalo Rada, Beth Visintine Sergio Rocha, Jorge Velarde, Paola Gallardo, Soheil Nazarian Rajaratnam Siddharthan, Seyyed Nasimifar
More informationLow Carbon Vehicle Technology Project Benchmarking and Teardown Activities Undertaken on Nissan Leaf and Chevrolet Volt
Low Carbon Vehicle Technology Project Benchmarking and Teardown Activities Undertaken on Nissan Leaf and Chevrolet Volt Johnathan Breddy, Tata Motors European Technical Centre (TMETC) plc Agenda Benchmarking
More informationMONTHLY RIDERSHIP AND PERFORMANCE REPORT. July 2018 Monthly Performance Report
MONTHLY RIDERSHIP AND PERFORMANCE REPORT July 2018 Monthly Performance Report JULY, 2018 MONTHLY PERFORMANCE REPORT Ridership Ridership for the month of July increased 1% when compared to July of 2017.
More informationDIVISION V SURFACINGS AND PAVEMENTS
36-3.01 GENERAL DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL 04-20-18 Replace section 36-3 with: 36-3 PAVEMENT SMOOTHNESS 36-3.01A Summary Section 36-3 includes specifications for measuring the smoothness
More information