Size: px
Start display at page:

Download ""

Transcription

1

2

3

4

5

6 1) Introduction Chevron Richmond Refinery Revised Renewal Project Conditional Use Permit Application - Project Description The Chevron Richmond Refinery (Refinery) processes crude oil blends, externally sourced gas oils, and natural gas into a variety of fuel and oil products. In addition to producing motor gasoline, jet fuel, diesel fuel, and lubricating oils, the Refinery produces industrial fuel oil, liquefied petroleum gas, sulfur, and other products. The Refinery also produces steam, electricity, fuel gas, and hydrogen, primarily for its own use. In 2005, Chevron proposed the Hydrogen and Energy Renewal Project at the Refinery (Original Project). In 2008, the City of Richmond (City) certified an environmental impact report (Original EIR) and issued the necessary permits for the project. In 2010, the court ordered that the Original EIR be set aside. Chevron has reduced the overall project scope of the Original Project (now called the Revised Project). The Revised Project will complete construction and make operational only the Hydrogen Plant Replacement and Hydrogen Purity Improvement portions of the Original Project, as more fully described below. The Catalytic Reformer Replacement, Power Plant Replacement, and Other New and Replacement facilities (e.g. storage tanks) that were part of the Original Project are not part of the Revised Project. The City will prepare a Revised EIR to comply with the court decision regarding the Original EIR 1 and to address changes in the project proposed by Chevron which have reduced the overall project scope. The Revised EIR will be prepared by the City as the Lead Agency for the purpose of considering conditional use and design review permits for the Revised Project. In addition to the City permits, the project sponsor must obtain Authority to Construct from the Bay Area Air Quality Management District (BAAQMD) and comply with all applicable plans, rules and regulations of the BAAQMD in respect to air emissions from the Revised Project. 2) Project Location The Revised Project is located entirely within the boundaries of the existing 2,900 acre Refinery, at 841 Chevron Way in the City of Richmond, County of Contra Costa. As shown in Figure 1, the Project is located in the central and northern portions of the Refinery and within the existing Refinery footprint. The Hydrogen Plant Replacement will be installed in an area of the Central Yard referred to as the Y. The Y is currently occupied with the partially constructed Hydrogen Plant. Construction of the Hydrogen Purity Improvements will occur within or adjacent to the Sulfur Recovery Units (SRUs) and FCC 2 Feed Hydrotreater (FCCFHT). 1 The prior permit proceedings and court decisions are described in Appendix A. 2 FCC refers to the Fluid Catalytic Cracking Unit, a conversion unit which cracks gas oil molecules into smaller molecules suitable for further processing and blending into transportation fuels.

7 Southeast of the Refinery, across Castro Street and Garrard Boulevard, are the residential communities of Atchison Village, Santa Fe and Iron Triangle. Shields-Reid lies toward the northeast. Further east are central and downtown Richmond. Parchester Village is located northeast of the Refinery and Point Richmond is located to the southwest. Point San Pablo Peninsula and the San Francisco Bay form the western border of the Refinery and San Pablo Bay forms the northern boundary of the Refinery property. The main portion of the Refinery lies within the City s M-3 Heavy Industrial, Zoning District. The Refinery is bounded by the Chevron Richmond Marketing Fuels Terminal to the southeast, and Chevron Energy Technology Company to the south. The main Revised Project components will be located a minimum of 5,000 feet from any residential uses. 3) Project Objectives Chevron s primary objectives for the Revised Project are to: Allow the Refinery to process crude oil blends and externally-sourced gas oils containing higher levels of sulfur than those currently processed in order to continue producing competitive transportation fuels and lubricating oils. Replace existing hydrogen production facilities with modern facilities that are more energy efficient, produce purer hydrogen, and have sufficient capacity to meet Chevron s needs and enable the owner and operator of the new Hydrogen Plant to export hydrogen to third-party customers. 4) Revised Project Characteristics This discussion of the Revised Project characteristics is divided into three sections. The first section describes the specific equipment and equipment changes involved in the Revised Project. The second section provides a summary of the Refinery operational changes that could result from constructing and operating the Revised Project. The third section describes potential environmental effects that may be caused by the Revised Project or by the associated Refinery operational changes. a) Equipment Changes This section describes the equipment changes included in the Hydrogen Plant Replacement, Hydrogen Purity Improvements, and other infrastructure changes related to these components. Figure 2 is a Refinery flow diagram showing where these components fit in the Refinery s overall manufacturing process. Specific equipment changes are listed in Appendix B. Page 2 of 15

8 i) Hydrogen Plant Replacement The Refinery s existing Hydrogen Plant contains two hydrogen trains and hydrogen recovery vessels. It is 45 years old, and uses more energy to produce hydrogen that is less pure than that produced by modern plants. The existing maximum production capacity of each hydrogen train is 90 million standard cubic feet per day (SCFD) for a total of 180 million SCFD for both trains. Adding 50 million SCFD from hydrogen recovery vessels brings the total hydrogen production capacity to a total of 230 million SCFD. Currently, the product hydrogen is approximately 95 percent hydrogen, with 5 percent impurities consisting primarily of methane. The Revised Project proposes completion of construction of the new Hydrogen Plant and hydrogen recovery vessels. Following startup of the new plant the existing Hydrogen Plant and hydrogen recovery vessels will be removed from service. The new Hydrogen Plant consists of two trains, each capable of producing a maximum of 122 million SCFD hydrogen on an annual basis, plus 50 million SCFD of hydrogen from the hydrogen recovery unit, for a total of 294 million SCFD, a net increase of 64 million SCFD hydrogen capacity. The new equipment will be more energy efficient and will produce higher purity hydrogen. The new trains will use Pressure Swing Adsorption (PSA) technology allowing the Refinery to generate hydrogen from natural gas, ammonia, 3 and Refinery process gas. The resulting hydrogen product is expected to be greater than 99 percent hydrogen, a net increase of approximately four percent in hydrogen gas purity over current operations. Improving the purity of hydrogen reduces the density of the hydrogen streams which necessitates replacements or modifications of existing Refinery compressors to preserve their current operation and capacities. The replacements and modifications will reduce compressor energy consumption. The Revised Project will also include the installation of low-no X burners on five process heaters to maintain compliance with the Refinery-wide NO X emission limit in BAAQMD Regulation 9, Rule 10. ii) Hydrogen Purity Improvements (Sulfur Removal) Hydrogen Purity Improvements will enable the Refinery to process crude oil blends and gas oils with higher levels of sulfur. Although the Refinery cannot predict with certainty the sulfur content of future crude blends, it is reasonably foreseeable that post-project crude oil blends will contain up to as much as 3 percent sulfur. This compares to the current Refinery capacity of approximately 2 percent sulfur and a recent three-year 3 Ammonia fed to the new Hydrogen Plant is converted to hydrogen and nitrogen gas. Converting ammonia to hydrogen in the new Hydrogen Plant reduces natural gas consumption and CO2 production and reduces the quantities of ammonia stored on site and transported outside the refinery. Page 3 of 15

