1 USER INSTRUCTIONS Durco Mark 3 ISO frame mounted Standard two piece bearing frame foot mounted, centerline mounted and unitized self-priming chemical process pumps Installation Operation Maintenance PCN= (E). Original instructions. These instructions must be read prior to installing, operating, using and maintaining this equipment.

2 CONTENTS Page 1 INTRODUCTION AND SAFETY General CE marking and approvals Disclaimer Copyright Duty conditions Safety Nameplate and safety labels Specific machine performance Noise level TRANSPORT AND STORAGE Consignment receipt and unpacking Handling Lifting Storage Recycling and end of product life DESCRIPTION Configurations Name nomenclature Design of major parts Performance and operating limits INSTALLATION Location Part assemblies Foundation Grouting Initial alignment Piping Electrical connections Final shaft alignment check Protection systems COMMISSIONING, START-UP, OPERATION AND SHUTDOWN Pre-commissioning procedure Pump lubricants Impeller clearance Direction of rotation Guarding Priming and auxiliary supplies Starting the pump Running the pump Stopping and shutdown Hydraulic, mechanical and electrical duty.. 25 Page 6 MAINTENANCE General Maintenance schedule Spare parts Recommended spares Tools required Fastener torques Setting impeller clearance Disassembly Examination of parts Assembly Sealing arrangements FAULTS; CAUSES AND REMEDIES PARTS LISTS AND DRAWINGS Mark 3 ISO Centerline mounted, recessed impeller and self-primer configurations Additional details Parts interchangeability General arrangement drawing CERTIFICATION OTHER RELEVANT DOCUMENTATION AND MANUALS Supplementary User Instruction manuals Change notes Additional sources of information Page 2 of 53

3 INDEX Page Additional sources (10.3) Alignment of shafting (see 4.3, 4.5 and 4.8) Assembly (6.10) ATEX marking ( )... 7 Bearing sizes and capacities (5.2.2) CE marking and approvals (1.2)... 4 Certification (9) Change notes (10.2) Clearances, impeller (6.7) Commissioning and operation (5) Compliance, ATEX ( )... 6 Configurations (3.1) Copyright (1.4)... 4 Design of major parts (3.3) Direction of rotation (5.4) Disassembly (6.8) Disclaimer (1.3)... 4 Dismantling (6.8, Disassembly) Drawings (8) Duty conditions (1.5)... 4 Electrical connections (0) End of product life (2.5) Examination of parts (6.9) Fastener torques (6.6) Faults; causes and remedies (7) Foundation (4.3) General arrangement drawing (8.5) General assembly drawings (8) Grouting (4.4) Guarding (5.5) Handling (2.2) Hydraulic, mechanical and electrical duty (5.10) Impeller clearance (see 5.3 and 6.7) Inspection (6.2.1 and 6.2.2) Installation (4) Lifting (2.3) Location (4.1) Lubrication (see 5.1.1, 5.2 and 6.2.3) Lubrication schedule (see 6.2.3) Maintenance (6) Maintenance schedule (6.2) Name nomenclature (3.2) Nameplate (1.7.1)... 9 Nozzle loads (4.6.4) Operating limits (3.4.1) Ordering spare parts (6.3.1) Part assemblies (4.2) Parts interchangeability (8.4) Parts lists (8) Performance (3.4) Piping (4.6) Pre-commissioning (5.1) Priming and auxiliary supplies (5.6) Page Protection systems (4.9)...20 Reassembly (6.10, Assembly)...31 Receipt and unpacking (2.1)...10 Recommended fill quantities (see 5.2.2)...21 Recommended grease lubricants (5.2.3)...22 Recommended oil lubricants (5.2.1)...21 Recommended spares (6.4)...27 Recycling (2.5)...11 Replacement parts (6.3 and 6.4)...27 Running the pump (5.8)...23 Safety action (1.6.3)... 5 Safety labels (1.7.2)... 9 Safety markings (1.6.1)... 5 Safety, protection systems (see 1.6 and 4.9) Sealing arrangements (6.11)...34 Sectional drawings (8)...38 Setting impeller clearance (6.7)...28 Sound pressure level (1.9, Noise level)... 9 Sources, additional information (10.3)...49 Spare parts (6.3)...27 Specific machine performance (1.8)... 9 Starting the pump (5.7)...23 Stop/start frequency (5.8.5)...24 Stopping and shutdown (5.9)...24 Storage, pump (2.4)...11 Storage, spare parts (6.3.2)...27 Supplementary manuals or information sources...49 Supplementary User Instructions (10.1)...49 Thermal expansion (4.5.1)...14 Tools required (6.5)...27 Torques for fasteners (6.6)...28 Trouble-shooting (see 7)...37 Vibration (5.8.4)...24 Page 3 of 53

4 1 INTRODUCTION AND SAFETY 1.1 General These instructions must always be kept close to the product's operating location or directly with the product. Flowserve products are designed, developed and manufactured with state-of-the-art technologies in modern facilities. The unit is produced with great care and commitment to continuous quality control, utilizing sophisticated quality techniques and safety requirements. Flowserve is committed to continuous quality improvement and being at service for any further information about the product in its installation and operation or about its support products, repair and diagnostic services. These instructions are intended to facilitate familiarization with the product and its permitted use. Operating the product in compliance with these instructions is important to help ensure reliability in service and avoid risks. The instructions may not take into account local regulations; ensure such regulations are observed by all, including those installing the product. Always coordinate repair activity with operations personnel, and follow all plant safety requirements and applicable safety and health laws and regulations. These instructions must be read prior to installing, operating, using and maintaining the equipment in any region worldwide. The equipment must not be put into service until all the conditions relating to safety, noted in the instructions, have been met. Failure to follow and apply the present user instructions is considered to be misuse. Personal injury, product damage, delay or failure caused by misuse are not covered by the Flowserve warranty. 1.2 CE marking and approvals It is a legal requirement that machinery and equipment put into service within certain regions of the world shall conform with the applicable CE Marking Directives covering Machinery and, where applicable, Low Voltage Equipment, Electromagnetic Compatibility (EMC), Pressure Equipment Directive (PED) and Equipment for Potentially Explosive Atmospheres (ATEX). Where applicable, the Directives and any additional Approvals, cover important safety aspects relating to machinery and equipment and the satisfactory provision of technical documents and safety instructions. Where applicable this document incorporates information relevant to these Directives and Approvals. To confirm the Approvals applying and if the product is CE marked, check the serial number plate markings and the Certification. (See section 9, Certification.) 1.3 Disclaimer Information in these User Instructions is believed to be complete and reliable. However, in spite of all of the efforts of Flowserve Corporation to provide comprehensive instructions, good engineering and safety practice should always be used. Flowserve manufactures products to exacting International Quality Management System Standards as certified and audited by external Quality Assurance organizations. Genuine parts and accessories have been designed, tested and incorporated into the products to help ensure their continued product quality and performance in use. As Flowserve cannot test parts and accessories sourced from other vendors the incorrect incorporation of such parts and accessories may adversely affect the performance and safety features of the products. The failure to properly select, install or use authorized Flowserve parts and accessories is considered to be misuse. Damage or failure caused by misuse is not covered by the Flowserve warranty. In addition, any modification of Flowserve products or removal of original components may impair the safety of these products in their use. 1.4 Copyright All rights reserved. No part of these instructions may be reproduced, stored in a retrieval system or transmitted in any form or by any means without prior permission of Flowserve. 1.5 Duty conditions This product has been selected to meet the specifications of your purchase order. The acknowledgement of these conditions has been sent separately to the Purchaser. A copy should be kept with these instructions. The product must not be operated beyond the parameters specified for the application. If there is any doubt as to the suitability of the product for the application intended, contact Flowserve for advice, quoting the serial number. If the conditions of service on your purchase order are going to be changed (for example liquid pumped, temperature or duty) you should seek the written agreement of Flowserve before start up. Page 4 of 53

5 1.6 Safety Summary of safety markings These User Instructions contain specific safety markings where non-observance of an instruction would cause hazards. The specific safety markings are: This symbol indicates electrical safety instructions where non-compliance will involve a high risk to personal safety or the loss of life. This symbol indicates safety instructions where non-compliance would affect personal safety and could result in loss of life. This symbol indicates hazardous and toxic fluid safety instructions where non-compliance would affect personal safety and could result in loss of life. This symbol indicates safety instructions where non-compliance will involve some risk to safe operation and personal safety and would damage the equipment or property. This symbol indicates explosive atmosphere zone marking according to ATEX. It is used in safety instructions where non-compliance in the hazardous area would cause the risk of an explosion. This symbol is used in safety instructions to remind not to rub non-metallic surfaces with a dry cloth; ensure the cloth is damp. It is used in safety instructions where non-compliance in the hazardous area would cause the risk of an explosion. This sign is not a safety symbol but indicates an important instruction in the assembly process Personnel qualification and training All personnel involved in the operation, installation, inspection and maintenance of the unit must be qualified to carry out the work involved. If the personnel in question do not already possess the necessary knowledge and skill, appropriate training and instruction must be provided. If required the operator may commission the manufacturer/supplier to provide applicable training. Always coordinate repair activity with operations and health and safety personnel, and follow all plant safety requirements and applicable safety and health laws and regulations Safety action This is a summary of conditions and actions to help prevent injury to personnel and damage to the environment and to equipment. For products used in potentially explosive atmospheres section also applies. NEVER DO MAINTENANCE WORK WHEN THE UNIT IS CONNECTED TO POWER GUARDS MUST NOT BE REMOVED WHILE THE PUMP IS OPERATIONAL DRAIN THE PUMP AND ISOLATE PIPEWORK BEFORE DISMANTLING THE PUMP The appropriate safety precautions should be taken where the pumped liquids are hazardous. FLUORO-ELASTOMERS (When fitted.) When a pump has experienced temperatures over 250 ºC (482 ºF), partial decomposition of fluoroelastomers (example: Viton) will occur. In this condition these are extremely dangerous and skin contact must be avoided. HANDLING COMPONENTS Many precision parts have sharp corners and the wearing of appropriate safety gloves and equipment is required when handling these components. To lift heavy pieces above 25 kg (55 lb) use a crane appropriate for the mass and in accordance with current local regulations. THERMAL SHOCK Rapid changes in the temperature of the liquid within the pump can cause thermal shock, which can result in damage or breakage of components and should be avoided. NEVER APPLY HEAT TO REMOVE IMPELLER Trapped lubricant or vapor could cause an explosion. HOT (and cold) PARTS If hot or freezing components or auxiliary heating supplies can present a danger to operators and persons entering the immediate area action must be taken to avoid accidental contact. If complete protection is not possible, the machine access must be limited to maintenance staff only, with clear visual warnings and indicators to those entering the immediate area. Note: bearing housings must not be insulated and drive motors and bearings may be hot. If the temperature is greater than 80 ºC (175 ºF) or below -5 ºC (23 ºF) in a restricted zone, or exceeds local regulations, action as above shall be taken. Page 5 of 53

6 HAZARDOUS LIQUIDS When the pump is handling hazardous liquids care must be taken to avoid exposure to the liquid by appropriate siting of the pump, limiting personnel access and by operator training. If the liquid is flammable and or explosive, strict safety procedures must be applied. Gland packing must not be used when pumping hazardous liquids. PREVENT EXCESSIVE EXTERNAL PIPE LOAD Do not use pump as a support for piping. Do not mount expansion joints, unless allowed by Flowserve in writing, so that their force, due to internal pressure, acts on the pump flange. NEVER RUN THE PUMP DRY ENSURE CORRECT LUBRICATION (See section 5, Commissioning, startup, operation and shutdown.) ONLY CHECK DIRECTION OF MOTOR ROTATION WITH COUPLING ELEMENT/ PINS REMOVED Starting in reverse direction of rotation will damage the pump. START THE PUMP WITH OUTLET VALVE PART OPENED (Unless otherwise instructed at a specific point in the User Instructions.) This is recommended to minimize the risk of overloading and damaging the pump or motor at full or zero flow. Pumps may be started with the valve further open only on installations where this situation cannot occur. The pump outlet control valve may need to be adjusted to comply with the duty following the run-up process. (See section 5, Commissioning start-up, operation and shutdown.) Products used in potentially explosive atmospheres Measures are required to: Avoid excess temperature Prevent build up of explosive mixtures Prevent the generation of sparks Prevent leakages Maintain the pump to avoid hazard The following instructions for pumps and pump units when installed in potentially explosive atmospheres must be followed to help ensure explosion protection. For ATEX, both electrical and non-electrical equipment must meet the requirements of European Directive 2014/34/EU. Always observe the regional legal Ex requirements eg Ex electrical items outside the EU may be required certified to other than ATEX eg IECEx, UL Scope of compliance Use equipment only in the zone for which it is appropriate. Always check that the driver, drive coupling assembly, seal and pump equipment are suitably rated and/or certified for the classification of the specific atmosphere in which they are to be installed. Where Flowserve has supplied only the bare shaft pump, the Ex rating applies only to the pump. The party responsible for assembling the ATEX pump set shall select the coupling, driver and any additional equipment, with the necessary CE Certificate/ Declaration of Conformity establishing it is suitable for the area in which it is to be installed. The output from a variable frequency drive (VFD) can cause additional heating effects in the motor and so, for pumps sets with a VFD, the ATEX Certification for the motor must state that it is covers the situation where electrical supply is from the VFD. This particular requirement still applies even if the VFD is in a safe area. INLET VALVES TO BE FULLY OPEN WHEN PUMP IS RUNNING Running the pump at zero flow or below the recommended minimum flow continuously will cause damage to the pump and mechanical seal. DO NOT RUN THE PUMP AT ABNORMALLY HIGH OR LOW FLOW RATES Operating at a flow rate higher than normal or at a flow rate with no back pressure on the pump may overload the motor and cause cavitation. Low flow rates may cause a reduction in pump/bearing life, overheating of the pump, instability and cavitation/vibration. Page 6 of 53

7 Marking An example of ATEX equipment marking is shown below. The actual classification of the pump will be engraved on the nameplate. Equipment Group I = Mining II = Non-mining Category 2 or M2 = high level protection 3 = normal level of protection Gas and/or dust G = Gas D = Dust II 2 GD c IIC 135 ºC (T4) c = Constructional safety (in accordance with EN ) b = Control of ignition source (in accordance with EN ) Gas Group IIA Propane (typical) IIB Ethylene (typical) IIC Hydrogen (typical) Maximum surface temperature (Temperature Class) (see section ) Avoiding excessive surface temperatures ENSURE THE EQUIPMENT TEMPERATURE CLASS IS SUITABLE FOR THE HAZARD ZONE Pumps have a temperature class as stated in the ATEX Ex rating on the nameplate. These are based on a maximum ambient of 40 ºC (104 ºF); refer to Flowserve for higher ambient temperatures. The surface temperature on the pump is influenced by the temperature of the liquid handled. The maximum permissible liquid temperature depends on the ATEX temperature class and must not exceed the values in the table that follows. Maximum permitted liquid temperature for pumps Temperature class to EN Maximum surface temperature permitted Temperature limit of liquid handled T6 T5 T4 T3 T2 T1 85 C (185 F) 100 C (212 F) 135 C (275 F) 200 C (392 F) 300 C (572 F) 450 C (842 F) 65 C (149 F) * 80 C (176 F) * 115 C (239 F) * 180 C (356 F) * 275 C (527 F) * 400 C (752 F) * Maximum permitted liquid temperature for pumps with self-priming casing Temperature class to EN Maximum surface temperature permitted Temperature limit of liquid handled T6 T5 T4 T3 T2 T1 85 C (185 F) 100 C (212 F) 135 C (275 F) 200 C (392 F) 300 C (572 F) 450 C (842 F) Consult Flowserve Consult Flowserve 110 C (230 F) * 175 C (347 F) * 270 C (518 F) * 350 C (662 F) * * The table only takes the ATEX temperature class into consideration. Pump design or material, as well as component design or material, may further limit the maximum working temperature of the liquid. The temperature rise at the seals and bearings and due to the minimum permitted flow rate is taken into account in the temperatures stated. The operator is responsible to ensure that the specified maximum liquid temperature is not exceeded. Temperature classification Tx is used when the liquid temperature varies and when the pump is required to be used in differently classified potentially explosive atmospheres. In this case the user is responsible for ensuring that the pump surface temperature does not exceed that permitted in its actual installed location. Avoid mechanical, hydraulic or electrical overload by using motor overload trips, temperature monitors or a power monitor and make routine vibration monitoring checks. In dirty or dusty environments, make regular checks and remove dirt from areas around close clearances, bearing housings and motors. Where there is any risk of the pump being run against a closed valve generating high liquid and casing external surface temperatures fit an external surface temperature protection device Pumps with threaded/locking screw on impellers only Do not attempt to check the direction of rotation with the coupling element/pins fitted due to the risk of severe contact between rotating and stationary components Pumps with key drive impellers only If an explosive atmosphere exists during the installation, do not attempt to check the direction of rotation by starting the pump unfilled. Even a short run time may give a high temperature resulting from contact between rotating and stationary components. Page 7 of 53

8 Additional requirements for self-priming pumps only Where the system operation does not ensure control of priming, as defined in these User Instructions, and the maximum permitted surface temperature of the T Class could be exceeded, fit an external surface temperature protection device Preventing the build-up of explosive mixtures ENSURE THE PUMP IS PROPERLY FILLED AND VENTED AND DOES NOT RUN DRY Ensure the pump and relevant suction and discharge pipeline system is totally filled with liquid at all times during the pump operation, so that an explosive atmosphere is prevented. In addition it is essential to make sure that seal chambers, auxiliary shaft seal systems and any heating and cooling systems are properly filled. If the operation of the system cannot avoid this condition, fit an appropriate dry run protection device (for example liquid detection or a power monitor). To avoid potential hazards from fugitive emissions of vapor or gas to atmosphere the surrounding area must be well ventilated Preventing sparks To prevent a potential hazard from mechanical contact, the coupling guard must be non-sparking. To avoid the potential hazard from random induced current generating a spark, the baseplate must be properly grounded. Avoid electrostatic charge: do not rub non-metallic surfaces with a dry cloth; ensure cloth is damp Preventing leakage The pump must only be used to handle liquids for which it has been approved to have the correct corrosion resistance. Avoid entrapment of liquid in the pump and associated piping due to closing of suction and discharge valves, which could cause dangerous excessive pressures to occur if there is heat input to the liquid. This can occur if the pump is stationary or running. Bursting of liquid containing parts due to freezing must be avoided by draining or protecting the pump and ancillary systems. Where there is the potential hazard of a loss of a seal barrier fluid or external flush, the fluid must be monitored. If leakage of liquid to atmosphere can result in a hazard, install a liquid detection device Maintenance to avoid the hazard CORRECT MAINTENANCE IS REQUIRED TO AVOID POTENTIAL HAZARDS WHICH GIVE A RISK OF EXPLOSION The responsibility for compliance with maintenance instructions is with the plant operator. To avoid potential explosion hazards during maintenance, the tools, cleaning and painting materials used must not give rise to sparking or adversely affect the ambient conditions. Where there is a risk from such tools or materials, maintenance must be conducted in a safe area. It is recommended that a maintenance plan and schedule is adopted. (See section 6, Maintenance.) For ATEX the coupling must be selected to comply with the requirements of European Directive 2014/34/EU. Correct coupling alignment must be maintained Additional requirement for metallic pumps on non-metallic baseplates When metallic components are fitted on a nonmetallic baseplate they must be individually earthed. Page 8 of 53

