MERSEYSIDE ROUTE UTILISATION STRATEGY (RUS): CHESHIRE COUNTY COUNCIL S COMMENTS ON THE DRAFT FOR CONSULTATION SECTION 2: CHESHIRE SCHEMES AND ISSUES

Size: px
Start display at page:

Download "MERSEYSIDE ROUTE UTILISATION STRATEGY (RUS): CHESHIRE COUNTY COUNCIL S COMMENTS ON THE DRAFT FOR CONSULTATION SECTION 2: CHESHIRE SCHEMES AND ISSUES"

Transcription

1 MERSEYSIDE ROUTE UTILISATION STRATEGY (RUS): CHESHIRE COUNTY COUNCIL S COMMENTS ON THE DRAFT FOR CONSULTATION 1.0 INTRODUCTION Cheshire County Council welcomes the opportunity extended to stakeholders to respond to the draft of the Merseyside RUS and to provide its views on the options put forward or being recommended. The responses to the options and recommendations are provided in Section 3 of this paper. Section 2 provides further information about schemes or issues in Cheshire and how these may impact on the Merseyside RUS and the RUS process. The opportunity has been taken to include adjacent neighbouring RUS lines, particularly those covered by the Wales RUS, and which have since been referred to the Merseyside RUS for consideration. SECTION 2: CHESHIRE SCHEMES AND ISSUES 2.1 The Wirral Line: The RUS states passenger trips from Chester to Liverpool are 2.8m per annum; and by comparison 0.1m per annum from Ellesmere Port to Liverpool. However, it is important to note that Ellesmere Port is expected to experience significant housing growth through the West Cheshire Growth Point Programme over the next 9 years. Large areas of land have been identified very close to the station, in Cromwell Road and East of the Town Centre, and these have some planning permission for residential-led mixed use development (approximately 700 homes). The development will include sustainable pedestrian and transport links to the bus and rail stations in Ellesmere Port. In addition, a much larger development is also proposed for Ellesmere Port Waterfront (just off the M53) which consists of a potential redevelopment of the town s docks for a scheme of around 7,000 new homes. As a result there is expected to be significant increase in demand for rail services from Ellesmere Port to Liverpool over the next 10 years; this may therefore affect the RUS baseline and demand forecasts, and possibly the options recommended Similarly, demand for rail services from Ellesmere Port to Helsby is expected to increase. Demand on this section is currently considered to be suppressed by the lack of a useable service (ie just four trains per day), whilst Helsby by comparison is at full capacity during peak hours (causing on street parking problems for residents), mainly for journeys to/from Warrington and Manchester. Improvements to the Ellesmere Port to Helsby service would also provide commuting opportunities from the new housing developments (mentioned in 2.0 above) to the industrial sites at Ince and Elton (eg currently 600 employees at Quinn Glass). Cheshire notes and supports Merseytravel s aspiration to extend the electrified network to Helsby, but appreciate that this is a long term aim. However, in the meantime a business case needs to be established for increasing the diesel services to meet the suppressed and

2 forecast increase in demand The business case for Ellesmere Port to Helsby would further be improved by the reopening of Halton Curve. Halton Curve reopening (currently at GRIP3) would provide improved rail links from Chester, Wirral, and parts of North Wales to Liverpool John Lennon Airport via Liverpool South Parkway. Cheshire supports the early implementation of the Halton Curve scheme At Chester (the 4 th busiest station in the Merseyside RUS network) improvement works are progressing through the Chester Gateway Project. A feasibility study is being carried out to increase car park capacity. The RUS does not make reference to this in its Planned and Proposed Schemes (RUS Section 4), and this may therefore have an impact on the RUS baseline and demand forecast Hooton car park is currently operating at around 90% capacity (and already has some on street parking problems which are receiving attention from the highways authority). Car park capacity is likely to be at 100% within the next 3 years. Areas of land in close proximity to Hooton Station have been identified for residential development and these will be brought forward through West Cheshire s growth point status. Working with Merseytravel and the rail industry, some maintenance and improvement works have already taken place at Hooton. The car park (of around 430 spaces) has been refurbished and the number of disabled spaces increased. Further improvements are planned through Access for All to install platform lifts in December These improvements will provide a fully accessible facility which no doubt will result in further growth in numbers and pressure on capacity. However, there is additional land available, in Cheshire County Council ownership, providing the opportunity to extend the car park and thereby increase capacity, subject to establishing a business case and secure funding The RUS examines road versus rail travel times. It highlights North Wales - Liverpool and Chester - Liverpool as two examples where rail currently compares poorly to road. Cheshire would welcome and support a scheme that proposes to improve the travel times on these two corridors, without significant detriment to frequency between Hooton and Liverpool (noting the Capital Utilisation Index of 80% on this section between 0600 and 0900). In particular Cheshire welcomes measures to encourage modal shift from the currently heavily congested roads which run parallel between Chester and Liverpool. These roads include the A41 to Birkenhead Tunnel, M53 to Wallasey Tunnel, M56 via Runcorn Bridge and John Lennon Airport Improving rail journey times between Chester and Liverpool will undoubtedly put greater pressure on car park capacity at Hooton and Chester, particularly when Special Events take place such as race meetings, golf tournaments, football matches and the Tall Ships. This presents further opportunities for consideration to develop other currently under-utilised station car parks as Park and Rides, for example Ellesmere Port Station on the

