Chapter 7: Infrastructure

Size: px
Start display at page:

Download "Chapter 7: Infrastructure"

Transcription

1 CHAPTER 7: INFRASTRUCTURE Chapter 7: Infrastructure Overview Morgan Hill has a variety of infrastructure services including transportation, water, sewer, storm drainage, solid waste, and energy systems to meet the demands of residents and businesses. Much of Downtown is located within the floodplain of Upper Llagas Creek. Floodplain regulations must be met by development until such time that the Upper Llagas Creek Flood Protection Project (PL566) is constructed. The development anticipated from this Specific Plan will be served by the following infrastructure improvements, some of which already exist and some of which are planned for improvement within the next five to 10 years. Morgan Hill Caltrain Station near Third and Depot Streets VTA bus stop shelter July

2 Morgan Hill Downtown Specific Plan Transportation Existing Roadways Regional access to Downtown Morgan Hill is provided by Monterey Road. Local access is provided by Butterfield Boulevard, Main Avenue, Dunne Avenue, and Depot Street. Monterey Road runs north-south and is the main street in Downtown. Through Downtown it currently has four lanes with on-street parking, but is proposed for a reduction to two travel lanes (see Chapter 3: Multi-Modal Circulation and Streetscapes) so that a regional road facility does not intrude on the desired pedestrian-friendly multi-modal character desired for Downtown. To the north and south of the Downtown area, Monterey Road is a four-lane arterial roadway. Butterfield Boulevard runs north-south and is the easternmost street in Downtown. Through the Downtown area it is a four-lane roadway. Main Avenue runs east-west and is the northern boundary of this Specific Plan area. Through the Downtown area it is a two-lane roadway. Dunne Avenue runs east-west and is the southern boundary of this Specific Plan area. Through the Downtown area it is a four-lane roadway, with right-of-way for six lanes. Depot Street runs north-south and is in between the railroad tracks and Monterey Road. Through the Downtown area it is a two-lane roadway. While at one time Depot Street was proposed to be modified to remove its current connection to Dunne Avenue (by implementing a cul-de-sac at Fifth Street), this Specific Plan recommends retaining the existing connection to Dunne so that Depot remains a parallel north-south route in Downtown. Existing Transit Service Bus service in Morgan Hill is operated by the Santa Clara Valley Transportation Authority (VTA). Four bus routes operate in or near Downtown: Route 15 is a local community bus route that provides service between Saddleback and the Morgan Hill Civic Center, with limited service to Jackson Oaks, the Centennial Recreation Center, and Watsonville Road. In Downtown, Route 15 operates on Main Avenue, Butterfield Boulevard, and Dunne Avenue. This route services the Morgan Hill Caltrain Station. Route 16 is a local community bus route that provides service between Burnett Avenue and the Morgan Hill Civic Center. In Downtown, Route 16 operates on Main Avenue. Route 68 is a regional bus route that provides service between the City of Gilroy and the San Jose Diridon Caltrain Station. In Downtown, Route 68 operates on Monterey Road and Main Avenue. Route 121 is an express bus route that provides service between the City of Gilroy and the Lockheed Martin Light Rail Station in Sunnyvale. In Downtown, Route 121 operates on Butterfield Boulevard and Dunne Avenue. This route services the Morgan Hill Caltrain station. Express Route 168 provides direct service between the Gilroy, Morgan Hill and the San Jose Diridon Transit Centers, via the recently approved HOV (carpool) lanes on Route Public Review Draft