9 average of 1.5 percent sulfur. In addition, the Refinery will have the flexibility to process more externally-sourced medium-high sulfur gas oils, displacing low-sulfur gas oils 4. The Revised Project will increase the capacity of the Fluid Catalytic Cracker Feed Hydrotreater (FCCFHT) in keeping with a potentially higher sulfur feedstock slate, enable sulfur removal from the recycle hydrogen stream of the FCCFHT, add the #6 H 2 S Amine Regenerator, and increase the capacity of the Sulfur Recovery Units (SRUs). The following paragraphs describe the proposed equipment changes in greater detail. These descriptions focus on major equipment changes. There will also be modifications and additions of ancillary process equipment such as pumps, piping, heat exchangers vessels, tanks, instrumentation, off-plot interconnections and utilities. FCCFHT Capacity Increase. Presently, the Refinery feeds medium-high sulfur gas oils (both from the crude unit and externally-sourced gas oils) to the FCCFHT for sulfur removal (i.e. conversion into low sulfur gas oils). The FCCFHT low sulfur gas oil, along with externally-sourced low sulfur gas oils, are fed to the FCC. FCC capacity will remain unchanged. Increasing the capacity of the FCCFHT from 65 thousand barrels per day to 80 thousand barrels per day allows the Refinery the flexibility to use higher sulfur gas oil blends than are presently used. The existing major FCCFHT process equipment can accommodate the desired throughput. To eliminate hydraulic limitations related pumps, heat exchangers, vessels, and the recycle hydrogen compressor steam turbine driver will be modified or replaced. Several new heat exchangers and air coolers will be added to improve energy efficiency and allow the increased throughput, without raising furnace firing rates above existing permit limits. FCCFHT Recycle Hydrogen Sulfur Removal. The FCCFHT recycle hydrogen stream contains the Refinery s greatest concentration of recoverable sulfur and is the most efficient place to remove sulfur. 5 An amine contactor, ancillary pumps, piping vessels, and heat exchangers will be added to the FCCFHT recycle hydrogen stream. Diethanol amine (DEA) in the amine contactor absorbs hydrogen sulfide (H 2 S) from the recycle hydrogen stream and is then routed to the #6 H 2 S Amine Regenerator 6 described below. #6 H 2 S Amine Regenerator. The absorbed H 2 S will be stripped from the DEA in a new #6 H 2 S Amine Regenerator which will be built adjacent to the SRUs. It consists of a regenerator column, amine storage and handling facilities, and typical ancillary equipment. The H 2 S will then be routed to the Sulfur Recovery Units (SRUs) for conversion to elemental sulfur. 4 Medium-high sulfur gas oils contain 0.5 wt % sulfur or more. 5 The project component name, Hydrogen Purity Improvements, refers to the removal of sulfur from this hydrogen stream. 6 Amine regeneration could also take place in one or more of the Refinery s three existing amine regenerators. Page 4 of 15

10 SRU Capacity Increase. The Sulfur Recovery Units (SRUs) convert H 2 S to elemental sulfur, a product that is sold to various agriculture and industrial users. The Refinery s existing SRUs consist of three trains with a combined sulfur recovery capacity of 600 long tons 7 per day. Adding oxygen enrichment facilities enables the SRUs to increase the combined sulfur recovery capacity to 900 long tons per day without increasing the volume of gas that flows through the units. Since the gas flow does not increase, the main SRU equipment does not need to be enlarged. Oxygen storage and handling facilities will be added at the front end of the SRUs; the main reaction furnace burners will be converted to accommodate oxygen enrichment; and the boiler feed water system will be upgraded to enable additional heat recovery and steam generation. These modifications also allow the SRUs to process the Refinery s surplus ammonia. The tail gas units at the back ends of the SRUs will be modified to reduce sulfur dioxide (SO2), nitrogen oxide (NO X ), carbon monoxide (CO), particulate, and sulfuric acid mist emissions. Additional new ancillary equipment will include a new acid gas scrubber, which prevents the release of H 2 S during an unplanned loss of SRU operation; storage and loading facilities for process chemicals such as caustic, and sodium bisulfite; and a new sulfur loading rack equipped with enhanced vapor controls. iii) Other Infrastructure To tie the Hydrogen Plant Replacement and Hydrogen Purity Improvements into the existing Refinery process plants, new pipe racks, piping, and utility infrastructure (including electricity, steam, fuel gas, process gas, water, instrumentation, process and storm sewer connections) will be installed. Appendix B lists specific equipment to be installed or modified as part of the Revised Project. b) Operational Changes The Revised Project does not change the basic function and operation of the Refinery. However, there will be secondary operational changes as described in this section. i) Sulfur After the Revised Project equipment is installed, the additional sulfur from crude and gas oil feedstocks will be captured by hydrotreating and amine treating, and converted to sulfur in the higher-capacity SRUs. 7 One long ton (the standard unit for measuring sulfur exports) equals 2,240 pounds or 1.12 standard tons. Page 5 of 15

11 ii) Crude Unit and SDA The Crude Unit and Solvent Deasphalting Unit (SDA) are the first steps in converting crude oil blends to marketable transportation fuels and other products (see Figure 2). These units separate crude oil blends, a mixture of many hydrocarbon fractions, into various streams without altering the molecules that make up the fractions. The Crude Unit makes the separation by vaporizing and condensing the mixture in such a way that draws lighter fractions from the top of a distillation column, medium-weight fractions from the middle, and the heavier fractions from the bottom. The SDA further separates the heaviest fraction, vacuum residuum (vacuum resid) into gas oil and SDA residuum (SDA resid) by extracting the gas oil component with a solvent which is recycled. These units are not being modified as part of the Revised Project. While the Revised Project proposes equipment modifications that will enable the Refinery to process crude oil blends and externally-sourced gas oils with higher sulfur content, the Project does not involve any equipment changes to the Refinery s existing capacity with regard to crude oil heaviness. The Refinery has the capacity to process crude oil blends with heaviness at the lighter end of the intermediate range 8 (lightintermediate gravity), and will remain configured in the same manner to process such crude oil blends after the Revised Project is completed and becomes operational. The Refinery s capacity for processing the heaviest fraction of crude oil, vacuum resid, is limited by Crude Unit and SDA capacity. Processing crude oil blends heavier than the light-intermediate range would require an increase in SDA capacity, among other changes, or the addition of a new process unit such as a coker to convert vacuum resid to lighter materials. Crude Unit and SDA capacities will not change as part of the Project. The operation of the SDA is constrained by its throughput capacity limit which corresponds to an annual average gravity of approximately 28 API for crude oil blends fed to the crude unit. In the past three years, the Refinery has not used all of its existing capacity for vacuum resid, and has run the SDA in the range of thousand barrels per day. During this period the annual average gravity for crude oil blends fed to the crude unit was 34 API. Post-Project it is reasonably foreseeable that, in running crude oil blends with increased sulfur content, the Refinery will run some crude oil blends that have more vacuum resid than the recent operating conditions, but within the existing capacity of units that limit the heaviness of crude oil blends that can be processed and within existing BAAQMD air permit limits. Among other things, the Revised EIR will analyze the potential 8 Heaviness of crude oil is generally measured in degrees of API gravity. Light crude is above 36 API, intermediate crude is from 18 to 36 API, and heavy crude is below 18 API. [California Energy Commission (CEC), 2006, Fossil Fuels Office, Fuels and Transportation Division, Sheridan, Margaret: California Crude Oil Production and Imports, at page 1, CEC , April 2006] Page 6 of 15

12 environmental effects of processing the full range of light-intermediate crude blends, consistent with existing Refinery capacity, as compared to the current operating baseline. iii) Conversion and Treating Units Conversion and treating are processes that change the molecules in various hydrocarbon fractions. Conversion units (shown in Figure 2 as FCC, TKN Hydrocracker, and Lube Crackers and Finishers) break gas oil molecules into smaller ones, more suitable for further treating and blending into lighter transportation fuels. Treating Units (shown in Figure 2 as FCCFHT, NHT, JHT, DHT, Penhex Isom, and Reformers), use catalyst to remove impurities from molecules, or alter the structures of molecules, without changing their size. Removing impurities prevents catalyst contamination in downstream units and helps produce cleaner burning transportation fuels. The only physical change the Revised Project will make to conversion and treating units is the increase in throughput capacity of the FCCFHT. In addition, the Revised EIR will examine the range of reasonably foreseeable operating scenarios for all the conversion and treating units. iv) Fuel Gas System Nearly all Refinery process units generate process gases that are collected, treated to remove H2S, and blended with natural gas and other refinery gases in the fuel gas system to become fuel for Refinery furnaces. Small amounts of sulfur remaining in the process gases are emitted from furnace stacks. When the new Hydrogen Plant begins operation, up to two-thirds of the Refinery s process gas will feed the new Hydrogen Plant 9 where all sulfur will be removed. Refinery process gas previously routed to the fuel gas system will be replaced by commercial natural gas which has much less sulfur. Currently, to maintain hydrogen system purity, some Refinery hydrogen is routed to the fuel gas system and burned, rather than being recycled through the hydrogen recovery units. With the Revised Project, hydrogen systems will maintain the necessary purity without having to route hydrogen to the fuel gas system. The hydrogen otherwise lost to the fuel gas system will be recovered, thereby reducing the quantity of hydrogen that needs to be produced 10. v) Energy Efficiency and Greenhouse Gas Emissions The replacement Hydrogen Plant will be approximately 15% more energy efficient than the existing Hydrogen Plant on an emission basis per unit volume of hydrogen product. However, because the replacement Hydrogen Plant has additional capacity, at maximum 9 The existing Hydrogen Plant uses purchased natural gas as its feedstock. 10 Removing hydrogen from the fuel gas system increases the amount of natural gas needed to maintain the Refinery s fuel requirements. But this increased natural gas demand is offset by the reduction in the demand for natural gas for Hydrogen Plant feed. Page 7 of 15

