1 Hot on hot through the Zürich highlands, Switzerland. Swiss Champion : VÖGELE Technology Sets New Speed Record
2 Hot on hot through the Zürich highlands, Switzerland. Swiss Champion : VÖGELE Technology Sets New Speed Record Ever more construction companies the world over are discovering the advantages of the innovative VÖGELE InLine Pave process in which binder course and wearing course are paved hot on hot in a single pass. The result is an asphalt pavement of high stability and resistance to deformation. It is the InLine Pave train which makes this feat possible. In this train, a feeder, a paver for binder course combined with a screed for extremely high precompaction and a paver for wearing course all operate directly one behind the other. Seite 1/4 Job Site Details 1/2 Pavement rehabilitation on the A 53 motorway between Uster Nord and Uster East and on a highroad, Switzerland Length of section: 7.7km (2 x 2km on the A 53 motorway between Uster Nord and Uster East, 3.7km on the Zürichstrasse highroad between Uster and Wetzikon) Width of section: m in each direction Paving Details Pave width: m Layer thickness: binder course 9.5cm wearing course 2.5cm
3 Pavement rehabilitation of a 7.7km stretch of the A 53 motorway in the Zürich highlands broke all records: the roadworks were completed and all traces of the job site vanished within a speedy 51 hours. Never before had a project of this length in Switzerland been completed so swiftly. And all kudos went to the VÖGELE InLine Pave train used by Swiss contractor Awestra. Repaired in record time: paving work on the A 53 / Zürichstrasse job site near Aathal was able to be completed extremely quickly thanks to the InLine Pave technique. For the VÖGELE InLine Pave train places binder course and wearing course in a single pass this saves time. The joint venture between contractors Awestra AG and Strabag Zürich opted for the new technology at the initiative of Awestra s Managing Director, Roger Reichmuth. Hot on hot paving over a distance of 7.7km All told, 7.7 kilometres of road were rehabilitated using the new paving method. These involved two 2km stretches in both directions of the A 53 motorway, plus a 3.7km stretch of Zürichstrasse between the towns of Uster and Wetzikon. Zürichstrasse is a highroad that closes a gap in the A 53. On the complete job site, the screeds of the two pavers in the InLine Pave train were configured for a pave width of 7.5m. For an InLine Pave job, the SUPER IP for paving binder course always comes with the AB Extending Screed in TP2 Plus version. For placing wearing course, contractor Awesta combined its SUPER with an AB Extending Screed in TV version. A VÖGELE MT Mobile Feeder alternately supplied the two machines with binder and wearing course mixes throughout the entire project. Seite 2/4 Job Site Details 2/2 Material Motorway Binder course: asphaltic concrete (AC 22 EME C1 PMB 10/40-70 E) Wearing course: asphaltic concrete (AC MR8 PMB 45/65 E) Zürichstrasse (highroad) Binder course: asphaltic concrete (AC 22 EME C1 PMB 10/40-70 E) Wearing course: asphaltic concrete (AC 8 H PMB 45/65 E) Total quantity of mix paved: 20,000 tonnes Equipment VÖGELE InLine Pave train comprising: MT Mobile Feeder SUPER IP for Binder Course with AB Extending Screed in TP2 Plus Version SUPER for Wearing Course with AB Extending Screed in TV Version HAMM HD+ 140 VO Tandem Roller
4 Seite 3/4 Setting the Swiss record with the VÖGELE paving train For pavement rehabilitation of the motorway section, the contractor s paving team worked in a constant pave width of 7.5m and placed 9.5cm binder course and 2.5cm wearing course. On the highroad section, the SUPER IP and SUPER placed layers of identical thickness but in pave widths varying between 5.5 and 7m. After 51 hours in all, the roadworks were completed: the paving team had rehabilitated the 7.7km stretch and placed some 20,000 tonnes of mix. With this outcome they had set the Swiss record for paving. Afterwards, all parties involved were full of praise for the InLine Pave technology. And the Managing Director of Awestra, Roger Reichmuth, has great plans for the paving train: My vision is pavement rehabilitation of the A 1 motorway, which is roughly 360km long and traverses the whole of Switzerland, in just one year. Thanks to the new VÖGELE technology, this is now a real possibility. 01 // 01 // Working in 12-hour shifts: an easy job for the paving train. Roger Reichmuth, Managing Director of Awestra AG: "My vision is pavement rehabilitation of the A 1 motorway, which is roughly 360km long and traverses the whole of Switzerland, in just one year. Thanks to the new VÖGELE technology, this became a real possibility. Now, paving only takes half as long as before. On the Aathal job site, we gained four whole days during the six weeks of roadworks and that has earned us the Swiss record.