3 Wirral line. Feasibility studies are proposed at Ellesmere Port with the Government funding that has been allocated to West Cheshire to develop its Growth Point Programme. Further, opportunites to increase capacity are also being explored at Capenhurst Station. 2.2 Wrexham to Bidston Line Cheshire has commissioned Faber Maunsell to produce a Station Travel Plan for Neston Station and this is due to be complete within the next month. This Study is intended to feed into the North Wales Rail Strategy Study being carried out by Faber Maunsell, funded by TAITH. The Travel Plan is expected to produce proposals for improving integration at Neston with other public transport modes and improvements to station facilities, including safety and security. However, one of the main conclusions of the report is expected to be that one of the main deterrents to rail use is the reliability of the Arriva Trains Wales service between Wrexham and Bidston, often cancelled and/or turned around at Shotton (and therefore not always reflected in the Public Performance Measure figures). The RUS acknowledges the fact that the timetable between Wrexham and Bidston has tight turnarounds and is not robust at times of pressure. The Wrexham to Bidston electrification study is currently at GRIP 3, and it is understood that further options are currently being examined, one of which being diesel service improvements. Cheshire supports service improvements on this line and awaits the conclusions of the Study. 2.3 Chester to Wrexham On the North Wales Chester Liverpool lines the RUS refers to a number of performance issues, which includes the lack of a diversionary route, and the constraints of a 10 mile single line section between Saltney Junction and Wrexham North Junction. Cheshire County Council is a core funding partner in the Chester Shrewsbury Rail Partnership, and fully endorses the detailed response provided to the Wales RUS dated 21 August 2008 (and now being considered by the Merseyside RUS). That response refers to the Scott Wilson Study undertaken in 2006/7 which examined the capacity constraints and pinch points, and identified options for re-doubling and partial re-doubling of the single track. That Study also considered the case for a new station at Lache, Saltney. SECTION 3: CHESHIRE S RESPONSE TO RUS GAP ANALYSIS, OPTIONS AND RECOMMENDATIONS (6.4.1) Connectivity between Chester and Liverpool: Currently a half hourly frequency weekdays and Saturdays with a journey time of about 43 minutes. Chester and Ellesmere Port Branch of the Wirral line is currently the worst performing service group on the Merseyrail network. Option: The RUS recommends the service frequency between Chester and Liverpool is increased from 2 to 4 per hour in the inter-peak, matching high peak, so a quarter-hourly service. Between Hooton and Birkenhead Central