3 CHAPTER 7: INFRASTRUCTURE Commuter rail service, Caltrain, is operated by the Peninsula Joint Powers Board and connects to the Cities of San Francisco and Gilroy. Caltrain provides northbound service from Morgan Hill and Gilroy during the morning commute period and southbound service to Morgan Hill and Gilroy during the evening commute period. During the 2015 to 2030 timeframe, Caltrain service is projected to increase frequency and to construct double-tracking through Morgan Hill, which will better serve a reverse commute. This rail corridor also has the potential to accommodate the through route (no Morgan Hill stop is planned) of the California High Speed Rail Project. California voters will consider funding on the November 2008 ballot. Existing Pedestrian and Bicycle Facilities Pedestrian facilities consist of sidewalks, crosswalks, and pedestrian signals. Crosswalks exist at all of the intersections on Monterey Road between Main Avenue and Dunne Avenue. Sidewalks are provided on both sides of Monterey Road. Bicycle facilities consist of bike paths, bike lanes, sharrow markings (a symbol painted in the travel lane to establish a road shared by vehicles and bicycles) bike routes, bike racks and lockers. There are bicycle lanes on Main Avenue and Dunne Avenue east of Monterey Road. The Third Street Promenade includes sharrow markings. A more detailed discussion of bicycle facilities in included in Chapter 4 (Parking Resources Management Strategy). Streetlights are generally provided throughout Downtown; however, lighting and safety are some of the top concerns of residents and Downtown property and business owners. Depot Street has recently received new lighting at a pedestrian scale. Although some feel this street now has too much lighting, once the trees mature this street should have proper lighting. New pedestrian-scaled streetlights will eventually be provided along Monterey Road, East Third Street, and various side streets. Pedestrian paths linking parking lots to streets will also include proper lighting either by the City or by property owners as the areas are redeveloped. Transportation Projections and Improvements The Master Environmental Impact Report provides transportation projections and improvements for Downtown. Monterey Road is currently being studied for the feasibility of reconfiguring the roadways to include one travel lane in each direction after other parallel route(s) exist and after a trial period, as described in Chapter 3 (Multi-Modal Circulation and Streetscapes). Depot Street is currently being studied for the feasibility of maintaining the connection to Dunne Avenue and a study should be conducted to assess that feasibility of connecting Depot Street to Church Street via the Community and Cultural Center parking lot (see Chapter 3: Multi- Modal Circulation and Streetscapes). To create a more pedestrian-friendly atmosphere along Monterey Road and to better connect to the train station, bus routes running along Monterey Road should be diverted to Depot Street or Butterfield Boulevard via Main Avenue and/or Dunne Avenue. July

4 Morgan Hill Downtown Specific Plan Water Service Existing Water Service The City of Morgan Hill provides potable water service to its residential, commercial, industrial, and institutional customers within the City limits. The City has 15 groundwater wells, 1 potable water storage tank, 10 booster stations, and more than 160 miles of pressured pipes that range from 2 to 14 inches in diameter. The water distribution system meets the needs of existing customers. Figure 27 shows the existing water system in Downtown. Water Service Projections and Improvements The vast majority of the proposed projects in the Water Master Plan consist of new or increased capacity pipelines that are needed to extend service. Because the Downtown area is predominantly developed, improvements primarily consist of upgrading the existing pipelines to the current 8-inch City Standards. This project is not on the list for impact fees and, therefore, will be funded by the Redevelopment Agency and private development (as a potential condition of approval). Additionally, the City will be upgrading the water main from Monterey Road to Peak/Main booster Station to 12-inch per City s Water Master Plan. The City has a program to implement these improvements and water infrastructure does not and will not act as a constraint to the intensity of development within the Specific Plan. The improvements will be paid for by the Redevelopment Agency and/or private development (as a potential condition of approval) in accordance with Chapter 3.56 (Development Impact Mitigation Fees) and Chapter (Street and Sidewalk Development). Sanitary Sewer System Existing Sanitary Sewer System The City of Morgan Hill has a sewer collection system that contains approximately 135 miles of 6-inch through 30-inch diameter sewers, and includes 15 sewage lift stations and associated force mains. This system also consists of trunk sewers that are generally 12 inches in diameter and larger, which convey the collected wastewater flows through an outfall that continues south to the Wastewater Treatment Facility (WWTF) in Gilroy. This WWTF is jointly owned by the Cities of Gilroy and Morgan Hill. Morgan Hill s sewer collection system meets the needs of existing customers. Figure 27 shows the existing sanitary sewer system in Downtown. Sanitary Sewer System Projections and Improvements The vast majority of the proposed projects in the Sanitary Sewer Master Plan consist of new or increased capacity pipelines that are needed to extend service. Because the Downtown area is predominantly developed, improvements primarily consist of upgrading the existing pipelines to the current 8-inch City Standards. This project is not on the list for impact fees and, therefore, will be funded by the Redevelopment Agency and private development (as a potential condition of approval). Additionally, City will be upgrading the sewer main from just east of the railroad tracks on Main Avenue to Hale Avenue to 18 inches per City s Sewer Master Plan. Refer to Figure 27 for further details. The City has a program to implement these improvements and sanitary sewer infrastructure does not and will not act as a constraint to the intensity of development within the Specific Plan. The improvements will be paid for by the Redevelopment Agency and/or private development (as a potential condition of approval) in accordance with Chapter 3.56 (Development Impact Mitigation Fees) and Chapter (Street and Sidewalk Development). 7-4 Public Review Draft