5 Seite 4/4 Paving only takes half as long Rolf Vaqué of the Canton of Zürich s Building Department, who accompanied the roadworks as a representative of the contract-letting authority, was also convinced of the hot on hot technique s advantages: We gain a day during each phase of paving and have greater certainty that we can comply with the time schedule. The new technique offers advantages above all for trunk roads. Paving now only takes half as long as before, said Reichmuth. On the Aathal job site, we gained four days during the six weeks of roadworks. After completing the A 53 road rehabilitation project, the team of contractor Awestra and their VÖGELE InLine Pave train carried out two more pavement rehabilitation jobs in the towns of Küsnacht and Stäfa, Canton of Zürich. 02 // 02 // The InLine Pave train restored the A 53 motorway's load bearing capacity. 03 // 04 // 03 // Binder and wearing courses placed in a single pass: pavement rehabilitation completed in a very short time thanks to the InLine Pave technique. 04 // Only Usain is faster : alluding to 100m world record holder Usain Bolt, the paving team celebrate the record-breaking job site.
Tracked Paver SUPER 800
Tracked Paver SUPER 800 SUPER 800 Pave Widths 0.5 3.2m Maximum Laydown Rate 250 tonnes/h Clearance Width 1.2m At a Glance Small Paver for a Wide Range of Applications SUPER 800 At a Glance Track gauge
More informationTracked Paver SUPER 800
Tracked Paver Pave Widths 0.5 3.2m Maximum Laydown Rate 250 tonnes/h Clearance Width 1.2m At a Glance Small Paver for a Wide Range of Applications The is a very compact small paver which, due to its overall
More informationTracked Paver SUPER 800. Mini Class. Pave Widths m Maximum Laydown Rate 250t/h Clearance Width 1.2m.
Tracked Paver SUPER 800 Pave Widths 0.5 3.2m Maximum Laydown Rate 250t/h Clearance Width 1.2m www.voegele.info Highlights Track gauge only 1.1m Pave speed up to 60m/min. Clearance width only 1.2m Powerful
More informationTracked Paver SUPER 700
Tracked Paver SUPER 700 SUPER 700 Pave Widths 0.5 3.2m Maximum Laydown Rate 200 tonnes/h Clearance Width 1.2m At a Glance Great Things Come in Small Packages SUPER 700 At a Glance Track gauge 1.1m Clearance
More informationVÖGELE Screeds Range of Products
VÖGELE Screeds Range of Products A Successful Brand for a Job Well Done Time and Again! VÖGELE Screeds Because Building Roads Requires Accuracy Modern road construction makes higher and higher demands
More informationWIRTGEN GROUP ORIGINAL SPARE PARTS
CLOSE TO OUR CUSTOMERS WIRTGEN GROUP ORIGINAL SPARE PARTS Special campaign 2017 / 2018 CAMPAIGN PERIOD 01/11/2017 until 31/03/2018 WIRTGEN GROUP I PARTS SPECIAL CAMPAIGN ORIGINAL WIRTGEN GROUP PARTS SPECIAL
More informationTracked Paver SUPER HD. Universal Class. Maximum Pave Width 8m Maximum Laydown Rate 700 tonnes/h Transport Width 3m.
Tracked Paver SUPER 1800-2 HD Maximum Pave Width 8m Maximum Laydown Rate 700 tonnes/h Transport Width 3m www.wirtgen-china.com.cn Highlights SUPER 1800-2 HD Maximum pave width 8m SB 300 HDT Extremely high
More informationAB 500 and AB 600. VÖGELE Extending Screeds AB 500 AB 600. VÖGELE AB 500 and AB 600
AB 500 and AB 600 AB 500 AB 600 Basic Width 2.55m Maximum Pave Width 8.5m Screed Versions TV, TP1, TP2, TP2 Plus Basic Width 3m Maximum Pave Width 9.5m Screed Versions TV, TP1, TP2, TP2 Plus www.voegele.info
More informationScreeds
VÖGELE Screeds 2014 www.voegele.info VÖGELE Screeds Because Building Roads Requires Accuracy Modern road construction makes increasingly higher and more complex demands on an asphalt paver s quality and
More informationOriginal Wirtgen Group parts requirement. Parts Special Campaign WINTER 2015 / 2016
Parts Special Campaign WINTER 2015 / 2016 Original Wirtgen Group parts requirement The practical ordering tool: From now on you can benefit from our new online service at www.partsandmore.net to find the
More informationWirtgen Limited presents new Kleemann products and solutions for road construction and repair at Hillhead 2014.