9 1.7 Nameplate and safety labels Nameplate For details of nameplate, see the Declaration of Conformity, or separate documentation included with these User Instructions Safety labels The usual approach is to control the exposure time to the noise or to enclose the machine to reduce emitted sound. You may have already specified a limiting noise level when the equipment was ordered, however if no noise requirements were defined, then attention is drawn to the following table to give an indication of equipment noise level so that you can take the appropriate action in your plant. Pump noise level is dependent on a number of operational factors, flow rate, pipework design and acoustic characteristics of the building, and so the values given are subject to a 3 dba tolerance and cannot be guaranteed. Similarly the motor noise assumed in the pump and motor noise is that typically expected from standard and high efficiency motors when on load directly driving the pump. Note that a motor driven by an inverter may show an increased noise at some speeds. If a pump unit only has been purchased for fitting with your own driver then the pump only noise levels in the table should be combined with the level for the driver obtained from the supplier. Consult Flowserve or a noise specialist if assistance is required in combining the values. It is recommended that where exposure approaches the prescribed limit, then site noise measurements should be made. Oil lubricated units only: The values are in sound pressure level L pa at 1 m (3.3 ft) from the machine, for free field conditions over a reflecting plane. For estimating sound power level L WA (re 1 pw) then add 14 dba to the sound pressure value. 1.8 Specific machine performance For performance parameters see section 1.5, Duty conditions. Where performance data has been supplied separately to the purchaser these should be obtained and retained with these User Instructions. The values in below table are valid for preferred range of pump operation, 80% to 110% of B.E.P. 1.9 Noise level Attention must be given to the exposure of personnel to the noise, and local legislation will define when guidance to personnel on noise limitation is required, and when noise exposure reduction is mandatory. This is typically 80 to 85 dba. Page 9 of 53

10 Typical sound pressure level LpA at 1 m reference 20 μpa, dba Motor size and speed 3550 r/min 2900 r/min 1750 r/min 1450 r/min kw (hp) Pump only Pump and motor Pump only Pump and motor Pump only Pump and motor Pump only Pump and motor <0.55 (<0.75) (1) (1.5) (2) (3) (4) (5) (7.5) (10) (15) (20) (25) (30) (40) (50) (60) (75) (100) (120) (150) (200) (270) (400) The noise level of machines in this range will most likely be of values which require noise exposure control, but typical values are inappropriate. Note: for and 960 r/min reduce r/min values by 2 dba. For 880 and 720 r/min reduce r/min values by 3 dba. 2 TRANSPORT AND STORAGE 2.1 Consignment receipt and unpacking Immediately after receipt of the equipment it must be checked against the delivery/shipping documents for its completeness and that there has been no damage in transportation. Any shortage and/or damage must be reported immediately to Flowserve and must be received in writing within one month of receipt of the equipment. Later claims cannot be accepted. Check any crate, boxes or wrappings for any accessories or spare parts that may be packed separately with the equipment or attached to side walls of the box or equipment. 2.3 Lifting A crane must be used for all pump sets or components in excess of 25 kg (55 lb.). Fully trained personnel must carry out lifting, in accordance with local regulations. Slings, ropes and other lifting gear should be positioned where they cannot slip and where a balanced lift is obtained. The angle between sling or ropes used for lifting must not exceed Bare pump The bare pump should be lifted as shown: Each product has a unique serial number. Check that this number corresponds with that advised and always quote this number in correspondence as well as when ordering spare parts or further accessories. 2.2 Handling Boxes, crates, pallets or cartons may be unloaded using fork lift vehicles or slings dependent on their size and construction. Page 10 of 53

11 2.3.2 Pump and folded steel or polycrete baseplate set Where the baseplate is folded steel or polycrete there are no specific lifting points provided for the complete machine set. Any lifting points that can be seen are provided only for dismantling parts for servicing. The pump and folded steel, or polycrete, baseplate set should be lifted as shown. With a sling around the pump discharge nozzle, and around the outboard end of the motor frame using choker hitches pulled tight. The sling should be positioned so the weight is not carried through the motor fan housing. Make sure the completion of the choker hitch on the discharge nozzle is toward the coupling end of the pump Pump and cast iron or fabricated, baseplate set The pump and cast iron, or fabricated, baseplate set which has specific lifting points, should be lifted as shown: Before lifting the driver alone, refer to the manufacturer s instructions. 2.4 Storage Store the pump in a clean, dry location away from vibration. Leave piping connection covers in place to keep dirt and other foreign material out of pump casing. Turn pump at intervals to prevent brinelling of the bearings and the seal faces, if fitted, from sticking. The pump may be stored as above for up to 6 months. Consult Flowserve for preservative actions when a longer storage period is needed. 2.5 Recycling and end of product life At the end of the service life of the product or its parts, the relevant materials and parts should be recycled or disposed of using an environmentally acceptable method and local requirements. If the product contains substances that are harmful to the environment, these should be removed and disposed of in accordance with current regulations. This also includes the liquids and/or gases that may be used in the "seal system" or other utilities. Make sure that hazardous substances are disposed of safely and that the correct personal protective equipment is used. The safety specifications must be in accordance with the current regulations at all times. 3 DESCRIPTION 3.1 Configurations The pump is a modular designed centrifugal pump that can be built to achieve almost all chemical liquid pumping requirements. (See 3.2 and 3.3 below.) 3.2 Name nomenclature The pump size will be engraved on the nameplate typically as below: 1K80-50-H200A-RV 1 = ISO frame size (1, 2, 3, 4) K = Durco Mark 3 family 80 = nominal suction size in mm 50 = nominal discharge size in mm Configuration modifier: Blank or no letter = standard frame mounted P = self-priming casing R = recessed impeller, low shear design N = centerline mounted high pressure casing H = foot mounted high pressure casing 200 = nominal impeller diameter A = extended flow hydraulic (B = standard hydraulic) RV = impeller design (RV = reverse vane, OP = open) Page 11 of 53

12 The typical nomenclature above is the general guide to the Durco Mark 3 ISO configuration description. Identify the actual pump size and serial number from the pump nameplate. Check that this agrees with the applicable certification provided. 3.3 Design of major parts Pump casing The pump casing is designed with a horizontal centerline end inlet and a vertical centerline top outlet that makes it self-venting. In addition, the P self-priming pump casing is designed with a self-priming action which works on the reflux principle for suction lifts up to 7 m (23 ft). For ease of maintenance, the pump is constructed so that pipe connectors do not have to be disturbed when internal maintenance is required. Casing feet pads are provided underneath the casing except on the N casing where they are on the shaft centerline Impeller Depending on the product, the impeller is either reverse vane or open. (On the R impeller it is recessed into the back of the casing.) Impeller locking Most A-OP type impellers are available with the option of key drive impeller. Most RV type impellers are available with the option of an impeller locking screw to provide an additional protection from loosening of the impeller during a reverse run Shaft The large diameter stiff shaft, mounted on bearings, has a keyed drive end Bearing housing The bearing housing enables adjustment of impeller face clearance via the bearing carrier micrometer mechanism Pump bearings and lubrication The pump is fitted with ball and or roller type bearings which may be configured differently dependent on use. The bearings may be oil or grease lubricated Adaptor The pump is fitted with an adaptor between bearing housing and cover for optimum interchangeability Cover (seal chamber) The cover has spigots between the pump casing and bearing housing for optimum concentricity. A fully confined gasket forms the seal between the pump casing and the cover. The cover designs provide improved performance of mechanical seals. The design enables one of a number of sealing options to be fitted Shaft seal The mechanical seal(s) attached to the drive shaft seals the pumped liquid from the environment. Gland packing may be fitted as an option, except on the P self-primer casing Driver The driver is normally an electric motor. Different drive configurations may be fitted such as internal combustion engines, turbines, hydraulic motors, and driving via couplings, belts, gearboxes, drive shafts etc IPS Beacon The pump is fitted with a temperature and vibration monitor as standard. For additional information see the IPS Beacon User Instructions ( ) which are supplied separately Accessories Accessories may be fitted when specified by the customer. Fan cooling is available for high temperature operation. (This is a fan fitted within the coupling guard to blow cooling air over the bearing housing and shaft.) 3.4 Performance and operating limits This product has been selected to meet the specifications of the purchase order. See section 1.5. The following data is included as additional information to help with your installation. It is typical, and factors such as temperature, materials, and seal type may influence this data. If required, a definitive statement for your particular application can be obtained from Flowserve Operating limits Normal maximum ambient temperature: +40 ºC (104 ºF). Normal minimum ambient temperature: -20 ºC (-4 ºF). Maximum pump speed: refer to the nameplate. Page 12 of 53

13 3.4.2 Energy efficiency operation of pumps The pump supplied will have been selected from Flowserve s extensive product line to have optimum efficiency for the application. If supplied with an electric motor then the motor will meet or exceed current legislation for motor efficiency. However it is the way the pump is operated which has the greatest impact on the amount and cost of energy used during the operating life of the pump. The following are key points in achieving minimum operating cost for the equipment: Design the pipe system for minimum friction losses Ensure that the control system switches off the pump when not required In a multi-pump system run the minimum number of pumps Try to avoid systems which by-pass excess flow As far as possible avoid controlling pump flow by using throttle valves When commissioned, check that the pump operates at the duty specified to Flowserve If it has been found that the pump head and flow exceed that required, trim the pump impeller diameter Ensure that the pump is operating with sufficient NPSH available Use variable speed drives for systems that require variable flow. A VFD for an induction motor is a particularly effective way of achieving speed variation and energy/cost reduction Notes for VFD usage: o make sure that the motor is compatible with VFD o Do not over-speed the pump without checking the power capability with Flowserve o On systems with high static head, speed reduction is limited. Avoid running the pump at a speed which gives low or zero flow o Do not run a low speed and flow rate that lets solids settle out of suspension in the pipework o Do not use a VFD for a fixed flow requirement; it will introduce power losses Select high efficiency motors If replacing a standard motor with a high efficiency motor it will run faster and the pump could take more power. Reduce the impeller diameter to achieve energy reduction If the pump system pipework or equipment is changed or process duty is changed, check that the pump is still correctly sized Periodically check that the pipe system has not become corroded or blocked Periodically check that the pump is operating at the flow, head and power expected and that the efficiency has not reduced with erosion or corrosion damage 4 INSTALLATION Equipment operated in hazardous locations must comply with the relevant explosion protection regulations. See section 1.6.4, Products used in potentially explosive atmospheres. 4.1 Location The pump should be located to allow room for access, ventilation, maintenance and inspection with ample headroom for lifting and should be as close as practicable to the supply of liquid to be pumped. Refer to the general arrangement drawing for the pump set. 4.2 Part assemblies On baseplated pump sets the coupling elements are supplied loose. It is the responsibility of the installer to ensure that the pump set is finally lined up as detailed in section 4.5.2, Alignment methods. 4.3 Foundation There are many methods of installing pump units to their foundations. The correct method depends on the size of the pump unit, its location and noise and vibration limitations. Non-compliance with the provision of correct foundation and installation may lead to failure of the pump and, as such, would be outside the terms of the warranty. Ensure the following are met: a) The baseplate should be mounted onto a firm foundation, either an appropriate thickness of quality concrete or sturdy steel framework. (It should NOT be distorted or pulled down onto the surface of the foundation, but should be supported to maintain the original alignment.) b) Install the baseplate onto packing pieces evenly spaced and adjacent to foundation bolts. c) Level with shims between baseplate and packing pieces. Page 13 of 53

14 d) The pump and driver have been aligned before dispatch however the alignment of pump and motor half coupling must be checked. If this is incorrect, it indicates that the baseplate has become twisted and should be corrected by re-shimming. e) If not supplied, guarding shall be fitted as necessary to meet the requirements of ISO and EN Grouting Where applicable, grout in the foundation bolts. After adding pipework connections and rechecking the coupling alignment, the baseplate should then be grouted in accordance with good engineering practice. Fabricated steel, folded steel and cast iron baseplates can be filled with grout. Polycrete baseplates cannot be grouted in the same way, see their User Instructions (E) for installation and use. If in any doubt, please contact your nearest service center for advice. Grouting provides solid contact between the pump unit and foundation, prevents lateral movement of vibrating equipment and dampens resonant vibrations. Foundation bolts should only be fully tightened when the grout has cured. 4.5 Initial alignment Thermal expansion The pump and motor will normally have to be aligned at ambient temperature with an allowance for thermal expansion at operating temperature. In pump installations involving high liquid temperatures, typically above 100 ºC (212 ºF), the unit should be run at the actual operating temperature, shut down and the alignment checked immediately. move the pump before recommencing the above procedure. For couplings with narrow flanges use a dial indicator as shown. The alignment values are maximums for continuous service. P a r a l l e l A n g u l a r Permissible misalignment limits at working temperature: Parallel alignment mm (0.010 in.) TIR maximum Angular alignment mm (0.012 in.) TIR maximum for couplings not exceeding 100 mm (4 in.) flange diameter mm (0.020 in.) TIR maximum for couplings over 100 mm (4 in.) diameter When checking parallel alignment, the total indicator read-out (TIR) shown is twice the value of the actual shaft displacement. Align in the vertical plane first, then horizontally by moving motor. Maximum pump reliability is obtained by near perfect alignment of mm ( in.) parallel and 0.05 mm (0.002 in.) per 100 mm (4 in.) of coupling flange diameter as angular misalignment Check for soft foot Alignment methods Pump and driver must be isolated electrically and the half couplings disconnected. The alignment MUST be checked. Although the pump will have been aligned at the factory it is most likely that this alignment will have been disturbed during transportation or handling. If necessary, align the motor to the pump, not the pump to the motor. Alignment is achieved by adding or removing shims under the motor feet and also moving the motor horizontally as required. In some cases where the alignment cannot be achieved it will be necessary to This is a check to ensure that there is no undue stress on the driver holding down bolts; due to non-level baseplate or twisting. To check, remove all shims and clean surfaces and tighten down driver to the baseplate. Set a dial indicator as shown in sketch and loosen off the holding down bolt while noting any deflection reading on the dial test Indicator - a maximum of 0.05 mm (0.002 in.) is considered acceptable but any more will have to be corrected by adding shims. Page 14 of 53

15 For example, if the dial test indicator shows the foot lifting 0.15 mm (0.006 in.) then this is the thickness of shim to be placed under that foot. Tighten down and repeat the same procedure on all other feet until all are within tolerance. Complete piping as below and see sections 4.8, Final shaft alignment check, up to and including section 5, Commissioning, startup, operation and shutdown, before connecting driver and checking actual rotation. 4.6 Piping Protective covers are fitted to the pipe connections to prevent foreign bodies entering during transportation and installation. Ensure that these covers are removed from the pump before connecting any pipes Suction and discharge pipework Never use pump as a support for piping. Maximum forces and moments allowed on the pump flanges vary with the pump size and type. To minimize these forces and moments that may, if excessive, cause misalignment, hot bearings, worn couplings, vibration and the possible failure of the pump casing, the following points should be strictly followed: Prevent excessive external pipe load Never draw piping into place by applying force to pump flange connections Do not mount expansion joints so that their force, due to internal pressure, acts on the pump flange before use. Ensure piping and fittings are flushed Ensure piping for hazardous liquids is arranged to allow pump flushing before removal of the pump. Take into account the available NPSH which must be higher than the required NPSH of the pump Non self-primer casings In order to minimize friction losses and hydraulic noise in the pipework it is good practice to choose pipework that is one or two sizes larger than the pump suction and discharge. Typically main pipework velocities should not exceed 2 m/s (6 ft/sec) suction and 3 m/s (9 ft/sec) on the discharge Self-priming casing The delivery pipework must permit priming air to escape unhindered from the pump during the priming cycle, without back pressure and prevent excessive run-back of liquid on shutdown to minimize syphoning. Priming air may be vented in one of the following ways: 1) The discharge pipework regulating valve, if fitted, may be partly opened during the priming cycle to freely vent the air. 2) An automatic air release valve may be fitted to the discharge pipework, between the pump and any valves, providing that gases and vapors given off are environmentally safe and acceptable for release into the atmosphere. 3) An air bleed pipe may be run from the discharge pipework, between the pump and any valves, back to the suction tank or sump. This arrangement has a disadvantage in that manual/automatic control will be necessary during operation to prevent continuous recirculation of the pumped liquid Suction piping Non self-primer casing suction piping a) The inlet pipe should be one or two sizes larger than the pump inlet bore and pipe bends should be as large a radius as possible. b) On suction lift the piping should be inclined up towards the pump inlet with eccentric reducers incorporated to prevent air locks. c) On positive suction, the inlet piping must have a constant fall towards the pump. d) The pipe next to the pump should be the same diameter as the pump suction and have a minimum of two pipe diameters of straight section between the elbow and the pump inlet flange. Where the NPSH margin is not large, it is recommended that the pipe straight is 5 to 10 pipe diameter. (See section 10.3, Reference 1.) Inlet strainers, when used, should have a net 'free area' of at least three times the inlet pipe area. e) Fitting isolation and non-return valves will allow easier maintenance. f) Never throttle pump on suction side and never place a valve directly on the pump inlet nozzle Self-priming casing suction piping a) The inlet pipe should be as short as possible, airtight and the smallest volume as practical for the pump flow rate so as to be able to prime quickly. Where inlet pipe volume is large an inlet ball-foot valve or flap valve will be required. b) It is recommended that the pump inlet pipe is no larger than the pump inlet bore or such that the suction velocity is in the range of 3 to 5 m/s (10 to 16 ft/sec). The piping should slope down towards the pump casing suction flange. Page 15 of 53

