1 Rubber Tyred Vehicles Technical Bulletin Bulletin Number: TB0906 Date: 17/06/2009 Subject: TBS Design Registration 130 Purpose To inform the industry of the registration of the Transport Braking System for 130 LHD's. Applicable to Sandvik 130 LHD's Description New South Wales design registration has been granted for the Transport Braking System on 130 LHD's currently in service. Although the registration applies to vehicles operating in NSW coal workplaces, attachments to this technical bulletin are applicable to all End Users. Changes Required changes to existing vehicles are nominated in A2U (attached). Contact Contact your Sandvik representative for further information or any questions you may have. Attachments DOCUMENT NO. ISSUE DATE TITLE 1 MDR TBS 13/11/08 Notice of Registration of Plant Design (Braking System) 2 A2U A 3/02/09 Compliance Statement, Conditions Of Use, MDR TBS 3 A2U E 17/10/08 Registration Drawing, Braking System, Model 130 LHD 4 RA0021 A 31/10/08 Non-Conformance Risk Assessment for 130 Braking System against MDG39, including Amendment No.1 Sandvik Mining and Construction Tomago Pty ABN Old Punt Road Telephone Tomago NSW Australia Facsimile

2

3

4

5

6 DOCUMENT No.: A2U Rev: A TECHNICAL STATEMENT DOCUMENT No.: A2U TITLE: COMPLIANCE STATEMENT, CONDITIONS OF USE, MDR TBS JOB No.: EN9105 PROJECT: PRODUCT LINE: RUBBER TYRED VEHICLES MACHINE MODEL(S): 130 SERIAL NO.(s): REFERENCE: MDR TBS Issued by: Mark Peristy Design Engineer Sandvik Mining and Construction Tomago Pty REV DATE DESCRIPTION AUTHOR A Initial Release Mark Peristy Sandvik Mining and Construction Tomago Pty Page 1 of 7 ABN Old Punt Road Telephone Tomago NSW Australia Facsimile

7 DOCUMENT No.: A2U Rev: A Table of Contents 1 Compliance Statement 2 2 Schedule of Partial and Non-Compliances 2 3 Document Schedule 2 4 Design Changes and End User Actions 3 5 General Recommendations for End Users Regarding Transport Braking Systems 4 6 Notes Regarding Braking Rates and Testing 5 7 Appendix A - Conditions of Use Compliance Details 6 1 Compliance Statement 1.1 The following compliance statement is applicable to 130 series Load Haul Dump vehicles (hereby referred to as loader(s)) designed, manufactured and supplied by Sandvik Mining and Construction Tomago Pty Limited (hereby referred to as Sandvik) into the New South Wales market. 1.2 The transport braking system design for this loader and any acceptable variation to it specified in documents listed in MDR TBS Section 2.1 complies with the following guideline, with the exceptions as listed in Section 2 of this document. MDG 39 February 2001 Handbook For Approval Assessment Of Transport Braking Systems On Free-Steered Vehicles In Underground Coal Mines incorporating Amendments No. 1 - MDG 39 December Schedule of Partial and Non-Compliances 2.1 Refer to Sandvik Risk Assessment RA0021 for listing of non-compliances and for recommended end user actions and residual risks arising from these noncompliances. 3 Document Schedule 3.1 The design of the 130 braking system has been examined and tested as recorded in MDR TBS Section 2.2. Sandvik Mining and Construction Tomago Pty Page 2 of 7 ABN Old Punt Road Telephone Tomago NSW Australia Facsimile

8 DOCUMENT No.: A2U Rev: A 4 Design Changes and End User Actions 4.1 This registration applies to existing loaders already in service. There are some changes from MDA DEV 51 including all supplementary approvals (but excluding Supplementary approvals MDA DEV 51/3 and 51/4 which will form part of an alternative design registration). 4.2 Loader Modifications Owners and operators of existing loaders are required to perform the modifications listed below in Table 1 in order to comply with the requirements of MDR TBS. Table 1 Required Loader Modifications Item Reference Design Change 1 MDR TBS Fit new compliance registration nameplate and remove existing TBS nameplate. 2 MDR TBS Ensure vehicles have separate hose runs for return lines for primary and secondary brake dump valves. 3 MDA DEV 51/2 Addition of secondary brake dump valve. 4 MDA DEV 51/2 Alterations to the transmission isolate valve and pilot line. 5 MDA DEV 51/2 Change to service brake valve, part No MDA DEV 51/2 Optional auto brake valve to apply the brakes when the engine safety circuit shut down the diesel engine. 7 MDA DEV 51 Issue M Automatic brake with door interlock. 8 MDA DEV 51 Initial design 4.3 Changes to Testing or Procedures Owners and operators of existing loaders are required to implement or change testing or procedures listed below in Table 2. Table 2 Required Changes to Testing or Procedures and End User Actions Change From Previous Design End User Action Required For Existing Loaders In-service testing requirements have been revised. Update mechanical engineering management plan in accordance with requirements in MDR Ensure Loader is routinely tested in service to the revised braking rates listed in the registration drawings. Sandvik Mining and Construction Tomago Pty Page 3 of 7 ABN Old Punt Road Telephone Tomago NSW Australia Facsimile

9 DOCUMENT No.: A2U Rev: A 5 General Requirements for End Users Regarding Transport Braking Systems 5.1 These recommendations are additional to those provided in the loader Operator and Service Manuals (including addendums), and relevant alerts and bulletins issued by Sandvik or the industry. 5.2 All vehicle operators to be suitably trained and qualified especially with regard to parking procedures and emergency braking procedures. 5.3 All vehicle operators to be made aware of roadway, vehicle and environment conditions that may significantly alter the vehicle s stopping distance and ability to hold on grade. 5.4 This MDR doesn t cover use of braked trailers. These must be assessed separately. 5.5 Sandvik FMEA's on vehicle systems may exclude generic faults from the analyses in accordance with AS Section 4. The generic faults that may be excluded and conditions for exclusion are in listed in AS Appendices A, B, C, and D. End Users should note that if the vehicle system is modified outside the scope of the registration or design intention, or has not been tested or maintained as specified, the conditions upon which a generic fault may have been excluded will no longer be valid, and the likelihood of this fault occurring will increase. 5.6 Sandvik FMEA's and risk assessments assume that the assessed design has not been modified and has been adequately maintained. End Users should note that modification or poor maintenance practices will invalidate assessment of some risks. 5.7 Mine Transport Rules should consider the following issues: Prevention of collisions with personnel, mobile plant, or fixed objects Rated grades for mobile plant are not exceeded Reduced loads and travelling speeds for some roadway conditions Sandvik Mining and Construction Tomago Pty Page 4 of 7 ABN Old Punt Road Telephone Tomago NSW Australia Facsimile

10 DOCUMENT No.: A2U Rev: A 6 Notes Regarding Braking Rates and Testing 6.1 The braking rate and pull force pass/fail criteria for in-service testing have been revised to comply with the requirements of MDG39 amendment No.1. The required braking rates are shown on the registration drawing and registration nameplate. 6.2 To provide flexibility in regards to testing, the braking rates are nominated for a loader without any QDS attachment fitted. 6.3 On some road surfaces the required braking rates and pull force may be difficult to achieve due to wheel slip. This may be addressed by changing the test location (road surface) and/or adding additional mass to the loader for testing purposes and using an adjusted pass/fail braking rate calculated as per MDG39 Amendment No.1 Amend. [18]. 6.4 Braking rates and holding forces for vehicles fitted with steel wheel chains are especially dependent on the type of road surface. It may be necessary to conduct routine brake testing of these vehicles on soft ground to ensure adequate braking effort is transferred between the tyres and the ground. Sandvik Mining and Construction Tomago Pty Page 5 of 7 ABN Old Punt Road Telephone Tomago NSW Australia Facsimile