Wirtgen Limited presents new Kleemann products and solutions for road construction and repair at Hillhead 2014. Visitors to this year's Hillhead trade show can look forward to 15 exhibits from the extensive
More informationTracked Paver SUPER
Tracked Paver SUPER 2100-2 SUPER 2100-2 Maximum Pave Width 13m Maximum Laydown Rate 1,100 tonnes/h Transport Width 2.55m At a Glance Powerful, Economical, Low-Noise SUPER 2100-2 At a Glance Maximum pave
More informationDELIVERY RANGE North America
DELIVERY RANGE North America Contents WIRTGEN GROUP OVERVIEW 04 Well rounded 04 A strong partner you can rely on 06 Right where you need us 08 WIRTGEN DELIVERY RANGE 10 Cold Milling Machines 11 Cold Recyclers
More informationWheeled Paver SUPER
Wheeled Paver SUPER 1603-2 SUPER 1603-2 Maximum Pave Width 7m Maximum Laydown Rate 600 tonnes/h Transport Width 2.55m At a Glance Compact-Sized Wheeled Paver SUPER 1603-2 At a Glance Maximum pave width
More informationWheeled Paver SUPER
Wheeled Paver SUPER 1603-2 SUPER 1603-2 Maximum Pave Width 7m Maximum Laydown Rate 600 tonnes/h Transport Width 2.55m At a Glance Compact-Sized Wheeled Paver Innovative paver technology is not a matter
More informationTracked Paver SUPER L. Universal Class. Maximum Pave Width 9m Maximum Laydown Rate 700 tonnes/h Transport Width 2.55m.
Tracked Paver SUPER 1800-2 L Maximum Pave Width 9m Maximum Laydown Rate 700 tonnes/h Transport Width 2.55m www.wirtgen-china.com.cn Highlights Maximum pave width 9m Powerful Perkins engine rated at 129.6kW
More informationTracked Paver SUPER
Tracked Paver SUPER 1600-2 SUPER 1600-2 Maximum Pave Width 8m Maximum Laydown Rate 600 tonnes/h Transport Width 2.55m At a Glance Tracked High-Tech Paver in the Mid Range SUPER 1600-2 At a Glance Maximum
More informationA maximum of power with a minimum investment the economical solution for road construction.
PAVING MACHINERY MADE IN GERMANY A maximum of power with a minimum investment the economical solution for road construction. an ASTEC Industries Company EQUIPMENT 01 02 10 09 08 07 01 02 03 Well-arranged
More informationCold Recycler WR Large working width and cutting-edge technology for economical cold recycling
Cold Recycler WR 4200 Large working width and cutting-edge technology for economical cold recycling Recycling and paving carriageways true to cross-section, line and level, all in a single pass Building
More informationExtremely Compact, Highly Manœuvrable, SUPER i
Just 5.68m long, the new SUPER 1600-3i is highly acclaimed Extremely Compact, Highly Manœuvrable, SUPER 1600-3i Just 5.68m long, the new SUPER 1600-3i is highly acclaimed Extremely Compact, Highly Manœuvrable,
More informationUniversal Class SUPER L
A WIRTGEN GROUP COMPANY Universal Class SUPER 1880-3 L Tracked Paver Maximum pave width 9.5m Maximum laydown rate 1000t/h Maximum layer thickness 50cm The high-grade asphalt specialist: powerful, efficient
More informationTracked Paver SUPER Universal Class. Maximum Pave Width 10m Maximum Laydown Rate 700 tonnes/h Transport Width 2.55m.
Tracked Paver SUPER 1800-3 Maximum Pave Width 10m Maximum Laydown Rate 700 tonnes/h Transport Width 2.55m www.voegele.info The Highlights of the Dash 3 Generation The PaveDock Assistant enhances process
More informationTracked Paver SUPER Highway Class. Maximum Pave Width 13m Maximum Laydown Rate 1,100 tonnes/h Transport Width 2.55m.