5 CHAPTER 7: INFRASTRUCTURE Figure 27 Existing Downtown Sanitary Sewer and Water System Source: City of Morgan Hill July

6 Morgan Hill Downtown Specific Plan Storm Drainage System Existing Storm Drainage System The City s storm drainage system consists of curb and gutter facilities, curb inlets, underground pipelines, and bubblers. These facilities drain to the nearest creek or manmade natural retention areas that flow through the City. These are tributary to either the Monterey Bay or San Francisco Bay. The City s storm drainage system meets existing drainage needs. Storm Drainage System Projections and Improvements The City s Storm Drain Master Plan does not call for any improvements to the existing storm drain system in Downtown, except for the Upper Llagas Creek Flood Protection Project (also known as PL566). PL566 is intended to provide flood protection for the Cities of Gilroy and Morgan Hill and the unincorporated portion of Santa Clara County known as San Martin. The project will consist of a series of channels, box culverts, and bridges designed to protect the floodplain from a one-percent flood. The southerly, downstream portion has been completed which protects the City of Gilroy. The northerly upstream portion that will someday protect Morgan Hill is not complete due to a lack of funding. The Santa Clara Valley Water District (SCVWD) is the sponsor of the project and has been working with the Corps of Engineers (COE) to prepare environmental documents and preliminary design. The COE has maintained minimal federal funding over the past five years to keep the environmental process moving forward. The SCVWD has taken on the property acquisition portion of the project and has made some progress. The overall construction cost to complete the project through Morgan Hill is approximately $105 million. The full federal share has been authorized in the 2007 Water Resources and Development Act pending annual appropriations. Progress on the project has been limited to right-of-way acquisition and preliminary engineering. Upper Llagas Creek winds through the Downtown area from Main Avenue to W. Dunne Avenue. The PL566 project will be comprised of open channels in this area except at locations where the creek now runs under Monterey Road and under the Shopping Center located at the SW corner of Dunne Ave and Monterey, where it will become a box culvert. Floodplain Regulations A significant portion of Downtown is in the floodplain (see Figure 28). These areas are most susceptible to flooding and will require additional measures to protect the properties from flood damage. Development within the floodplain is required to comply with the Flood Damage Prevention ordinance (Chapter 18.42), which provides various standards for construction, subdivisions, utilities, and other issues. Standards for new developments include, but are not limited to: anchoring building structures; using appropriate materials; flood-proofing commercial buildings; providing drainage paths; elevating residential structures; and designing utilities to minimize infiltration of floodways. 7-6 Public Review Draft

7 WDUNNEAVE MONTEREY RD DEPOTST RAILROADAVE BUTTERFIELD BLVD CHAPTER 7: INFRASTRUCTURE Figure 28 Downtown Floodplain Legend ALE AVE WCENTRALAVE CALLE CERRO CALLE VERDE Downtown Specific Plan Downtown Core Unimproved Right-of-Way Creek / Easement Downtown Floodplain KEYSTONE AVE EMAINAVE WARREN AVE WMAIN AVE DEL MONTE AVE W1STST E1STST CALLE MAZATAN CALLE DEL SOL CALLE ASTA CALLE ATAVIO R W2ND ST W3RDST E2NDST E3RDST CALLE CABALLERIA CALLE CABEZAL CORT C W4THST E4THST MARKROSS CT W5THST E5THST DIANA AVE CREEKSIDE LN EDUNNE AVE CIOLINO AVE MYRTLE AVE MANOR CT CHURCH ST BISCEGLIAAVE RAILROAD AVE BUTTERFIELD BLVD ,000 Feet CORY DR SAN LUIS NOTE: Map is general and approximate. Consult an engineering map for additional and more precise detail. July