11 DOCUMENT No.: A2U Rev: A 7 Appendix A - Conditions of Use Compliance Details 7.1 The following table details the compliance to conditions of use nominated in MDR TBS. 7.2 Note that Sandvik no longer manufacture this transport braking system. Table A1 Clause By Clause Conditions of Use Compliance Details Item Requirement End User Requirements 3 Conditions for Supply and Use 3.1 General Conditions for Supply 1. The plant design registration number must appear in a conspicuous place in a legible manner on each item of registered plant, unless specifically excluded. 2. The designer, manufacturer and/or supplier must provide any person who owns the plant, or who has control of the plant or the end use all information as required by clauses 96, 105, and 122 of the Regulation and all documents listed in section 2.1 of this registration. 3. A copy of the registration of plant design documentation must be supplied to any person who owns or who has control of the registered plant. The documentation must comprise the number of pages listed in the footer block together with all documentation and drawings as listed in the Schedule specifically nominated for the purposes of installation, inspection and maintenance of the plant design. 4. The manufacturer is to certify in writing that the particular plant design supplied is in accordance with the requirements of this design registration. 5. There must be no variation in the materials, design or construction of the plant associated with this registration. Unauthorised alteration or substitution of registered plant will render this registration void. 6. New plant must not be manufactured, (or supplied) to this design registration after the specified date of expiry. If no date is specified, after 10 years for the date of registration. This does not prevent ongoing use of existing plant manufactured prior to the specified date of expiry. Install nameplate to existing vehicles. Remove old approval nameplate. Ensure the required documentation is supplied when selling or hiring out the Loader. Ensure the required documentation is supplied when selling or hiring out the Loader. Ensure loader is maintained as per registration requirements. Not Applicable 3.2 General Conditions for Use Comply with requirements of Section 3.2 of MDR TBS. 3.3 Specific Conditions 1. The system identification number MDR TBS and the supplier s name or mark, the brake performance limits, the maximum operating grades, speed and masses must be inscribed on a durable plate fixed in a prominent position on the equipment. 2. The mine s Mechanical Engineering Management Plan under clause 20 of the Coal Mine Health and Safety Regulation 2006 must include provisions to regularly check, inspect and maintain the transport braking system to ensure it remains in a safe condition for use. 3. The Coal Operator must ensure that the underground Transport Management Plan (clause 31, Coal Mine Health and Safety Regulation 2006) incorporates provision to ensure site operational parameters do not exceed those stated in condition (4) below. Install nameplate BD Ensure MEMP complies with requirement. Ensure TMP complies with requirement. Sandvik Mining and Construction Tomago Pty Page 6 of 7 ABN Old Punt Road Telephone Tomago NSW Australia Facsimile

12 DOCUMENT No.: A2U Rev: A Item Requirement End User Requirements 4. The operating parameters for ideal conditions must not exceed: Ensure that the vehicle is a) Maximum gross vehicle 28,545 kg utilised within the mass nominated parameters, b) Tare mass (no QDS attach) 19,180 kg under ideal conditions. Tare mass (with QDS 21,545 kg attach) c) Maximum load 7,000 kg d) Maximum braked towing load Maximum un-braked towing load 7,000 kg f) Maximum combination of 28,545 kg payload and towing load g) Maximum operating speed 24 km/h h) Maximum grade 25% 1:4 Sandvik Mining and Construction Tomago Pty Page 7 of 7 ABN Old Punt Road Telephone Tomago NSW Australia Facsimile

13

14 REPORT NO.: RA0021 JOB NO.: EN 9105 MACHINE: 130 PROJECT: Non-conformance Risk Assessment for 130 Braking System against MDG39, including Amendment No.1 ASSESSMENT DATE: 31/10/08 PREPARED FOR: NSW Department of Primary Industries REVISION DATE REVISIONS A 31/10/08 Initial Release... Mark Peristy Design Engineer Construction Tomago Pty Construction - Tomago Pty Limited page 1 of 14

15 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY INTRODUCTION BACKGROUND REFERENCES DEFINITIONS RISK ASSESSMENT OBJECTIVE RISK ASSESSMENT SCOPE RISK ASSESSMENT TEAM MEMBERS METHODOLOGY RISK ASSESSMENT PROCEDURE RISK ASSESSMENT PROCESS RISK ASSESSMENT FLOWCHART SET ASSESSMENT OBJECTIVES DEVELOP OPERATIONAL PROCESS IDENTIFY HAZARDS NOMINATE EXISTING BARRIERS ESTIMATE FREQUENCY ESTIMATE SEVERITY ESTABLISH RISK FROM RISK MATRIX RECOMMEND POTENTIAL NEW BARRIERS IMPLEMENT NEW BARRIERS PREPARE REPORT RISK IDENTIFICATION AND HAZARD MANAGEMENT Construction - Tomago Pty Limited page 2 of 14

16 1 EXECUTIVE SUMMARY 1.1 In order to minimise risk due to partial and non-compliances to MDG39 incorporating Amendment No.1, Sandvik and End Users are required to perform the following actions. Refer to Section 4 for hazard identifications and specific actions required for each risk. 1.2 Sandvik Actions as an outcome of the Risk Assessment. These actions are nominally due for completion by November 2008: Design revised TBS nameplate Revise TBS drawing Engineer steering accumulator dump valve Issue Technical Bulletin on changes 1.3 End User Actions as an outcome of the Risk Assessment. These actions are nominally due for completion by June 2009: Install revised nameplate Ensure exisiting vehicles match TBS drawing Install steering accumulator dump valve if required. Construction - Tomago Pty Limited page 3 of 14

17 2 INTRODUCTION 2.1 BACKGROUND In order to apply for Design Registration for the 130 braking systems, a gap analysis and risk assessment are required to be performed and issued to the regulating authority. The gap analysis has been performed in Sandvik Compliance report CR0347. The partial and non-compliances identified by this compliance report have been risk assessed in this Risk Assessment Report to identify the criticality their non-compliances present to the use of the machine. 2.2 REFERENCES Australian / New Zealand Standard , Risk Management MDG Risk Management Handbook MDG Guide to Reviewing a Risk Assessment MDG39 - Handbook for the Design, Installation, Testing And Maintenance Of Braking Systems On Free-Steered Vehicles in Underground Coal Mines incorporating Amendment No. 1. CR Transport Braking System Compliance to MDG39 Including Amendment No DEFINITIONS Hazard Principle Hazard Likelihood Probability Consequence Risk Risk Analysis Risk Assessment Risk Management Risk Control Monitor FMEA A source of potential harm or a situation with a potential to cause loss. A source of potential harm or a situation with a potential to result in multiple fatalities. Used as a qualitative description of probability and frequency. The likelihood of a specific outcome, measured by the ratio of specific outcomes to the total number of possible outcomes. The outcome of an event or situation expressed qualitatively or quantitatively, being loss, injury disadvantage or gain. The chance of something happening that will have an impact upon objectives. It is measured in terms of consequences and likelihood. A systematic use of available information to determine how often specified events may occur and the magnitude of their likely consequences. The overall process of risk analysis and risk evaluation. The systematic application of management policies, procedures and practices to the tasks of identifying, analysing, evaluating, treating and monitoring risk. That part of risk management, which involves the provision of, polices, standards and procedures to eliminate, avoid or minimise adverse risks facing an enterprise. To check, supervise, observe critically, or record the progress of an activity, action or system on a regular basis in order to identify change. A procedure by which potential failures are analysed and each failure mode identified is ranked according to the combined influence of its likelihood of occurrence and the severity of its consequences. Construction - Tomago Pty Limited page 4 of 14