Tracked Paver SUPER 2100-3 Maximum Pave Width 13m Maximum Laydown Rate 1,100 tonnes/h Transport Width 2.55m www.voegele.info The Highlights of the New Generation The PaveDock Assistant enhances process
More informationThe complete product range. Tailor made products to meet your requirements
The complete product range. Tailor made products to meet your requirements 02 03 WIRTGEN where innovation happens What began as a haulage company for construction materials in 1961 has developed, over
More informationRoad Stabilizer. Improved Safety Four safe braking systems are provided as standard equipment Slim engine hood for a clear view Wide operator s deck
PM550 PM550-s Road Maintenance Machine & Others Road Stabilizer Innovative newly-designed road stabilizer PM550(-s) for full depth reclamation (FDR) and soil stabilization. It makes jobs environmentally-friendly
More informationOVERVIEW BROCHURE ROLLER PAVERS ROAD/ FLATWORK BRIDGE AIRPORT HIGHWAY SLOPE & CANALS
OVERVIEW BROCHURE ROLLER PAVERS ROAD/ FLATWORK BRIDGE AIRPORT HIGHWAY SLOPE & CANALS TM BRIDGING MORE THAN 60 YEARS BRIDGE / FLATWORK PAVER BRIDGE DECKS AND BEYOND Steel frame construction delivers rigidity
More informationDELIVERY RANGE. India
DELIVERY RANGE India CONTENTS WIRTGEN GROUP OVERVIEW 04 Well rounded 04 Strong in India 06 Strong and convincing local presence 10 WIRTGEN DELIVERY RANGE 12 Cold Milling Machines 14 Cold Recyclers and
More informationCLOSE TO OUR CUSTOMERS. The complete DELIVERY RANGE
CLOSE TO OUR CUSTOMERS The complete DELIVERY RANGE CONTENTS WIRTGEN GROUP OVERVIEW 04 WIRTGEN DELIVERY RANGE 08 Cold Milling Machines 09 Cold Recyclers and Soil Stabilizers 10 Binding Agent Spreaders 11
More informationNr ,200 km across Africa
E Nr. 51 1,200 km across Africa 1,200 km across Africa Africa s second largest country, Algeria, is currently experiencing an economic boom which has inspired this North African nation to invest into expanding
More informationPROACTIVE MAINTENANCE PARTS SPECIAL CAMPAIGN SUMMER WIRTGEN GROUP support high machine availability
PARTS SPECIAL CAMPAIGN SUMMER 2014 PROACTIVE MAINTENANCE WIRTGEN GROUP support high machine availability Detailed training for machine operators, dispatchers, workshop and purchasing staff: Proactive Maintenance
More informationTracked Paver SUPER Universal Class. Maximum Pave Width 10m Maximum Laydown Rate 700 tonnes/h Transport Width 2.55m.
Tracked Paver SUPER 1800-3 Maximum Pave Width 10m Maximum Laydown Rate 700 tonnes/h Transport Width 2.55m www.voegele.info The Highlights of the New Generation The PaveDock Assistant enhances process safety
More informationWheeled Paver SUPER Compact Class. Maximum Pave Width 4.5m Maximum Laydown Rate 250t/h Transport Width 1.85m.
Wheeled Paver SUPER 1303-3 Maximum Pave Width 4.5m Maximum Laydown Rate 250t/h Transport Width 1.85m www.voegele.info VÖGELE SUPER 1303-3 The Highlights of the New Generation Outside turning radius 3.8m
More informationWheeled Paver SUPER Compact Class. Maximum Pave Width 4.5m Maximum Laydown Rate 250 tonnes/h Transport Width 1.85m.
Wheeled Paver SUPER 1303-3 Maximum Pave Width 4.5m Maximum Laydown Rate 250 tonnes/h Transport Width 1.85m www.voegele.info VÖGELE SUPER 1303-3 The Highlights of the New Generation Outside turning radius
More informationVISION i. Tracked Paver. Highway Class
Tracked Paver VISION 5200-2i Maximum Paving Width 28 ft. (8.6 m) Maximum Laydown Rate 1,300 tons/h (1,200 tonnes/h) Transport Width 10 ft. (3.05 m) Tracked Paver VISION 5200-2i Superior technology with
More informationVISION i. Wheeled Paver. Highway Class. Maximum Paving Width 25 ft. 6 in. Maximum Laydown Rate 1,300 tons/h Transport Width 10 ft.