13 production it will generate more Greenhouse Gas (GHG) emissions than the existing Hydrogen Plant. The Hydrogen Purity Improvements will require additional energy in the form of increased electricity, steam, and fuel gas consumption to support the additional sulfur removal capability. The Revised EIR baseline and post-project GHG emissions will be calculated according to California Air Resources Board AB-32 protocols. vi) Flaring Potential changes in Refinery emergencies and flaring as a result of the Revised Project will be considered. c) Potential Environmental Effects The previous sections describe potential increases and reductions in Refinery combustion, process emissions and discharges. These include changes in criteria air pollutants, toxic air contaminants, greenhouse gases, and potentially other Refinery discharges resulting from equipment and operational changes. All potential impacts that may be associated with the Revised Project components and changes in Refinery operations resulting from the new components will be evaluated in the Revised EIR. Details of the pre- and post-project emissions and discharges will be confirmed by the BAAQMD and other state agencies, and will be described in detail in the Revised EIR. 5) Court Decision and Writ of Mandate The Revised EIR is intended to comply with the court decisions in the context of the Revised Project, as described below. Project Description. The court decision held that the project description in the Original EIR was unclear and inconsistent as to whether or not the project will enable Chevron to process a heavier crude slate than it is currently processing. The Revised EIR will clarify that the Revised Project does not include changes that would enable processing crude oil blends with heaviness outside the range of the Refinery s current capacity, and that the Refinery will continue to operate in the light-intermediate crude gravity range. Baseline and crude slate changes. The court decision held that the Original EIR did not state a baseline for measuring the potential for increased impacts from changes in the crude oil slate at the Refinery following the project. The Revised EIR will describe the crude slate used by Chevron for the last three years and other historical data to define the operational baseline. This operational baseline will be used to analyze whether there Page 8 of 15

14 would be any potential environmental impacts from the Revised Project or from changes to Refinery operations, taking into account both potential project-level and cumulative impacts, for all relevant resources identified in Appendix G to the California Environmental Quality Act (CEQA) Guidelines, including air toxics health risks, water discharges, and GHG emissions. Greenhouse Gas Emissions. The Court decision held that the City improperly deferred the formulation of GHG mitigation measures to a future, post-eir process. The Revised EIR baseline and post-project GHG emissions will be calculated according to California Air Resources Board AB-32 protocols, and will identify specific measures to achieve a netzero emissions standard for GHG emissions over the pre-project baseline. Cumulative Impacts. The Court decision indicated that the EIR s cumulative impacts analysis may be affected by the additional CEQA analysis described above. The Revised EIR will consider whether there will be potentially significant cumulative impacts from operation of the Revised Project or the Refinery as modified by the Project. 6) Discretionary Actions/Permits The Revised Project will require the following permits and approvals before construction of the new Hydrogen Plant and Hydrogen Purity Improvements can recommence: Conditional Use and Design Review Permits from the City of Richmond Building permits from the City of Richmond Authority to Construct from the BAAQMD Page 9 of 15

15 APPENDIX A - LEGAL BACKGROUND On April 6, 2005, Chevron applied to the City of Richmond (City) for permits necessary to construct and operate the Energy and Hydrogen Renewal Project (Original Project) within existing manufacturing facilities at the Richmond Refinery. The Original Project involved the replacement of existing equipment at four main process plants with newer technology and included the following components: Hydrogen Plant Replacement Hydrogen Purity Improvements Power Plant Replacement Catalytic Reformer Replacement Associated infrastructure modifications Other New and Replacement Facilities (e.g., storage tanks) On July 17, 2008, the City certified an environmental impact report (Original EIR or EIR) and approved the permits for the Original Project. Following the City s issuance of the Notice of Determination (NOD) on August 5, 2008, and the issuance of an authority to construct by the Bay Area Air Quality Management District (BAAQMD) on September 19, 2008, Chevron proceeded with construction of the Hydrogen Plant Replacement and Hydrogen Purity Improvements. Construction of these components was more than 50% complete when, in July 2009, the project was halted under a writ of mandate and injunction issued by the Superior Court of Contra Costa County ( Superior Court ) pursuant to the petition filed by Communities for a Better Environment, West County Toxics Coalition and Asian Pacific Environmental Network. Chevron appealed the Superior Court s ruling and in April 2010, the Court of Appeal issued a decision instructing the Superior Court to enter a new and different judgment granting the petition for writ of mandate with regard to the EIR s failure to provide an adequate project description and its failure to define mitigation measures for greenhouse gas emissions, while denying mandate relief with regard to the claim of improper segmentation of a larger project. (Communities for a Better Environment v.city of Richmond (2010) 184 Cal.App.4th 70.) In its decision, the Court of Appeal held that (i) the project description in the Original EIR was unclear and inconsistent as to whether or not the project would enable Chevron to process a heavier crude slate than it currently processes; (ii) the EIR did not establish a baseline for purposes of determining whether there would be any increased impacts from any changes in the crude slate processed at the Refinery; and (iii) the EIR improperly deferred the formulation of greenhouse gas mitigation measures to a future, post-eir process. The Court of Appeal did not address the EIR s cumulative impacts analysis challenged by Petitioners on the basis that the analysis would likely be affected by a revised project description and greenhouse gas analysis. As directed by the Court of Appeal, the Superior Court entered a final judgment and issued a writ of mandate (Writ of Mandate) on March 16, 2011directing the City to set aside (1) Resolution No , under which the City Council upheld the Planning Page 10 of 15

16 Commission's certification of the Original EIR and adopted findings and a mitigation monitoring and reporting program for the Original Project; (2) Resolution No , under which the City Council upheld the Planning Commission s approval of the conditional use and design review permits for the Original Project, and (3) any additional permits, authorizations, and any and all other approvals for the Original Project. The Writ of Mandate also ordered that the City take no action in reliance on the EIR and permits until the City reconsiders its approval of the EIR, brings the EIR into compliance with the requirements of CEQA, and makes the EIR consistent with the Court of Appeal s decision. Additionally, the Writ of Mandate enjoins Chevron from engaging in any project activity until the City complies with the Writ and issues new permits for the project. Page 11 of 15