18 2.4 RISK ASSESSMENT OBJECTIVE The objective of the risk assessment is to identify and then resolve or minimise any hazards which could impact on the health or safety of workers operating the 130 LHD due to it s non-conformances with the current braking system guideline for Underground Coal Mines. The resolution or minimisation of risks may be achieved via design changes, additional signage, or modifications to operating and maintenance procedures. Engineering changes that eliminate the risk are preferred where practical. 2.5 RISK ASSESSMENT SCOPE The Risk Assessment scope is limited to the braking system on 130 LHD s. Risk areas have been identified as areas of non-conformance with the current braking system guideline, MDG39 incorporating Amendment No RISK ASSESSMENT TEAM MEMBERS NAME ORGANISATION POSITION Phil Nelthorpe Construction Engineering Manager - RTV Tomago Pty. Mark Peristy Construction Tomago Pty. Design Engineer Construction - Tomago Pty Limited page 5 of 14

19 3 METHODOLOGY 3.1 RISK ASSESSMENT PROCEDURE The risk assessment was carried out by following the following four defined stages: Stage 1 Determine an objective and a scope. The objective was to identify non-compliances with MDG39 incorporating Amendment No.1, and then perform a risk assessment on these non-compliances. The scope was limited to the braking systems on the 130 LHD, specifically the noncompliances to MDG39 incorporating Amendment No.1. Stage 2 Identification of non-conformances of the 130 LHD braking systems to MDG39 incorporating Amendment No.1. These have been recorded in Sandvik Compliance Report CR0347. Stage 3 The formal risk review was undertaken at, Hexham offices on 31/10/08. This risk review nominated the expected criticality of the risks and suggested new barriers where applicable Stage 4 Following the completion of the risk assessment, the report was written and a list of recommendations developed for implementation. Stage 5 Additional actions are required subsequent to the risk assessment and these are as follows: Engineering and Management review of Risk Assessment recommendations to determine suitability, requirements, practicality and approval of each suggested new barrier. Engineering of approved suggested new barriers and recommendations. Update of vehicle training, operating and maintenance documentation to reflect approved recommendations. Communication of new barriers to industry via Technical Bulletin. Ongoing audit of Risk Assessment actions until all items closed out. Re-assessment of risks in response to changes to requirements, or vehicle design for the life of the machines. 3.2 RISK ASSESSMENT PROCESS The risk assessment process utilised is outlined on the following flowchart 2.3 to clearly define each step. Construction - Tomago Pty Limited page 6 of 14

20 3.3 RISK ASSESSMENT FLOWCHART SET ASSESSMENT OBJECTIVES DEVELOP OPERATIONAL PROCESS IDENTIFY HAZARDS NOMINATE EXISTING BARRIERS ESTIMATE PROBABILITY ESTIMATE CONSEQUENCES ESTIMATE RISK USING MATRIX RECOMMEND POTENTIAL NEW BARRIERS IMPLEMENT NEW BARRIERS PREPARE REPORT 3.4 SET ASSESSMENT OBJECTIVES Set an objective to aim at throughout the process. It is important that all parties agree on the objective of the process and that it is strictly adhered to throughout the discussions. 3.5 DEVELOP OPERATIONAL PROCESS Analyse the operation of the equipment and to lay it out in a flow chart form so that a step by step approach to the use of the equipment can be evaluated. 3.6 IDENTIFY HAZARDS Examine each operation along the flow chart created in step 2 to identify hazards or loss scenarios associated with those operations. In line with the previously decided limitations of the exercise, only the operations relating to the objectives and scope were examined for possible hazards and loss scenarios. 3.7 NOMINATE EXISTING BARRIERS Nominate, where possible, any existing barriers presently in the design of the machine, system or procedure, which may prevent identified hazards from occurring. 3.8 ESTIMATE FREQUENCY Determine the probability of a hazard, as identified in step 3, occurring. The rating of the probability is decided by team consensus or statistics where available. The basis of the rating is shown on the table below for a WRAC SYSTEM TO MDG 1010 APPENDIX A7. A B C D E FREQUENCY OF THE EVENT Almost certain to happen, more once per month Likely to happen at some point, more than once per year Possible, it might happen, more than once per 5 years Not likely to happen, less than once per 5 years Practically impossible, unlikely to ever occur Construction - Tomago Pty Limited page 7 of 14

21 3.9 ESTIMATE SEVERITY Determine the severity of the identified failure should they occur. The consequence rating is determined by team consensus or statistical information where available. The basis of the severity rating is shown on the following table. SEVERITY OF THE EVENT PERSONNEL INJURY FINANCIAL COST LOSS OF PRODUCTION 1 FATALITY OR PERMANENT > $500K > 1 DAY DISABILITY 2 SERIOUS LOST TIME INJURY $100K - $500K > 1 SHIFT OR ILLNESS 3 MODERATE LOST TIME $50K - $100K > 1 HOUR INJURY OR ILLNESS 4 MINOR LOST TIME INJURY $5K - $50K 1 HOUR OR ILLNESS 5 NO LOST TIME (POSSIBLE FIRST AID) <$5K INSIGNIFICANT 3.10 ESTABLISH RISK FROM RISK MATRIX The risk ranking can be determined by checking the frequency and severity rating for each hazard against the Risk Matrix below. The Risk Matrix has been sourced from Sandvik s Sandvik Safety Take 5 Personal Risk Assessment Handbook. RISK MATRIX FREQUENCY SEVERITY A B C D E RECOMMEND POTENTIAL NEW BARRIERS Recommend through group discussion, drawing from the team members' experience, means of reducing or eliminating the risk through appropriate barriers or controls. Construction - Tomago Pty Limited page 8 of 14

22 3.12 IMPLEMENT NEW BARRIERS The implementation of the potential new barriers that have been selected by the manufacturer and/or end-user of the equipment or system of use A written explanation as to the reasoning behind selection or rejection of the suggested new barriers is required for each of the identified hazards As a guide to ensure each identified hazard is sufficiently addressed, the table below may be used as a guide for the minimum expected controls or barriers for each risk ranking. RISK LOW MEDIUM HIGH NECESSARY CONTROLS AND BARRIERS Risk may or may not have barriers set but in the interest of the manufacturer/end-user those barriers that are relatively easy or cost effective to implement should be implemented. Controls or barriers should be implemented. Identified risks in this category shall have barriers or controls in place Hard barriers or mechanical forms of protection should be used in preference to soft barriers (training and procedures) where practical. This is especially true when implementing barriers and controls for High risk ranked hazards PREPARE REPORT Step 10 is to prepare the report; this report should have included the following as a minimum A list of the risk assessment team including the person's name, company and position A list of the new or revised items being assessed on the equipment Clear drawings, diagrams and photos where available to validate the affected equipment Any available injury and safety statistics should be documented in the appendix All processes, hazards, probabilities, consequences, risks and barriers nominated in the exercise are to be listed A final recommendation list of selected barriers and the hazards they minimise or eliminate must be listed Statements as to the reasons why potential new barriers have not been implemented must be supplied by the manufacturer/end-user. Construction - Tomago Pty Limited page 9 of 14

23 4 RISK IDENTIFICATION AND HAZARD MANAGEMENT 4.1 The partial compliances and non-compliances to MDG39 Incorporating Amendment No.1 have been assessed for design risk in this section. The information is contained in the following 3 tables: Table 1 Listing of all hazards requiring Sandvik or End User Action, sorted highest risk to lowest risk Table 2 Listing of all hazards requiring Sandvik action and delegation of responsibilities. Table 3 Listing of all risks pertaining to gap analysis between 130 LHD and MDG39 incorporating Amendment No.1. Construction - Tomago Pty Limited page 10 of 14