Wheeled Paver VISION 5203-2i Maximum Paving Width 25 ft. 6 in. Maximum Laydown Rate 1,300 tons/h Transport Width 10 ft. Wheeled Paver VISION 5203-2i Superior technology with very low noise emission Two
More informationElectronic Paver Titan 325 EPM
Electronic Paver Titan 325 EPM Applications Paving projects Motorways Rural roads, main roads and highways Runway construction Waste storage areas Hydraulic engineering (parallel and vertical to the slope)
More informationEmergency Repair of Runway after Cargo Plane Accident
Emergency Repair of Runway after Cargo e Accident K. Ookubo NIPPO Corporation, Narita office, Chiba, Japan S. Kakuta Narita International Airport Corporation, Chiba, Japan T. Inou Airport Maintenance Service
More informationSUPER performance: The new Universal Class pavers. SUPER L and SUPER 1880 L WIRTGEN CHINA introduces two new pavers: Variante 1
SUPER 1600-3 L // The compact powerhouse with impressive performance and manœuvrability SUPER 800-3 // The Mini Class paver with the maximum range of applications Paving asphalt in a covered parking area
More informationBalancing Paving & Compaction Operations. Presented by Todd Mansell, CAT Paving
Balancing Paving & Compaction Operations Presented by Todd Mansell, CAT Paving What are we trying to achieve? 1. Tonnage 2. Density 3. Smoothness 4. Efficiency 5. Overall quality How do we achieve these
More informationThe energy-saving road
The energy-saving road Danish Road Directorate Dynatest NIRAS NCC Roads Ole-Jan Nielsen, NCC Roads Ole-Jan Nielsen ViaNordica 2012 12. juni 2012 1 Purpose of the project 1. If possible to reduce energy
More informationWIRTGEN CHINA NEWS. The Magazine for Wirtgen Group China Clients. Edition 05 October 2009
WIRTGEN CHINA NEWS The Magazine for Wirtgen Group China Clients Edition 05 October 2009 Editorial content Ulrich Reichert, Managing Director of WIRTGEN (China) Machinery Co. Ltd. 2009 is a year which will
More informationIf it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA
$9 $8 $7 $6 $5 $4 $3 $2 $1 Month-Year Ton Tonne 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA The Tennessee Program HMA Thin Lifts for Pavement Preservation in Tennessee Mark Woods TDOT 5,109 Interstate Lane
More informationUltra-thin Bonded Wearing Course Performance Update, Minnesota
2009-30 Ultra-thin Bonded Wearing Course Performance Update, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research Ultra-thin Bonded Wearing Course Performance
More informationBAUMA April 2016
Press Release BAUMA 2016 11 17 April 2016 Press Release SECMAIR GreenSwift BOMAG BF 300 MARINI BE TOWER Press Release / Pre-BAUMA 2016 FAYAT ROAD BUILDING EQUIPMENT Page 1/ 10 Road Building Equipment Division
More informationConventional Paving Process: Vertical Drop-off
SAFETY EDGE Module 2: Equipment and Construction of Safety Edge Level of Audience: Engineers, Project Managers and Municipal Authorities Instructor: Eng. Freddie Salado Duration: 1 Hour 1 Acronyms AAA
More informationWays to Reduce Costs
Ways to Reduce Costs A Collection of Best Practices and Innovative Ideas from Asphalt Mix Producers and Construction Contractors Across the U.S. Dave Newcomb Minnesota Contractors Workshop February 19,
More informationDYNAPAC LARGE TRACKED PAVER RANGE. Dynapac SD2500C / SD2500CS SD2550C / SD2550CS
DYNAPAC LARGE TRACKED PAVER RANGE Dynapac SD2500C / SD2500CS SD2550C / SD2550CS THE DYNAPAC SD-PAVERS COMBINE decades of experience and new innovations. During development we focused on paving processes
More informationSANY PAVERS.
SANY Industry Town, Changsha Economic and Technological Development Zone, Hunan Province, China Service Line: +86 4006 098 318 E-mail: crd@sany.com.cn www.sanygroup.com Due to our process of continuous
More informationTracked Paver. VISION i. Highway Class. Maximum Paving Width 28 ft. Maximum Laydown Rate 1,300 tons/h Transport Width 10 ft.
Tracked Paver VISION 5200-2i Maximum Paving Width 28 ft. Maximum Laydown Rate 1,300 tons/h Transport Width 10 ft. Tracked Paver VISION 5200-2i Superior technology with very low noise emission Advanced
More informationMT i Offset. PowerFeeder. Special Class.
PowerFeeder MT 3000-2i Offset Material Feeder: Maximum Conveying Capacity 1,200 tonnes/h Pivoting Conveyor ErgoPlus Operating System www.voegele.info VÖGELE MT 3000-2i Offset Conveying Capacity Reaches
More informationRoadNewsfor new roads
RoadNewsfor new roads > Rehabilitation of US Route 70: Top paving results with the VÖGELE VR 600 Extending Screed > More than 330 acres of harbor area in Germany: VÖGELE technology for perfect evenness
More informationSANY PAVERS.
SANY Industry Town, Changsha Economic and Technological Development Zone, Hunan Province, China Service Line: +86 4006 098 318 E-mail: crd@sany.com.cn Distributor Info. Due to our process of continuous
More informationPARTS SPECIAL CAMPAIGN SUMMER 2015
PARTS SPECIAL CAMPAIGN SUMMER 2015 It does your machine good We offer you the elixir of life for your fleet: guarantee the effective performance and service life of your machine with original Wirtgen Group
More informationFalling Weight Deflectometer
Falling Weight Deflectometer Pave FWD Pave HWD Pave SHWD For all your pavement testing needs Design Overview A Falling Weight Deflectometer (FWD) is used to measure the vertical deflection response of
More informationWelcome. Tim Kowalski Application Support Manager Wirtgen America Inc.