8 Morgan Hill Downtown Specific Plan Solid Waste Existing Solid Waste Service Morgan Hill residents and businesses receive solid waste and recycling services from South Valley Disposal & Recycling, Inc. (SVDR). SVDR transports solid waste to the Pacheco Pass Landfill, recyclables to recycling processing facilities, and yard waste to South Valley Organics, a compost facility located at Pacheco Pass Landfill. The Pacheco Pass landfill is expected to close within the next 5 to 10 years. Santa Clara County has landfill capacity to serve the City of Morgan Hill. Solid Waste Projections and Improvements Energy Existing Energy Service The City s Energy Service is being fed through overhead services. In the Downtown area, there are two locations where overhead utilities have recently been undergrounded: Depot Street from Main Avenue to Fifth Street; and Monterey Road from Main Avenue to Dunne Avenue. Energy Projections and Improvements Currently, the City is working to underground overhead utilities on Third Street between Monterey Road and Depot Street. The remaining overhead utilities in Downtown will be undergrounded at the time that street improvements are made. Fire Service Existing Fire Service Fire suppression and prevention services are provided by the Santa Clara County Fire Department. Fire Service Projections and Improvements A new fire station is proposed north of the County Courthouse along Butterfield Boulevard. A Fire and Medical Services Master Plan Update Prepared by DMG Maximus in 2002 identified the need for a station located in the area of Dune Avenue and Butterfield Boulevard (see Figure 3 in Chapter 2: Land Uses and Development Standards) to redistribute the call load (reducing the 60-percent call demand upon the El Toro Station), as well as to provide enhanced response time to approximately 30 percent of the systems present call for services. It was estimated that overall system response times would be improved by approximately 37 percent as a greater number of calls would be within a reduced travel time of a fire station and there would be a decrease in delayed responses caused by engines out of their districts providing ancillary services to the southern end of the City. The station with be constructed as operational funding becomes available (capital construction funds are available). 7-8 Public Review Draft

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Chapter 7. Transportation Capital Improvement Projects. Chapter 7

Chapter 7. Transportation Capital Improvement Projects. Chapter 7 Chapter 7 Transportation Capital Improvement Projects Chapter 7 81 Chapter 7 Transportation Capital Improvement Projects Local Transportation Sales Tax Programs For over three decades, Santa Clara County

More information

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010 BART Silicon Valley Berryessa Extension Project Community Update October 27, 2010 1 Agenda Welcome and Introductions Program and Project Background Project Status Project and Station Details Current and

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE SAN FRANCISCO TO SAN JOSE PROJECT UPDATE San Francisco County Transportation Authority Tuesday, April 25, 2017 Ben Tripousis, Northern California Regional Director HIGH-SPEED RAIL: Connecting California

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension

More information

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California Big Easy RV & Boat Storage A Green Energy Project 36215 Jana Lane Wildomar, California 1 PROJECT OVERVIEW Project Description The construction and operation of a solar generation facility consisting of

More information

4 Circulation & Transportation

4 Circulation & Transportation 4.1 Mobility Network The mobility network at the new St. Paul s hospital and health campus is comprised of an interconnected system of sidewalks, cycle paths, transit routes and roadways. Figure 4-1: Indicative

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year

More information

CONNECTING AND TRANSFORMING CALIFORNIA

CONNECTING AND TRANSFORMING CALIFORNIA CONNECTING AND TRANSFORMING CALIFORNIA High-Speed Rail Local Policy Maker Group (LPMG) San Carlos, CA January 28, 2016 INTRODUCTIONS 1 STATEWIDE OVERVIEW CONNECTING CALIFORNIA Phase I:» 520 Miles» San

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

SAN FRANCISCO TO SAN JOSE PROJECT SECTION

SAN FRANCISCO TO SAN JOSE PROJECT SECTION SAN FRANCISCO TO SAN JOSE PROJECT SECTION Local Policy Maker Group Thursday, February 23, 2017 San Carlos, California INTRODUCTIONS 1 CALIFORNIA HIGH-SPEED RAIL PROGRAM UPDATE Jeff Morales, CEO HIGH-SPEED

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

What is the Peninsula Corridor Electrification Project (PCEP)?

What is the Peninsula Corridor Electrification Project (PCEP)? What is the Peninsula Corridor Electrification Project (PCEP)? Project Purpose and Need Improve Train Performance Increase Service and Ridership Increase Revenue and Reduce Cost Reduce Environmental Impacts

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget Capital Improvement Program (CIPs) City of Industry FY 2017/18 155 FY 2017/18 156 City of Industry, California Capital Improvement Program Overview of Department The Capital Improvement Program (CIP) is

More information

4.1 Land Use. SECTION CONTENTS Land Use Transit Transportation Technology

4.1 Land Use. SECTION CONTENTS Land Use Transit Transportation Technology 4 FUTURE CHANGES IN THE CORRIDOR Over the next 30 years, Santa Clara County will grow by roughly 637,000 residents and 303,500 jobs increases of 31 percent and 43 percent, respectively. 1 Changes in land

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

Caltrain Business Plan

Caltrain Business Plan Caltrain Business Plan FEBRUARY 2019 LPMG February 28, 2019 Caltrain Business Plan Project Update 2 3 What is the Caltrain Business Plan? What Why Addresses the future potential of the railroad over the