24 Construction Tomago Pty Table 1 Listing of all hazards requiring Sandvik or End User Action, sorted highest risk to lowest risk Rev Clause No. Hazard & Effects A para 2 (MDG39 Amend 1) Unplanned Movement (Collision due to failed braking) A (a) No increased risk. item included here as there is a Sandvik action. A 2.2 No increased risk. item included here as there is a Sandvik action. Risk Rank Suggested new Barriers 17 TBS schematic shows single tank line. Actual vehicle schematics specify separate return lines for Primary and Secondary Brake Dumps. TBS drawing should be revised to reflect this (no change in risk) Risk Rank Sandvik Action Required to Implement New Barrier 17 Revise TBS drawing. Refer A2U Revision E. Fit bleed valve Sandvik to issue Technical Bulletin advising of option for older vehicles. Install compliance plate Sandvik shall revise the nameplate to list required braking rates. End User Action Required to Implement New Barrier Ensure separate tank lines as per TBS drawing for primary and secondary brake dump valves. Fit steering accumulator dump valve Fit new nameplate page 11 of 14

25 Construction Tomago Pty Table 2 Listing of all hazards requiring Sandvik action and delegation of responsibilities. Rev ITEM SUGGESTED CONTROLS ACTION RESPONSIBLE APPROVED 1 A para 2 (MDG39 Amend 1) A (a) TBS schematic shows single tank line. Actual vehicle schematics specify separate return lines for Primary and Secondary Brake Dumps. TBS drawing should be revised to reflect this (no change in risk) Fit bleed valve Revise TBS drawing. Refer A2U Revision E. Sandvik to issue Technical Bulletin advising of option for older vehicles. (YES/NO) DATE REQUIRED M Peristy Yes Complete M Peristy Yes Complete A 2.2 Install compliance plate Sandvik shall revise the nameplate to list required braking rates. M Peristy Yes Complete 1. Approval may be determined subsequent to initial issue of this Risk Assessment. page 12 of 14

26 Construction Tomago Pty Rev A A Clause No para 2 (MDG39 Amend 1) para 3 (MDG39 Amend 1) Clause Comply Comments/Justification Hazard & Effects Failure of a single component shall not prevent the mobile plant from being held stationary on the maximum operating grade. The secondary brake system shall be tested to simulate the performance condition when the service brake system has failed under the worst case failure as identified by the risk assessment, refer clause If the secondary brake system forms part of the service brake, then the service brake must be modified and separated from the secondary brake, so that secondary brake system can be operated alone for the test. Partial Do Not Comply Table 3 Listing of all risks pertaining to gap analysis between 130 LHD and MDG39 incorporating Amendment No.1. Braking will not achieve required performance if hose line to brakes is crushed and high pressure retained. The likelihood of this occurring to a high pressure hydraulic hose protected by the vehicle frame is expected to be so rare that the risk level is low. Note that blockage of this line is a precluded failure as the hose is in the power (pressure) circuit as per AS Table C8. TBS schematic shows single tank line. Actual vehicle schematics specify separate return lines for Primary and Secondary Brake Dumps. TBS drawing should be revised to reflect this. Testing for worst case failure not conducted as vehicle predates MDG39. Refer also para 2. Unplanned Movement (Collision due to failed braking) Unplanned Movement (Collision due to single line component ceasing system function) page 13 of 14 Existing Barriers Steer LHD into rib, Drop bucket/qds, Protected hose, Filtered fluid, Engine retardation Pre-start check Line to front brake passes through centre of articulation clear of pinch points and is clear of lift arms. Rear brake line passes clear of bolster pinch points. Proven brake reliability in service. Steer LHD into rib, Drop bucket/qds, Protected hose, Filtered fluid Engine retardation Pre-start check Line to front brake passes through centre of articulation clear of pinch points and is clear of lift arms. Rear brake line passes clear of bolster pinch points. Front and rear brake lines are separated. Consequence to Personnel, or Equipment Probability Consequence Risk Rank Suggested new Barriers Both D 3 17 TBS schematic shows single tank line. Actual vehicle schematics specify separate return lines for Primary and Secondary Brake Dumps. TBS drawing should be revised to reflect this (no change in risk) Both D 3 17 Probability Consequence Risk Rank Risk Notes D 3 17 Refer also Clause (ii) (MDG39 Amend 1) Sandvik Action Required to Implement New Barrier Revise TBS drawing. Refer A2U Revision E. End User Action Required to Implement New Barrier Ensure separate tank lines as per TBS drawing for primary and secondary brake dump valves.

27 Construction Tomago Pty Rev A Clause No (ii) (MDG39 Amend 1) Clause Comply Comments/Justification Hazard & Effects (ii) A failure of a single component of the braking system that provides the worst condition for braking as identified by the design risk assessment, and Partial Brake will not achieve required performance if hose line to brakes is crushed and high pressure retained. The likelihood of this occurring to a high pressure hydraulic hose protected by the vehicle frame is expected to be so rare that the risk level is low. Note that blockage is a precluded failure as the hose is in the power (pressure) circuit as per AS Table C8. Unplanned Movement (Collision due to single line component ceasing system function) Existing Barriers Proven brake reliability in service. Steer LHD into rib, Drop bucket/qds, Protected hose, Filtered fluid Engine retardation Pre-start check Line to front brake passes through centre of articulation clear of pinch points and is clear of lift arms. Consequence to Personnel, or Equipment Probability Consequence Risk Rank Both D 3 17 Suggested new Barriers Probability Consequence Risk Rank Risk Notes Sandvik Action Required to Implement New Barrier End User Action Required to Implement New Barrier Rear brake line passes clear of bolster pinch points. Front and rear brake lines are separated. A (a) Fluid Power Systems (a) Accumulators A manual bleed valve shall be fitted to allow pressure relief for maintenance. Fluid should return to tank. Partial No bleed valve fitted for steering accumulators (not part of brake circuit). Steering accumulator drained by activation of steering controls. Brake Dump valve removes pressure from accumulator when engine shut off. Can also empty accumulator by applying foot brake a number of times. Gauge in dash indicates accumulator pressure. No increased risk. item included here as there is a Sandvik action. Fit bleed valve Sandvik to issue Technical Bulletin advising of option for older vehicles. Fit steering accumulator dump valve A 2.2 COMPLIANCE PLATE Partial Maximum gross unbraked towing capacity not stated. Calculations show that this is dependent on payload carried by vehicle, rolling resistance of trailer and coefficient of friction between vehicle wheels and mine floor. A single number is too simplistic No increased risk. item included here as there is a Sandvik action. Install compliance plate Sandvik shall revise the nameplate to list required braking rates. Fit new nameplate Holding grade quoted as ratio rather than percentage as ratio is in common use. page 14 of 14

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By ABN 70 250 995 390 180 Thomas Street, Sydney PO Box A1000 Sydney South NSW 1235 Australia T (02) 9284 3000 F (02) 9284 3456 18/10/2018 Mr Peter Adams General Manager, Wholesale Markets Australian Energy

More information

ECE/RCTE/CONF/4/Add.1/Rev.2

ECE/RCTE/CONF/4/Add.1/Rev.2 ECE/RCTE/CONF/4/Add.1/Rev.2 8 May 2018 Agreement Concerning the adoption of uniform conditions for periodical technical inspections of wheeled vehicles and the reciprocal recognition of such inspections

More information

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E 1. Scope 1.1 The general process is described in the implementation procedure for design approvals of aircraft, engine and propeller from CIS and in the implementation procedure for design approvals of