Welcome Tim Kowalski Application Support Manager Wirtgen America Inc. Outline Compaction Basics What is compaction? Why do we compact? 4 Elements of compaction Roller Train Varies with specifications and
More informationHMA Thin Lifts for Pavement Preservation in Tennessee
HMA Thin Lifts for Pavement Preservation in Tennessee The Tennessee Program 5,109 Interstate Lane Miles 26,244 State Route LM 31,353 Total* MARK WOODS, P.E. TDOT DIV. OF MATERIALS AND TESTS * As of 2008
More informationHURON COUNTY ENGINEER S OFFICE
HURON COUNTY ENGINEER S OFFICE 2017 ENGINEER S ANNUAL REPORT The Ohio Revised Code requires that each Ohio County Engineer publish an annual report to the commissioners outlining the general condition
More informationSPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT
SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,
More informationCaterpillar Paving Products Solutions Guide. One source for your compaction, paving and road rehabilitation needs
Caterpillar Paving Products Solutions Guide One source for your compaction, paving and road rehabilitation needs Vibratory Soil Compactors Smooth Drum Soil Compactors Soil Compactor CS-323C CP-323C CS-323C
More informationDYNAPAC LARGE TRACKED PAVER. Dynapac F3030C
DYNAPAC LARGE TRACKED PAVER Dynapac F3030C DYNAPAC LARGE TRACKED PAVER THE DYNAPAC F3030C is a multi-functional combing decades of experience and new innovations. It offers large paving capacity with lowest
More informationPAVER PERFECTION. road science by Tom Kuennen. 3 WINNING the PART
road science by Tom Kuennen PAVER 3 WINNING the BONUS PERFECTION PART WINNING Paving in echelon at the new National Corvette Museum Motorsports Track in Bowling Green, Kentucky, the Cat AP1055 paver of
More informationA WIRTGEN GROUP COMPANY. The asphalt professionals SERIES HD
A WIRTGEN GROUP COMPANY The asphalt professionals SERIES HD Visibility 03 Splendid allround visibility Four halogen working lights illuminate the working area. Unobstructed view for safe working The HD
More informationAP755 Asphalt Paver Product Introduction
AP755 Asphalt Paver Product Introduction AP755 Overview Cat C7 engine with ACERT Technology provides 149 kw (202 hp) of gross power (SAE J1995) Advanced hydrostatic propel control system. Standard paving
More informationInnovative Warm Mix Asphalt Projects: The Contractor s Perspective
Innovative Warm Mix Asphalt Projects: The Contractor s Perspective NESMEA 2009 Portland, ME October 7 th 2009 ROD BIRDSALL, PE What is Warm-Mix Asphalt (WMA)? Asphalt Mix produced at 40-100ºF less than
More informationPAVIJET MINI PAVERS Simple to use Low maintenance Labor & equipment cost saving...one smart investment.
PAVIJET MINI PAVERS Simple to use Low maintenance Labor & equipment cost saving...one smart investment. www.gradecontrol.com.au 02 43851041 CONTACT US FOR DEMONSTRATION AND HIRE DETAILS PAVIJET MG7 M I
More informationARP & ARX HEAVY TANDEM ROLLERS
MACHINES ARP & ARX HEAVY TANDEM ROLLERS ARP & ARX SERIES HEAVY TANDEM VIBRATORY ROLLERS YOUR BENEFITS AT A GLANCE WHAT CHARACTERISES THE RIGID FRAME / ARTICULATED TANDEM ROLLERS FROM AMMANN? ARP COMPACTOR
More informationP7110, P7170. VOLVO TRACKED AND WHEELED PAVERS ft 235 hp
P7110, P7170 VOLVO TRACKED AND WHEELED PAVERS 10-26 ft 235 hp Visibility Benefit from supreme visibility of the entire paving process. Volvo pavers provide unobstructed views of material flow from the
More informationABSTRACT OF COST FOR PAVEMENT
CHAPTER - 5 ABSTRACT OF COST FOR PAVEMENT Name of Work :- CONSTRUCTION OF TRANS - ARUNACHAL HIGHWAY (SH:- Road from Khodaso (Ch. 110.450 Km) to Dakte Hoj (Ch. 212.450 Km) via Sagalee, Toru, Kheel - 102.000
More informationCOMPETITION TRIBUNAL OF SOUTH AFRICA ROADSPAN HOLDINGS (PTY) LTD
COMPETITION TRIBUNAL OF SOUTH AFRICA In the matter between: Case No: 79/LM/Nov09 WBHO CONSTRUCTION (PTY) LTD Acquiring Firm And ROADSPAN HOLDINGS (PTY) LTD Target Firm Panel : Norman Manoim (Presiding