16 c) Take into account the available NPSH, which must be higher than the required NPSH of the pump. d) Allow a minimum of two pipe diameters of straight section between the elbow and inlet flange. e) Fitting an isolation valve will allow easier maintenance. f) Never throttle pump on suction side and never place a valve directly on the pump inlet nozzle Suction strainer In a new installation, great care should be taken to prevent dirt, scale, welding beads and other items from entering the pump, as it is particularly important to protect the numerous close running fits from abrasive matter present in new piping. The suction system should be thoroughly flushed before installing the suction strainer and making up suction piping to the pump. The suction strainer should be installed between 5 to 20 pipe diameters upstream from the pump suction flange. The open area of the strainer should have a minimum of a 3 to 1 ratio to the area of the pump suction. Cone type strainer The Flowserve recommendation for suction strainers consists of a conical shaped steel plate. The plate has 1.6 mm ( 1 / 16 in.) perforations and is of sufficient size and thickness for the required flow. (See figure above.) Other type of strainers may be used as long as they conform to the requirements stated above. Pressure gauges should be installed on both sides of the screen so that the pressure drop across the screen can be measured. When the unit is being started, the gauges on each side of the screen should be carefully watched. An increase in the differential pressure between the two gauges indicates that the screen is becoming clogged with dirt and scale. At this point, the pump should be shut down, and the screen cleaned and or replaced. A spool piece should be installed in suction line so that the suction strainer may be installed and removed with a pressure gauge between the strainer and pump Discharge piping Non self-primer casing discharge piping a) A non-return valve should be located in the discharge pipework to protect the pump from excessive back pressure and hence reverse rotation when the unit is stopped. b) Fitting an isolation valve will allow easier maintenance Self-priming casing discharge piping a) In order to minimize friction losses and hydraulic noise in the pipework it is good practice to choose pipework that is one or two sizes larger than the pump discharge. Typically main pipework velocities should not exceed 3 m/s (9 ft/sec) on the discharge. Pipework expanders should have a maximum angle of divergence of 9 degrees. b) If a non-return valve is located in the discharge pipework then a vent/bleed pipe should be fitted from the discharge pipe back to the sump or source tank. c) A regulating valve should be fitted in the discharge pipework unless pump flow is controlled by the delivery system design Allowable nozzle loads The pump complies with ISO 5199 shaft deflection limits for the following flange loads. The values are presented in the ISO 5199/ISO (API 610) format. Please note that the values permitted may be higher or lower than those in ISO 5199; see those specified for the actual pump size. The values permitted (50 mm and above) meet ISO (API th edition) Table 5 values with grouted metallic baseplates. Individual forces and moments up to twice ISO (API610) Table 5 values may be permitted but only when applied in accordance with the conditions in ISO (API610) Annex F. Values are presented in compliance with the ISO 1503 sign convention. All individual values which are greater than the following values must be referred to Flowserve for approval. Page 16 of 53

17 Size Table of maximum forces and moments (acting simultaneously) Forces in N (lbf) Moments in Nm (lbf ft) Suction Discharge Suction Discharge Mx My Mz Fx Fy Fz Mx My Mz Fx Fy Fz ƩM ƩF ƩM ƩF 840 (620) 930 (690) (1 210) ( (1 700) 470 (350) 840 (620) 930 (690) (1 210) (1 410) (1 970) (2 990) (2 990) 470 (350) 840 (620) 930 (690) (1 320) (1 410) (1 970) (3 470) (3 470) 450 (330) 470 (350) 820 (600) 960 (710) (850) 240 (160) 450 (330) 460 (340) 820 (600) 960 (710) (990) (1 500) (1 500) 340 (250) 450 (330) 470 (350) 860 (630) 960 (710) (990) (1 150) (1 150) 640 (470) (910) (1 050) (1 270) 350 (260) 640 (470) (910) (1 050) (1 480) (2 240) (2 240) 350 (260) 640 (470) (900) (1 050) (1 480) (2 610) (2 610) (400) (400) (600) (690) 890 (200) (400) (400) (600) (800) (1 210) (1 210) 890 (200) (400) (400) (600) (600) (800) (930) (930) (340) (320) (410) (480) (550) 710 (160) (340) (340) (410) (480) (640) (970) (970) 710 (160) (340) (340) (480) (480) (640) (1 130) (1 130) (270) (260) (340) (390) (450) 580 (130) (270) (270) (340) (390) (790) (790) 580 (130) (270) (270) (390) (390) (600) (600) 190 (140) 340 (250) 560 (410) 620 (460) (1 410) 150 (110) 190 (140) 290 (210) 560 (410) 620 (460) 980 (720) (970) (1 700) 150 (110) 190 (140) 290 (210) 460 (340) 620 (460) (890) (970) (1 970) 180 (130) 170 (130) 280 (210) 310 (230) 820 (600) 80 (60) 180 (130) 210 (150) 280 (210) 310 (230) 490 (360) (850) 80 (60) 180 (130) 210 (150) 230 (170) 310 (230) 600 (440) (650) 190 (140) 260 (190) 420 (310) 460 (340) (1 050) 120 (90) 190 (140) 220 (160) 420 (310) 460 (340) 730 (540) (740) (1 270) 120 (90) 190 (140) 220 (160) 350 (260) 460 (340) 900 (660) (740) (1 480) 460 (100) 520 (120) 860 (190) 940 (210) (410) 240 (50) 460 (100) 500 (110) 860 (190) 940 (210) (250) (420) (550) 240 (50) 460 (100) 500 (110) 710 (160) 940 (210) (300) (420) (420) 370 (80) 430 (100) 700 (160) 770 (170) (390) 210 (50) 370 (80) 400 (90) 700 (160) 770 (170) 890 (200) (340) (450) 210 (50) 370 (80) 400 (90) 570 (130) 770 (170) (250) (340) (130) 660 (150) (240) (260) (600) 310 (70) 580 (130) 590 (130) (240) (260) (310) (690) 310 (70) 580 (130) 590 (130) 880 (200) (260) (380) (800) (850) (930) (1 630) (1 900) (2 280) 630 (460) (850) (920) (1 630) (1 900) (2 660) (4 030) (4 030) 680 (500) (850) (930) (1 720) (1 900) (2 660) (4 500) (4 500) (590) (580) (740) (870) (990) (290) (590) (590) (740) (870) (1 150) (1 740) (1 740) (290) (590) (590) (870) (870) (1 150) (1 580) (1 580) 320 (240) 460 (340) 750 (550) 830 (610) (1 860) 210 (150) 320 (240) 420 (310) 750 (550) 830 (610) (970) (1 330) (2 280) 210 (150) 320 (240) 420 (310) 620 (460) 830 (610) (1 190) (1 330) (2 540) 830 (190) 940 (210) (350) (380) (830) 440 (100) 830 (190) 870 (200) (350) (380) (440) (740) (990) 440 (100) 830 (190) 870 (200) (290) (380) (550) (740) (1 050) Page 17 of 53

18 Size Forces in N (lbf) Moments in Nm (lbf ft) Suction Discharge Suction Discharge Mx My Mz Fx Fy Fz Mx My Mz Fx Fy Fz ƩM ƩF ƩM ƩF 840 (620) 930 (690) (1 310) (1 410) (1 970) (3 470) (3 470) (3 470) (5 160) 930 (690) (1 110) (1 410) (1 970) (3 470) (3 470) (3 470) (5 160) (1 970) (3 470) (3 470) (3 470) (5 160) (7 340) (5 160) 450 (330) 460 (340) 860 (630) 960 (710) (990) (1 370) (1 370) (1 740) (2 580) 470 (350) 840 (620) 960 (710) (990) (1 280) (1 280) (1 740) (2 580) (990) (1 280) (1 280) (1 740) (2 580) (3 670) (2 580) 640 (470) (900) (1 050) (1 480) (2 610) (2 610) (2 610) (3 870) (760) (1 050) (1 480) (2 610) (2 610) (2 610) (3 870) (1 480) (2 610) (2 610) (2 610) (3 870) (5 500) (3 870) (400) (400) (600) (600) (800) (1 120) (1 120) (1 120) (2 130) (400) (580) (600) (800) (1 050) (1 050) (1 410) (2 130) (800) (1 050) (1 050) (1 410) (2 130) (3 020) (2 130) (340) (340) (480) (480) (640) (1 130) (1 130) (1 130) (1 700) (340) (440) (480) (640) (1 130) (1 130) (1 130) (1 700) (640) (1 130) (1 130) (1 130) (1 700) (2 410) (1 700) (270) (270) (390) (390) (720) (720) (720) (1 380) (270) (390) (390) (680) (680) (920) (1 380) (680) (680) (920) (1 380) (1 960) (1 380) 190 (140) 290 (210) 500 (370) 720 (530) (850) (970) (1 970) (3 470) (3 470) 460 (340) 580 (430) 720 (530) (1 210) (1 970) (1 970) (3 470) (3 470) (890) (970) (1 970) (1 970) (3 470) (5 160) (3 470) 180 (130) 210 (150) 260 (190) 360 (270) 570 (420) (780) (990) (1 740) 230 (170) 290 (210) 360 (270) 820 (600) 990 (730) (780) (1 740) (1 740) 600 (440) (780) 990 (730) (1 740) (2 580) (1 740) 190 (140) 220 (160) 370 (270) 540 (400) 860 (630) (740) (1 480) (2 610) (2 610) 350 (260) 400 (300) 540 (400) (910) (1 480) (1 480) (2 610) (2 610) 900 (660) (740) (1 480) (1 480) (2 610) (3 870) (2 610) 450 (100) 500 (110) 750 (170) (250) (290) (420) (420) (640) (1 130) 720 (160) 900 (200) (250) (410) (470) (420) (1 130) (1 130) (300) (420) (420) (470) (1 130) (1 700) (1 130) 370 (80) 370 (80) 610 (140) 890 (200) (230) (340) (920) (920) 580 (130) 730 (160) 890 (200) (330) (920) (920) (250) (340) (920) (1 380) (920) 540 (120) 590 (130) 940 (210) (310) (360) (800) (1 410) (1 410) 890 (200) (250) (310) (800) (800) (1 410) (1 410) (380) (800) (800) (1 410) (2 130) (1 410) (850) (920) (1 710) (1 900) (2 660) (4 500) (4 560) (4 680) (6 940) (930) (1 480) (1 900) (2 660) (4 530) (4 530) (4 680) (6 940) (2 660) (4 530) (4 530) (4 680) (6 940) (9 880) (6 940) (590) (590) (870) (870) (1 150) (1 580) (1 740) (1 740) (3 050) (590) (860) (870) (1 150) (1 680) (1 680) (2 030) (3 050) (1 150) (1 680) (1 680) (2 030) (3 050) (4 330) (3 050) 320 (240) 420 (310) 670 (490) 970 (720) (1 140) (1 330) (2 580) (4 460) (4 680) 620 (460) 760 (560) 970 (720) (1 630) (2 570) (2 580) (4 680) (4 680) (1 190) (1 330) (2 580) (2 570) (4 680) (6 940) (4 680) 790 (180) 860 (190) (300) (440) (740) (1 050) (1 800) (2 030) (290) (360) (440) (740) (1 070) (1 050) (2 030) (2 030) (550) (740) (1 050) (1 070) (2 030) (3 050) (2 030) The values in the table above must be multiplied by the following factors. Liquid temperature ºC (ºF) Casing material -20 to 100 (-4 to 212) 101 to 200 (213 to 392) 201 to 299 (393 to 570) 300 to 350 (571 to 662) 350 to 400 (663 to 752) Austenitic ductile iron, Alloy 20, Titanium, Titanium Pd Nickel All other materials Page 18 of 53

19 4.6.5 Final checks Check the tightness of all bolts in the suction and discharge pipework. Check also the tightness of all foundation bolts. Open impellers (OP) generated rear pressure: Auxiliary piping The connections that are to be piped up will have been fitted with protective metal or plastic plugs which will need to be removed Pumps fitted with packed glands When suction pressure is below ambient pressure and differential head is less than 10 m (32.8 ft), it may be necessary to feed gland packing with liquid to provide lubrication and prevent the ingress of air Pumps fitted with mechanical seals The Seal Sentry design of the anti-vortex chamber for single internal seals provides excellent liquid circulation around the seal and will not normally require a separate flush. Reverse vane impellers (RV) generated rear pressure: Single seals requiring re-circulation will normally be provided with the auxiliary piping from pump casing already fitted. Flowserve seal connections are designated as follows: Q - quench F - flush D - drain outlet BI - barrier fluid in (double seals) BO - barrier fluid out (double seals) H - heating jacket C - cooling jacket Seal chambers/covers having an auxiliary quench connection, require connection to a suitable source of liquid flow, low pressure steam or static pressure from a header tank. Recommended pressure is 0.35 bar (5 psi) or less. Check General arrangement drawing. Double seals require a barrier liquid between the seals, compatible with the pumped liquid. With back-to-back double seals, the barrier liquid should be at a minimum pressure of 1 bar (14.5 psi) above the maximum pressure on the pump side of the inner seal (see appropriate chart). The barrier liquid pressure must not exceed limitations of the seal on the atmospheric side. For toxic service the barrier liquid supply and discharge must be handled safely and in line with local legislation Notes: Differential pressure in bar = Head in meters x specific gravity a) Total seal pressure is equal to the sum of pressure at seal (from the applicable chart above) plus suction pressure. b) Ensure to check the seal minimum and maximum pressure limits are not exceeded. Special seals may require modification to auxiliary piping described above. Consult Flowserve if unsure of correct method or arrangement. For pumping hot liquids, to avoid seal damage, it is recommended that any external flush/cooling supply be continued after stopping the pump. Dual seals require a barrier liquid between the seals compatible with the pumped liquid Pumps fitted with heating/cooling jackets Connect the heating/cooling pipes from the site supply. The top connection should be used as the outlet to ensure complete filling/venting of the annulus with heating/cooling liquids; steam is usually in at the top, out at the bottom. It is important to understand the pressure at the rear of the impeller and in the seal chamber, to have reliable seals. Consult Flowserve or the seal manufacturer for guidance if required. Page 19 of 53

20 4.7 Electrical connections Electrical connections must be made by a qualified Electrician in accordance with relevant local national and international regulations. It is important to be aware of the EUROPEAN DIRECTIVE on potentially explosive areas where compliance with IEC is an additional requirement for making electrical connections. It is important to be aware of the EUROPEAN DIRECTIVE on electromagnetic compatibility when wiring up and installing equipment on site. Attention must be paid to ensure that the techniques used during wiring/installation do not increase electromagnetic emissions or decrease the electromagnetic immunity of the equipment, wiring or any connected devices. If in any doubt contact Flowserve for advice. The motor must be wired up in accordance with the motor manufacturer's instructions (normally supplied within the terminal box) including any temperature, earth leakage, current and other protective devices as appropriate. The identification nameplate should be checked to ensure the power supply is appropriate. A device to provide emergency stopping must be fitted. If not supplied pre-wired to the pump unit, the controller/starter electrical details will also be supplied within the controller/starter. For electrical details on pump sets with controllers see the separate wiring diagram. See section 5.4, Direction of rotation before connecting the motor to the electrical supply. 4.8 Final shaft alignment check After connecting piping to the pump, rotate the shaft several times by hand to ensure there is no binding and all parts are free. Recheck the coupling alignment, as previously described, to ensure no pipe strain. If pipe strain exists, correct piping. 4.9 Protection systems The following protection systems are recommended particularly if the pump is installed in a potentially explosive area or is handling a hazardous liquid. If in any doubt consult Flowserve. If there is any possibility of the system allowing the pump to run against a closed valve or below minimum continuous safe flow a protection device should be installed to ensure the temperature of the liquid does not rise to an unsafe level. If there are any circumstances in which the system can allow the pump to run dry, or start up empty, a power monitor should be fitted to stop the pump or prevent it from being started. This is particularly relevant if the pump is handling a flammable liquid. If leakage of product from the pump or its associated sealing system can cause a hazard it is recommended that an appropriate leakage detection system is installed. To prevent excessive surface temperatures at bearings it is recommended that temperature or vibration monitoring is carried out. The IPS Beacon with a local display is fitted as standard. When a centralized control system is required it will be necessary to replace the IPS Beacon with appropriate temperature and/or vibration probes. 5 COMMISSIONING, START-UP, OPERATION AND SHUTDOWN These operations must be carried out by fully qualified personnel. 5.1 Pre-commissioning procedure Lubrication Determine the mode of lubrication of the pump set, e.g. grease, oil. For oil lubricated pumps, fill the bearing housing [3200] with correct grade of oil to the correct level, i.e. by use of the sight glass [3856] or constant level oiler bottle [3855]. When fitted with a constant level oiler [3855], the bearing housing [3200] should be filled by unscrewing or hinging back the transparent bottle and filling it with oil. The standard Adams oilers and the Trico Watchdog oilers are self-setting and internally vent balanced. Page 20 of 53