More information

PDS COLLISION AVOIDANCE AACSA UNDERGROUND IMPLEMENTATION LEARNINGS

PDS COLLISION AVOIDANCE AACSA UNDERGROUND IMPLEMENTATION LEARNINGS PDS COLLISION AVOIDANCE AACSA UNDERGROUND IMPLEMENTATION LEARNINGS Coal South Africa - 11 June 2015 Prepared for the SACEA Workshop 1 PDS BACKGROUND NEW DENMARK EXAMPLE SUCCESSES CHALLENGES AACSA COLLISION

More information

Risk Management of Rail Vehicle Axle Bearings

Risk Management of Rail Vehicle Axle Bearings Railway Group Standard Risk Management of Rail Vehicle Axle Bearings Synopsis This Railway Group Standard mandates that there shall be riskbased processes to minimise and detect failures of rail vehicle

More information

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS Title: Cranes - Inspection and Maintenance PROCEDURE Procedure No: P314.422 Issue: 1 Revision: 0 Operative Date: 22/12/2016 Department: HSEC Sect./Classification: Safety / Gear & Equipment Author: D Steel

More information

} Rev.1/Add.12/Rev.6/Amend.4

} Rev.1/Add.12/Rev.6/Amend.4 30 December 2009 AGREEMENT CONCERNING THE ADOPTION OF UNIFORM TECHNICAL PRESCRIPTIONSFOR WHEELED VEHICLES, EQUIPMENT AND PARTS WHICH CAN BE FITTEDAND/OR BE USED ON WHEELED VEHICLES AND THE CONDITIONS FOR

More information

June Safety Measurement System Changes

June Safety Measurement System Changes June 2012 Safety Measurement System Changes The Federal Motor Carrier Safety Administration s (FMCSA) Safety Measurement System (SMS) quantifies the on-road safety performance and compliance history of

More information

Assisted School Travel Program. Eligible Service Provider Request for Increased Run Capacity

Assisted School Travel Program. Eligible Service Provider Request for Increased Run Capacity Version 1.0 Assisted School Travel Program Eligible Service Provider Request for Increased Run Capacity Eligible Service Providers to the Department of Education and Communities Assisted School Travel

More information

Managing Electrical Safety on Boats

Managing Electrical Safety on Boats Managing Electrical Safety on Boats Note Throughout this document there are several specific terms with which you should be familiar, and they are defined in the dictionary below. These terms are identified

More information

Tractor-Trailer Combination Braking and Safety. Presented by : Paul Schutte Date: 12 April 2007

Tractor-Trailer Combination Braking and Safety. Presented by : Paul Schutte Date: 12 April 2007 Tractor-Trailer Combination Braking and Safety Presented by : Paul Schutte Date: 12 April 2007 Introduction When you think about tractor-trailer combinations used on declines at our Mines; What are the

More information

ECONOMIC COMPARISON OF TRUCK CONFIGURATIONS

ECONOMIC COMPARISON OF TRUCK CONFIGURATIONS ISSN 1171-( 1 NEW ZEi.,...., LIF ECONOMIC COMPARISON OF TRUCK CONFIGURATIONS Gareth Jones Figure 1-6x4 + 4 axle convertible; now able to load to 44 tonnes under the new regulations ABSTRACT An economic

More information

DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 40 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia

DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 40 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 4 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia ABSTRACT Two speed surveys were conducted on nineteen

More information

INFORMATION BULLETIN No. 165

INFORMATION BULLETIN No. 165 Bulletin No. 165 Revision No. 00 Issue Date 09 Jun 2017 Effective Date 09 Jun 2017 INFORMATION BULLETIN No. 165 International Convention for the Control and Management of Ships Ballast Water and Sediments,

More information

Mechanical Trainstop Systems

Mechanical Trainstop Systems Mechanical Trainstop Systems Synopsis This document defines the functional requirements for mechanical trainstop systems and the requirements relating to their use on both track and trains. Signatures

More information

Offshore manufacturing and fabrication: guidelines for heavy trailers (class TC and TD)

Offshore manufacturing and fabrication: guidelines for heavy trailers (class TC and TD) Offshore manufacturing and fabrication: guidelines for heavy trailers (class TC and TD) 1. INTRODUCTION This guideline has been prepared to alleviate confusion regarding the difference in Rule requirements

More information

Appendix 3. DRAFT Policy on Vehicle Activated Signs

Appendix 3. DRAFT Policy on Vehicle Activated Signs Appendix 3 DRAFT Policy on Vehicle Activated Signs Ealing Council has been installing vehicle activated signs for around three years and there are now 45 across the borough. These signs help to reduce

More information

NATIONAL TRANSPORTATION SAFETY BOARD Public Meeting of February 9, 2016 (Information subject to editing)

NATIONAL TRANSPORTATION SAFETY BOARD Public Meeting of February 9, 2016 (Information subject to editing) NATIONAL TRANSPORTATION SAFETY BOARD Public Meeting of February 9, 2016 (Information subject to editing) Commercial Truck Collision with Stopped Vehicle on Interstate 88, Naperville, Illinois January 27,

More information

PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels

PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels Scope: This program must be utilized by participating pellet fuel manufacturers to assure consistent quality

More information

Application of claw-back

Application of claw-back Application of claw-back A report for Vector Dr. Tom Hird Daniel Young June 2012 Table of Contents 1. Introduction 1 2. How to determine the claw-back amount 2 2.1. Allowance for lower amount of claw-back

More information

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act Land Transport Rule: Vehicle Standards Compliance 2002

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act Land Transport Rule: Vehicle Standards Compliance 2002 WELLINGTON, NEW ZEALAND PURSUANT to section 152 of the Land Transport Act 1998 I, Mark Gosche, Minister of Transport, HEREBY make the following ordinary Rule: Land Transport Rule: Vehicle Standards Compliance

More information

PS 127 Abnormal / Indivisible Loads Policy

PS 127 Abnormal / Indivisible Loads Policy PS 127 Abnormal / Indivisible Loads Policy June 2017 Version 1.5 Statement of legislative compliance This document has been drafted to comply with the general and specific duties in the Equality Act 2010;

More information

NZQA registered unit standard version 1 Page 1 of 6

NZQA registered unit standard version 1 Page 1 of 6 Page 1 of 6 Title Demonstrate knowledge of theory and legislation for registration of electrical appliance servicepersons Level 3 Credits 3 Purpose This unit standard covers the theory assessment required

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item No: 10 Wolverhampton City Council OPEN DECISION ITEM Committee / Panel LICENSING COMMITTEE Date 09/02/11 Originating Service Group(s) REGENERATION & ENVIRONMENT ENVIRONMENTAL SERVICES Contact

More information

MINIBUS SAFETY POLICY STANDARD & PROCEDURES

MINIBUS SAFETY POLICY STANDARD & PROCEDURES MINIBUS SAFETY POLICY STANDARD & PROCEDURES This Policy Standard details the requirements placed on Colleges and Departments to ensure owned, leased and hired minibuses that are driven by staff, students

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

LIFT TRUCK POLICY AND PROGRAM

LIFT TRUCK POLICY AND PROGRAM LIFT TRUCK POLICY AND PROGRAM Table of Contents 1.0 Policy Statement and Program Overview... 4 2.0 Lift Truck Applicable Legislation, Guidelines and Standards... 4 3.0 Forklift Program Requirements...

More information

Centerwide System Level Procedure

Centerwide System Level Procedure 5.ARC.0004.2 1 of 10 REVISION HISTORY REV Description of Change Author Effective Date 0 Initial Release J. Hanratty 7/17/98 1 Clarifications based on 7/98 DNV Audit and 6/98 Internal Audit (see DCR 98-029).