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

Reston Transportation Strategy July 9, 2018

Reston Transportation Strategy July 9, 2018 Reston Transportation Strategy July 9, 2018 Background: On February 11, 2014, the Board of Supervisors adopted the Reston Phase I Comprehensive Plan Amendment for the core areas of Reston between Sunset

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 6, 2018

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 6, 2018 TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 6, 2018 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER HAMILTON

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

TransNet Dollars Keep San Diego Moving

TransNet Dollars Keep San Diego Moving TransNet Dollars Keep San Diego Moving In 1987, San Diego region voters approved the TransNet program a half-cent sales tax to fund a variety of important transportation projects throughout the region.

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Purpose and Need Report

Purpose and Need Report Purpose and Need Report State Highway (SH) 29 From Southwestern Boulevard to SH 95 Williamson County, Texas (CSJ: 0337-02-045) Prepared by Blanton & Associates, Inc. Date: November, 2015 The environmental

More information

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: Richmond North of Oxford Street Richmond Row Dundas Street

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

REGIONAL RAIL RIGHT OF WAY ACTION PLAN TECHNICAL MEMORANDUM #1 RIGHT OF WAY INVENTORY

REGIONAL RAIL RIGHT OF WAY ACTION PLAN TECHNICAL MEMORANDUM #1 RIGHT OF WAY INVENTORY REGIONAL RAIL RIGHT OF WAY ACTION PLAN TECHNICAL MEMORANDUM #1 RIGHT OF WAY INVENTORY This memorandum provides an update to the description of corridor planning contained in the 2007 MTC Regional Rail

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

San Rafael Civic Center Station Area Plan May 2012 DRAFT FOR PUBLIC REVIEW

San Rafael Civic Center Station Area Plan May 2012 DRAFT FOR PUBLIC REVIEW CHAPTER 4. PARKING Parking has been identified as a key concern among neighbors and employers in the area, both in terms of increased demand from potential new development and from SMART passengers that

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012 Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly

More information

Revised Evaluation Scores. System Preservation

Revised Evaluation Scores. System Preservation Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights

More information

Mobility Management: Caltrain

Mobility Management: Caltrain Mobility Management: Caltrain Community Relations Committee October 4, 2017 Agenda Item 7 Presentation Outline Operating Statistics Ridership On-time Performance Fleet Reliability Capital Program Review

More information

APPENDIX E: BIBLIOGRAPHY

APPENDIX E: BIBLIOGRAPHY Caltrain Electrification Program EA/EIR APPENDIX E: BIBLIOGRAPHY Technical Reports The following technical reports, listed alphabetically by report title, document the studies conducted for this EA/EIR.

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation Capital Improvements Update April 2014: Pl dp j t Planned Projects through 2019 - $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation

More information

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by 2. Assessment of Current Conditions and Needs In order to prepare a plan to reach the vision desired by the residents of Texarkana, it is first necessary to ascertain the current situation. Since there

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

Transit in Bay Area Blueprint

Transit in Bay Area Blueprint Rail~Volution 2010 Click to edit Master title style Transit in Bay Area Blueprint October 21, 2010 0 Bottom Line State-of-Good Repair essential for reliable transit service large funding shortfalls BART

More information

Chapter 7: Corridor Visions

Chapter 7: Corridor Visions Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicants for the proposed Sepulveda/Rosecrans Site Rezoning are: Mar Ventures, Inc., 2050 West 190 th Street, Suite 108, Torrance, California,

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

High Speed Rail Conference

High Speed Rail Conference High Speed Rail Conference Denver, October 23, 2012 FAST START PROJECT FOR PENINSULA HIGH-SPEED RAIL Kern Jacobson InfraConsult LLC Objective Evaluate incremental approach to expedite high-speed rail to

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Transportation Sustainability Program

Transportation Sustainability Program Transportation Sustainability Program Photo: Sergio Ruiz San Francisco is a popular place to work, live and visit, straining the existing transportation network Roads and transit vehicles nearing capacity

More information

3.15 SAFETY AND SECURITY

3.15 SAFETY AND SECURITY 3.15 SAFETY AND SECURITY Introduction This section describes the environmental setting and potential effects of the alternatives analyzed in this EIR with regard to safety and security in the SantaClara-Alum