17 Appendix B - Specific Equipment To Be Installed or Modified As Part of the Revised Project: Component Hydrogen Plant Replacement (construction 50% complete) Proposed Scope 1. Construct new hydrogen plant, including hydrogen separation PSA units (2 trains) Shut down existing hydrogen plant (2 trains) 3. Install hydrogen recovery PSA unit (1) 4. Shut down PSA section of the existing hydrogen recovery unit (1) 5. Construct new cooling water tower (1) 6. Construct new flare (1) 7. Construct a new Hydrogen Plant Control Room (1) 8. Upgrade Richmond Lube Oil Plant (RLOP) Area Compressors (4) 9. Upgrade Distillation and Reforming Area Compressors (3) 10. Install Steam Turbine Generator (1) 11. Install low-nitrogen oxides (NO x ) burners on existing TKN Hydrocracker 12 furnaces (3) 12. Install low-nox burners on existing Poly (Polymer) Plant furnaces (2) 13. Upgrade Isomax Area Compressors (8) 14. Relocate electrical infrastructure and Refinery power cables (5) 15. Install communication cables (6) 11 The Revised Project includes one new stand-alone hydrogen recovery unit, a Pressure Swing Adsorption ("PSA") unit that recovers hydrogen from the feed to the new hydrogen plant before that feed is sent to the hydrogen plant. This is BAAQMD source S Each of the new hydrogen plants (S-4449 and S-4450) also includes a PSA unit after the reformer furnace to separate produced hydrogen from byproducts. These PSA units are considered part of each respective hydrogen plant, and are not considered separate units (i.e., they do not have a separate BAAQMD source number). 12 TKN is the trade name of a Hydrocracker at the Refinery. Page 12 of 15

18 Component Hydrogen Purity Improvements (construction 57% complete) Associated Infrastructure Improvements (construction 60% complete) Proposed Scope 1. Construct new Recycle Hydrogen Amine Contactor (1) for Fluid Catalytic Cracker Feed Hydrotreater 2. Refurbish and rename Fresh Amine Storage Tank T-2421 from T (1) (switched to Amine service from caustic) 3. Construct new Rich Amine Storage Tank T-2420 (1) 4. Construct new Amine Regenerator (1) 5. Upgrade Isomax Area Compressor (1) 6. Construct new Oxygen Storage Tanks (2) 7. Upgrade sour water processing 8. Construct new Acid Gas Scrubber (1) 9. Construct new Fresh Caustic Tank T-2440 (1) 10. Construct new Spent Caustic Tank T-2445 (1) 11. Modify existing Fluid Catalytic Cracker Feed Hydrotreater (1) 12. Modify existing Sulfur Recovery Units (3) 13. Install new sulfur loading rack (1) including option to replace or upgrade existing vent scrubber (1) 14. Install truck and railcar loading and unloading stations for amines, sodium bisulfite, fresh and spent caustic (5) 15. Install automated caustic dilution and delivery system (1) 1. Construct P, Q, U, V, and W Pipe Racks from various plants to hydrogen plant for refinery process gas, hydrogen gas and utilities (steam, instrument air, firewater, freshwater). 2. Install approximately 7 miles of new process and utility piping 3. Install or modify Refinery Electrical Infrastructure 4. Install or Modify Instrument and Communication Cables with Pipe- Way Structural Supports Page 13 of 15

19 Figure 1. Richmond Refinery Site Plan (Colors match Figure 2) FCC Feed Hydrotreater Sulfur Recovery Units Hydrogen Plant Detail Page 14 of 15

20 Crude Figure 2. Richmond Refinery Block Flow Diagram Crude Unit NHT * Process Gas with H 2 S H 2 S Plants* LPG H H 2 2 Naphtha Jet Diesel H 2 Lt Gas Oil Hvy Gas Oil JHT H 2 * * Reformers H 2 Hydrocracker (TKN) H 2 S H 2 Penhex Isom Fuel Gas (for furnaces) Reformate Splitter DHT Sulfur Recovery Unit * Export Sulfur Isomerate Gasoline Reformate Gasoline Jet Diesel Iso Overhead H Gasoline * 2 Lube Crackers and Finishers * Lubricants Resid Low Sulfur Gas Oil High Sulfur Gas Oil H 2 FCCFHT * FCC Poly LPG Butamer Alky Tetramer Av Gas Alkylate Gasoline FCC Light Gasoline FCC Hvy Gasoline HSFO Replaced Equipment SDA Altered Equipment Process gas with H 2 S * Nat l Gas LPG Hydrogen H 2 Hydrogen Plant H 2 Fuel Fuel Power Plant Cogens Steam Electricity Steam * A new FCCFHT amine contactor and a new #6 H 2 S amine regenerator will be added to the Refinery s existing H2S Plants Page 15 of 15

Challenges and Opportunities in Managing CO 2 in Petroleum Refining

Challenges and Opportunities in Managing CO 2 in Petroleum Refining Challenges and Opportunities in Managing CO 2 in Petroleum Refining Theresa J. Hochhalter ExxonMobil Research & Engineering Fairfax, VA GCEP Workshop on Carbon Management in Manufacturing Industries STANFORD

More information

Conversion Processes 1. THERMAL PROCESSES 2. CATALYTIC PROCESSES

Conversion Processes 1. THERMAL PROCESSES 2. CATALYTIC PROCESSES Conversion Processes 1. THERMAL PROCESSES 2. CATALYTIC PROCESSES 1 Physical and chemical processes Physical Thermal Chemical Catalytic Distillation Solvent extraction Propane deasphalting Solvent dewaxing

More information

Preface... xii. 1. Refinery Distillation... 1

Preface... xii. 1. Refinery Distillation... 1 Preface... xii Chapter Breakdown... xiii 1. Refinery Distillation... 1 Process Variables... 2 Process Design of a Crude Distillation Tower... 5 Characterization of Unit Fractionation... 11 General Properties

More information

Crude Distillation Chapter 4

Crude Distillation Chapter 4 Crude Distillation Chapter 4 Gases Gas Sat Gas Plant Polymerization LPG Sulfur Plant Sulfur Alkyl Feed Alkylation Butanes Fuel Gas LPG Gas Separation & Stabilizer Light Naphtha Heavy Naphtha Isomerization

More information

HOW OIL REFINERIES WORK

HOW OIL REFINERIES WORK HOW OIL REFINERIES WORK In order to model oil refineries for model railroads some research was conducted into how they operate and what products a refinery produces. Presented below is a basic survey on

More information

HOW OIL REFINERIES WORK

HOW OIL REFINERIES WORK HOW OIL REFINERIES WORK In order to model oil refineries for model railroads some research was conducted into how they operate and what products a refinery produces. Presented below is a basic survey on

More information

On-Line Process Analyzers: Potential Uses and Applications

On-Line Process Analyzers: Potential Uses and Applications On-Line Process Analyzers: Potential Uses and Applications INTRODUCTION The purpose of this report is to provide ideas for application of Precision Scientific process analyzers in petroleum refineries.

More information

HOW OIL REFINERIES WORK

HOW OIL REFINERIES WORK HOW OIL REFINERIES WORK In order to model oil refineries for model railroads some research was conducted into how they operate and what products a refinery produces. Presented below is a basic survey on

More information

Distillation process of Crude oil

Distillation process of Crude oil Distillation process of Crude oil Abdullah Al Ashraf; Abdullah Al Aftab 2012 Crude oil is a fossil fuel, it was made naturally from decaying plants and animals living in ancient seas millions of years

More information

Catalytic Reforming for Aromatics Production. Topsoe Catalysis Forum Munkerupgaard, Denmark August 27 28, 2015 Greg Marshall GAM Engineering LLC 1

Catalytic Reforming for Aromatics Production. Topsoe Catalysis Forum Munkerupgaard, Denmark August 27 28, 2015 Greg Marshall GAM Engineering LLC 1 Catalytic Reforming for Aromatics Production Topsoe Catalysis Forum Munkerupgaard, Denmark August 27 28, 2015 Greg Marshall GAM Engineering LLC GAM Engineering LLC 1 REFINERY CONFIURATION LPG NAPHTHA HYDROTREATING

More information

Petroleum Refining Fourth Year Dr.Aysar T. Jarullah

Petroleum Refining Fourth Year Dr.Aysar T. Jarullah Catalytic Operations Fluidized Catalytic Cracking The fluidized catalytic cracking (FCC) unit is the heart of the refinery and is where heavy low-value petroleum stream such as vacuum gas oil (VGO) is