More information

AS/NZS :2013. Wheelchairs AS/NZS :2013. Australian/New Zealand Standard

AS/NZS :2013. Wheelchairs AS/NZS :2013. Australian/New Zealand Standard AS/NZS 3695.2:2013 Australian/New Zealand Standard Wheelchairs Part 2: Requirements and test methods for electrically powered wheelchairs (including mobility scooters) Superseding AS 3695 1992 AS/NZS 3695.2:2013

More information

ROAD SAFETY RESEARCH, POLICING AND EDUCATION CONFERENCE, NOV 2001

ROAD SAFETY RESEARCH, POLICING AND EDUCATION CONFERENCE, NOV 2001 ROAD SAFETY RESEARCH, POLICING AND EDUCATION CONFERENCE, NOV 2001 Title Young pedestrians and reversing motor vehicles Names of authors Paine M.P. and Henderson M. Name of sponsoring organisation Motor

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3696.19:2009 AS/NZS 3696.19:2009 Australian/New Zealand Standard Wheelchairs Part 19: Wheeled mobility devices for use as seats in motor vehicles (ISO 7176-19:2008, MOD) AS/NZS 3696.19:2009 This

More information

Transport by road overweight and overdimension loads that do not require a pilot or overdimension permit

Transport by road overweight and overdimension loads that do not require a pilot or overdimension permit Page 1 of 7 Transport by road overweight and overdimension loads that do not require a pilot or overdimension permit Level 4 Credits 9 Purpose This unit standard is for drivers who transport overweight

More information

Information to ASB2013/02/18 Containment Risk for NA and NR Turbochargers. MAN Diesel & Turbo SE Business Unit Turbocharger

Information to ASB2013/02/18 Containment Risk for NA and NR Turbochargers. MAN Diesel & Turbo SE Business Unit Turbocharger Containment Risk for NA and NR Turbochargers MAN Diesel & Turbo SE Business Unit Turbocharger MAN Diesel & Turbo BU Turbocharger 19.08.2014 < 1 > Agenda 1 Why has MAN released ASB2013/02/18 and Supplement

More information

Motor Vehicle Safety and Journey Management Document Number OHS-PROC-31. Rockhampton Office Brisbane Office Tarong Site

Motor Vehicle Safety and Journey Management Document Number OHS-PROC-31. Rockhampton Office Brisbane Office Tarong Site Business Procedure Motor Vehicle Safety and Journey Management Document Number OHS-PROC-31 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron

More information

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1 30 August 2011 Agreement Concerning the adoption of uniform technical prescriptions for wheeled vehicles, equipment and parts which can be fitted and/or be used on wheeled vehicles and the conditions for

More information

UNDER VEHICLE ACCESS SAFETY

UNDER VEHICLE ACCESS SAFETY UNDER VEHICLE ACCESS SAFETY Crushing incidents involving the movement or collapse of vehicles under repair result in serious injuries and deaths per year. Whenever a worker enters the space beneath a vehicle

More information

TECHNICAL BULLETIN. Australia, New Zealand Canada, USA China

TECHNICAL BULLETIN. Australia, New Zealand Canada, USA China TECHNICAL BULLETIN 1(2) TB1403 February 18, 2014 TOPIC: CONCERNS: MALFUNCTION OF QUICK CONNECT COUPLING IN MANUAL BRAKE RELEASE CONNECTION (2) SANDVIK LOADERS: LS170 (former name ED7), LS170L (ED7LP),

More information

INFORMATION BULLETIN No. 84

INFORMATION BULLETIN No. 84 Bulletin No. 84 Revision No. 05 Issue Date 23 Oct 2017 Effective Date 01 Nov 2017 INFORMATION BULLETIN No. 84 Oil Record Books Guidance and Instructions for Bahamas Recognised Organisations, Bahamas Approved

More information

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Page 1 of 14 Part A Synopsis A standard detailing the requirements for the control, safe use and operation of excavators,

More information

Connecting your home or small business generation

Connecting your home or small business generation Connecting your home or small business generation For connections 10kW or less March 2018 2 Contents Introduction to small distributed generation systems 3 Congestion management and safety 6 Application

More information

E/ECE/324/Rev.2/Add.141 E/ECE/TRANS/505/Rev.2/Add.141

E/ECE/324/Rev.2/Add.141 E/ECE/TRANS/505/Rev.2/Add.141 30 January 2017 Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and the Conditions

More information

Vehicle Operation Procedure HSE

Vehicle Operation Procedure HSE 1 Purpose and Scope The Purpose of this Procedure is to prevent injury to personnel and damage to property through the safe operation of vehicles. This Vehicle Operation Procedure provides mandatory requirements

More information

Vehicle Management Policy and Procedure Document No: VMPol 001

Vehicle Management Policy and Procedure Document No: VMPol 001 Vehicle Management Policy and Procedure Document No: VMPol 001 SHE Unit/March 2017 1 Safety, Health and Environment Unit Title Reference Number Vehicle Management Policy and Procedure VMPol 001 DOCUMENT

More information

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements AS/NZS 4777.1:2016 Australian/New Zealand Standard Grid connection of energy systems via inverters Part 1: Installation requirements AS/NZS 4777.1:2016 AS/NZS 4777.1:2016 This joint Australian/New Zealand

More information

PART 665 BUS TESTING. Subpart A General. 49 CFR Ch. VI ( Edition)

PART 665 BUS TESTING. Subpart A General. 49 CFR Ch. VI ( Edition) Pt. 665 PART 665 BUS TESTING Subpart A General Sec. 665.1 Purpose. 665.3 Scope. 665.5 Definitions. 665.7 Grantee certification of compliance. Subpart B Bus Testing Procedures 665.11 Testing requirements.

More information

Land Transport Rule: Seatbelts and Seatbelt Anchorages 2002

Land Transport Rule: Seatbelts and Seatbelt Anchorages 2002 Land Transport Rule: Seatbelts and Seatbelt Anchorages 2002 Rule 32011 Part 1 Rule... 2 Section 1 Application...2 1.1 Title...2 1.2 Scope of the rule... 2 1.3 Date when rule comes into force... 2 1.4 Application

More information

Australian Standard. Cranes, hoists and winches. Part 18: Crane runways and monorails. AS (Incorporating Amendment Nos 1 and 2)

Australian Standard. Cranes, hoists and winches. Part 18: Crane runways and monorails. AS (Incorporating Amendment Nos 1 and 2) AS 1418.18 2001 (Incorporating Amendment Nos 1 and 2) AS 1418.18 Australian Standard A1 Cranes, hoists and winches Part 18: Crane runways and monorails This Australian Standard was prepared by Committee

More information

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015 Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015 SPEED LIMIT CHANGE ON KĀPITI ROAD PURPOSE OF REPORT Meeting Status: Public Purpose of Report: For Decision 1 The purpose

More information

committee report General Permitted Development Order SPT response to consultation

committee report General Permitted Development Order SPT response to consultation committee report General Permitted Development Order SPT response to consultation Committee Strategy and Programmes Date of meeting 24 June 2011 Date of report 1 June 2011 Report by Assistant Chief Executive

More information

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities New Ulm Public Utilities Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities INDEX Document Review and History... 2 Definitions... 3 Overview... 3 Application

More information

TRAILER TANK SIGNAGE REQUIREMENTS. The following information has been received courtesy of David Smith at Allied Petroleum.