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

CITY COUNCIL STUDY SESSION UPDATE ON SMART. January 19, 2017 CITY OF SAN RAFAEL

CITY COUNCIL STUDY SESSION UPDATE ON SMART. January 19, 2017 CITY OF SAN RAFAEL CITY COUNCIL STUDY SESSION UPDATE ON SMART January 19, 2017 CITY OF SAN RAFAEL SONOMA MARIN AREA RAIL TRANSIT UPDATE OUTLINE BACKGROUND INITIAL OPERATION SYSTEM (IOS1) CIVIC CENTER AREA LARKSPUR EXTENSION

More information

ENVIRONMENTAL SETTING

ENVIRONMENTAL SETTING II. ENVIRONMENTAL SETTING A. OVERVIEW OF ENVIRONMENTAL SETTING This section provides a brief overview of the project site s regional and local setting. Additional descriptions of the environmental setting

More information

Major Widening/New Roadway

Major Widening/New Roadway Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

Rail alignment and benefits (rab) study

Rail alignment and benefits (rab) study Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study May 22, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

SCHEDULE OF CAPITAL PROJECTS BY FUND

SCHEDULE OF CAPITAL PROJECTS BY FUND CIP Project Funding Summary 5 7 8 9 10 11 Streets & Highways Fund 3,950,541 2,148,259 1,250,000 1,290,000 1,250,000 9,888,800 Prop C Fund 20,936,435 700,000 700,000 700,000 700,000 23,736,435 Measure R

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

JOINT SHORT RANGE TRANSIT PLANS FOR SLO AND RTA TRANSIT Working Paper Six (RTA): Capital Improvement Program

JOINT SHORT RANGE TRANSIT PLANS FOR SLO AND RTA TRANSIT Working Paper Six (RTA): Capital Improvement Program JOINT SHORT RANGE TRANSIT PLANS FOR SLO AND RTA TRANSIT : Capital Improvement Program Prepared for the San Luis Obispo Regional Transit Authority and for SLO Transit Prepared by Joint Short Range Transit

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

Rail~Volution 2012 R. Gregg Albright

Rail~Volution 2012 R. Gregg Albright CALIFORNIA HIGH-SPEED RAIL AUTHORITY October 16 th, 2012 Rail~Volution 2012 R. Gregg Albright WHAT IS CALIFORNIA HIGH-SPEED TRAIN PROJECT (CHSTP) and HOW WILL IT BE IMPLEMENTED? 2 CALIFORNIA HIGH SPEED

More information

FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)

FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST) FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST) The Fresno County subsection of the California High- Speed Train System (HST) is analyzed in two separate EIR/EISs the Merced-Fresno EIR/EIS

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT V03 APTA Multimodal Operations Planning Workshop August 2016 Green Line LRT 2 Presentation Outline Past Present Future 3 16/03/2016 RouteAhead Update 4 4 16/03/2016 RouteAhead Update 5 5 16/03/2016 6 6

More information

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015 Van Ness Transit Corridor Improvement Project Engineering, Maintenance and Safety Committee March 25, 2015 Project Need 16,000 daily passenger boardings within the project corridor Average bus speed 8

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE ELEMENT

CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE ELEMENT CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE ELEMENT CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE GUIDING PRINCIPLE 1.0 INTRODUCTION The City of Carson is committed to providing a safe and efficient circulation

More information

Caltrain Business Plan. Project Update July 2018 through January 2019

Caltrain Business Plan. Project Update July 2018 through January 2019 Caltrain Business Plan JANUARY 2019 Project Update July 2018 through January 2019 2 Business Plan Overview Business Plan Overview A Vision for Growth Crafting Scenarios Looking Beyond the Tracks Outreach

More information

engineering phase and during the procurement of design build contracts.

engineering phase and during the procurement of design build contracts. CONSIDERATION OF ALTERNATIVES Below-grade trench alignment along Aviation Boulevard, adjacent to LAX south runways. miles. MOS-Century would extend from the Metro Exposition Line to the Aviation/ Century

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for GENERAL FUND (01) C017060.589000 EXPO Maintenance Yard Buffer Park 440,000 - - - C019098.589000 Downtown Santa Monica Temporary Use TOD Site 836,400 - - - M014078.589000 Swim Facilities Planned Maintenance

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

2007 Traffic Impact Mitigation Fee Update Study

2007 Traffic Impact Mitigation Fee Update Study 2007 Traffic Impact Mitigation Fee Update Study Prepared for: Council of San Benito County Governments Prepared by: Hexagon Transportation Consultants Adopted June 21, 2007 MEMORANDUM To: From: Subject:

More information