More information

Solvent Deasphalting Conversion Enabler

Solvent Deasphalting Conversion Enabler Kevin Whitehead Solvent Deasphalting Conversion Enabler 5 th December 2017 Bottom of the Barrel Workshop NIORDC, Tehran 2017 UOP Limited Solvent Deasphalting (SDA) 1 Natural Gas Refinery Fuel Gas Hydrogen

More information

SOLVENT DEASPHALTING OPTIONS How SDA can increase residue upgrading margins

SOLVENT DEASPHALTING OPTIONS How SDA can increase residue upgrading margins SOLVENT DEASPHALTING OPTIONS How SDA can increase residue upgrading margins ME Tech Dubai, February 18 & 19, 2014 Steve Beeston - Vice President, Technology Business Environment Requirements Improve refinery

More information

Co-Processing of Green Crude in Existing Petroleum Refineries. Algae Biomass Summit 1 October

Co-Processing of Green Crude in Existing Petroleum Refineries. Algae Biomass Summit 1 October Co-Processing of Green Crude in Existing Petroleum Refineries Algae Biomass Summit 1 October - 2014 1 Overview of Sapphire s process for making algae-derived fuel 1 Strain development 2 Cultivation module

More information

Refinery Maze Student Guide

Refinery Maze Student Guide Refinery Maze Student Guide Petroleum Refining Student Text Distillation In its crude form, petroleum is of little use to us. To make it into products we know and use, petroleum must be refined or separated

More information

Refining/Petrochemical Integration-A New Paradigm

Refining/Petrochemical Integration-A New Paradigm Refining/Petrochemical Integration-A New Paradigm Introduction The global trend in motor fuel consumption favors diesel over gasoline. There is a simultaneous increase in demand for various petrochemicals

More information

Fig:1.1[15] Fig.1.2 Distribution of world energy resources. (From World Energy Outlook 2005, International Energy Agency.)[16,17]

Fig:1.1[15] Fig.1.2 Distribution of world energy resources. (From World Energy Outlook 2005, International Energy Agency.)[16,17] Introduction :Composition of petroleum,laboratory tests,refinery feedstocks and products Fig:1.1[15] Fig.1.2 Distribution of world energy resources. (From World Energy Outlook 2005, International Energy

More information

Refining/Petrochemical Integration-A New Paradigm Joseph C. Gentry, Director - Global Licensing Engineered to Innovate

Refining/Petrochemical Integration-A New Paradigm Joseph C. Gentry, Director - Global Licensing Engineered to Innovate Refining/Petrochemical Integration-A New Paradigm Introduction The global trend in motor fuel consumption favors diesel over gasoline. There is a simultaneous increase in demand for various petrochemicals

More information

Bottom of Barrel Processing. Chapters 5 & 8

Bottom of Barrel Processing. Chapters 5 & 8 Bottom of Barrel Processing Chapters 5 & 8 Gases Gas Sat Gas Plant Polymerization LPG Sulfur Plant Sulfur Alkyl Feed Alkylation Butanes Fuel Gas LPG Gas Separation & Stabilizer Light Naphtha Heavy Naphtha

More information

Petroleum Refining Fourth Year Dr.Aysar T. Jarullah

Petroleum Refining Fourth Year Dr.Aysar T. Jarullah Catalytic Reforming Catalytic reforming is the process of transforming C 7 C 10 hydrocarbons with low octane numbers to aromatics and iso-paraffins which have high octane numbers. It is a highly endothermic

More information

THE OIL & GAS SUPPLY CHAIN: FROM THE GROUND TO THE PUMP ON REFINING

THE OIL & GAS SUPPLY CHAIN: FROM THE GROUND TO THE PUMP ON REFINING THE OIL & GAS SUPPLY CHAIN: FROM THE GROUND TO THE PUMP ON REFINING J. Mike Brown, Ph.D. Senior Vice President Technology BASICS OF REFINERY OPERATIONS Supply and Demand Where Does The Crude Oil Come From?

More information

Results Certified by Core Labs for Conoco Canada Ltd. Executive summary. Introduction

Results Certified by Core Labs for Conoco Canada Ltd. Executive summary. Introduction THE REPORT BELOW WAS GENERATED WITH FEEDSTOCK AND PRODUCT SAMPLES TAKEN BY CONOCO CANADA LTD, WHO USED CORE LABORATORIES, ONE OF THE LARGEST SERVICE PROVIDERS OF CORE AND FLUID ANALYSIS IN THE PETROLEUM

More information

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68. RULE 69.4. STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted 9/27/94; Rev. Effective11/15/00; Rev. Effective 7/30/03) (a) APPLICABILITY (1) Except

More information

GTC TECHNOLOGY WHITE PAPER

GTC TECHNOLOGY WHITE PAPER GTC TECHNOLOGY WHITE PAPER Refining/Petrochemical Integration FCC Gasoline to Petrochemicals Refining/Petrochemical Integration - FCC Gasoline to Petrochemicals Introduction The global trend in motor fuel

More information

LOADING OF ORGANIC LIQUID CARGO VESSELS. (Adopted 10/13/1992, revised 1/18/2001)

LOADING OF ORGANIC LIQUID CARGO VESSELS. (Adopted 10/13/1992, revised 1/18/2001) RULE 346. LOADING OF ORGANIC LIQUID CARGO VESSELS. (Adopted 10/13/1992, revised 1/18/2001) A. Applicability The provisions of this rule shall apply to the transfer of organic liquids into an organic liquid

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT March 2014 PROPOSED NATREF CLEAN N FUELS II IN SASOLBURG, FREE STATE (NEAS Ref No: DEA/EIA/0001446/2012; DEA Ref. No: 14/12/16/3/3/2/413) 1. PURPOSE OF THIS DOCUMENT C O

More information

The purpose of this rule is to limit VOC emissions from the transfer of organic liquids.

The purpose of this rule is to limit VOC emissions from the transfer of organic liquids. RULE 4624 TRANSFER OF ORGANIC LIQUID (Adopted April 11, 1991; Amended September 19, 1991; Amended May 21, 1992; Amended December 17, 1992; Amended December 20, 2007) 1.0 Purpose The purpose of this rule

More information

Changes to America s Gasoline Pool. Charles Kemp. May 17, Baker & O Brien, Inc. All rights reserved.

Changes to America s Gasoline Pool. Charles Kemp. May 17, Baker & O Brien, Inc. All rights reserved. Changes to America s Gasoline Pool Charles Kemp May 17, 2016 Baker & O Brien, Inc. All rights reserved. Discussion Points Light Naphtha Definitions Sources and Uses of Light Naphtha Octane Challenges Tier

More information

The Role of the Merox Process in the Era of Ultra Low Sulfur Transportation Fuels. 5 th EMEA Catalyst Technology Conference 3 & 4 March 2004

The Role of the Merox Process in the Era of Ultra Low Sulfur Transportation Fuels. 5 th EMEA Catalyst Technology Conference 3 & 4 March 2004 The Role of the Merox Process in the Era of Ultra Low Sulfur Transportation Fuels 5 th EMEA Catalyst Technology Conference 3 & 4 March 2004 Dennis Sullivan UOP LLC The specifications for transportation

More information

CONTENTS 1 INTRODUCTION SUMMARY 2-1 TECHNICAL ASPECTS 2-1 ECONOMIC ASPECTS 2-2

CONTENTS 1 INTRODUCTION SUMMARY 2-1 TECHNICAL ASPECTS 2-1 ECONOMIC ASPECTS 2-2 CONTENTS GLOSSARY xxiii 1 INTRODUCTION 1-1 2 SUMMARY 2-1 TECHNICAL ASPECTS 2-1 ECONOMIC ASPECTS 2-2 3 INDUSTRY STATUS 3-1 TRENDS IN TRANSPORTATION FUEL DEMAND 3-3 TRENDS IN ENVIRONMENTAL REGULATION 3-3