21 Oil companies and lubricants Centrifugal pump lubrication DURCO MARK 3 ISO FRAME MOUNTED ENGLISH Where an adjustable body Denco oiler is fitted this should be set to the height shown in the following diagram. Grease lubricated pumps and electric motors are supplied pre-greased. Where the ambient temperature is very low, special lubricants are required. Where oil lubrication is utilized and the ambient is less than -5 C (23 F) ensure the oil pour point is at least 15 C (27 F) lower than the ambient, or use oil class SAE 5W-50 or API-SJ and ensure the upper operating range of the oil is then not exceeded. IS0 VG 46 oil is generally selected for an initial lubrication schedule. The oil filled bottle should then be refitted so as to return it to the upright position. Other drivers and gearboxes, if appropriate, should be lubricated in accordance with their manuals. Filling should be repeated until oil remains visible within the bottle. Approximate oil volumes are shown in section 5.2.2, Bearing sizes and capacities. 5.2 Pump lubricants Recommended oil lubricants Oil Splash / force feed / purge and pure **oil mist lubrication Viscosity 40 ºC Oil temperature range * -5 to 65 ºC -5 to 78 ºC -5 to 80 ºC (23 to 149 ºF) (23 to 172 ºF) (23 to 176 ºF) Designation to ISO 3448 and DIN51524 part 2 ISO VG 32 ISO VG 46 ISO VG HLP 46 HLP 68 HLP BP Castrol Energol HLP-HM 32 Energol HLP-HM 46 Energol HLP-HM 68 ESSO NUTO HP 32 NUTO HP 46 NUTO HP 68 ELFOLNA DS 32 ELFOLNA DS 46 ELFOLNA DS 68 ELF/Total Azolla ZS 32 Azolla ZS 46 Azolla ZS 68 LSC (for oil mist only long life) LSO 32 (synthetic oil) LSO 46 (synthetic oil) LSO 68 (synthetic oil) ExxonMobil (mineral oil) Mobil DTE 24 Mobil DTE 25 Mobil DTE 26 ExxonMobil (oil bath only long life) Mobil SHC524 Mobil SHC525 Mobil SHC526 (synthetic oil) *** (synthetic oil) (synthetic oil) Q8 Q8 Haydn 32 Q8 Haydn 46 Q8 Haydn 68 Shell Shell Tellus 32 Shell Tellus 46 Shell Tellus 68 Chevron Texaco Rando HD 32 Rando HD 46 Rando HD 68 Wintershall (BASF Group) Wiolan HS32 Wiolan HS46 Wiolan HS68 Fuchs Renolin CL 32 Renolin CL 46 Renolin CL 68 * Note that it normally takes 2 hours for bearing temperature to stabilize and the final temperature will depend on the ambient, r/min, pumpage temperature and pump size. Also some oils have a very low pour point and good viscosity index which extend the minimum temperature capability of the oil. Always check the grade capability where the ambient is less than -5 ºC (23 ºF). ** If preheated pure oil mist lubrication, LCS LSO 68 or LSO 100 synthetic oils are permitted. Use LSC for oil mist. Oil parameters provide flash point >166 ºC (331 ºF), density >0.87@15 ºC (59 ºF), pour point of -10 ºC (14 ºF) or lower. *** ExxonMobil SHC 524 synthetic oil has a pour point temperature of -54 ºC. This oil can be used for ambient temperature as low as -50 ºC Bearing sizes and capacities Frame size Grease lubricated Grease lubricated Grease lubricated bearing capacities medium duty bearings heavy duty bearings g (oz.) Pump end Drive end Pump end Drive end * Pump end Drive end Z C Z C Z C Z C Z C Z C Z C Z C Z C Z C Z C Z C pair back-to-back 7309 pair back-to-back 7311 pair back-to-back 7313 pair back-to-back 6 (0.2.) 13 (0.5) 18 (0.6) 20 (0.7) 14 (0.5) 25 (0.9) 35 (1.2) 46 (1.6) * Nilos ring fitted into bearing locknut [3712.2] Page 21 of 53

22 Frame size Oil lubricated medium duty bearings Oil lubricated heavy duty bearings Oil lubricated optional heavy duty bearings Pump end Drive end Pump end Drive end Pump end Drive end 6207 C C C back-to-back NUP 207 C back-to-back 6309 C C C back-to-back NUP 309 C back-to-back 6311 C C C back-to-back NUP 311 C back-to-back 6313 C C C back-to-back NUP 313 C back-to-back Note: the bearing sizes do not constitute a purchasing specification. * Sump volume only, does not include the oil in the constant level oiler. Frame oil capacity (approx.) * litre (fl.oz) 0.5 (17) 1.0 (34) 0.8 (27) 1.6 (54) Recommended grease lubricants NLGI grade 2 is generally advised for horizontal bearing housings and NLGI 3 where the bearing housing is used vertically. The bearings are pre-greased. The NLGI 2 grade fitted in the factory with grease nipples is Mobil Polyrex EM grease which has a Polyurea soap incorporating a mineral oil. NLGI 3 grade is recommended for vertical applications, if vertical orientation was specified with order, then the NLGI 3 grease fitted in the factory for vertical application is Mobil Polyrex EM103 grease or equivalent which has a Polyurea soap incorporating a mineral oil. These greases are suitable for high bearing and ambient temperatures and ambient down to at least -20 C. Below this ambient, specialist greases may be required and Shell Aeroshell 22 is normally required for the minimum ambient down to nitrile limitation of -45 C. Different types or grades of greases must never be mixed Food grade grease, when applicable NSF H1 Klubersynth UH is the food grade grease option and it is NLGI grade Recommended fill quantities Refer to section 5.2.2, Bearing sizes and capacities Lubrication schedule Refer to section Impeller clearance The impeller clearance is set in the factory. The clearance may require adjustment because of high liquid temperature. If piping attachment alters the impeller clearance then correct piping. For setting instructions see section 6.7, Setting impeller clearance. 5.4 Direction of rotation Serious damage can result if the pump is started or run in the wrong direction of rotation. The pump is shipped with the coupling element removed. Ensure the direction of rotation of the motor is correct before fitting the coupling element. Direction of rotation must correspond to the direction arrow. If maintenance work has been carried out to the site's electricity supply, the direction of rotation should be re-checked as above in case the supply phasing has been altered. 5.5 Guarding Guarding is supplied fitted to the pump set. In member countries of the EU and EFTA, it is a legal requirement that fasteners for guards must remain captive in the guard to comply with the Machinery Directive 2006/42/EC. When releasing such guards, the fasteners must be unscrewed in an appropriate way to ensure that the fasteners remain captive. Whenever guarding is removed or disturbed ensure that all the protective guards are securely refitted prior to start-up. 5.6 Priming and auxiliary supplies Filling and priming, non self-primer casing Ensure inlet pipe and pump casing is completely full of liquid before starting continuous duty operation. Priming may be carried out with an ejector, vacuum pump, interceptor or other equipment, or by flooding from the inlet source. When in service, pumps using inlet pipes with foot valves may be primed by passing liquid back from the outlet pipe through the pump Filling and priming, self-priming casing Fill the pump with liquid to be pumped, or compatible liquid, via the filling hole, before starting continuous duty operation. The pump has self-priming action for which a separate air pump is not normally required. Page 22 of 53

23 Pump size Pump housing filling hole. When the initial fill reaches the suction pipe, excess liquid will flow out of the casing. Initial fill litre (US gal.) (0.65) (1.60) (0.80) (1.75) (1.30) (2.25) (3.20) Auxiliary supplies Ensure all electrical, hydraulic, pneumatic, sealant and lubrication systems (as applicable) are connected and operational. 5.7 Starting the pump Starting the non self-primer casing pump a) Ensure flushing and/or cooling/ heating liquid supplies are turned ON, before starting pump. b) CLOSE the outlet valve. c) OPEN all inlet valves. d) Prime the pump, ensure the air within the pump has a route to escape. e) Start motor and check the outlet pressure. f) If the pressure is satisfactory, SLOWLY open the outlet valve. g) Do not run the pump with the outlet valve closed for a period longer than 10 seconds. h) If NO pressure, or LOW pressure, STOP the pump. Refer to section 7, Faults; causes and remedies, for fault diagnosis Starting the self-priming casing pump a) Ensure flushing and/or cooling/ heating liquid supplies are turned ON, before starting pump. b) CLOSE the outlet valve. c) OPEN all inlet valves. d) Prime the pump. (See section ) The pump casing must initially be filled with compatible liquid before starting the unit. e) Damage will occur if the pump is run dry or for prolonged periods with no incoming liquid. f) Subsequent filling should not be necessary unless the pump has been emptied or drained of fluid. g) Start the motor and, if no specific provision has been made in the delivery pipework for evacuating the primed air, open the delivery valve by approximately 10 % to allow priming air to escape. h) When the pump has primed, check outlet pressure. i) If the pressure is satisfactory, SLOWLY open the outlet valve. j) It is recommended that the priming time is noted. Priming times in excess of 5 minutes will indicate a pump or system fault. Any noticeable increases in priming time on subsequent starts will also indicate a fault. Irregular use could lead to the risk of 'evaporation' of the priming fluid. k) Do not run the pump with the outlet valve closed for a period longer than 30 seconds. l) If the pump has to fill the system it may take a short time before the outlet is pressurized. m) If NO pressure, or LOW pressure, STOP the pump. Refer to section 7, Faults; causes and remedies for fault diagnosis. 5.8 Running the pump Pumps fitted with packed gland If the pump has a packed gland there must be some leakage from the gland. Gland nuts should initially be finger-tight only. Leakage should take place soon after the stuffing box is pressurized. The gland must be adjusted evenly to give visible leakage and concentric alignment of the gland ring to avoid excess temperature. If no leakage takes place the packing will begin to overheat. If overheating takes place the pump should be stopped and allowed to cool before being re-started. When the pump is re-started, check to ensure leakage is taking place at the packed gland. If hot liquids are being pumped it may be necessary to slacken the gland nuts to achieve leakage. The pump should be run for 30 minutes with steady leakage and the gland nuts tightened by 10 degrees at a time until leakage is reduced to an acceptable level, normally 30 to 120 drops per minute. Bedding in of the packing may take another 30 minutes. Page 23 of 53

24 Care must be taken when adjusting the gland on an operating pump. Safety gloves are essential. Loose clothing must not be worn to avoid being caught up by the pump shaft. Shaft guards must be replaced after the gland adjustment is complete. short time. Never run gland packing dry, even for a Pumps fitted with mechanical seal Mechanical seals require no adjustment. Any slight initial leakage will stop when the seal is run in. Before pumping dirty liquids it is advisable, if possible, to run the pump in using clean liquid to safeguard the seal face. External flush or quench should be started before the pump is run and allowed to flow for a period after the pump has stopped. Never run a mechanical seal dry, even for a short time Bearings If the pumps are working in a potentially explosive atmosphere temperature or vibration monitoring at the bearings is recommended. If bearing temperatures are to be monitored it is essential that a benchmark temperature is recorded at the commissioning stage and after the bearing temperature has stabilized. Record the bearing temperature (t) and the ambient temperature (ta) Estimate the likely maximum ambient temperature (tb) Set the alarm at (t+tb-ta+5) ºC (t+tb-ta+10) ºF and the trip at 100 ºC (212 ºF) for oil lubrication and 105 ºC (220 ºF) for grease lubrication It is important, particularly with grease lubrication, to keep a check on bearing temperatures. After start up the temperature rise should be gradual, reaching a maximum after approximately 1.5 to 2 hours. This temperature should then remain constant or marginally reduce with time. Refer to section for further information Normal vibration levels, alarm and trip For guidance, pumps generally fall under a classification for rigid support machines within the International rotating machinery standards and the recommended maximum levels below are based on those standards. Alarm and trip values for installed pumps should be based on the actual measurements (N) taken on the pump in the fully commissioned as new condition. Measuring vibration at regular intervals will then show any deterioration in pump or system operating conditions. Vibration velocity unfiltered Horizontal pumps 15 kw (20 hp) Horizontal pumps > 15 kw (20 hp) mm/s (in./sec) r.m.s. Normal N 3.0 (0.12) 4.5 (0.18) Alarm N x (0.15) 5.6 (0.22) Shutdown trip N x (0.24) 9.0 (0.35) Where a grease lubricated unit is utilized in a vertical shaft configuration with a duck-foot bend onto the pump suction, the following apply: Vibration velocity unfiltered Vertical configurations mm/s (in./sec) r.m.s. Normal N 7.1 (0.28) Alarm N x (0.35) Shutdown trip N x (0.56) Stop/start frequency Pump sets are normally suitable for the number of equally spaced stop/starts per hour shown in the table below. Check capability of the driver and control/starting system before commissioning. Motor rating kw (hp) Maximum stop/starts per hour Up to 15 (20) 15 Between 15 (20) and 90 (120) 10 Above 90 (120) 6 Where duty and standby pumps are installed it is recommended that they are run alternately every week. 5.9 Stopping and shutdown a) Close the outlet valve, but ensure that the pump runs in this condition for no more than a few seconds. b) Stop the pump. c) Switch off flushing and/or cooling/heating liquid supplies at a time appropriate to the process. d) For prolonged shut-downs and especially when ambient temperatures are likely to drop below freezing point, the pump and any cooling and flushing arrangements must be drained or otherwise protected. Page 24 of 53

25 5.10 Hydraulic, mechanical and electrical duty This product has been supplied to meet the performance specifications of your purchase order, however it is understood that during the life of the product these may change. The following notes may help the user decide how to evaluate the implications of any change. If in doubt contact your nearest Flowserve office Specific gravity (SG) Pump capacity and total head in metres (feet) do not change with SG, however pressure displayed on a pressure gauge is directly proportional to SG. Power absorbed is also directly proportional to SG. It is therefore important to check that any change in SG will not overload the pump driver or over-pressurize the pump Viscosity For a given flow rate the total head reduces with increased viscosity and increases with reduced viscosity. Also for a given flow rate the power absorbed increases with increased viscosity, and reduces with reduced viscosity. It is important that checks are made with your nearest Flowserve office if changes in viscosity are planned Pump speed Changing pump speed effects flow, total head, power absorbed, NPSH R, noise and vibration. Flow varies in direct proportion to pump speed, head varies as speed ratio squared and power varies as speed ratio cubed. The new duty, however, will also be dependent on the system curve. If increasing the speed, it is important therefore to ensure the maximum pump working pressure is not exceeded, the driver is not overloaded, NPSH A > NPSH R, and that noise and vibration are within local requirements and regulations Net positive suction head (NPSH A ) NPSH available (NPSH A ) is a measure of the head available in the pumped liquid, above its vapor pressure, at the pump suction branch. NPSH required (NPSH R ) is a measure of the head required in the pumped liquid, above its vapor pressure, to prevent the pump from cavitating. It is important that NPSHA > NPSH R. The margin between NPSH A > NPSH R should be as large as possible. If any change in NPSH A is proposed, ensure these margins are not significantly eroded. Refer to the pump performance curve to determine exact requirements particularly if flow has changed. If in doubt please consult your nearest Flowserve office for advice and details of the minimum allowable margin for your application Pumped flow Flow must not fall outside the minimum and maximum continuous safe flow shown on the pump performance curve and or data sheet. 6 MAINTENANCE 6.1 General It is the plant operator's responsibility to ensure that all maintenance, inspection and assembly work is carried out by authorized and qualified personnel who have adequately familiarized themselves with the subject matter by studying this manual in detail. (See also section ) Any work on the machine must be performed when it is at a standstill. It is imperative that the procedure for shutting down the machine is followed, as described in section 5.9. On completion of work all guards and safety devices must be re-installed and made operative again. Before restarting the machine, the relevant instructions listed in section 5, Commissioning, start up, operation and shut down, must be observed. Oil and grease leaks may make the ground slippery. Machine maintenance must always begin and finish by cleaning the ground and the exterior of the machine. If platforms, stairs and guard rails are required for maintenance, they must be placed for easy access to areas where maintenance and inspection are to be carried out. The positioning of these accessories must not limit access or hinder the lifting of the part to be serviced. When air or compressed inert gas is used in the maintenance process, the operator and anyone in the vicinity must be careful and have the appropriate protection. Do not spray air or compressed inert gas on skin. Do not direct an air or gas jet towards other people. Never use air or compressed inert gas to clean clothes. Page 25 of 53

26 Before working on the pump, take measures to prevent an uncontrolled start. Put a warning board on the starting device with the words: "Machine under repair: do not start". With electric drive equipment, lock the main switch open and withdraw any fuses. Put a warning board on the fuse box or main switch with the words: "Machine under repair: do not connect". Never clean equipment with inflammable solvents or carbon tetrachloride. Protect yourself against toxic fumes when using cleaning agents. 6.2 Maintenance schedule It is recommended that a maintenance plan and schedule is adopted, in line with these User Instructions, to include the following: a) Any auxiliary systems installed must be monitored, if necessary, to ensure they function correctly. b) Gland packings must be adjusted correctly to give visible leakage and concentric alignment of the gland follower to prevent excessive temperature of the packing or follower. c) Check for any leaks from gaskets and seals. The correct functioning of the shaft seal must be checked regularly. d) Check bearing lubricant level, and if the hours run show a lubricant change is required. e) Check that the duty condition is in the safe operating range for the pump. f) Check vibration, noise level and surface temperature at the bearings to confirm satisfactory operation. g) Check dirt and dust is removed from areas around close clearances, bearing housings and motors. h) Check coupling alignment and re-align if necessary. Our specialist service personnel can help with preventative maintenance records and provide condition monitoring for temperature and vibration to identify the onset of potential problems. If any problems are found the following sequence of actions should take place: a) Refer to section 7, Faults; causes and remedies, for fault diagnosis. b) Ensure equipment complies with the recommendations in this manual. c) Contact Flowserve if the problem persists Routine inspection (daily/weekly) The following checks should be made and the appropriate action taken to remedy any deviations: a) Check operating behavior. Ensure noise, vibration and bearing temperatures are normal. b) Check that there are no abnormal fluid or lubricant leaks (static and dynamic seals) and that any sealant systems (if fitted) are full and operating normally. c) Check that shaft seal leaks are within acceptable limits. d) Check the level and condition of oil lubricant. On grease lubricated pumps, check running hours since last recharge of grease or complete grease change. e) Check any auxiliary supplies eg heating/cooling (if fitted) are functioning correctly. Refer to the manuals of any associated equipment for routine checks needed Periodic inspection (six monthly) a) Check foundation bolts for security of attachment and corrosion. b) Check pump running records for hourly usage to determine if bearing lubricant requires changing. c) The coupling should be checked for correct alignment and worn driving elements. Refer to the manuals of any associated equipment for periodic checks needed Re-lubrication Lubricant and bearing temperature analysis can be useful in optimizing lubricant change intervals. In general however, the following is recommended Oil lubricated bearings Normal oil change interval for mineral oil lubricated pumps is every six months. When synthetic oils are used the lubrication interval can increase to 18 months, and up to 36 months for the ISO 3A construction of pumps. For pumps on hot service or in severely damp or corrosive atmosphere, the oil will require changing more frequently. Lubricant and bearing temperature analysis can be useful in optimizing lubricant change intervals. The lubricating oil should be a high quality mineral oil having foam inhibitors or synthetic without foam inhibitors for oil mist. Synthetic oils may also be used if checks show that the rubber oil seals will not be adversely affected. Page 26 of 53