TRAILER TANK SIGNAGE REQUIREMENTS. The following information has been received courtesy of David Smith at Allied Petroleum. TRAILER TANK SIGNAGE REQUIREMENTS The following information has been received courtesy of David Smith at Allied Petroleum. Information from the Risk & Asset Manager and relates to the latest Trailer Tank

More information

Electrical Safety in the Workplace

Electrical Safety in the Workplace Electrical Safety in the Workplace Increasing Electrical Safety in the Workplace through Purchasing and Procurement Robert Mitchell, Safety and Technical Safety Advisor Safety Risk, Policy and Innovation

More information

Clyde Waste Transfer Facility Quarterly Truck Noise Measurements April 2009

Clyde Waste Transfer Facility Quarterly Truck Noise Measurements April 2009 REPORT 10-6815-R3 Quarterly Truck Noise Measurements April 2009 PREPARED FOR Cnr Unwin & Shirley Street ROSEHILL NSW 2142 30 APRIL 2009 HEGGIES PTY LTD ABN 29 001 584 612 Quarterly Truck Noise Measurements

More information

INFORMATION BULLETIN No. 165

INFORMATION BULLETIN No. 165 Bulletin No. 165 Revision No. 03 Issue Date 05 Sep 2017 Effective Date 05 Sep 2017 INFORMATION BULLETIN No. 165 International Convention for the Control and Management of Ships Ballast Water and Sediments,

More information

NSW Grain Harvest Management Scheme

NSW Grain Harvest Management Scheme NSW Grain Harvest Management Scheme October 2013 Contents 1. Introduction... 1 2. Summary... 1 3. Definitions... 3 4. Grain Harvest Management Scheme (GHMS)... 5 4.1. Scheme Objectives... 5 4.2. Scheme

More information

Hydro Plant Risk Assessment Guide

Hydro Plant Risk Assessment Guide September 2006 Hydro Plant Risk Assessment Guide Appendix E8: Battery Condition Assessment E8.1 GENERAL Plant or station batteries are key components in hydroelectric powerplants and are appropriate for

More information

Road Safety. Background Information. Motor Vehicle Collisions

Road Safety. Background Information. Motor Vehicle Collisions Background Information Motor Vehicle Collisions For many Canadians, the riskiest part of their job is their time spent on the road driving. Motor vehicle collisions are the leading cause of injury and

More information

Higher National Unit Specification. General information for centres. Electrical Motor Drive Systems. Unit code: DN4K 35

Higher National Unit Specification. General information for centres. Electrical Motor Drive Systems. Unit code: DN4K 35 Higher National Unit Specification General information for centres Unit code: DN4K 35 Unit purpose: This Unit has been designed to allow candidates to develop a knowledge and understanding of electrical

More information

Flashing Amber Lamp Application, Permit and Device Information

Flashing Amber Lamp Application, Permit and Device Information British Columbia Ministry of Transportation & Infrastructure Commercial Vehicle Safety & Enforcement Vehicle Inspections & Standards Program Updated: December 2017 Flashing Amber Lamp Application, Permit

More information

NZQA registered unit standard 9076 version 4 Page 1 of 5

NZQA registered unit standard 9076 version 4 Page 1 of 5 Page 1 of 5 Title Repair vehicle chassis damage Level 4 Credits 10 Purpose This unit standard is for people who work in the collision repair industry. People credited with this unit standard are able to

More information

Addressing ambiguity in how electricity industry legislation applies to secondary networks

Addressing ambiguity in how electricity industry legislation applies to secondary networks In Confidence Office of the Minister of Energy and Resources Chair, Cabinet Business Committee Addressing ambiguity in how electricity industry legislation applies to secondary networks Proposal 1 This

More information

Weight Allowance Reduction for Quad-Axle Trailers. CVSE Director Decision

Weight Allowance Reduction for Quad-Axle Trailers. CVSE Director Decision Weight Allowance Reduction for Quad-Axle Trailers CVSE Director Decision Brian Murray February 2014 Contents SYNOPSIS...2 INTRODUCTION...2 HISTORY...3 DISCUSSION...3 SAFETY...4 VEHICLE DYNAMICS...4 LEGISLATION...5

More information

Vehicle Parking, Isolation and Maintenance. Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Vehicle Parking, Isolation and Maintenance. Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Vehicle Parking, Isolation and Maintenance Document Number OHS-PROC-140 This document applies to the following site(s): Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro

More information

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act 1998

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act 1998 WELLINGTON, NEW ZEALAND PURSUANT to section 152 of the Land Transport Act 1998 I, Maurice Donald Williamson, Minister of Transport, HEREBY make the following ordinary Rule: Land Transport Rule: Vehicle

More information

Guidelines for Safety Structure Homologation / Approval

Guidelines for Safety Structure Homologation / Approval TECHNICAL DEPARTMENT MotorSport New Zealand Inc MotorSport House 69 Hutt Road, Thorndon Wellington 6015 PO Box 3793, Wellington 6014 Phone: 04-815-8015 Fax: 04-472-9559 Email: technical@motorsport.org.nz

More information

Key DRAFT OPERATING CODE 2 LEGAL TEXT

Key DRAFT OPERATING CODE 2 LEGAL TEXT Key DRAFT OPERATING CODE 2 LEGAL TEXT 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From HVDC Code 5) Green From DCC (not used in this document)

More information

Australian Explosives Industry and Safety Group (AEISG) Code of Practice Mobile Processing Units 4 th edition. Compliance Checklist.

Australian Explosives Industry and Safety Group (AEISG) Code of Practice Mobile Processing Units 4 th edition. Compliance Checklist. Australian Explosives Industry and Safety Group (AEISG) Code of Practice Mobile Processing Units 4 th edition Compliance Checklist Note: The requirements noted against the various sections in this checklist

More information

Land Transport Rule Traction Engines [2008]

Land Transport Rule Traction Engines [2008] Land Transport Rule Traction Engines [2008] Rule 63001 Overview Land Transport Rules are law produced by Land Transport New Zealand for the Minister of Transport. Land Transport NZ drafts Rules in plain

More information

Land Transport Rule Heavy Vehicles Preface to Consolidated Rule with amendments incorporated as at 1 December 2016

Land Transport Rule Heavy Vehicles Preface to Consolidated Rule with amendments incorporated as at 1 December 2016 Land Transport Rule Heavy Vehicles Preface to Consolidated Rule with amendments incorporated as at 1 December 2016 The consolidation of the Rule and its amendments is intended to provide upto-date details

More information

CITY OF MINNEAPOLIS GREEN FLEET POLICY

CITY OF MINNEAPOLIS GREEN FLEET POLICY CITY OF MINNEAPOLIS GREEN FLEET POLICY TABLE OF CONTENTS I. Introduction Purpose & Objectives Oversight: The Green Fleet Team II. Establishing a Baseline for Inventory III. Implementation Strategies Optimize

More information

Motor Vehicle Policy Essential Knowledge

Motor Vehicle Policy Essential Knowledge Motor Vehicle Policy Essential Knowledge Policy Description This policy outlines requirements for work related use of Carclew Youth Arts, Fleet SA and private vehicles. Carclew Youth Arts is committed

More information

Response of the Road Haulage Association to the Scottish Government. Removal, Storage & Disposal of Vehicles Regulations.