4 (inclusive) there would be six trains per hour at all stations. During the interpeak every second service would not call at stations between Chester and Hooton in the directon of Liverpool, with the other two services not calling between Hooton and Chester in the direction of Chester (ie not calling at Bache or Capenhurst). This would reduce the return journey time by around 3 minutes and would provide an improved performance buffer for services. The frequency of services at Bache and Capenhurst would remain half hourly. This would also improve connections with services from North Wales to Chester. This proposal could generate 190,000 passengers per annum with only moderate investment. In addition a further scheme is recommended to increase the line speed between Bache and Hooton from 65mph to 75mph, increasing turnaround time and providing a performance buffer for peak services. Response: These proposals are broadly supported as they provide much better frequency at key stations, improve journey times and reliability, whilst also noting no worse level of service proposed at Bache or Capenhurst. It is pleased to note the intention of immediate delivery during Control Period 4. Option: In addition stakeholders are asked for their views on the option to replace the current half hourly Ellesmere Port Services with a quarter-hourly shuttle service to Hooton, allowing a 5 minute connection to the faster Chester and Liverpool Services. Response: The disadvantage of not providing a direct journey to Liverpool must be recognised, and weighed against the advantages of providing double the frequency from Ellesmere Port to Hooton, for fast onward connections to Chester and Liverpool. This presents an interesting option, which linked to improvements at Ellesmere Port Station for additional Park and Ride, presents an opportunity for development worth exploring further. (6.4.2) Connectivity between North Wales and Merseyside including Liverpool John Lennon Airport: Passengers from North Wales are required to change at Bidston, Chester or Crewe, which is time consuming and can be difficult. Option: Extending the Merseyrail third-rail electric network from Bidston to Shotton and Wrexham would allow the current diesel shuttle service to be replaced with electric trains. As costs of this option are likely to be prohibitive, there may be potential for electrification using overhead wires and dual-voltage rolling stock; or dual (diesel/electric) tram-train technology. Response: Cheshire supports the aims of this scheme by whichever option proves to be the most cost effective. This is an important scheme for Cheshire as it opens up employment opportunities in Deeside to areas in Cheshire and across the Mersey Dee where unemployment is high.

5 Option: Merseytravel is investigating the potential demand for new services between and Chester and Liverpool Lime Street via Halton Curve. This would provide services to Liverpool South Parkway (for the airport). Response: Cheshire County Council recognise the benefits of this scheme to Chester, Wirral and North Wales areas and fully support the aims and proposals (6.6.1) Significant Causes of Delay: One of the worst causes of reactionary delay on the Merseyrail electric network is the four-minute turnaround on the Chester service group, which results in irrecoverable lateness and cancellations. The increase in frequency (described in 6.4.1) is expected to resolve this situation, but there may be call for an improved station layout or a new platform, and this will be investigated during the consultation period. Response: Cheshire County Council support the proposals to increase frequency from Chester, and will continue to support improvements and developments at Chester Station through the Chester Gateway Steering Group. Report of: Christine Garner Principal Transportation Officer Transport Strategy Unit Cheshire County Council Backford Hall Chester

Friends of WALKDEN station MANCHESTER HUB. Response to Network Rail Stakeholder Consultation

Friends of WALKDEN station MANCHESTER HUB. Response to Network Rail Stakeholder Consultation Friends of WALKDEN station MANCHESTER HUB Response to Network Rail Stakeholder Consultation November 2009 Foreword This document has been compiled by the Friends of Walkden Station (FOWS) in response to

More information

WATFORD LOCAL PLAN PART 2. Review of Car Parking Policy and Standards. Evidence Base. February 2012

WATFORD LOCAL PLAN PART 2. Review of Car Parking Policy and Standards. Evidence Base. February 2012 WATFORD LOCAL PLAN PART 2 Review of Car Parking Policy and Standards Evidence Base February 2012 1.0 Background 1.1 The Watford District Plan 2000 contains various policies relating to the provision of

More information

Submission to Greater Cambridge City Deal

Submission to Greater Cambridge City Deal What Transport for Cambridge? 2 1 Submission to Greater Cambridge City Deal By Professor Marcial Echenique OBE ScD RIBA RTPI and Jonathan Barker Introduction Cambridge Futures was founded in 1997 as a

More information

Modernising the Great Western railway

Modernising the Great Western railway Report by the Comptroller and Auditor General Department for Transport and Network Rail Modernising the Great Western railway HC 781 SESSION 2016-17 9 NOVEMBER 2016 4 Key facts Modernising the Great Western

More information

Wilsons Auctions PROPOSED VEHICLE STORAGE COMPOUND, QUEENSFERRY, FLINTSHIRE. Transport Assessment VN60593