27 The bearing temperature may be allowed to rise to 50 ºC (90 ºF) above ambient, but should not exceed 82 ºC (180 ºF) (API 610 limit). A continuously rising temperature, or an abrupt rise, indicate a fault. Pumps that handle high temperature liquids may require their bearings to be cooled to prevent bearing temperatures exceeding their limits Grease lubricated bearings When grease nipples are fitted, one charge between grease changes is advisable for most operating conditions; ie hours interval. Normal intervals between grease changes are hours. For food grade grease the grease change and relubrication intervals are half those of conventional greases. The characteristics of the installation and severity of service will determine the frequency of lubrication. Lubricant and bearing temperature analysis can be useful in optimizing lubricant change intervals. The bearing temperature may be allowed to rise to 55 ºC (99 ºF) above ambient, but should not exceed 95 ºC (204 ºF). Never mix greases containing different bases, thickeners or additives Mechanical seals When leakage becomes unacceptable the seal [4200] will need replacement Gland packing The stuffing box split gland can be completely removed for re-packing or to enable the addition of extra rings of packing. The stuffing box is normally supplied with a lantern ring to enable a clean or pressurized flush to the center of the packing. If not required, this can be replaced by an extra 2 rings of packing. 6.3 Spare parts Ordering of spares Flowserve keeps records of all pumps that have been supplied. When ordering spares the following information should be quoted. 1) Pump serial number. 2) Pump size. 3) Part name taken from section 8. 4) Part number taken from section 8. 5) Number of parts required. (The pump size and serial number are shown on the pump nameplate.) To ensure continued satisfactory operation, replacement parts to the original design specification should be obtained from Flowserve. Any change to the original design specification (modification or use of a non-standard part) will invalidate the pump safety certification Storage of spares Spares should be stored in a clean dry area away from vibration. Inspection and re-treatment of metallic surfaces (if necessary) with preservative is recommended at 6 monthly intervals. 6.4 Recommended spares For two years operation (as per VDMA 24296). Part no. Designation Number of pumps (including stand-by) /7 8/9 10(+) 2200 Impeller % 2100 Shaft % Bearing locknut % 2400 Sleeve (if fitted) % 3011 Radial ball bearing % 3013 Thrust bearing % * Gasket % O-ring % O-ring % O-ring % 2540 Deflector % 4130 Gland packing % 4134 Lantern ring % 4200 Mechanical seals % 4305 V-ring % - Power end * Note: for recessed impeller version replace with the following part: Gasket % Additional spares for keyed impeller option / Impeller nut % O-ring (if sleeve fitted) % O-ring % Key % 6.5 Tools required A typical range of tools that will be required to maintain these pumps is listed below. Readily available in standard tool kits, and dependent on pump size: Open ended spanners (wrenches) to suit up to M 48 screws/nuts Socket spanners (wrenches), up to M 48 screws Allen keys, up to 10 mm (A/F) Range of screwdrivers Soft mallet Page 27 of 53

28 More specialized equipment: Bearing pullers Bearing induction heater Dial test indicator C-spanner (wrench) - for removing shaft nut. (If difficulties in sourcing are encountered, consult Flowserve.) Coupling grip/shaft spanner 6.6 Fastener torques Fastener Screw size Torque Nm (lbf ft) M8 16 (12) M10 25 (18) All except where M12 35 (26) otherwise stated M16 80 (59) M (96) Impeller nut M12 M16 M22 M24 16 (12) 41 (31) 106 (79) 135 (100) For the tightening sequence also refer to good industry practice. See section 10.3, Reference 6, for more detail. Non-metallic gaskets incur creep relaxation - before commissioning the pump check and retighten fasteners to tightening torques stated. 6.7 Setting impeller clearance This procedure may be required after the pump has been dismantled or a different clearance is required. Before carrying out this procedure ensure that the mechanical seal(s) [4200] fitted can tolerate a change in their axial setting, otherwise it will be necessary to dismantle the unit and reset the seal axial position after adjusting the impeller clearance. a) Disconnect the coupling if it has limited axial flexibility. b) The impeller adjustment is easily made externally by loosening the screws [6570.1/2] and rotating the bearing carrier [3240] to obtain the proper clearance Setting open impeller (OP) front clearance a) Turn the bearing carrier [3240] clockwise until the impeller [2200] comes into light contact with the front profile on the casing [1100]. Rotating the shaft [2100] at the same time will accurately determine when a detectable rub is obtained. This is the zero clearance setting. b) Rotating the bearing carrier [3240] the width of one of the indicator patterns cast into the bearing carrier moves the impeller [2200] axially 0.1 mm (0.004 in.). Example: for an impeller setting of 0.4 mm, (0.016 in.) simply move the bearing carrier [3240] counterclockwise four indicator patterns for the required clearance. c) Use the indicator pattern closest to the top center of the bearing housing as the reference point to begin adjustment. Temp ºC (ºF) 50 (122) 100 (212) 150 (302) 200 (392) 250 (482) Indicator pattern Impellers up to 210 mm 0.3 (0.012) 0.4 (0.016) 0.5 (0.020) 0.6 (0.024) 0.7 (0.028) Impellers 211 mm to 260 mm 0.4 (0.016) 0.5 (0.020) 0.6 (0.024) 0.7 (0.028) 0.8 (0.032) Rotation equivalent to 0.1 mm axial movement Clearance mm (in.) Impellers over 260 mm (except *) 0.5 (0.020) 0.6 (0.024) 0.7 (0.028) 0.8 (0.032) 0.9 (0.036) (*) (*) (*) (0.040) 1.0 (0.040) 1.1 (0.044) 1.2 (0.048) 1.3 (0.052) d) After obtaining the proper clearance, listed in the table above, tighten the screws [6570.1] evenly to lock the impeller [2200] and shaft [2100] assembly. Tightening the set screws [6570.1] will cause the impeller to move 0.05 mm (0.002 in.) closer to the rear cover because of the internal clearance in the bearing carrier threads. This must be considered when setting the impeller clearance. e) Check that the shaft [2100] can turn freely without binding. f) If a cartridge seal [4200] is fitted it should be reset at this point. g) Ensure the coupling distance between shaft ends (DBSE) is correct. Reset/re-align if necessary Setting reverse vane (RV) impeller rear clearance a) Reverse vane impellers are set off the cover. This allows the impeller to be set without the casing. Page 28 of 53

29 b) Turn the bearing carrier [3240] counter-clockwise until the impeller [2200] comes into light contact with the rear cover [1220]. Rotating the shaft [2100] at the same time will accurately determine when a detectable rub is obtained. This is the zero clearance setting. c) Rotating the bearing carrier [3240] the width of one of the indicator patterns cast into the bearing carrier moves the impeller [2200] axially 0.1 mm (0.004 in.). Example: for an impeller setting of 0.4 mm (0.016 in.) simply move the bearing carrier clockwise four indicator patterns for the required clearance. d) Use the indicator pattern closest to the top center of the bearing housing as the reference point to begin adjustment. e) After obtaining the proper clearance, listed in the table above, tighten the set-screws [6570.1] evenly to lock the impeller [2200] and shaft [2100] assembly. Tightening the screws [6570.1] will cause the impeller to move 0.05 mm (0.002 in.) closer to the rear cover because of the internal clearance in the bearing carrier threads. This must be considered when setting the impeller clearance. f) If a cartridge seal [4200] is fitted it should be reset at this point. g) Check that the shaft can turn freely without binding. h) Ensure the coupling distance between shaft ends (DBSE) is correct. Reset/re-align if necessary Setting recessed impeller rear clearance a) Recessed open impellers are set off the cover. This allows the impeller to be set without the casing. b) Turn the bearing carrier [3240] counter-clockwise until the impeller [2200] comes into light contact with the cover [1220]. Rotating the shaft [2100] at the same time will accurately determine when a detectable rub is obtained. This is the zero clearance setting. c) Rotating the bearing carrier [3240] the width of one of the indicator patterns cast into the bearing carrier moves the impeller [2200] axially 0.1 mm (0.004 in.). Example: for an impeller setting of 1.5 mm (0.059 in.) simply move the bearing carrier clockwise fifteen indicator patterns for the required clearance. d) Use the indicator pattern closest to the top center of the bearing housing as the reference point to begin adjustment. e) After obtaining the proper clearance of 1.5 mm (0.059 in.) to 2 mm (0.079 in.), tighten the setscrews [6570.1/2] evenly to lock the impeller [2200] and shaft [2100] assembly. Tightening the screws will cause the impeller to move 0.05 mm (0.002 in.) closer to the rear cover because of the internal looseness in the bearing carrier threads. This must be considered when setting the impeller clearance. If possible, check results with a feeler gauge. f) If a cartridge seal [4200] is fitted it should be reset at this point. g) Check that the shaft can turn freely without binding. h) Ensure the coupling distance between shaft ends (DBSE) is correct. Reset/re-align if necessary. 6.8 Disassembly Refer to Safety section before dismantling the pump. Before dismantling the pump for overhaul, ensure genuine Flowserve replacement parts are available. Refer to sectional drawings for part numbers and identification. (See section 8, Parts lists and drawings.) Bearing housing disassembly To remove, proceed as follows: a) Disconnect all auxiliary pipes and tubes where applicable. b) Remove coupling guard and disconnect coupling. c) If oil lubricated frame, drain oil by removing drain plug. d) Record the gap between the bearing carrier [3240] and bearing housing [3200] so that this setting can be used during workshop assembly. e) Place hoist sling through bearing housing adaptor window. f) Remove casing nuts [6582.1] and support foot [3134] to baseplate screws. Page 29 of 53

30 g) Remove bearing housing assembly from pump casing [1100]. h) The two threaded holes in the adaptor flange can be used for jacking screws to assist with removal. i) Remove pump casing gasket [4590.1] and discard. A replacement gasket will be required for assembly. j) Clean gasket mating surfaces Impeller removal NEVER APPLY HEAT TO REMOVE THE IMPELLER. TRAPPED OIL OR LUBRICANT MAY CAUSE AN EXPLOSION Impeller removal with threaded on impeller/locking screw a) Ensure the pump bearing housing assembly is firmly fixed to the work bench. b) Fit a chain wrench or bolt a bar to the holes in the coupling half, or fit a keyed shaft wrench directly to the shaft. Make sure the wrench or bar cannot slip. c) Unscrew the locking screw [6570.6] in the impeller hub completely (applicable only on the locking screw configuration). d) Turn the shaft [2100] counter-clockwise as viewed from the drive end of the shaft with the wrench. e) Give the shaft a quick turn clockwise to sharply strike the wrench handle against the work bench surface or a wooden block. A few sharp strikes by the handle onto the bench/wooden block will free the impeller from the shaft. f) Alternatively, twist the impeller by firmly grabbing hold of the impeller and twist it counter-clockwise. To make the wrench handle impact on the work bench. This method requires the use of metal mesh reinforced gloves. g) Remove and discard the impeller O-ring [4610.1]. Use a new O-ring for assembly Impeller removal with key drive impeller c) Remove impeller nut [2912.1/2912.2] complete with O-ring [4610.5], which should be discarded. (A new O-ring will be required for assembly.) d) Pull impeller [2200] off shaft [2100]. e) Remove impeller key [6700.2]. f) Remove impeller sealing gasket [4590.4] and discard. (A new sealing gasket will be required for assembly.) Cover and seal The seal manufacturer's instructions should be followed for dismantling and assembly, but the following guidance should assist with most seal types: a) Remove shaft guard (if fitted). b) Remove the seal gland nuts, if a separate seal gland is fitted, and slide the seal gland away. Remove the two cover nuts [6580]. c) Loosen the grub screws (used in most mechanical seals). d) Carefully pull off the cover and mechanical seal rotating element(s). e) Remove the seal cover. f) Remove shaft sleeve (if fitted). g) On non-cartridge seals the stationary seat remains in the cover/mechanical seal gland with its sealing member. Remove only if damaged or worn out. h) On pumps fitted with gland packing, the packing and lantern ring should be removed only if the packing is to be replaced Bearing housing a) Take grub screw(s) out of the pump half coupling and pull off this coupling and remove the coupling key. b) Remove support foot [3134] (if necessary). c) Remove the pump side liquid deflector [2540] and/or labyrinth seal rotary half (depending on option fitted). d) Slacken the bearing carrier screws to initiate bearing carrier release. e) Remove bearing carrier [3240] and shaft [2100] assembly from the bearing housing [3200] by pulling it towards the coupling end. f) Remove bearing circlip [6544] (or bearing lock nut [3712.2] if paired angular contact bearings are fitted). Bearing carrier locking rings are left-hand thread. g) Remove drive side v-ring [4305] and/or labyrinth seal rotary half (depending on option fitted). h) Remove bearing carrier [3240]. i) Remove pump side bearing [3011]. j) Release the self-locking drive side bearing nut [3712.1] and remove drive side bearing [3013]. k) When pressing bearings off the shaft, use force on the inner race only. 6.9 Examination of parts Used parts must be inspected before assembly to ensure the pump will subsequently run properly. In particular, fault diagnosis is essential to enhance pump and plant reliability Casing, cover and impeller Inspect for excessive wear, pitting, corrosion, erosion or damage and any sealing surface irregularities. Replace as necessary Shaft and sleeve (if fitted) Replace if grooved or pitted. With the bearing mounting diameters (or bearing outer) supported by V-blocks, check that the shaft runouts are within mm (0.001 in.) at the coupling end and mm (0.002 in.) at the sleeve/impeller end. Page 30 of 53

31 6.9.3 Gaskets, O-rings and V-ring when fitted After dismantling, discard and replace Bearings It is recommended that bearings are not re-used after any removal from the shaft Bearing labyrinths/isolators Labyrinth seals and bearing isolators should be inspected for damage but are normally non-wearing parts and can be re-used. The lubricant, bearings and bearing housing seals are to be inspected for contamination and damage. If oil bath lubrication is utilized, these provide useful information on operating conditions within the bearing housing. If bearing damage is not due to normal wear and the lubricant contains adverse contaminants, the cause should be corrected before the pump is returned to service. Bearing seals are not totally leak free devices. Oil from these may cause staining adjacent to the bearings Bearing housing and carrier Inspect the bearing carrier circlip groove. Ensure it is free from damage and that housing lubrication passages are clear. Replace grease nipples or the filter breather (where fitted) if damaged or clogged. On oil lubricated versions, the oil level sight glass should be replaced if oil stained Assembly To assemble the pump consult the sectional drawings. See section 8, Parts lists and drawings. Ensure threads, gasket and O-ring mating faces are clean. Apply thread sealant to non-face-sealing pipe thread fittings Bearing housing and rotating element assembly a) Clean the inside of the bearing housing [3200], bearing carrier [3240] and bores for bearings. b) Attach bearing housing support foot [3134]. c) Fit the thrust ball bearing [3013] on to shaft [2100]. The double row thrust bearing must not have a filling slot, as such bearings are limited to taking thrust in only one direction. If the pair of angular contact thrust bearings are to be fitted, these must be mounted back-to-back, as shown below: Grease retainer [3864] Grease retainer (clearance type) is only fitted on grease lubricated units The following methods are recommended for fitting the bearings onto the shaft: Method 1: Use a hotplate, hot bath, oven or induction heater to heat the bearing race so it can easily be placed in position then allowed to shrink and grip the shaft. It is important that the temperature is not raised above 100 ºC (212 ºF). Method 2: Press the bearing onto the shaft using equipment that can provide a steady, even load to the inner race. Take care to avoid damaging the bearing and shaft. d) With bearings at ambient temperature, screw on the self-locking bearing locknut [3712.1] (with its polyamide insert facing away from the bearing) until tight. e) With the double row thrust bearing place the bearing circlip [6544] over the shaft, with the tapered face facing the impeller end. f) With the heavy duty thrust bearing option, the lock nut [3712.2], [3864] grease retainer and [3712.2] if grease lubricated, should be placed on the shaft with the larger diameter end facing the impeller end. g) Fit pump radial ball bearing [3011] onto the shaft using Method 1 or 2 above. h) With the NUP roller bearing option, the loose ring should be against the shaft shoulder. i) Fit O-ring [4610.2] on the bearing carrier. Lightly lubricate the bearing carrier bore and O-ring. j) Ensure the shaft keyway edges are free of burrs. During installation, use shimming or tape over the keyway to avoid damaging the drive side bearing seals. k) On grease lubricated pumps, ¾ fill the space between bearing races with the appropriate grease. l) Slide the bearing carrier [3240] onto the shaft/bearing assembly and insert inner circlip [6544] into the carrier groove or screw up the bearing locking ring. m) Check shaft [2100] for free rotation. n) Fit the labyrinth ring [4330] into the bearing housing [3200] ensuring the drain hole faces the bearing and is at the 6 o'clock position. On the single piece labyrinth ring [4330] ensure a Flowserve approved Anaerobic liquid Page 31 of 53

32 gasket is used around 360 degrees of the outside of this prior part to fitting it into the bearing housing. o) Install the shaft assembly into the bearing housing [3200] until the gap is approximately 5 mm (0.2 in.). 0.5 to 2 mm (0.02 to 0.08 in.) Fit the bearing carrier screws [6570.1] but do not tighten. p) Press drive side v-ring [4305] and pump side liquid deflector [2540] onto shaft [2100] where applicable. The V-ring type shall be fitted with light contact with the bearing carrier [3240]. q) The pump side deflector [2540] (this feature is integral with some proprietary labyrinth seals) should only be set in its final position after setting the shaft axial position. r) Temporarily fit the cover [1220] to the power-end. The cover, above 125 size, is retained by studs [6580] and their nuts. The shaft [2100] may now be positioned in relation to the cover face, by rotating the carrier, position as shown below: Bearing housing Dia. X mm (in.) Z mm (in.) Frame 1 24 (0.945) 9 (0.354) Frame 2 32 (1.260) 17 (0.669) Frame 3 42 (1.654) 9 (0.354) Frame 4 48 (1.890) 22 (0.866) t) The pump side deflector [2540] may then be moved towards the bearing housing [3200] and set with its clearance Seal cover and seal assembly a) Extreme cleanliness is required. The sealing faces and shaft [2100] or sleeve [2400] surface must be free from scratches or other damage. b) Refer to section 6.11, Seal arrangements, for seal diagrams. c) Carefully press the stationary seat into the cover [1220] or mechanical seal cover [4213], ensuring that the seating ring is not deformed. Where an anti-rotation pin is fitted ensure that correct engagement with the slot is achieved. d) Place any separate seal covers over the shaft [2100]. e) Refer to manufacturer's instructions to position the mechanical seal rotating elements. Tighten any drive screws in the seal drive collar. For precise compression most cartridge seals should be set after complete pump assembly. f) Fit the cover [1220] into the bearing housing [3200] and tighten all fasteners Gland packed stuffing box assembly a) Assemble the gland packing [4130] into the cover before fitting on to the shaft [2100], see b) Stagger the joints in the gland packing by 90 degrees to each other. c) The lantern ring halves [4134], if required, should be positioned mid-way along the packing. d) Position the gland [4120] squarely against the last ring and tighten the gland nuts finger-tight only. Install into bearing housing assembly, fit the two studs and nuts to hold the cover [1220] in place. e) Check that the shaft [2100] rotates freely Impeller assembly and setting Impeller assembly and setting - screwed on impeller/locking screw a) Fit a new O-ring [4610.1] into the impeller [2200] using a small amount of grease to hold it in place. Apply anti-galling compound (which does not contain copper) to the impeller thread to help subsequent removal. b) Assemble impeller [2200] onto the shaft [2100]. c) Tighten the impeller. Use the same method as in disassembly but rotating in opposite direction. A few sharp strikes will tighten it to the correct level. d) Fit a new O-ring [4610.6] into the locking screw [6570.6] using a small amount of grease to hold it in Page 32 of 53