More informationCLOSE TO OUR CUSTOMERS. Parts and More Compact Screed
CLOSE TO OUR CUSTOMERS Parts and More Compact Screed contents 2 A Wirtgen Group Company ADVANTAGES 4 Original VÖGELE screeds 4 Original VÖGELE screed types 6 Original VÖGELE screed components 8 FACTS 10
More informationBIM rakendamine Soomes teede ehituses ja korrashoius (inglise keeles)
Eesti Asfaldiliidu 42. ASFALDIPÄEV 11. november 2014 BIM rakendamine Soomes teede ehituses ja korrashoius (inglise keeles) Manu Marttinen Site Manager NCC Roads Oy CONTENTS 1. BIM in general 2. Road Rehab
More informationINLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY
INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY Howard Hamby Spokane County Road Maintenance Administrator PAVEMENT CUT FAILURES 1. Sloughing 2. Poor Compaction 3. Poor
More informationPARTS AND MORE COMPACT SCREED
PARTS AND MORE COMPACT SCREED ROAD AND MINERAL TECHNOLOGIES www.wirtgen-group.com CONTENTS ADVANTAGES PAGE 4 Original Vögele screeds Page 4 Original Vögele screed types Page 6 Original Vögele screed components
More informationMR SERIES. One smooth operator. *MR Trolleys can only be used with ER Hoists.
SERIES One smooth operator. How do you move five tonnes across a factory floor safely and easily? Here s how: add an MR motorized trolley to your Kito ER electric hoist and you ll increase productivity
More informationAutostrade per l Italia SpA
Autostrade per l Italia SpA The European Road to increased Safety Work zones and technologies: management and communication to the users 21st January 2008 Antonino Galatà - Director Operations Agenda Introduction
More informationCASE STUDY. History. Liebherr-Werk Ehingen GmbH EU Directive Compliance, R& D Testing. Germany. Automotive. PULSE, Transducers
CASE STUDY Liebherr-Werk Ehingen GmbH EU Directive Compliance, R& D Testing Germany Automotive PULSE, Transducers Liebherr-Werk Ehingen GmbH, a wholly owned subsidiary of the Liebherr Group, is a market
More informationDRIVEWAY/SIDEWALK PERMIT APPLICATION
JOB INFORMATION CITY OF ALEXANDRIA 704 Broadway Alexandria, MN 56308 Phone: 320-763-6678 Fax: 320-763-3511 DRIVEWAY/SIDEWALK PERMIT APPLICATION Permit Fee: $50.00 Deposit: $300.00 PERMIT NUMBER: ROW DATE:
More informationa_e o ed i_e e u ed i_e e o u a_e e u o a_e i_e ed Grade 2, Theme 1, Week 3 -- Jane's Mistake (accompanies Mrs. Brown Went to Town) -- Target Skills
Grade 2, Theme 1, Week 3 -- Jane's Mistake (accompanies Mrs. Brown Went to Town) -- Target Skills a_e o ed i_e e u Grade 2, Theme 1, Week 3 -- Jane's Mistake (accompanies Mrs. Brown Went to Town) -- Target
More informationVOLVO TRACKED AND WHEELED PAVERS P7110, P ft 235 hp
VOLVO TRACKED AND WHEELED PAVERS P7110, P7170 10-26 ft 235 hp All-around visibility. Visibility Benefit from supreme visibility of the entire paving process. Volvo pavers provide unobstructed views of
More informationOn-the-Job Training Program. Overview of Training Programs
On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete
More informationThe development and use of the Skid Resistance and Smart Ravelling Interface Testing Device
The development and use of the Skid Resistance and Smart Ravelling Interface Testing Device Radjan Khedoe 1, a, Arian de Bondt 1, Mirella Villani 2, Tom Scarpas 2 1 Ooms Civiel, Scharwoude, Netherlands
More informationHighway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030
Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030 Kentucky Fatality Assessment and Control Evaluation Program Kentucky Injury Prevention and Research Center
More informationFAQ s Categories. Frequently Asked Questions related to Safety Edge Technology grouped in 5 categories:
SAFETY EDGE Module 3: Frequently Asked Questions of the EDC Initiative Level of Audience: Engineers, Project Managers and Municipal Authorities Instructors: Dr. Benjamín Colucci, Eng. Juan C. Rivera, Eng.