Wilsons Auctions PROPOSED VEHICLE STORAGE COMPOUND, QUEENSFERRY, FLINTSHIRE. Transport Assessment VN60593 Wilsons Auctions PROPOSED VEHICLE STORAGE COMPOUND, QUEENSFERRY, FLINTSHIRE Transport Assessment VN60593 REPORT CONTROL Document: Transport Assessment Project: Client: Job Number: File Origin: Proposed

More information

How will high speed rail transform the sheffield city region

How will high speed rail transform the sheffield city region How will high speed rail transform the sheffield city region HSR and the wider rail network 1 How HSR will transform the Sheffield City Region SUMMARY By 2033 the Sheffield City Region (SCR) will be served

More information

Merseytravel Permanent Way Institution

Merseytravel Permanent Way Institution Merseytravel Permanent Way Institution 2 nd March 2017 Mark Cleave Rail Development The Merseyrail Network - 2017 A network centred on Liverpool Northern Line (blue) Lancashire side of the Mersey Operated

More information

TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING

TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL TRANSFORMING RAIL

More information

A Presentation of the case for and applications of. TramTrain. A low cost, clean, sustainable mode. for Cheshire, Warrington & Merseyside

A Presentation of the case for and applications of. TramTrain. A low cost, clean, sustainable mode. for Cheshire, Warrington & Merseyside A Presentation of the case for and applications of TramTrain A low cost, clean, sustainable mode for Cheshire, Warrington & Merseyside 21 st January 2010 Macclesfield Town Hall By Jim Harkins FCILT Managing

More information

Click to edit Master title style

Click to edit Master title style Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment

More information

Transport Group Perspective Chris Blow Chair of The Guildford Society Transport Group 21st Jan 2015

Transport Group Perspective Chris Blow Chair of The Guildford Society Transport Group 21st Jan 2015 Transport Group Perspective Chris Blow Chair of The Guildford Society Transport Group 21st Jan 2015 LET'S REMEMBER THAT THIS IS NOT A STATION REDEVELOPMENT BUT A STATION SITE REDEVELOPMENT. The big question:

More information

Powering Sydney s Future

Powering Sydney s Future Powering Sydney s Future Frequently Asked Questions December 2017 Project background Q: Why is this project needed? A: Inner Sydney is one of the most critical parts of the NSW electricity network. However,

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

GTA West Corridor Planning and EA Study Stage 1

GTA West Corridor Planning and EA Study Stage 1 GTA West Corridor Planning and EA Study Stage 1 Draft Development Strategy Presentation to Peel Goods Movement Task Force April 8 2011 Study Areas 2 Unique Approach Unprecedented two-stage EA process:

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982 Subject MINISTERIAL BRIEFING NOTE Rapid Transit in Auckland Date 1 November 2017 Briefing number BRI-1133 Contact(s) for telephone discussion (if required) Name Position Direct line Cell phone 1 st contact

More information

SUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018

SUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018 SUBMISSION TO METROLINK PUBLIC CONSULTATION From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018 Suggested Route Map including stations Rathmines, Terenure, Rathfarnham INTRODUCTION

More information

committee report General Permitted Development Order SPT response to consultation

committee report General Permitted Development Order SPT response to consultation committee report General Permitted Development Order SPT response to consultation Committee Strategy and Programmes Date of meeting 24 June 2011 Date of report 1 June 2011 Report by Assistant Chief Executive

More information

Background Information about the Metrobus 29 Lines Study

Background Information about the Metrobus 29 Lines Study Background Information about the Metrobus 29 Lines Study Questions Overview of Existing Service Q. Why is the study being conducted? A. The 29 Lines provide an important connection between Annandale and

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 CTfastrak Expansion Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 Today s Agenda Phase I Update 2016 Service Plan Implementation Schedule & Cost Update Phase II Services Timeline Market Analysis

More information

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit The Jack A. Markell Trail Delaware s Bicycle Highway 2018 New England Bike- Walk Summit The Jack A. Markell Trail Sometimes a very difficult project, including significant investment and perseverance,

More information

WP3 Transport and Mobility Analysis. D.3.5. Transport Scenarios Results Report Nottingham