33 place. Apply anti-galling compound (which does not contain copper) to the impeller thread to help subsequent removal (applicable only on the locking screw configuration). e) Tighten the locking screw (left hand thread) to the predefined torque. Refer to section 6.6 (applicable only on the locking screw configuration) Page 33 of 53

34 Impeller assembly with key drive impeller a) Fit a new impeller sealing gasket [4590.4] against shaft shoulder. b) Fit impeller key [6700.2]. c) Assemble impeller [2200] onto the shaft [2100]. d) Fit a new O-ring [4610.5] into the impeller nut [2912.1/2912.2] groove. e) Apply anti-galling compound (which does not contain copper) to the impeller nut threads to help any subsequent removal. f) Fit impeller nut [2912.1/2] onto the shaft [2100] and torque up Assembly of power-end into casing a) Fit a new gasket [4590] into the casing [1100]. On the recessed impeller a new gasket is required each side of the distance ring [2510.2]. b) Ensure bearing housing and adaptor concentricity and squareness. c) Install the power-end assembly into the pump casing. Coat the studs [6572.1] with anti-galling compound and tighten nuts [6580.1] onto casing. d) Check impeller clearance against original setting or process requirement and adjust as necessary. (See section 6.7, Setting impeller clearance.) e) Ensure that all other items have been re-attached and all fasteners tightened to the correct torques, then follow the instructions in the sections on Installation and Commissioning Sealing arrangements The following section shows details of the seal arrangements. The dimensions provided are for non-step balanced mechanical seals conforming to EN L1K and L1N. Contact your nearest Flowserve sales office or service center if you require further information, such as a mechanical seal dimensional drawing, or are unsure of the specific arrangement supplied. Refer also to section 4.6.5, Auxiliary piping Single seal types seal Single stepped balanced seal Single unbalanced (or inherently balanced) Bearing housing Setting dimension mm (in.) X Y Frame (0.925) 11.0 (0.433) Frame (1.339) 19.0 (0.748) Frame (1.319) 11.0 (0.433) Frame (2.028) 24.0 (0.945) Single seal with external neck bush Q - Rp ¼ in. quench D - Rp ¼ in. drain F - Rp ¼ in. flush Bearing housing Setting dimension mm (in.) X Y Frame (0.925) 11.0 (0.433) Frame (1.339) 19.0 (0.748) Frame (1.319) 11.0 (0.433) Frame (2.028) 24.0 (0.945) Page 34 of 53

35 Single seal with external lip seal Cartridge seal types Cartridge seal in Seal Sentry conical cover Q - Rp ¼ in. quench D - Rp ¼ in. drain F - Rp ¼ in. flush Z - Position of lip seal hard sleeve NB: Lever flange away after fitting hard sleeve to shaft. Bearing housing Setting dimension mm (in.) X Y Frame (0.925) 11.0 (0.433) Frame (1.339) 19.0 (0.748) Frame (1.319) 11.0 (0.433) Frame (2.028) 24.0 (0.945) Hooked sleeve' cartridge seal Pump Setting dimension Z mm (in.) size Frame 1 Frame 2 Frame 3 Frame (1.634) (1.634) 49.0 (1.929) (1.437) 49.0 (1.929) (1.732) 45.0 (1.771) (1.732) 45.0 (1.771) 65.0 (2.559) (1.437) 57.0 (2.244) (1.732) 45.0 (1.771) 65.0 (2.559) Single internal seal with internal and external neck bush Q - Rp ¼ in. quench D - Rp ¼ in. drain F - Rp ¼ in. flush EN12757 L1N For S see seal supplier's instructions Tandem seal types Tandem seal with Flowserve eccentric pumping annulus circulation BI - Rp ¼ in. barrier liquid inlet BO - Rp ¼ in. barrier liquid outlet F - Rp ¼ in. flush EN12757 L1K Setting dimension mm (in.) Pump Frame 1 Frame 2 Frame 3 Frame 4 size X Y X Y X Y X Y (0.492) (0) (0.492) (0) (0.217) (-0.374) (0.689) (0.197) (0.217) (-0.374) (0.417) (-0.173) (0.720) (-0.169) (0.417) (-0.173) (0.720) (-0.169) (-0.185) (-1.272) (1.063) (-0.169) (0.138) (-0.945) (0.417) (-0.173) (0.720) (-0.169) (-0.185) (-1.272) Setting dimension mm (in.) Pump size Frame 1 Frame 2 Frame 3 Frame 4 X Y X Y X Y X Y (0.787) (1.240) (0.787) (1.240) (1.102) (1.634) (0.787) (1.043) (1.102) (1.634) (1.102) (1.433) (1.083) (1.327) (1.102) (1.433) (1.083) (1.327) (1.791) (2.232) (1.083) (1.996) (1.791) (1.902) (1.102) (1.433) (1.083) (1.327) (1.791) (2.232) Page 35 of 53

36 Double seal types Double back-to-back seal with Flowserve eccentric pumping annulus circulation BI - Rp ¼ in. barrier liquid inlet BO - Rp ¼ in. barrier liquid outlet Pump Setting dimension X mm (in.) size Frame 1 Frame 2 Frame 3 Frame (0.433) (0.433) 17.5 (0.689) (0.236) 17.5 (0.689) (0.488) 14.4 (0.567) (0.488) 14.3 (0.563) 32.3 (1.272) (0.224) 24.0 (0.945) (0.488) 14.3 (0.563) 32.3 (1.272) External seal types External seal D - drain Packed gland seal types Packed gland with fiber packing F - Rp ¼ in. flush Page 36 of 53

37 7 FAULTS; CAUSES AND REMEDIES FAULT SYMPTOM Pump overhea ts and seiz es Bea rings have sh ort life Pump vibrate s or is nois y M echanical se al has shor t life M echanical se al lea ks exces sivel y Pump requires exc es sive pow er Pump loses prime af te r st arting Insuffi cien t pre ssur e developed Insuffi cien t cap aci t y deli ver ed Pump does not deliver liquid POSSIBLE CAUSES POSSIBLE REMEDIES A. System troubles Pump not primed or filled with liquid. Check complete filling. Pump or suction pipe not completely filled with liquid. (Where not a self-priming arrangement.) Suction lift too high or level too low. Insufficient margin between suction pressure and vapor pressure. Vent and/or prime. Check NPSH A > NPSH R, proper submergence, losses at strainers and fittings. Excessive amount of air or gas in liquid. Check and purge pipes and system. Air or vapor pocket in suction line. Check suction line design for vapor pockets. Air leaks into suction line. Check suction pipe is airtight. Air leaks into pump through mechanical seal, sleeve joints, casing joint or pipe lugs. Check and replace faulty parts. CONSULT FLOWSERVE. Foot valve too small. Investigate replacing the foot valve. Foot valve partially clogged. Clean foot valve. Inlet of suction pipe insufficiently submerged. Check out system design. Speed too low. CONSULT FLOWSERVE. Speed too high. CONSULT FLOWSERVE. Total head of system higher than differential head of pump. Total head of system lower than pump design head. Specific gravity of liquid different from design. Viscosity of liquid differs from that for which designed. Operation at very low capacity. Operation at high capacity. Check system losses. Remedy or CONSULT FLOWSERVE. Check and CONSULT FLOWSERVE. Measure value and check minimum permitted. Remedy or CONSULT FLOWSERVE. Measure value and check maximum permitted. Remedy or CONSULT FLOWSERVE. Misalignment due to pipe strain. Improperly designed foundation. Shaft bent. B. Mechanical troubles Check the flange connections and eliminate strains using elastic couplings or a method permitted. Check setting of baseplate: tighten, adjust, grout base as required. Check shaft runouts are within acceptable values. CONSULT FLOWSERVE. Page 37 of 53

38 FAULT SYMPTOM Pump overhea ts and seiz es Bea rings have sh ort life Pump vibrate s or is nois y M echanical se al has shor t life M echanical se al lea ks exces sivel y Pump requires exc es sive pow er Pump loses prime af te r st arting Insuffi cien t pre ssur e developed Insuffi cien t cap aci t y deli ver ed Pump does not deliver liquid POSSIBLE CAUSES POSSIBLE REMEDIES Rotating part rubbing on stationary part internally. Check and CONSULT FLOWSERVE, if necessary. Bearings worn Replace bearings. Wearing ring surfaces worn. Replace worn wear ring/surfaces. Impeller damaged or eroded. Replace or CONSULT FLOWSERVE for improved material selection. Leakage under sleeve due to joint failure. Replace joint and check for damage. Shaft sleeve worn or scored or running off center. Check and renew defective parts. Mechanical seal improperly installed. Incorrect type of mechanical seal for operating conditions. Shaft running off center because of worn bearings or misalignment. Impeller out of balance resulting in vibration. Abrasive solids in liquid pumped. Internal misalignment of parts preventing seal ring and seat from mating properly. Mechanical seal was run dry. Internal misalignment due to improper repairs causing impeller to rub. Excessive thrust caused by a mechanical failure inside the pump. Check alignment of faces or damaged parts and assembly method used. CONSULT FLOWSERVE. Check misalignment and correct if necessary. If alignment satisfactory check bearings for excessive wear. Check and CONSULT FLOWSERVE. Check mechanical seal condition and source of dry running and repair. Check method of assembly, possible damage or state of cleanliness during assembly. Remedy or CONSULT FLOWSERVE, if necessary. Check wear condition of impeller, its clearances and liquid passages. Excessive grease in ball bearings. Check method of regreasing. Lack of lubrication for bearings. Improper installation of bearings (damage during assembly, incorrect assembly, wrong type of bearing etc). Damaged bearings due to contamination. Check hours run since last change of lubricant, the schedule and its basis. Check method of assembly, possible damage or state of cleanliness during assembly and type of bearing used. Remedy or CONSULT FLOWSERVE, if necessary. Check contamination source and replace damaged bearings. C. Motor electrical problems Wrong direction of rotation. Reverse 2 phases at motor terminal box. Motor running on 2 phases only. Check supply and fuses. Motor running too slow. Check motor terminal box connections and voltage. Page 38 of 53

39 8 PARTS LISTS AND DRAWINGS 8.1 Mark 3 ISO Open impeller (OP) sectional drawing Drawing taken from B731/ Open impeller (OP) parts list Item Description 1100 Casing 1220 Cover 1340 Adaptor 2100 Shaft 2200 Impeller 2540 Deflector (liquid) 3011 Radial ball bearing 3013 Thrust ball bearing 3134 Support foot 3200 Bearing housing 3240 Bearing carrier Bearing locknut Bearing locknut Grease nipples (grease lubrication only) * Grease nipples (grease lubrication only) * 3855 Constant level oiler * 3856 Oil sight gauge 4200 Mechanical seal 4305 Shaft seal ring 4330 Labyrinth ring Gasket Gasket * O-ring O-ring 6544 Circlip Plug (filler) Plug * Plug (magnetic) Screw Screw Screw Screw Stud Stud Nut Nut Key 9035 Guard * Standard option Page 39 of 53

40 8.1.3 Reverse vane (RV) impeller sectional drawing Drawing taken from B731/ Reverse vane (RV) impeller parts list Item Description 1100 Casing 1220 Cover 1340 Adaptor 2100 Shaft 2200 Impeller 2540 Deflector (liquid) 3011 Radial ball bearing 3013 Thrust ball bearing 3134 Support foot 3200 Bearing housing 3240 Bearing carrier Bearing locknut Bearing locknut Grease nipples (grease lubrication only) * Grease nipples (grease lubrication only) * 3855 Constant level oiler * 3856 Oil sight gauge 4200 Mechanical seal 4305 Shaft seal ring 4330 Labyrinth ring Gasket Gasket * O-ring O-ring 6544 Circlip Plug (filler) Plug * Plug (magnetic) Screw Screw Screw Screw Stud Stud Nut Nut Key 9035 Guard * Standard option Page 40 of 53

41 8.2 Centerline mounted, recessed impeller and self-primer configurations Centerline mounted sectional drawing Drawing taken from C128/ Centerline mounted casing parts list Item Description 1100 Casing 1220 Cover 1340 Adaptor 2100 Shaft 2200 Impeller 2540 Deflector (liquid) 3011 Radial ball bearing 3013 Thrust ball bearing 3134 Support foot 3200 Bearing housing 3240 Bearing carrier Bearing locknut Bearing locknut 3855 Constant level oiler 3856 Oil sight gauge 4200 Mechanical seal 4305 Shaft seal ring 4330 Labyrinth ring 4590 Gasket O-ring O-ring 6544 Circlip Plug (filler) Plug (magnetic) Screw Screw Screw Screw Stud Stud Nut Nut Key 9035 Guard Items not illustrated 2400 Sleeve * * Standard option Page 41 of 53

42 8.2.3 Recessed impeller pump sectional drawing Drawing taken from B731/ Recessed impeller pump parts list Item Description 1100 Casing 1220 Cover 1340 Adaptor 2100 Shaft 2200 Impeller 2400 Sleeve 2510 Distance ring 2540 Deflector (liquid) 3011 Radial ball bearing 3013 Thrust ball bearing 3134 Support foot 3200 Bearing housing 3240 Bearing carrier Bearing locknut Bearing locknut Grease nipples (grease lubrication only) * Grease nipples (grease lubrication only) * 3855 Constant level oiler (oil lubrication only) * 3856 Oil sight gauge 4200 Mechanical seal 4305 Shaft seal ring 4330 Labyrinth ring Gasket Gasket * O-ring O-ring 6544 Circlip Plug (filler) Plug * Plug (magnetic) Screw Screw Screw Screw Stud Stud Nut Nut Key 9035 Guard * Standard option Page 42 of 53

43 8.2.5 Self-priming casing pump sectional drawing Drawing taken from C665/ Self-priming casing pump parts list Item Description 1100 Casing 1220 Cover 1340 Adaptor 2100 Shaft 2200 Impeller 2400 Sleeve * 2540 Deflector (liquid) 3011 Radial ball bearing 3013 Thrust ball bearing 3134 Support foot 3200 Bearing housing 3240 Bearing carrier Bearing locknut Bearing locknut Grease nipples (grease lubrication only) * Grease nipples (grease lubrication only) * 3855 Constant level oiler * 3856 Oil sight gauge 4200 Mechanical seal 4305 Shaft seal ring 4330 Labyrinth ring Gasket Gasket * O-ring O-ring 6544 Circlip Plug (filler) Plug * Plug (magnetic) Plug (filler) Screw Screw Screw Screw Stud Stud Nut Nut Key 9035 Guard * Standard option Page 43 of 53

44 8.3 Additional details Bearing housing sealing details Open impeller (OP) key drive impeller option SLEEVED SHAFT SHOWN ABOVE CENTRE-LINE (includes heli-coil 6589) Frame 1 and 2 SOLID SHAFT SHOWN BELOW CENTRE-LINE Frame 3 and 4 KEY DRIVE DESIGN FOR 304/316 STAINLESS STEEL Key AND drive ABOVE. design SECURE for SCREW 304/316 WITH stainless steel and above, PTFE secure SEALANT screw (LOCTITE with 577) PTFE sealant (Loctite 577) Item Description 2100 Shaft 2200 Impeller 2400 Sleeve (if fitted) Impeller nut Impeller nut Gasket O-ring (if sleeve fitted) O-ring Screw Key Frame 1 to 4 proprietary labyrinth/face seals (where fitted) Page 44 of 53

45 8.3.3 Reverse impeller (RV) - screwed locking bolt drive impeller option Drawing taken from B731/2221 Item Description (sleeved and solid shaft) 2100 Shaft 2200 Impeller 2400 Sleeve (if fitted) O-ring Screw (LH thread for impeller locking) Page 45 of 53

46 8.4 Parts interchangeability Durco Mark3 ISO A hydraulic parts interchangeability Drawing taken from E576/159, issue date 16/04/14 Page 46 of 53

47 8.4.2 Durco Mark3 ISO B hydraulic parts interchangeability Drawing taken from E576/159, issue date 16/04/14 Page 47 of 53

48 8.4.3 Durco Mark 3 ISO self-priming pump parts interchangeability Drawing taken from E576/159, issue date 16/04/14 Page 48 of 53

49 8.4.4 Durco Mark 3 ISO recessed impeller pump parts interchangeability Drawing taken from E576/159, issue date 16/04/14 Page 49 of 53

50 8.5 General arrangement drawing The typical general arrangement drawing and any specific drawings required by the contract will be sent to the Purchaser separately unless the contract specifically calls for these to be included into the User Instructions. If required, copies of other drawings sent separately to the Purchaser should be obtained from the Purchaser and retained with these User Instructions. 9 CERTIFICATION Certificates determined from the Contract requirements are provided with these Instructions where applicable. Examples are certificates for CE marking, ATEX marking etc. If required, copies of other certificates sent separately to the Purchaser should be obtained from the Purchaser for retention with these User Instructions. 10 OTHER RELEVANT DOCUMENTATION AND MANUALS 10.1 Supplementary User Instruction manuals Supplementary instruction determined from the contract requirements for inclusion into User Instructions such as for a driver, instrumentation, controller, sub-driver, seals, sealant system, mounting component etc are included under this section. If further copies of these are required they should be obtained from the purchaser for retention with these User Instructions Additional sources of information Reference 1: NPSH for Rotordynamic Pumps: a reference guide, Europump Guide No. 1, Europump & World Pumps, Elsevier Science, United Kingdom, Reference 2: Pumping Manual, 9 th edition, T.C. Dickenson, Elsevier Advanced Technology, United Kingdom, Reference 3: Pump Handbook, 2 nd edition, Igor J. Karassik et al, McGraw-Hill Inc., New York, Reference 4: ANSI/HI Centrifugal Pumps - Nomenclature, Definitions, Application and Operation. Reference 5: ANSI B Process Piping. Reference 6: ESA Guidelines for safe seal usage (flanges and gaskets). Where any pre-printed set of User Instructions are used, and satisfactory quality can be maintained only by avoiding copying these, they are included at the end of these User Instructions such as within a standard clear protection envelope Change notes If any changes, agreed with Flowserve Solution Group, are made to the product after its supply, a record of the details should be maintained with these User Instructions. Page 50 of 53