More information

Maximizing Refinery Margins by Petrochemical Integration

Maximizing Refinery Margins by Petrochemical Integration Topic Maximizing Refinery Margins by Petrochemical Integration Presented by : Rajeev Singh Global Demand for Refined Products 29% 29% 29% 29% 30% 30% 33% 10% 10% 10% 9% 8% 8% 7% 7% 7% 7% 7% 7% 7% 22% 22%

More information

USES FOR RECYCLED OIL

USES FOR RECYCLED OIL USES FOR RECYCLED OIL What happens to your recycled used oil? Used oil, or 'sump oil' as it is sometimes called, should not be thrown away. Although it gets dirty, used oil can be cleaned of contaminants

More information

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS Revision 2 Page 1 of 7 January 2018 ExxonMobil Production Company, a division of Exxon Mobil Corporation (ExxonMobil

More information

SOUTH DAKOTA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES PREVENTION OF SIGNIFICANT DETERIORATION AIR QUALITY PRECONSTRUCTION PERMIT

SOUTH DAKOTA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES PREVENTION OF SIGNIFICANT DETERIORATION AIR QUALITY PRECONSTRUCTION PERMIT Permit #: Effective Date: 28.0701 -PSD Draft SOUTH DAKOTA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES PREVENTION OF SIGNIFICANT DETERIORATION AIR QUALITY PRECONSTRUCTION PERMIT Steven M Pirner, Secretary

More information

The following events were obtained from the Department of Energy (DOE) website:

The following events were obtained from the Department of Energy (DOE) website: Refinery Events October 2, 2013 October 10, 2013 The following events were obtained from the Department of Energy (DOE) website: Lima Energy to Supply 22,000 b/d of Synthetic Crude Oil to Husky s Lima

More information

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) RULE 69.3 STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) (a) APPLICABILITY This rule shall apply to any stationary

More information

Handbook of Petroleum Processing

Handbook of Petroleum Processing Handbook of Petroleum Processing Handbook of Petroleum Processing Edited by DAVID S. J. STAN JONES retired chemical engineer (Fluor) Calgary, Canada and PETER R. PUJADÓ UOP LLC (retired)-illinois, U.S.A.

More information

CHAPTER 2 REFINERY FEED STREAMS: STREAMS FROM THE ATMOSPHERIC AND VACUUM TOWERS

CHAPTER 2 REFINERY FEED STREAMS: STREAMS FROM THE ATMOSPHERIC AND VACUUM TOWERS CHAPTER 2 REFINERY FEED STREAMS: STREAMS FROM THE ATMOSPHERIC AND VACUUM TOWERS About This Chapter The previous chapter introduced crude oil as a mixture of compounds. The characteristics of these compounds

More information

Renewable Diesel: The Sustainable High-Performance Fuel

Renewable Diesel: The Sustainable High-Performance Fuel Renewable Diesel: The Sustainable High-Performance Fuel CONTENTS I. THE FUEL MADE FROM 100% RENEWABLE & SUSTAINABLE RAW MATERIALS II. IMPROVE OPERATIONS WHILE ALSO REDUCING YOUR ENVIRONMENTAL IMPACT III.

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

MEG/WRI s Partial Bitumen Upgrader Project Adding Value to MEG and Alberta

MEG/WRI s Partial Bitumen Upgrader Project Adding Value to MEG and Alberta MEG/WRI s Partial Bitumen Upgrader Project Adding Value to MEG and Alberta February 2015 Presentation Format Who we are - MEG and WRI Introduction to Alberta oil sands Resource recovery, transportation

More information

Converting Visbreakers to Delayed Cokers - An Opportunity for European Refiners

Converting Visbreakers to Delayed Cokers - An Opportunity for European Refiners Converting Visbreakers to Delayed Cokers - An Opportunity for European Refiners European Coking.com Conference Sept. 30 - Oct. 2, 2008 Alex Broerse Lummus Technology a CB&I company Overview Introduction

More information

CHEVRON REFINERY MODERNIZATION PROJECT FINAL EIR

CHEVRON REFINERY MODERNIZATION PROJECT FINAL EIR CHEVRON REFINERY MODERNIZATION PROJECT FINAL EIR VOLUME 3A: RESPONSES TO COMMENTS AND DRAFT EIR TEXT REVISIONS CHAPTER 1. INTRODUCTION AND SUMMARY OF CHANGES... 1-1 1.1 PURPOSE OF THE FINAL EIR... 1-1

More information

Implications Across the Supply Chain. Prepared for Sustainableshipping Conference San Francisco 30 September 2009

Implications Across the Supply Chain. Prepared for Sustainableshipping Conference San Francisco 30 September 2009 Implications Across the Supply Chain Prepared for Sustainableshipping Conference San Francisco 30 September 2009 Agenda Residual Markets & Quality Refinery Bunker Production Supply & Pricing 2 World marine

More information

100,000 bpd Refurbished Oil Refinery FOR SALE AND RELOCATION

100,000 bpd Refurbished Oil Refinery FOR SALE AND RELOCATION Ref.-No.: ProOil-276 100,000 bpd Refurbished Oil Refinery FOR SALE AND RELOCATION Presented by: LOHRMANN RBD (Refinery Business Division) 1. Process Units Capacity Description barrels per day Licensor

More information

Docket No EI Date: May 22, 2014

Docket No EI Date: May 22, 2014 Docket No. 140032-EI Big Bend Units 1 through 4 are pulverized coal steam units that currently use distillate oil 2 for start-ups and for flame stabilization. The Company seeks to use natural gas in place

More information

Innovative & Cost-Effective Technology for Producing Low Sulfur Diesel

Innovative & Cost-Effective Technology for Producing Low Sulfur Diesel Innovative & Cost-Effective Technology for Producing Low Sulfur Diesel Matthew Clingerman, DuPont Clean Technologies EGYPT DOWNSTREAM SUMMIT & EXHIBITION February 2016 Copyright 2016 DuPont. The DuPont

More information

Optimizing Distillate Yields and Product Qualities. Srini Srivatsan, Director - Coking Technology

Optimizing Distillate Yields and Product Qualities. Srini Srivatsan, Director - Coking Technology Optimizing Distillate Yields and Product Qualities Srini Srivatsan, Director - Coking Technology Email: srini.srivatsan@amecfw.com Optimizing Distillate Yields and Product Properties Overview Delayed coker

More information

NPRA 2010 Q&A and Technology Forum

NPRA 2010 Q&A and Technology Forum HYDROPROCESSING Safety 1 What is your experience with emergency isolation equipment (such as a check valve or actuated valve) on the outlet of reactor charge heaters to prevent loss of containment of the

More information

Challenges and Solutions for Shale Oil Upgrading

Challenges and Solutions for Shale Oil Upgrading Challenges and Solutions for Shale Oil Upgrading Don Ackelson UOP LLC, A Honeywell Company 32 nd Oil Shale Symposium Colorado School of Mines October 15-17, 2012 2012 UOP LLC. All rights reserved. UOP

More information

FSR on Expansion and Modernization of the MOIN Refinery Project

FSR on Expansion and Modernization of the MOIN Refinery Project 1 EXECUTIVE SUMMARY 1.1 Introduction SORESCO S.A., a Joint Venture between RECOPE and CNPCI, have been evaluating the feasibility of the Moín Refinery expansion from 166 m 3 /h (25,000 barrels per day,

More information

Emission from gasoline powered vehicles are classified as 1. Exhaust emission 2. Crank case emission 3. Evaporative emission. Table 1.