WP3 Transport and Mobility Analysis. D.3.5. Transport Scenarios Results Report Nottingham WP3 Transport and Mobility Analysis D.3.5. Transport Scenarios Results Report Nottingham October 2015 314164 (ENER/FP7/314164) Project acronym: InSMART Project full title: Integrative Smart City Planning

More information

PROPOSED TRAFFIC RESOLUTION

PROPOSED TRAFFIC RESOLUTION Reference Number: TR 50-18 Location:, Brooklyn Bus Hub - Brooklyn Proposal: Information: To provide new bus stops to create a Bus hub location on Cleveland Street, Brooklyn, as part of Wellington s new

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

RESPONSE TO CROSSCOUNTRY CONSULTATION ON PROPOSED TIMETABLE CHANGES FOR DECEMBER 2017.

RESPONSE TO CROSSCOUNTRY CONSULTATION ON PROPOSED TIMETABLE CHANGES FOR DECEMBER 2017. RESPONSE TO CROSSCOUNTRY CONSULTATION ON PROPOSED TIMETABLE CHANGES FOR DECEMBER 2017. Emailed to consultation@crosscountrytrains.co.uk on 1 st January 2017 1. INTRODUCTION CrossCountry are currently consulting

More information

Post Opening Project Evaluation. M6 Toll

Post Opening Project Evaluation. M6 Toll M6 Toll Five Post Years Opening After Study: Project Summary Evaluation Report Post Opening Project Evaluation M6 Toll Five Years After Study Summary Report October 2009 Document History JOB NUMBER: 5081587/905

More information

Future Fuel for Britain s Railways. Stephen Kent, University of Birmingham Shawn Laight, Land Transport Authority, Singapore

Future Fuel for Britain s Railways. Stephen Kent, University of Birmingham Shawn Laight, Land Transport Authority, Singapore Future Fuel for Britain s Railways Stephen Kent, University of Birmingham Shawn Laight, Land Transport Authority, Singapore The Powertrain Challenge The Powertrain Challenge Competition launched by UK

More information

Bus timetable 1, 2. Liverpool - Chester. These services are provided by Stagecoach. Valid from 3 September

Bus timetable 1, 2. Liverpool - Chester. These services are provided by Stagecoach. Valid from 3 September Valid from 3 September 07 Bus timetable, Liverpool Chester These services are provided by Stagecoach LIVERPOOL Sir Thomas Street BIRKENHEAD Bus Station ROCK FERRY BROMBOROUGH EASTHAM Bridle Road HOOTON

More information

Attachment 5 Eglinton West LRT Planning and Technical Update

Attachment 5 Eglinton West LRT Planning and Technical Update Eglinton West LRT Planning and Technical Update 1. Introduction In July 2016, City Council approved an Eglinton West LRT with between 8 and 12 stops between Mount Dennis and Renforth Gateway, and up to

More information

Ottawa LRT Stage 2. McKellar Park Information Session

Ottawa LRT Stage 2. McKellar Park Information Session Ottawa LRT Stage 2 McKellar Park Information Session Stage 2 Background Approved unanimously by Ottawa City Council in July 2015 East to Place d Orléans, west to Bayshore and Baseline, and south to Bowesville

More information

THE TRANSFORMATIONAL BENEFITS OF INVESTING IN REGIONAL RAIL FOUR CASE STUDIES

THE TRANSFORMATIONAL BENEFITS OF INVESTING IN REGIONAL RAIL FOUR CASE STUDIES THE TRANSFORMATIONAL BENEFITS OF INVESTING IN REGIONAL RAIL FOUR CASE STUDIES October 2017 The Urban Transport Group represents the seven strategic transport bodies which between them serve more than twenty

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

Central Maryland Transit Development Plan

Central Maryland Transit Development Plan Central Maryland Transit Development Plan Planning the Future of Transit in Our Region Anne Arundel County Transportation Commission December 13, 2017 Anne Arundel County Howard County Prince George s

More information

BIRMINGHAM CONNECTED Anne Shaw Tuesday 20 January 2015

BIRMINGHAM CONNECTED Anne Shaw Tuesday 20 January 2015 BIRMINGHAM CONNECTED Anne Shaw Tuesday 20 January 2015 www.birmingham.gov.uk/connected Birmingham Connected Setting the context challenges in Birmingham The need for action The EU the SUMP process Strategy