51 Notes: Page 51 of 53

52 Notes: Page 52 of 53

53 Your Flowserve factory contact: Flowserve Sihi (Spain) S.L. Vereda de los Zapateros C.P Pozuelo de Alarcón Madrid Spain Flowserve Sihi (Spain) S.L. Avenida de Madrid 67 C.P Arganda del Rey Madrid Spain Telephone +34 (0) Fax +34 (0) Your local Flowserve representative: Flowserve India Controls Pvt. Ltd. - Pump Division SF No. 136/3 & 137, Myleripalayam Road, Myleripalayam Post, Othakkalmandapam, Coimbatore , India Flowserve Fluid Motion and Control (Suzhou) Co.Ltd. No. 26, Lisheng Road, Suzhou Industrial Park, Suzhou , Jiangsu Province, P.R.China Flowserve GB Limited Lowfield Works, Balderton Newark, Notts NG24 3BU United Kingdom Telephone (24 hours) Repair & Service Fax FLOWSERVE REGIONAL SALES OFFICES: USA and Canada Flowserve Corporation 5215 North O Connor Blvd. Suite 2300 Irving, Texas , USA Telephone: Europe, Middle East, Africa Flowserve Corporation Parallelweg AH Etten-Leur The Netherlands Telephone: Latin America Flowserve Corporation Martín Rodriguez 4460 B1644CGN-Victoria-San Fernando Buenos Aires, Argentina Telephone: Telefax: Asia Pacific Flowserve Pte. Ltd. 10 Tuas Loop Singapore Telephone: Telefax: To find your local Flowserve representative please use the Sales Support Locator System found at www. Page 53 of 53

USER INSTRUCTIONS. Installation Operation Maintenance. IDP CPXV and CPXRV

USER INSTRUCTIONS. Installation Operation Maintenance. IDP CPXV and CPXRV USER INSTRUCTIONS IDP CPXV and CPXRV Centrifugal, modular design, vertical sump pumps, including high temperature configuration Installation Operation Maintenance PCN=71569193 05-16 (E). (Based on C942KH001,

More information

Pump Division. LR, LRV, LLR and LR-S CENTRIFUGAL PUMPS USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE

Pump Division. LR, LRV, LLR and LR-S CENTRIFUGAL PUMPS USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE Pump Division Types: LR, LRV, LLR and LR-S CENTRIFUGAL PUMPS USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE PCN=71569088 07-04(E) (incorporating C953KH013) These instructions must be read prior

More information

USER INSTRUCTIONS. Installation Operation Maintenance. PLC centrifugal pump

USER INSTRUCTIONS. Installation Operation Maintenance. PLC centrifugal pump USER INSTRUCTIONS PLC centrifugal pump Single-stage, vertical centrifugal-type immersion pump, vertical axial suction, horizontal lateral discharge Installation Operation Maintenance PCN=71561172 11/09

More information

USER INSTRUCTIONS. Installation Operation Maintenance. FP centrifugal pump

USER INSTRUCTIONS. Installation Operation Maintenance. FP centrifugal pump USER INSTRUCTIONS FP centrifugal pump Multi-stage, single suction and radial joint plan pump type centrifugal pump Installation Operation Maintenance PCN=71576286 02/13 (E) Original instructions. CONTENTS

More information

USER INSTRUCTIONS. Installation Operation Maintenance. MHP centrifugal pump

USER INSTRUCTIONS. Installation Operation Maintenance. MHP centrifugal pump USER INSTRUCTIONS MHP centrifugal pump Single-stage, axial suction, vertical discharge type centrifugal pump Installation Operation Maintenance PCN=71576282 02/13 (E) Original instructions. These instructions

More information

USER INSTRUCTIONS. Installation Operation Maintenance. ME centrifugal pump

USER INSTRUCTIONS. Installation Operation Maintenance. ME centrifugal pump USER INSTRUCTIONS ME centrifugal pump Single-stage, axial suction, tangential vertical discharge type centrifugal pump Installation Operation Maintenance PCN=71576287 02/13 (E) Original instructions. These

More information

USER INSTRUCTIONS. Installation Operation Maintenance. MHP-TN centrifugal pump

USER INSTRUCTIONS. Installation Operation Maintenance. MHP-TN centrifugal pump USER INSTRUCTIONS MHP-TN centrifugal pump Single-stage, axial suction, vertical discharge type centrifugal pump Installation Operation Maintenance PCN=71576313 02/13 (E) Original instructions. These instructions

More information

USER INSTRUCTIONS. Installation Operation Maintenance. Durco Mark 3 ISO close coupled

USER INSTRUCTIONS. Installation Operation Maintenance. Durco Mark 3 ISO close coupled USER INSTRUCTIONS Durco Mark 3 ISO close coupled Close coupled, single stage, end suction, centrifugal, chemical process pumps Installation Operation Maintenance PCN= 26999985 02-14 (E). Original instructions.

More information

USER INSTRUCTIONS. Installation Operation Maintenance. NM centrifugal pump

USER INSTRUCTIONS. Installation Operation Maintenance. NM centrifugal pump USER INSTRUCTIONS centrifugal pump Multi-stage, single suction and radial joint plan pump type centrifugal pump Installation Operation Maintenance PCN=71576289 11/09 (E) Original instructions. USER INSTRUCTIONS

More information

USER INSTRUCTIONS. Installation Operation Maintenance. L and U

USER INSTRUCTIONS. Installation Operation Maintenance. L and U USER INSTRUCTIONS L and U Horizontal, split case, volute type centrifugal pumps for water and general service Installation Operation Maintenance PCN=85392721 11-08 (Based on C953KH025) These instructions

More information

USER INSTRUCTIONS. Installation Operation Maintenance. LC, LCT and LCH centrifugal pumps

USER INSTRUCTIONS. Installation Operation Maintenance. LC, LCT and LCH centrifugal pumps USER INSTRUCTIONS LC, LCT and LCH centrifugal pumps Single-stage, single volute, axial suction and directional lateral discharge type centrifugal pumps Installation Operation Maintenance PCN=71576290 11/09

More information

USER INSTRUCTIONS. Installation Operation Maintenance. IDP CPXM and CPXRM

USER INSTRUCTIONS. Installation Operation Maintenance. IDP CPXM and CPXRM USER INSTRUCTIONS IDP CPXM and CPXRM Close coupled, single stage, end suction, centrifugal, chemical process pumps Installation Operation Maintenance PCN=71569101 03-17 (E) (Based on C939KH038 and C939KH050.)

More information

Pump Division. Type MPT Centrifugal Pumps

Pump Division. Type MPT Centrifugal Pumps Pump Division Type MPT Centrifugal Pumps USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE PCN=85392699 07-09 (E) These instructions must be read prior to installing, operating, using and maintaining

More information

USER INSTRUCTIONS. Installation Operation Maintenance. Vertical Turbine Pumps Wet Pit (VTP) Double Casing (VPC)

USER INSTRUCTIONS. Installation Operation Maintenance. Vertical Turbine Pumps Wet Pit (VTP) Double Casing (VPC) USER INSTRUCTIONS Vertical Turbine Pumps Wet Pit (VTP) Double Casing (VPC) E, S and A series VTPs in wet pit and suction barrel designs ranging in sizes from 50 mm (6 in.) to 1300 mm (52 in.) with a single

More information

IMPORTANT SAFETY NOTICE

IMPORTANT SAFETY NOTICE IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined in this manual will minimize your risk of injury. ITT Goulds

More information

USER INSTRUCTIONS. Installation Operation Maintenance. Niigata Worthington WTB centrifugal pumps

USER INSTRUCTIONS. Installation Operation Maintenance. Niigata Worthington WTB centrifugal pumps USER INSTRUCTIONS Niigata Worthington WTB centrifugal pumps Between bearings, multi-stage, radially split, volute centrifugal pump Installation Operation Maintenance PCN=87900064 10-15 (E). Original instructions.

More information

Types: MNV and MNZ (Vertical long shafted) CENTRIFUGAL PUMPS

Types: MNV and MNZ (Vertical long shafted) CENTRIFUGAL PUMPS Pump Division Types: MNV and MNZ (Vertical long shafted) CENTRIFUGAL PUMPS USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE PCN = 71569188 11-04 (E) (incorporating MNV/MNZ.IOM) These instructions

More information

Type: MFC and MFV (Standard design - Grease Lubricated Pumps) CENTRIFUGAL PUMPS USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE

Type: MFC and MFV (Standard design - Grease Lubricated Pumps) CENTRIFUGAL PUMPS USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE Pump Division Type: MFC and MFV (Standard design - Grease Lubricated Pumps) CENTRIFUGAL PUMPS USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE PCN = 71569256 12-04 (E) (Incorporating MFC/MFV.IM)

More information

USER INSTRUCTIONS. Installation Operation Maintenance. Worthington WUC centrifugal pumps. Vertical, Multistage Can Type

USER INSTRUCTIONS. Installation Operation Maintenance. Worthington WUC centrifugal pumps. Vertical, Multistage Can Type USER INSTRUCTIONS Worthington WUC centrifugal pumps Vertical, Multistage Can Type Installation Operation Maintenance Original Instructions PCN=71569264, 71569265, 71569266, 71569267 05-16 (E) CONTENTS

More information

USER INSTRUCTIONS MANUAL

USER INSTRUCTIONS MANUAL USER INSTRUCTIONS MANUAL Sier-Bath MP1 User Instructions Multiphase Twin Screw Rotary Pumps Manual PCN= 26999958 10/12 (E). Original instructions These instructions must be read prior to installing, operating,

More information

SERIES PC INSTRUCTION AND OPERATION MANUAL

SERIES PC INSTRUCTION AND OPERATION MANUAL MEGGA SERIES PC INSTRUCTION AND OPERATION MANUAL Models PCT and PCF Close-coupled and frame-mounted single-stage horizontal end-suction pumps. WARNING: Read this manual before installing or operating this

More information

USER INSTRUCTIONS. Installation Operation Maintenance. CPXV fitted with Mark 3 end suction hydraulics

USER INSTRUCTIONS. Installation Operation Maintenance. CPXV fitted with Mark 3 end suction hydraulics USER INSTRUCTIONS CPXV fitted with Mark 3 end suction hydraulics Centrifugal, modular design, vertical sump pump Installation Operation Maintenance PCN=71569291 10-09 (E). Original instructions. These

More information

Type: MF Horizontal close-coupled CENTRIFUGAL PUMPS USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE

Type: MF Horizontal close-coupled CENTRIFUGAL PUMPS USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE Pump Division Type: MF Horizontal close-coupled CENTRIFUGAL PUMPS USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE PCN = 71569191 12 04 (E) (Incorporating MF.IM) These instructions should be read

More information

USER INSTRUCTIONS. Installation Operation Maintenance. Worthington LPNV centrifugal pumps

USER INSTRUCTIONS. Installation Operation Maintenance. Worthington LPNV centrifugal pumps USER INSTRUCTIONS Worthington LPNV centrifugal pumps API 610 (BB1), Between Bearings, Axially Spit, Single Stage, Double Suction Pumps, Vertically Mounted Installation Operation Maintenance PCN=87900031-06/14

More information

USER INSTRUCTIONS. Installation Operation Maintenance FLOWSERVE MARK 3 GROUP 4

USER INSTRUCTIONS. Installation Operation Maintenance FLOWSERVE MARK 3 GROUP 4 USER INSTRUCTIONS FLOWSERVE MARK 3 GROUP 4 Horizontal, end suction, centrifugal pumps for chemical process, water and general service Installation Operation Maintenance PCN= 71569286 08-12 (E) Original

More information

USER INSTRUCTIONS. Installation Operation Maintenance. IDP HPX-H & HPX-MP centrifugal pumps

USER INSTRUCTIONS. Installation Operation Maintenance. IDP HPX-H & HPX-MP centrifugal pumps USER INSTRUCTIONS IDP HPX-H & HPX-MP centrifugal pumps Single stage, single suction, radially split volute type centrifugal pumps Installation Operation Maintenance PCN=87900021-06/14 (E) Original instructions

More information

USER INSTRUCTIONS. Installation Operation Maintenance. R and RX. Centrifugal Rubber Lined Slurry Pump

USER INSTRUCTIONS. Installation Operation Maintenance. R and RX. Centrifugal Rubber Lined Slurry Pump USER INSTRUCTIONS R and RX Centrifugal Rubber Lined Slurry Pump Installation Operation Maintenance PCN = 71569242 03-11(E) (incorporating 2162-EID) Original instructions These instructions must be read

More information

USER INSTRUCTIONS Installation Operation Maintenance

USER INSTRUCTIONS Installation Operation Maintenance PolyChem M-series Pumps ISO and ANSI Foot mounted, PFA lined, chemical process pumps with magnetic drive USER INSTRUCTIONS Installation Operation Maintenance PCN=71569218 07-11 (E) Original instructions.

More information

KEYSTONE. Butterfly valves Figure 9 Installation & Maintenance Instructions. Please read these instructions carefully

KEYSTONE. Butterfly valves Figure 9 Installation & Maintenance Instructions.  Please read these instructions carefully KEYSTONE Please read these instructions carefully This symbol indicates important messages and safety instructions. Hazard potentials: disregarding of instructions improper use of product insufficiently

More information

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS Contents Section 1. General Observations... 2 2. Operation... 4 3. Control During Operation... 5 4. Trouble Shooting... 6 5. Maintenance... 7 Please

More information

PROJ. NO SECTION HYDRONIC PUMPS

PROJ. NO SECTION HYDRONIC PUMPS SECTION 23 21 23 HYDRONIC PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Butterfly valves Figure 56 Installation & Maintenance Instructions

Butterfly valves Figure 56 Installation & Maintenance Instructions KEYSTONE Please read these instructions carefully This symbol indicates important messages and safety instructions. Hazard potentials: disregarding of instructions improper use of product insufficiently

More information

USER INSTRUCTIONS. Installation Operation Maintenance. IDP WPG, WPH, CPG and CPH

USER INSTRUCTIONS. Installation Operation Maintenance. IDP WPG, WPH, CPG and CPH USER INSTRUCTIONS IDP WPG, WPH, CPG and CPH D-line centrifugal pumps Installation Operation Maintenance PCN= 26999969 10-12 (E). (Based on C937KH037.) Original instructions. These instructions must be

More information

These installation and maintenance instructions must be read in full and completely understood before the installation!

These installation and maintenance instructions must be read in full and completely understood before the installation! These installation and maintenance instructions must be read in full and completely understood before the installation! 1. General information on the installation and maintenance instructions These instructions

More information

M Series Condensate Recovery Unit

M Series Condensate Recovery Unit 0898050/3 IM-P089-29 ST Issue 3 M Series Condensate Recovery Unit Installation and Maintenance Instructions 1. General safety information 2. General product information 3. Installation 4. Wiring diagram

More information

KEYSTONE SERIES 320 BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

KEYSTONE SERIES 320 BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood HAZARD POTENTIALS disregarding of instructions improper use of product insufficiently qualified personnel Valve application to be

More information

Starting up hydraulic systems

Starting up hydraulic systems General / Installation A hydraulic system that operates economically, safely, and trouble-free requires careful planning, as well as proper installation and start-up. Conscientious maintenance has a considerable

More information

Medium and high pressure pumps

Medium and high pressure pumps Screw pumps Medium and high pressure pumps Installation and Start-up Instruction This instruction is valid for all standard high pressure pumps: E4, D4 and D6 Contents Page Pump identification 2 Installation

More information

NEOTECHA NTB-NTC BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

NEOTECHA NTB-NTC BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood 2 SAFETY Please also read through these notes carefully. 2.1 General potential danger due to: a. Failure to observe the instructions

More information

Storage, operating and maintenance instructions for AZ plug valves and Standard valves

Storage, operating and maintenance instructions for AZ plug valves and Standard valves ARMATUREN Plug - Valves metallic with PTFE Sleeve 2-7 way Storage, operating and maintenance instructions for AZ plug valves and Standard valves Plug - Valves FEP/PFA - lined, 2-3 way Butterfly - Valves

More information

KEYSTONE. Check valves Figure 85/86 Installation & Maintenance Instructions. Figure 85. Figure 86.