Emission from gasoline powered vehicles are classified as 1. Exhaust emission 2. Crank case emission 3. Evaporative emission. Table 1. Introduction: Main three types of automotive vehicle being used 1. Passenger cars powered by four stroke gasoline engines 2. Motor cycles, scooters and auto rickshaws powered mostly by small two stroke

More information

MARKETS & APPLICATIONS. Elliott Turbomachinery for Refineries

MARKETS & APPLICATIONS. Elliott Turbomachinery for Refineries MARKETS & APPLICATIONS Elliott Turbomachinery for Refineries Elliott in the Refinery C 2 To LPG Facility C 3 To LPG Facility Absorber ic 4 Gas Plant nc 4 Plant Power Turbine Generator Package Refrigeration

More information

Advanced Biolubricants and Used Oil Re-refining

Advanced Biolubricants and Used Oil Re-refining P a g e 1 Advanced Biolubricants and Used Oil Re-refining Introduction The lubricants industry has been active in developing processes and technologies that meet regulatory and societal demands for sustainability

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) A. Applicability The provisions of this

More information

Brief Summary of the Project

Brief Summary of the Project Brief Summary of the Project 1. BackGround: HPCL Mittal Energy Limited (HMEL) currently operates a 9.0 MMTPA Guru Gobind Singh Refinery in Bathinda-Punjab, supplying EURO-III and EURO-IV compliant fuels

More information

Changing Refinery Configuration for Heavy and Synthetic Crude Processing

Changing Refinery Configuration for Heavy and Synthetic Crude Processing Changing Refinery Configuration for Heavy and Synthetic Crude Processing Gary Brierley UOP LLC 2006 UOP LLC. All rights reserved. UOP 4525A-01 Why Should I Even Think About Running Synthetics? Oil sands

More information

Fuel Oil Conversions. Association of Energy Engineers (AEE) September 20, 2011

Fuel Oil Conversions. Association of Energy Engineers (AEE) September 20, 2011 Fuel Oil Conversions Association of Energy Engineers (AEE) September 20, 2011 Overview Our Plan to Improve Air Quality 1. Heating Oil Regulations 2. Accelerating Conversions 3. Streamlining the Process

More information

EST technology: an advanced way to upgrade the bottom of the barrel G. Rispoli

EST technology: an advanced way to upgrade the bottom of the barrel G. Rispoli EST technology: an advanced way to upgrade the bottom of the barrel G. Rispoli OMC 2015 WORKSHOP: ADVANCED PROVEN TECHNOLOGIES INCREASE PRODUCTIVITY QUALITY, SAFETY AND SECURITY Ravenna, 26th March 2015

More information

Methanol distribution in amine systems and its impact on plant performance Abstract: Methanol in gas treating Methanol impact on downstream units

Methanol distribution in amine systems and its impact on plant performance Abstract: Methanol in gas treating Methanol impact on downstream units Abstract: Presented at the AIChE Spring 2015 meeting in Austin, TX, USA Methanol distribution in amine systems and its impact on plant performance Anand Govindarajan*, Nathan A. Hatcher, and Ralph H. Weiland

More information

REFINING SOLUTIONS IN A CHANGING WORLD RFG, RFS, SULFUR, BENZENE, TIER 3 AND BEYOND

REFINING SOLUTIONS IN A CHANGING WORLD RFG, RFS, SULFUR, BENZENE, TIER 3 AND BEYOND REFINING SOLUTIONS IN A CHANGING WORLD RFG, RFS, SULFUR, BENZENE, TIER 3 AND BEYOND Thomas R. Hogan, P.E. Senior Vice President January 22, 2015 Turner, Mason & Company Privately held established 1971

More information

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted 06-01-95 INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION, EMERGENCY STANDBY 111 EXEMPTION,

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

Transportation Fuel Issues

Transportation Fuel Issues Transportation Fuel Issues 2017 IEPR Commissioner Workshop on Transportation Energy Supply Trends July 6, 2017 Gordon Schremp Energy Assessments Division California Energy Commission Gordon.schremp@energy.ca.gov

More information

OPPORTUNITY CRUDES: TO PROCESS OR NOT TO PROCESS?

OPPORTUNITY CRUDES: TO PROCESS OR NOT TO PROCESS? OPPORTUNITY CRUDES: TO PROCESS OR NOT TO PROCESS? Claire Weber Serena Yeung 1 Oct. 27, 2011 COQA Meeting Doubletree by Hilton Hotel Tulsa, Oklahoma HYDROCARBON PUBLISHING COMPANY Translating Knowledge

More information

Once a waste of lamp oil production

Once a waste of lamp oil production Refinery All processes and activities described so far happened on the upstream side. he next step to convert crude to e.g. gasoline is happening on the downstream side in refineries. olie 1 Once a waste

More information

Unipar Oxo Alcohols Plant. Start Up: August, 1984 Location: Mauá - São Paulo - Brasil. Nameplate Capacity:

Unipar Oxo Alcohols Plant. Start Up: August, 1984 Location: Mauá - São Paulo - Brasil. Nameplate Capacity: page 1 Unipar Oxo Alcohols Plant Start Up: August, 1984 Location: Mauá - São Paulo - Brasil Nameplate Capacity:! Oxo plant: 33 KTA in Isodecyl Alcohol [6 t/day of Isodecyl Alcohol or 70 t/day of Tridecyl

More information

Eni Slurry Technology:

Eni Slurry Technology: Eni Slurry Technology: An opportunity for refinery/petrochemical industry integration G. Rispoli Platts 2nd Annual European Petrochemicals Conference Dusseldorf, Germany (March 11-12, 2015) 1 2 EST: the

More information

Report. Refining Report. heat removal, lower crude preheat temperature,

Report. Refining Report. heat removal, lower crude preheat temperature, Delayed coker FCC feed hydrotreater FCCU Crude unit Hydrotreater Hydrotreater P r o c e s s i n g Better fractionation hikes yields, hydrotreater run lengths Scott Golden Process Consulting Services Houston

More information

Annex A: General Description of Industry Activities

Annex A: General Description of Industry Activities Annex A: General Description of Industry Activities 65. The EHS Guidelines for Petroleum Refining cover processing operations from crude oil to finished liquid products, including liquefied petroleum gas

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

PEP Review METHYL TERTIARY BUTYL ETHER PRODUCTION FROM STEAM CRACKER C 4 STREAM By Syed N. Naqvi (December 2012)

PEP Review METHYL TERTIARY BUTYL ETHER PRODUCTION FROM STEAM CRACKER C 4 STREAM By Syed N. Naqvi (December 2012) PEP Review 2012-07 METHYL TERTIARY BUTYL ETHER PRODUCTION FROM STEAM CRACKER C 4 STREAM By Syed N. Naqvi (December 2012) ABSTRACT This Review presents a technoeconomic evaluation of a methyl tertiary butyl

More information

The road leading to the 0.50% sulphur limit and IMO s role moving forward

The road leading to the 0.50% sulphur limit and IMO s role moving forward The road leading to the 0.50% sulphur limit and IMO s role moving forward 2020 global sulphur challenge Copenhagen, 21 March 2017 Dr Edmund Hughes Marine Environment Division International Maritime Organization

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT DRAFT STAFF REPORT Draft Amendments to Rule 4621 (Gasoline Transfer into Stationary Storage Containers, Delivery Vessels, and Bulk Plants) and Rule 4622 (Gasoline Transfer into Motor Vehicle Fuel Tanks)

More information

Life-Cycle Energy and Greenhouse Gas Results of Fischer-Tropsch Diesel Produced from Natural Gas, Coal, and Biomass

Life-Cycle Energy and Greenhouse Gas Results of Fischer-Tropsch Diesel Produced from Natural Gas, Coal, and Biomass Life-Cycle Energy and Greenhouse Gas Results of Fischer-Tropsch Diesel Produced from Natural Gas, Coal, and Biomass Michael Wang, May Wu, and Hong Huo Center for Transportation Research Argonne National

More information

Coking and Thermal Process, Delayed Coking

Coking and Thermal Process, Delayed Coking Coking and Thermal Process, Delayed Coking Fig:4.1 Simplified Refinery Flow Diagram [1,2] Treatment processes : To prepare hydrocarbon streams for additional processing and to prepare finished products.

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

Study on Relative CO2 Savings Comparing Ethanol and TAEE as a Gasoline Component

Study on Relative CO2 Savings Comparing Ethanol and TAEE as a Gasoline Component Study on Relative CO2 Savings Comparing Ethanol and TAEE as a Gasoline Component Submitted by: Hart Energy Consulting Hart Energy Consulting 1616 S. Voss, Suite 1000 Houston, Texas 77057, USA Terrence

More information

White Paper.