More information

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada Converting BRT to LRT in the Nation s Capital Ottawa, Canada John Manconi City of Ottawa Ottawa, Canada 1 The Challenge *Mackenzie King Bridge Ottawa, AM peak period 2 The Challenge Ottawa s population

More information

Status of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS

Status of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS Status of Plans March 2011 Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS Transit project update Project rationale The system New Britain Hartford Busway New Haven/Hartford/ Springfield Passenger Rail

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting August 2, 2011 Introduction Key players Local lead agency: Metro Federal lead agency: Federal

More information

Light Rail Review 2011

Light Rail Review 2011 Ref: LR Applrg Winter 09 v1 Light Rail Review 2011, 12 th July 2011 This meeting by invitation only, where MPs, Stakeholders etc, wwwapplrgukcouk Email lightrailuk@aolcom wwwlightrailukcom 1 Ref: LR Applrg

More information

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based

More information

Stadler selected to supply bespoke Merseyrail train fleet

Stadler selected to supply bespoke Merseyrail train fleet 1 Stadler selected to supply bespoke Merseyrail train fleet 16 Dec 2016 UK: The leaders of the Liverpool City Region Combined Authority gave the go-ahead on December 16 for a 460m project to replace the

More information

TRAIN, BUS & TRANSIT

TRAIN, BUS & TRANSIT TRAIN, BUS & TRANSIT Input Metra 1 Metra does not want to add parking because of space; maxed out on number of cars per train. Developments on Rt. 59 will affect. 2 Should do studies regarding what the

More information

WAITING FOR THE GREEN LIGHT: Sustainable Transport Solutions for Local Government

WAITING FOR THE GREEN LIGHT: Sustainable Transport Solutions for Local Government WAITING FOR THE GREEN LIGHT: Sustainable Transport Solutions for Local Government C Published by the Climate Council of Australia Limited Climate Council of Australia Ltd 2018 ISBN-13: 978-1-925573-70-1

More information

High-Speed Intercity Passenger Rail

High-Speed Intercity Passenger Rail September 13, 2011 LTRC Seminar Series: Congestion Management Baton Rouge New Orleans High-Speed Intercity Passenger Rail AGENDA LTRC Seminar Series: Congestion Management Baton Rouge, Louisiana Project

More information

1. How has traffic congestion changed in London in recent years? Are there differences in the amount, time, type and/or location of congestion?

1. How has traffic congestion changed in London in recent years? Are there differences in the amount, time, type and/or location of congestion? 16 September 2016 Georgina Wells London Assembly City Hall The Queen s Walk London SE1 2AA Submitted electronically to: georgina.wells@london.gov.uk Institution of Civil Engineers One Great George Street

More information

Local Highway Panels Members Guide. 8 Passenger Transport Improvements

Local Highway Panels Members Guide. 8 Passenger Transport Improvements Local Highway Panels Members Guide 8 Passenger Transport Improvements 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction Bus Services The bus services outside London were deregulated in

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

Bus Rapid Transit. Briefing. Common to all BRT schemes is the aim to improve passengers experience and percep on of public transport

Bus Rapid Transit. Briefing. Common to all BRT schemes is the aim to improve passengers experience and percep on of public transport Briefing This briefing answers some frequently asked ques ons about Bus Rapid Transit. Q. What is Bus Rapid Transit? Common to all BRT schemes is the aim to improve passengers experience and percep on

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County

More information

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council:

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council: Corporate NO: R279 Report COUNCIL DATE: DECEMBER 18, 2006 REGULAR COUNCIL TO: Mayor & Council DATE: December 15, 2006 FROM: General Manager, Engineering FILE: 8710-20 (Heritage) SUBJECT: Update on Community

More information

Denver Car Share Permit Program

Denver Car Share Permit Program Denver Car Share Permit Program Rocky Mountain Land Use Institute Conference 13 March 2014 Strategic Parking Plan (SPP) Vision & Framework Acknowledge a variety of land use patterns & contexts Manage parking

More information

Iarnród Éireann Dublin Integrated Rail Plan Presentation to Institution of Engineers of Ireland. 17 th November