More informationHomogeneous distribution of concrete fed from the side. Side Feeder ISF 94 / ISF 94 i
Homogeneous distribution of concrete fed from the side. Side Feeder ISF 94 / ISF 94 i 02 03 Outstanding features of the ISF 94 / ISF 94 i side feeder 3 PIVOTING LEGS Four pivoting legs to adjust the track
More information2/5/2019. Definitions. Consolidation. Compaction 101: Doing the Right Things, the Right Way Session W14 Dale Starry, Volvo Construction Equipment
Compaction 101: Doing the Right Things, the Right Way Session W14 Dale Starry, Volvo Construction Equipment Definitions Consolidation Compression Compaction 2 Consolidation Material volume change achieved
More informationTHE NEXT GENERATION OF MECHANICALLY LAYING CONCRETE BLOCK PAVING
Pave Israel 96 THE NEXT GENERATION OF MECHANICALLY LAYING CONCRETE BLOCK PAVING N.P. Walsh Optimas GmbH Saterland - Ramsloh. Germany Summary: As producers of the Auto-Optimas Concrete Block Paver (CBP)
More informationPavement Thickness Design Parameter Impacts
Pavement Thickness Design Parameter Impacts 2012 Municipal Streets Seminar November 14, 2012 Paul D. Wiegand, P.E. How do cities decide how thick to build their pavements? A data-based analysis Use same
More informationMACHINES APF VIBRATORY PLATES APF SERIES FORWARD MOVING VIBRATORY PLATES
MACHINES APF VIBRATORY PLATES APF SERIES FORWARD MOVING VIBRATORY PLATES Ammann has the ideal machine for every purpose thanks to a wide range of models. 2 THE RIGHT FIT ON YOUR JOBSITE AMMANN APF FORWARD
More informationA century of history
The Forklift from 1917 to 2017 CLARK Material Handling Company celebrates 100 years in the forklift industry A century of history Duisburg, März 2017. CLARK will celebrate the 100th anniversary of the
More informationBest Practices for Material Transfer Operations
1 Best Practices for Material Transfer Operations WINDROW PAVING OPERATIONS Principles and Techniques 2 Quality Production Material Management Machine Setup Paving Tips Machine Features Quality 3 Pavement
More informationLessons Learned Communication
Lessons Learned Communication Incident: Type of Incident: HIPO Trackhoe boom severed overhead power lines Business Unit: NA NGL BU Country: USA Location of Incident: Anadarko Asset, Ochiltree gathering
More informationThe Use of Milled Bituminous Material in Capping Layer A Case Study
The Use of Milled Bituminous Material in The Use of Milled Bituminous Material in Fung, Eduardo - COBA, S.A. Baptista, Teresa - ALBERTO COUTO ALVES, S.A. Quintão, António - COBA, S.A. 1 INTRODUCTION 2
More informationRisk-free compaction of Warm Mix Asphalt modified with Evotherm
XXXVII Seminarium Techniczna PSWNA Asfalty wielowymiarowe Paving of Asphalt mix modified with Evotherm in challenging climatical conditions Risk-free compaction of Warm Mix Asphalt modified with Evotherm
More informationSection 5 - Operations and Maintenance Program
Section 5 - Operations and Maintenance Program A. Introduction The intent of this section of the SSMP is to describe the current operation of the City s wastewater collection system. There are five areas
More informationSmart Controls for PAVING MACHINES
Smart Controls for PAVING MACHINES www.hydraforce.com The Pavement never ends INNOVATIVE DESIGN CUSTOMIZE TO APPLICATION EASILY SERVICEABLE THE ROAD GOES ON Roadbuilding is a never-ending enterprise. It
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007
07-08001 Sheet 1 of 2 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY TYPICAL TRAFFIC CONTROL, 2-LANE
More informationVDOT Land Development Toolbox Improving Services to Our Customers June 2, 2016
VDOT Land Development Toolbox Improving Services to Our Customers June 2, 2016 Michael Doczi, P.E. Area Land Use Engineer Fredericksburg District Harley E. Joseph, Jr., P.E. Transportation and Land Use
More informationPN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road
More informationMarch, 2011 THE CONTRACTOR S GUIDE TO SUCCESSFUL PAVING PRACTICES REMEDIES FOR ASPHALT SEGREGATION. pg. 4 PRODUCT GUIDE. pg. 6
March, 2011 THE CONTRACTOR S GUIDE TO SUCCESSFUL PAVING PRACTICES REMEDIES FOR ASPHALT SEGREGATION pg. 4 PRODUCT GUIDE pg. 6 Columbus Equipment Company PROUDLY INTRODUCES DYNAPAC A Partnership You Can
More informationMore care. Built in. VOLVO TRACKED PAVER ABG6820
More care. Built in. VOLVO TRACKED PAVER ABG6820 A Powerful paving machine for Demanding job-sites Every Volvo ABG paver is the result of 60 years experience in the road construction industry. With ample
More information