KEYSTONE. Check valves Figure 85/86 Installation & Maintenance Instructions. Figure 85. Figure 86. KEYSTONE Please read these instructions carefully. This symbol indicates important messages and safety instructions. Hazard potentials: disregarding of instructions improper use of product insufficiently

More information

KEYSTONE OPTISEAL F14/16-15/17 AND BREWSEAL BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

KEYSTONE OPTISEAL F14/16-15/17 AND BREWSEAL BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood 4. Ozone: storage rooms should not contain any equipment generating ozone. E.g. lamps, electric motors. IMPORTANT Before valves

More information

Series Base mounted pump. Installation and operating instructions

Series Base mounted pump. Installation and operating instructions Series 4030 Installation and File No: 40.80 Date: june 25, 2015 Supersedes: 40.80 Date: october 10, 2009 contents General 4 Inspection 4 Installation - Series 4030 base mounted Pump 4 1.0 Location 4 2.0

More information

Mark 3 High Silicon Iron Pumps

Mark 3 High Silicon Iron Pumps Pump Division Mark 3 High Silicon Iron Pumps USER INSTRUCTIONS: INSTALLATION, OPERATION, MAINTENANCE PCN=71569249 09-04 (E) These instructions must be read prior to installing, operating, using and maintaining

More information

USER INSTRUCTIONS. Installation Operation Maintenance. Worthington HWX centrifugal pumps

USER INSTRUCTIONS. Installation Operation Maintenance. Worthington HWX centrifugal pumps USER INSTRUCTIONS Worthington HWX centrifugal pumps Vertical single stage, single suction, radially split volute type centrifugal pumps Original Instructions PCN= 85392694 06-16 (E) Installation Operation

More information

Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors

Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors Type range: UN813.3ANI UN813.4ANI UN813.3ANDCB UN813.4ANDCB UN813.5ANI Fig. 1: UN813.3ANI Fig. 2: UN813.4ANI You have selected

More information

Pumps and pumping units SL i & Micro C

Pumps and pumping units SL i & Micro C INSTRUCTIONS 1071 e Section Effective October 2016 Replaces April 2016 Original instructions Additional instructions for ATEX certified equipment Pumps and pumping units SL i & Micro C Дистрибутор: България,

More information

USER INSTRUCTIONS. Installation Operation Maintenance. Durco Mark 3 sealed metallic pumps

USER INSTRUCTIONS. Installation Operation Maintenance. Durco Mark 3 sealed metallic pumps USER INSTRUCTIONS Durco Mark 3 sealed metallic pumps Mark 3 Standard, In-Line, Lo-Flo, Recessed Impeller, Unitized Self-Priming and Sealmatic pumps Installation Operation Maintenance PCN=71569102 08-06

More information

Keystone Series GR resilient seated butterfly valves GRW/GRL Installation and operation manual

Keystone Series GR resilient seated butterfly valves GRW/GRL Installation and operation manual Before installation these instructions must be fully read and understood Important Before valves are installed or used the following actions are recommended. 1. Valves/parts have to be inspected and thoroughly

More information

Keystone Figure 85/86 Check valves Installation and Maintenance Instructions

Keystone Figure 85/86 Check valves Installation and Maintenance Instructions Please read these instructions carefully 1.3 Handling 1.3.1 Packed valves Lifting and handling of the packed valves in crates should be carried out by appropriate lifting equipment. If a fork lift truck

More information

Keystone Butterfly valves ParaSeal Installation and maintenance instructions

Keystone Butterfly valves ParaSeal Installation and maintenance instructions Before installation these instructions must be fully read and understood Please read these instructions carefully Hazard potentials: disregarding of instructions improper use of product insufficiently

More information

KP-C Series. Close Coupled End Suction Centrifugal Pumps. Installation, Operation and Maintenance

KP-C Series. Close Coupled End Suction Centrifugal Pumps. Installation, Operation and Maintenance KP-C Series Close Coupled End Suction Centrifugal Pumps Installation, Operation and Maintenance PUMP MODEL NOMENCLATURE KP - 8 x 6 x 16 - E C - AI - BCM Pump Series Suction Pipe Size (in) Discharge Pipe

More information

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual Intelligent Flow Measurement Your Sole Source for Badger Differential Producers Worldwide 6 Blackstone Valley Place, Lincoln RI 02865-1162 Ph: 401 334 1170 Fx: 401 334 1173 Em: solutions@wyattflow. Installation,

More information

PROCESS PUMPS (INDIA) PVT LTD

PROCESS PUMPS (INDIA) PVT LTD VERTICAL CANTILEVER SHAFT SUMP PUMP (PPCS)_ METALLIC INSTALLATION, OPERATION AND MAINTENANCE MANUAL PROCESS PUMPS (INDIA) PVT LTD Plot No.86, III Phase, Peenya Industrial Area, Bangalore 560058 Phone:

More information

This manual presents installation, servicing, troubleshooting, and maintenance for M PUMPS CM MAG-M SERIES Information that may be required regarding

This manual presents installation, servicing, troubleshooting, and maintenance for M PUMPS CM MAG-M SERIES Information that may be required regarding Installation, Operating, Maintenance & Safety Instruction for M PUMPS CM MAG-M SERIES Centrifugal light Mag-Drive pumps (CM MAG-M06/1/2/3/4) This manual presents installation, servicing, troubleshooting,

More information

Air Operated Diaphragm Pumps Operating and Maintenance Instructions

Air Operated Diaphragm Pumps Operating and Maintenance Instructions Product & Chemical Disclaimer The user must take responsibility in the selection of the products materials of construction. Empire Pumps Ltd will act in an advisory role and offer recommendations; however,

More information

USER INSTRUCTIONS. Installation Operation Maintenance. Worthington ERPN centrifugal pumps. Horizontal, End Suction

USER INSTRUCTIONS. Installation Operation Maintenance. Worthington ERPN centrifugal pumps. Horizontal, End Suction USER INSTRUCTIONS Worthington ERPN centrifugal pumps Horizontal, End Suction Installation Operation Maintenance Original Instructions PCN=71569274, 71569275, 71569276 06-16 (E) CONTENTS PAGE 1.0 INTRODUCTION

More information

SELF PRIMING CHEMICAL SERVICE PUMPS

SELF PRIMING CHEMICAL SERVICE PUMPS SELF PRIMING CHEMICAL SERVICE PUMPS INSTALLATION AND OPERATING INSTRUCTIONS This Manual covers: SELF PRIMING MODEL RANGE J50ECX TO J250ECX STAINLESS STEEL*, and NON METALLIC SEAL PUMP MODEL: SERIAL NO:

More information

Instructions for installation, operation and maintenance of: GATE VALVE

Instructions for installation, operation and maintenance of: GATE VALVE Instructions for installation, operation and maintenance of: GATE VALVE GEN GAC GAF/GENF TERMOVENT SC Temerin Republic of Serbia Instruction for installation, operation and maintenance: Table of Contents

More information

VEM motors Thurm GmbH

VEM motors Thurm GmbH VEM motors Thurm GmbH Installation, Operating and Maintenance Instructions Single-Phase Squirrel-Cage Induction Motors, Standard Version March 2005 1. General To avoid damage to the motors and equipment

More information

CSO / CP PUMPS Vertical Spindle Type Installation, Operation and Maintenance Manual

CSO / CP PUMPS Vertical Spindle Type Installation, Operation and Maintenance Manual CSO / CP PUMPS Vertical Spindle Type Installation, Operation and Maintenance Manual www.sameng.co.za (011) 823 4250 Proud Manufacturers of SAMCO Pumps Contents INTRODUCTION 3 LOCATION OF UNIT 3 INSTALLATION

More information

VERTICAL MULTI-STAGE CENTRIFUGAL PUMPS

VERTICAL MULTI-STAGE CENTRIFUGAL PUMPS Installation and Operating Instructions VERTICAL MULTI-STAGE CENTRIFUGAL PUMPS Models 1, 3, 5, 10, 15, 20, 32, 45, 64, 90 1. Model numbering and nameplate format 1.1 Model numbering Example: SBI / SBN

More information

NEOTECHA NEOSEAL BUTTERFLY VALVE INSTALLATION AND MAINTENANCE INSTRUCTIONS

NEOTECHA NEOSEAL BUTTERFLY VALVE INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood 2 SAFETY Please also read through these notes carefully. 2.1 General potential danger due to: a. Failure to observe the instructions

More information

SERIES G3DB/AG3DB ELEVATOR

SERIES G3DB/AG3DB ELEVATOR TM INSTRUCTIONS AND PARTS LIST SERIES G3DB/AG3DB ELEVATOR WARNING This manual, and GENERAL INSTRUCTIONS MANUAL, CA-1, should be read thoroughly prior to pump installation, operation or maintenance. SRM00059

More information

VADA - V60-J PRODUCT OVERVIEW CONSTRUCTION MOTOR USAGE LIMITATIONS WARRANTY

VADA - V60-J PRODUCT OVERVIEW CONSTRUCTION MOTOR USAGE LIMITATIONS WARRANTY PRODUCT OVERVIEW The VADA series of self priming jet pumps combine the functional benefits of centrifugal pumps and the practical and qualitative benefits of self-priming pumps. The Venturi system the

More information

These installation and maintenance instructions must be read in full and completely understood before the installation!

These installation and maintenance instructions must be read in full and completely understood before the installation! NEOTECHA These installation and maintenance instructions must be read in full and completely understood before the installation! 1. General information on the installation and maintenance instructions

More information

Swing Piston Compressors and Vacuum Pumps

Swing Piston Compressors and Vacuum Pumps Swing Piston Compressors and Vacuum Pumps NPK 018 AC Pressure NPK 018 DC Pressure NPK 018 AC Vacuum NPK 018 DC Vacuum Operating and Installation Instructions Read and observe these Operating and Installation

More information

CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080

CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080 CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080 STI S.r.l has taken every care in collecting and verifying the documentation contained in this Instruction Manual. The information herein contained are

More information

Wilo-NPG. Installation and operating instructions /Ed_01_gb_0610_Wilo

Wilo-NPG. Installation and operating instructions /Ed_01_gb_0610_Wilo Wilo-NPG GB Installation and operating instructions 4095556/Ed_01_gb_0610_Wilo 1 Introduction and Safety 1.1 General These instructions must always be kept close to the product's operating location or

More information

Centrifugal Pump Type: KSMK

Centrifugal Pump Type: KSMK Centrifugal Pump Type: KSMK API PROCESS PUMP USER INSTRUCTION MANUAL: INSTALLATION, ASSEMBLY, MAINTENANCE Doc. Rev. 10/12/2004 CONTENTS: 1. INTRODUCTION AND SAFETY... 3 1.1. General... 3 1.2. Disclaimer

More information

INSTALLATION AND MAINTENANCE

INSTALLATION AND MAINTENANCE System Series SDB A.GENERAL The Deflagration- and Endurance burning Flame Arresters, Series SDB, are intended for use in Piping Systems handling flammable Gases / Vapours of Gas Group Ex. IIA / I. B. GUIDANCE

More information

S3 General Installation

S3 General Installation Wilfley Drylock Assembly General Installation Operating & General Servicing Clearance Settings Safety Precautions Spare Parts Ordering Assembly Instructions Model S3 General Installation Inspection upon

More information

Operating manual Separator

Operating manual Separator Operating manual Separator Sheet no. AS/4.1.141.1.1 issue 20.08.2014 Contents Section Title Page 0 Introduction... 1 1 Intended use......1 2 Marking of the fitting... 1 3 Safety instructions... 2 4 Transport

More information

GT-200 GATE VALVES PN16, Screwed end

GT-200 GATE VALVES PN16, Screwed end Document No. : MD-QO-04-281 Date : 2009/07 /17 Version : 1.0 GT-200 GATE VALVES PN16, Screwed end USER MANUAL Modentic Industrial Corporation 14F-1,No.57Taya Rd.,Taichung,Taiwan,R.O.C. Email:modentic@ms9.hinet.net

More information

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions Please read these instructions carefully This symbol indicates important messages and safety instructions. Intended valve use The valve is intended to be used only in applications within the pressure/temperature

More information

GUIDE TO THE INSTALLATION OF SPP PUMPS

GUIDE TO THE INSTALLATION OF SPP PUMPS PUMP INSTALLATION GUIDE GUIDE TO THE INSTALLATION OF SPP PUMPS SPP Pumps Limited. Theale Cross Reading Berkshire ENGLAND RG31 7SP Telephone: +44 (0)1189 323123 Fax: +44 (0)1189 323302 Document No: W00-002E

More information

PROCESS PUMPS (INDIA) PVT LTD

PROCESS PUMPS (INDIA) PVT LTD MANUAL: - M10 HORIZONTAL BPO METALLIC PUMP WITH EXTERNAL MECHANICAL SEAL (GROUP- III & IV) INSTALLATION, OPERATION AND MAINTENANCE MANUAL PROCESS PUMPS (INDIA) PVT LTD Plot No.86, III Phase, Peenya Industrial

More information

DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR LIQUID RING VACUUM PUMPS

DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR LIQUID RING VACUUM PUMPS (Rev. 2.0_10-2010) DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR LIQUID RING VACUUM PUMPS TRVK 2003 to 5003 TRSK 2005 to 5005 INTRODUCTION These instructions are for the maintenance staff in case of repair

More information

Operating Instructions

Operating Instructions Operating Instructions BE2700 Brinkmann Immersions pumps of the series TA/STA/TAL/SAL901... 1303 Contents 1 General...1 2 Safety...2 3 Transport and storage...2 4 Description of product and accessories...2

More information

VERTICAL MULTI-STAGES CENTRIFUGAL PUMPS

VERTICAL MULTI-STAGES CENTRIFUGAL PUMPS Installation and Operating Instructions VERTICAL MULTI-STAGES CENTRIFUGAL PUMPS Models 1, 3, 5, 10, 15, 20, 32, 45, 64, 90, 120, 150 1. Model numbering and nameplate format 1.1 Model numbering Example:

More information

Mounting and Operating Instructions EB 8135/8136 EN. Series V2001 Valves Type 3535 Three-way Valve for Heat Transfer Oil

Mounting and Operating Instructions EB 8135/8136 EN. Series V2001 Valves Type 3535 Three-way Valve for Heat Transfer Oil Series V2001 Valves Type 3535 Three-way Valve for Heat Transfer Oil Type 3535 Three-way Valve with bellows seal and rod-type yoke (partial view) Mounting and Operating Instructions EB 8135/8136 EN Edition

More information

Installation Operation & Maintenance Manual. Oil-Free (Dry) Rotary Vane Vacuum Pump Systems

Installation Operation & Maintenance Manual. Oil-Free (Dry) Rotary Vane Vacuum Pump Systems Installation Operation & Maintenance Manual Oil-Free (Dry) Rotary Vane Vacuum Pump Systems Part No. 9983-0000-S07 / November 2018 OIL-FREE (DRY) ROTARY VANE VACUUM PUMP SYSTEMS TABLE OF CONTENTS CUSTOMER

More information

T95 Load Cell Assembly for Silo, Tank & Vessel Weighing and Axle Weighing

T95 Load Cell Assembly for Silo, Tank & Vessel Weighing and Axle Weighing T95 Load Cell Assembly for Silo, Tank & Vessel Weighing and Axle Weighing Capacities 2t to 20t Stainless Steel Load Sensor OIML C3 approved Integrated Lift Off Prevention Load cell is always in Tension

More information

NECO Pumping Systems

NECO Pumping Systems INSTALLATION OPERATION & MAINTENANCE INSTRUCTIONS For Your NECO Pumping Systems Fuel Oil Transfer System THIS COMPLETELY ASSEMBLED, TESTED, PACKAGED SYSTEM IS OF THE HIGHEST QUALITY AND DESIGN. TO OBTAIN

More information

Installation, Operation and Maintenance Instructions

Installation, Operation and Maintenance Instructions Installation, Operation and Maintenance Instructions 3996 IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined

More information

Turbocharger / VTR..0, VTR..1 Original assembly instructions English

Turbocharger / VTR..0, VTR..1 Original assembly instructions English Assembly Instructions Turbocharger / VTR..0, VTR..1 Original assembly instructions English This document is valid for the VTR..0/..1 series: VTR160, VTR200, VTR250, VTR320, VTR400 VTR161, VTR201, VTR251,

More information

PROCESS PUMPS (INDIA) PVT LTD

PROCESS PUMPS (INDIA) PVT LTD MANUAL: - M12 HORIZONTAL BPO METALLIC PUMP WITH GLAND PACKING (GROUP- III & IV) INSTALLATION, OPERATION AND MAINTENANCE MANUAL PROCESS PUMPS (INDIA) PVT LTD Plot No.86, III Phase, Peenya Industrial Area,

More information

ACHL Series Pump. Operation and Maintenance Manual Air Driven, Hand Operated High Pressure Liquid Pump

ACHL Series Pump. Operation and Maintenance Manual Air Driven, Hand Operated High Pressure Liquid Pump ACHL Series Pump Operation and Maintenance Manual Air Driven, Hand Operated High Pressure Liquid Pump Catalog: 02-9245ME February 2013 Model # Serial # Drawing # Order # Mfg. Date Table of Contents page

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 23 2123 - PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Solutions beyond products...

Solutions beyond products... ORIGINAL INSTRUCTIONS IH102C Installation, Operation & Maintenance Manual Model B177 External Automatic Bypass Valve Model B177 External Automatic Bypass Valve Warning: (1) Periodic inspection and maintenance

More information

PROMAG SR SERIES SEAL-LESS CENTRIFUGAL PUMPS

PROMAG SR SERIES SEAL-LESS CENTRIFUGAL PUMPS PROMAG SR SERIES SEAL-LESS CENTRIFUGAL PUMPS INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS TO OBTAIN THE BEST PERFORMANCE FROM YOUR PROMAG SR PUMP, PLEASE READ THE MANUAL CAREFULLY. Failure to

More information

VALIADIS S.A. HELLENIC MOTORS

VALIADIS S.A. HELLENIC MOTORS Explosion proof motors MAK 56-250 (MAKe 63-250) series Groups IIB and IIC Ex db / Ex db e (EPL) executions Gb or Ex tb IIIC (EPL) Db II 2 G, II 2D, 2GD SAFETY INSTRUCTIONS Safety Instructions MAK and MAKe

More information

Dry installed pump type LANDY BTP.

Dry installed pump type LANDY BTP. OPERATION & MAINTENANCE MANUAL Dry installed pump type LANDY BTP. Landustrie Sneek BV Pieter Zeemanstraat 6 Tel. 0031 515-486888 P.O. BOX 199 Fax. 0031 515-412398 NL-8600 AD Sneek info@landustrie.nl The

More information

1. Wiring Diagrams: Power, signal, and control wiring.

1. Wiring Diagrams: Power, signal, and control wiring. Page 232123-1 SECTION 232123 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

AUTOGAS 150 SERIES PUMPS INSTALLATION GUIDELINES FOR UNDERGROUND TANK APPLICATIONS

AUTOGAS 150 SERIES PUMPS INSTALLATION GUIDELINES FOR UNDERGROUND TANK APPLICATIONS Application Bulletin A Unit of IDEX Corporation No. 13 June 21 AUTOGAS 1 SERIES PUMPS INSTALLATION GUIDELINES FOR UNDERGROUND TANK APPLICATIONS CORKEN, INC. A Unit of IDEX Corporation P.O. Box 12338, Oklahoma

More information

INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS Y-FILTER 83700

INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS Y-FILTER 83700 INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS Y-FILTER 83700 11.106.32.0001 INOXPA, S.A. c/telers, 54 Aptdo. 174 E-17820 Banyoles Girona (Spain) Tel. : (34) 972-57 52 00 Fax. : (34) 972-57 55 02 email:

More information

INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS Y-FILTER 83700

INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS Y-FILTER 83700 INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS Y-FILTER 83700 11.106.32.0001 INOXPA, S.A. c/telers, 54 Aptdo. 174 E-17820 Banyoles Girona (Spain) Tel. : (34) 972-57 52 00 Fax. : (34) 972-57 55 02 email:

More information

INSTALLATION, OPERATION & MAINTENANCE MANUAL FOR SERIES 470 VM VERTICAL MULTISTAGE PUMPS

INSTALLATION, OPERATION & MAINTENANCE MANUAL FOR SERIES 470 VM VERTICAL MULTISTAGE PUMPS INSTALLATION, OPERATION & MAINTENANCE MANUAL FOR SERIES 470 VM VERTICAL MULTISTAGE PUMPS 05 MAY 2010 Copyright 2010 American-Marsh Pumps ENGINEERED PROCESS GROUP 1 240061 CONTENTS SAFETY CONSIDERATIONS...

More information

Installation Vertical Pump: Installation 'CM' and 'CDM' Style: Operation:

Installation Vertical Pump: Installation 'CM' and 'CDM' Style: Operation: Installation Vertical Pump: Gusher vertical end suction pumps with integral shaft is easily installed and put into service. With the one piece shaft design there is no couplings to align, no shims or no

More information

Turbocharger / A100-L Original assembly instructions English

Turbocharger / A100-L Original assembly instructions English Assembly Instructions Turbocharger / A100-L Original assembly instructions English This document is valid for the A100-L series: A165-L, A170-L, A175-L, A180-L, A185-L, A190-L Purpose The assembly instructions

More information