Iarnród Éireann Dublin Integrated Rail Plan Presentation to Institution of Engineers of Ireland. 17 th November Iarnród Éireann Dublin Integrated Rail Plan Presentation to Institution of Engineers of Ireland 17 th November 2004 www.irishrail.ie Contents Overview of current suburban rail network Projects underway

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University Shift: The City of London s Rapid Transit Proposal Shift: The City of London s Rapid Transit Proposal

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Expansion Projects Description

Expansion Projects Description Expansion Projects Description The Turnpike expansion program was authorized by the Florida Legislature in 1990 to meet the State s backlog of needed highway facilities. The Legislature set environmental

More information

4. Transportation Plan

4. Transportation Plan The sizes of the most suitable sites are indicated in Table 4.3.6.2. Table 4.3.6.2: Site Sizes and Potential Development Area Potential Development Site Site Size (m 2 ) Area m 2 (3 Floors) D1 29,000 87,000

More information

The Smart Growth Countywide Transit Master Plan

The Smart Growth Countywide Transit Master Plan Choose the Future The Smart Growth Transit Master Plan What is the Transit Master Plan? A robust and integrated plan to establish countywide public transportation priorities over the next thirty years

More information

DRAFT Subject to modifications

DRAFT Subject to modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The

More information

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present

More information

Controlled Parking Zones Commentary

Controlled Parking Zones Commentary Controlled Parking Zones Commentary November 2012 Residents Association Controlled Parking Zones Commentary 244884 TPN ITQ 001 C http://localhost:3579/ahjycdovl0vvtkfqau1tl0rpq1vnru5uly9ilw FjdGlvbiUzYV9hX2FmaW5kaXRlbWluZm9hY3Rpb25fYWl0ZW1fY19hMT

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

Proposed Program of Interrelated Projects

Proposed Program of Interrelated Projects DALLAS AREA RAPID TRANSIT Proposed Program of Interrelated Projects Federal Transit Administration Capital Investment Program Summer 204 INTRODUCTION The current federal transportation bill, Moving Ahead

More information

2013 ELR Addendum Note Implications of Siemens / ABP Announcement East Riding of Yorkshire Council

2013 ELR Addendum Note Implications of Siemens / ABP Announcement East Riding of Yorkshire Council Report Report GVA 1 st Floor, City Point 29 King Street Leeds LS1 2HL Implications of Siemens / ABP Announcement April 2014 gva.co.uk Contents 1. Introduction... 1 2. Siemens / ABP proposals... 2 3. Commercial

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

August 2, 2010 Public Meeting

August 2, 2010 Public Meeting Public Meeting LYMMO Expansion Alternatives Analysis Study Purpose of study is to provide a fresh look at potential LYMMO expansion, following Federal Transit Administration (FTA) Alternatives Analysis

More information

Three ULTra Case Studies examples of the performance of the system in three different environments

Three ULTra Case Studies examples of the performance of the system in three different environments Three ULTra Case Studies examples of the performance of the system in three different environments airport application: London Heathrow : linking business and staff car parks through the access tunnel

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Early Scoping Meeting for Alternatives Analysis (AA) May 17, 2011 Introduction Key players Local lead agency: Metro Federal lead agency:

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Analysis of Radial and Trunk Feeder Transit System Configurations in Downtown Charlottesville

Analysis of Radial and Trunk Feeder Transit System Configurations in Downtown Charlottesville Analysis of Radial and Trunk Feeder Transit System Configurations in Downtown Charlottesville 1. Introduction During the stakeholder input sessions of Charlottesville Area Transit s (CAT) Transit Development

More information

King of Prussia Rail Project Frequently Asked Questions - Archive Version: Summer 2016

King of Prussia Rail Project Frequently Asked Questions - Archive Version: Summer 2016 - Archive These frequently asked questions (FAQ) have been developed to help residents, businesses and area stakeholders develop a better understanding of the proposed, the project development process,

More information

Wellington City Bus Review. What are we going to do this evening? The Review so far. Welcome. Draft Timetable Presentation April & May 2013

Wellington City Bus Review. What are we going to do this evening? The Review so far. Welcome. Draft Timetable Presentation April & May 2013 Wellington City Bus Review Welcome Draft Timetable Presentation April & May 2013 What are we going to do this evening? The Review so far Recap on the Review (10 minutes) Summary of Network Design (10 minutes)