White Paper. The Advantage of Real Atmospheric Distillation Complying with the ASTM D7345 Test Method in the Distillation Process Introduction / Background In the past, refiners enjoyed a constant supply of the same

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks Approved By: Signed Seyed Sadredin Director of Permit Services

More information

Unit 1. Naphtha Catalytic Reforming. Assistant lecturers Belinskaya Nataliya Sergeevna Kirgina Maria Vladimirovna

Unit 1. Naphtha Catalytic Reforming. Assistant lecturers Belinskaya Nataliya Sergeevna Kirgina Maria Vladimirovna Unit 1. Naphtha Catalytic Reforming Assistant lecturers Belinskaya Nataliya Sergeevna Kirgina Maria Vladimirovna Introduction Catalytic reforming of heavy naphtha and isomerization of light naphtha constitute

More information

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number STATEMENT OF BASIS Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number 701-0013 Introduction On June 30, 2017, the Department received an application to renew the Title V Major Source

More information

Crude Oil Distillation. Chapter 4

Crude Oil Distillation. Chapter 4 Crude Oil Distillation Chapter 4 Gases Gas Sat Gas Plant Polymerization LPG Sulfur Plant Sulfur Alkyl Feed Alkylation Butanes Fuel Gas LPG Gas Separation & Stabilizer Light Naphtha Heavy Naphtha Isomerization

More information

PILOT PLANT DESIGN, INSTALLATION & OPERATION Training Duration 5 days

PILOT PLANT DESIGN, INSTALLATION & OPERATION Training Duration 5 days Training Title PILOT PLANT DESIGN, INSTALLATION & OPERATION Training Duration 5 days Training Date Pilot Plant Design, Installation & Operation 5 21 25 Sep $3,750 Dubai, UAE In any of the 5 star hotels.

More information

Refining/Petrochemical Integration A New Paradigm. Anil Khatri, GTC Technology Coking and CatCracking Conference New Delhi - October 2013

Refining/Petrochemical Integration A New Paradigm. Anil Khatri, GTC Technology Coking and CatCracking Conference New Delhi - October 2013 Refining/Petrochemical Integration A New Paradigm Anil Khatri, GTC Technology Coking and CatCracking Conference New Delhi - October 2013 Presentation Themes Present integration schemes focus on propylene,

More information

Changes in Bunker Fuel Quality Impact on European and Russian Refiners

Changes in Bunker Fuel Quality Impact on European and Russian Refiners Changes in Bunker Fuel Quality Impact on European and Russian Refiners Russia & CIS Bottom of the Barrel Technology Conference 23 &24 April 2015, Moscow Euro Petroleum Consultants TABLE OF CONTENT Requirements

More information

PCE154. Refinery Process and Products. H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

PCE154. Refinery Process and Products. H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E PCE154 Refinery Process and Products H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: To provide broad technical information on refining

More information

Acombination. winning

Acombination. winning winning Acombination Gary M. Sieli, Lummus Technology, USA, and Nash Gupta, Chevron Lummus Global LLC, USA, discuss delayed coking and the LC-FINING ebullated bed hydrocracker technology. Refinery operations

More information

State of the Art (SOTA) Manual for Internal Combustion Engines

State of the Art (SOTA) Manual for Internal Combustion Engines State of the Art (SOTA) Manual for Internal Combustion Engines July 1997 State of New Jersey Department of Environmental Protection Air Quality Permitting Program State of the Art (SOTA) Manual for Internal

More information

GTC TECHNOLOGY. GT-BTX PluS Reduce Sulfur Preserve Octane Value - Produce Petrochemicals. Engineered to Innovate WHITE PAPER

GTC TECHNOLOGY. GT-BTX PluS Reduce Sulfur Preserve Octane Value - Produce Petrochemicals. Engineered to Innovate WHITE PAPER GTC TECHNOLOGY GT-BTX PluS Reduce Sulfur Preserve Octane Value - WHITE PAPER Engineered to Innovate FCC Naphtha Sulfur, Octane, and Petrochemicals Introduction Sulfur reduction in fluid catalytic cracking

More information

Unit 7 Part 2 Introduction to Organic Chemistry Crude Oil: Sources and Uses of Alkanes UNIT 7 INTRODUCTION TO ORGANIC CHEMISTRY

Unit 7 Part 2 Introduction to Organic Chemistry Crude Oil: Sources and Uses of Alkanes UNIT 7 INTRODUCTION TO ORGANIC CHEMISTRY Unit 7 Part 2 Introduction to Organic hemistry rude Oil: Sources and Uses of Alkanes UNIT 7 INTRODUTION TO ORGANI EMISTRY PART 2 RUDE OIL: SOURES AND USES OF ALKANES ontents 1. rude Oil 2. ombustion of

More information

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.34 NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) A. Purpose and Applicability The purpose of this rule is to reduce emissions of oxides

More information

Middle East DownStream Weak May 2013 ABU DHABI, UAE

Middle East DownStream Weak May 2013 ABU DHABI, UAE Middle East DownStream Weak 12 15 May 2013 ABU DHABI, UAE Libyan Oil Refineries and Petrochemical plants: Present and Future Plans AZZAWIYA TRIPOLI BANGHAZI TOBRUK RASLANUF BREGA SARIR SABHA REFINERIES

More information

Abstract Process Economics Program Report 222 PETROLEUM INDUSTRY OUTLOOK (July 1999)

Abstract Process Economics Program Report 222 PETROLEUM INDUSTRY OUTLOOK (July 1999) Abstract Process Economics Program Report 222 PETROLEUM INDUSTRY OUTLOOK (July 1999) Global energy demand is rising, with fossil fuels oil, natural gas, and coal continuing to provide more than 90% of

More information

Mini refinery feasibility study

Mini refinery feasibility study Mini refinery feasibility study Introduction The first part of any study into a mini-refinery application is an initial assessment of its economic feasibility. This requires an understanding of what a

More information

RULE 210 AND RULE 213 FEES FOR FISCAL YEAR July 1, 2017

RULE 210 AND RULE 213 FEES FOR FISCAL YEAR July 1, 2017 RULE 210 AND RULE 213 FEES FOR FISCAL YEAR 2017-2018 July 1, 2017 In accordance with the provisions of Santa Barbara County Air Pollution Control District Rule 210.V.C and Rule 213.C, the Air Pollution

More information

CHEMSYSTEMS. Report Abstract. Petrochemical Market Dynamics Feedstocks

CHEMSYSTEMS. Report Abstract. Petrochemical Market Dynamics Feedstocks CHEMSYSTEMS PPE PROGRAM Report Abstract Petrochemical Market Dynamics Feedstocks Petrochemical feedstocks industry overview, crude oil, natural gas, coal, biological hydrocarbons, olefins, aromatics, methane

More information

PROCESS ECONOMICS PROGRAM

PROCESS ECONOMICS PROGRAM PROCESS ECONOMICS PROGRAM Abstract Process Economics Program Report No. 29C SRI INTERNATIONAL Menlo Park, California 94025 ETHYLENE PLANT CONVERSION (July 1985) This report deals with the technology and

More information

PETROLEUM: CHEMISTRY, REFINING, FUELS AND PETROCHEMICALS - Petroleum: Chemistry, Refining, Fuels and Petrochemicals Refining - James G.

PETROLEUM: CHEMISTRY, REFINING, FUELS AND PETROCHEMICALS - Petroleum: Chemistry, Refining, Fuels and Petrochemicals Refining - James G. PETROLEUM: CHEMISTRY, REFINING, FUELS AND PETROCHEMICALS -REFINING James G. Speight 2476 Overland Road,Laramie, WY 82070-4808, USA Keywords: Dewatering, desalting, atmospheric distillation, vacuum distillation,

More information