More information

APP/P1.2/SCH. Scheme Overview Summary Proof of Evidence Peter Adams

APP/P1.2/SCH. Scheme Overview Summary Proof of Evidence Peter Adams Scheme Overview Summary Proof of Evidence Peter Adams SUMMARY PROOF OF EVIDENCE Peter Adams Scheme Overview TRANSPORT AND WORKS ACT 1992 MIDLAND METRO (WOLVERHAMPTON CITY CENTRE EXTENSION) ORDER INQUIRY

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Transit Access Study

Transit Access Study West of Hudson Regional Transit Access Study Open House presentation July 20, 2010 1 Agenda Progress To date Summary of Level 2 Alternatives and Screening Service Plans Bus and Rail Operating and Capital

More information

A Transit Plan for the Future. Draft Network Plan

A Transit Plan for the Future. Draft Network Plan A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year

More information

1 Downtown LRT Connector: Draft Concept

1 Downtown LRT Connector: Draft Concept Downtown LRT Connector: Draft Concept Plan November 2010 We re moving forward. Get involved. On June 21, 2010, City Council approved a street-level downtown LRT route, including a connector for the future

More information

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS 2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak

More information

New Haven-Hartford-Springfield Rail Project Gateway to New England. Program Update March 14, 2011 Revised & Updated March 31, 2011

New Haven-Hartford-Springfield Rail Project Gateway to New England. Program Update March 14, 2011 Revised & Updated March 31, 2011 New Haven-Hartford-Springfield Rail Project Gateway to New England Program Update March 14, 2011 Revised & Updated March 31, 2011 1 New Haven-Hartford-Springfield Rail Corridor Glory Days: 1925-1955 22

More information

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only METRONext Vision & Moving Forward Plans Board Workshop December 11, 2018 Disclaimer This presentation is being provided solely for discussion purposes by the Board of Directors of the Metropolitan Transit

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information

Denver Metro Association of Realtors

Denver Metro Association of Realtors Denver Metro Association of Realtors North Metro Rail Line October 2, 2014 1 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides;

More information

SERVICE DESIGN GUIDELINES

SERVICE DESIGN GUIDELINES VTA TRANSIT SUSTAINABILITY POLICY: APPENDIX A SERVICE DESIGN GUIDELINES Adopted February 2007 COMMUNITYBUS LOCALBUS EXPRESSBUS BUSRAPIDTRANSIT LIGHTRAILTRANSIT STATIONAREAS S A N T A C L A R A Valley Transportation

More information

March - Wisbech Rail Study Stage 1 Final Report

March - Wisbech Rail Study Stage 1 Final Report March - Wisbech Rail Study Stage 1 Final Report Cambridgeshire County Council 7 th December 2012 Notice This document and its contents have been prepared and are intended solely for Cambridgeshire County

More information

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration Legislative Committee on Urban Growth and Infrastructure Carolyn Flowers CEO Charlotte Area Transit System March 23, 2010 Charlotte Region

More information

Panama City Beach Community Redevelopment Agency

Panama City Beach Community Redevelopment Agency Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB Program History City Council initiated iti t a study that t indicated transportation blight 2001 - Front Beach Road Community Redevelopment

More information

MEDIA RELEASE. June 16, 2008 For Immediate Release

MEDIA RELEASE. June 16, 2008 For Immediate Release MEDIA RELEASE June 16, 2008 For Immediate Release Recommendations to Keep Trolleys Released Alternative Proposal for Trolleys Ensures City s Sustainability The Edmonton Trolley Coalition, a non-profit

More information

London 2050 Infrastructure Plan

London 2050 Infrastructure Plan London 2050 Infrastructure Plan RTPI London Future City Summit Michèle Dix 23 rd October 2014 The background to the 2050 London Infrastructure Plan is the city s expected strong population growth.. By

More information

Very Light Rail (VLR) as a means of delivering low-cost railways

Very Light Rail (VLR) as a means of delivering low-cost railways Very Light Rail (VLR) as a means of delivering low-cost railways Dr Nick Mallinson Programme Manager, WMG Centre High Value Manufacturing Catapult LCV2018 Event Sponsor: Very Light Rail (VLR) as a means

More information