Response of the Road Haulage Association to the Scottish Government. Removal, Storage & Disposal of Vehicles Regulations. Response of the Road Haulage Association to the Scottish Government. Removal, Storage & Disposal of Vehicles Regulations. 06/08/2018 Summary 1. This consultation document seeks views on changes to the

More information

Specifications for Surface Earthmoving Equipment Surface Mobile Equipment Major Hazard Standard

Specifications for Surface Earthmoving Equipment Surface Mobile Equipment Major Hazard Standard WMC Environment, Health & Safety Management System Specifications for Surface Earthmoving Equipment Surface Mobile Equipment Major Hazard Standard MHS-11 DocsOpen Ref: 57445, 21/05/1999 Uncontrolled copy

More information

CONSULTATION DOCUMENT

CONSULTATION DOCUMENT EUROPEAN COMMISSION Brussels, 31.5.2017 C(2017) 3815 final CONSULTATION DOCUMENT First phase consultation of the Social Partners under Article 154 of TFEU on a possible revision of the Road Transport Working

More information

COMPONENT HOMOLOGATION POLICY AND PROCEDURE

COMPONENT HOMOLOGATION POLICY AND PROCEDURE COMPONENT HOMOLOGATION POLICY AND PROCEDURE Policy number THS001 Version V2 Approved by Board 2 December 2014 Responsible person Status CEO Public Fees reviewed Scheduled review date 8 November 2016 31

More information

National Aluminium Company Limited TRAFFIC RULES AND PROCEDURES

National Aluminium Company Limited TRAFFIC RULES AND PROCEDURES National Aluminium Company Limited TRAFFIC RULES AND PROCEDURES INTRODUCTION The following rules are designed for safe operation of vehicles in and around the mine. Operators of vehicles shall observe

More information

Interconnection Process for Generation Systems

Interconnection Process for Generation Systems Interconnection Process for Generation Systems I. INTRODUCTION...1 II. GENERAL INFORMATION...2 A. Definitions...2 B. Nodak Electric Cooperative, Inc. Generation Interconnection Contacts...3 C. Engineering

More information

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

An advisory circular may also include technical information that is relevant to the rule standards or requirements. Revision 0 Electrical Load Analysis 2 August 2016 General Civil Aviation Authority advisory circulars contain guidance and information about standards, practices, and procedures that the Director has found

More information

Supplementary advice to the Transport and Industrial Relations Committee

Supplementary advice to the Transport and Industrial Relations Committee Supplementary advice to the Transport and Industrial Relations Committee Land Transport Amendment Bill 1. In the course of preparing the revision-tracked version of Land Transport Amendment Bill (the Bill),

More information

GLOBAL REGISTRY. Addendum. Global technical regulation No. 10 OFF-CYCLE EMISSIONS (OCE) Appendix

GLOBAL REGISTRY. Addendum. Global technical regulation No. 10 OFF-CYCLE EMISSIONS (OCE) Appendix 9 September 2009 GLOBAL REGISTRY Created on 18 November 2004, pursuant to Article 6 of the AGREEMENT CONCERNING THE ESTABLISHING OF GLOBAL TECHNICAL REGULATIONS FOR WHEELED VEHICLES, EQUIPMENT AND PARTS

More information

Reference Number PDS 18 - (RIC Standard: EP SP)

Reference Number PDS 18 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Reference Number PDS 18 - (RIC Standard: EP 06 00 00 01 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Jan 05 Standards

More information

Federal Railroad Administration, DOT CFR section Description Guideline PART 179

Federal Railroad Administration, DOT CFR section Description Guideline PART 179 Federal Railroad Administration, DOT 210.3 PENALTY ASSESSMENT GUIDELINES Continued 49 CFR section Description Guideline PART 179 179.1(e)... Tank car not constructed according to specifications also cite

More information

MAINE LEMON LAW SUMMARY

MAINE LEMON LAW SUMMARY MAINE LEMON LAW SUMMARY EXECUTIVE SUMMARY TIME PERIOD FOR FILING CLAIMS ELIGIBLE VEHICLE Earlier of (1) three years from original delivery to the consumer, or (2) the term of the express warranties. Any

More information

WELLINGTON, NEW ZEALAND

WELLINGTON, NEW ZEALAND WELLINGTON, NEW ZEALAND PURSUANT to Section 152 of the Land Transport Act 1998 I, MARK GOSCHE, Minister of Transport, HEREBY make the following ordinary rule: Land Transport Rule: Seatbelts and Seatbelt

More information

Microgeneration Installation Standard: MCS

Microgeneration Installation Standard: MCS Microgeneration Installation Standard: MCS 001-01 MCS Contractor Certification Scheme Requirements Part 1: Requirements for MCS Contractors Issue 3.1 This Microgeneration Installation Standard is the property

More information

IMIHV01 SQA Unit Code (HA68 04) Carry out routine commercial vehicle maintenance

IMIHV01 SQA Unit Code (HA68 04) Carry out routine commercial vehicle maintenance Overview This NOS is about conducting routine examination, adjustment and replacement activities as part of the periodic maintenance of commercial vehicles. IMIHV01 1 Performance criteria You must be able

More information

Maritime New Zealand Guidelines

Maritime New Zealand Guidelines Maritime New Zealand Guidelines MARINE GUIDANCE NOTICE ISSUE 02-2007 VEHICLE REQUIREMENTS FOR SHIPMENT BY RO-RO This guidance is for: Any person who offers vehicles for carriage by a ro-ro ship Ro-ro ship

More information

ANNEX. to the. Commission Delegated Regulation (EU).../...

ANNEX. to the. Commission Delegated Regulation (EU).../... EUROPEAN COMMISSION Brussels, XXX [ ](2016) XXX draft ANNEX 1 ANNEX to the Commission Delegated Regulation (EU).../... amending Regulation (EU) No 540/2014 of the European Parliament and of the Council

More information

MAINTENANCE AND TESTING OF PORTABLE ELECTRICAL EQUIPMENT, RCDS AND TOOLS CS-OHS-33

MAINTENANCE AND TESTING OF PORTABLE ELECTRICAL EQUIPMENT, RCDS AND TOOLS CS-OHS-33 CS ENERGY OPERATIONS PROCEDURE FOR MAINTENANCE AND TESTING OF PORTABLE ELECTRICAL EQUIPMENT, RCDS AND TOOLS CS-OHS-33 Responsible Officer: Electrical Services Engineering Manager Responsible Manager: Group

More information

A Cost-Benefit Analysis of Heavy Vehicle Underrun Protection

A Cost-Benefit Analysis of Heavy Vehicle Underrun Protection A Cost-Benefit Analysis of Heavy Vehicle Underrun Protection Narelle Haworth 1 ; Mark Symmons 1 (Presenter) 1 Monash University Accident Research Centre Biography Mark Symmons is a Research Fellow at Monash

More information

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014 Solar and Smart Meter Update 1 April 2014 to 30 June 2014 Released July 2014 2 CONTENTS 1. Solar and Smart Meter Cases... 3 2. SMART METER UPDATE... 4 2.1. EWOV Smart Meter Cases Increase by 36%... 4 2.2.

More information

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Adopted Based on State and Tariff Interconnection Rules Applicable to Northern States Power,

More information

Certification Memorandum. Additive Manufacturing

Certification Memorandum. Additive Manufacturing Certification Memorandum Additive Manufacturing EASA CM No.: CM S-008 Issue 01 issued 04 April 2017 Regulatory requirement(s): CS X.571, CS X.603, CS X.605, CS X.613, 25 X.853, CS E 70, CS E 100 (a), CS

More information

Response to. Department for Transport Consultation Paper. Allowing Learner Drivers To Take Lessons on Motorways

Response to. Department for Transport Consultation Paper. Allowing Learner Drivers To Take Lessons on Motorways Response to Department for Transport Consultation Paper Allowing Learner Drivers To Take Lessons on Motorways 6 February 2017 Introduction This is RoSPA s response to the Department for Transport s consultation

More information

EUROPEAN NEW CAR ASSESSMENT PROGRAMME (Euro NCAP) CAR SPECIFICATION, SPONSORSHIP, TESTING AND RETESTING PROTOCOL

EUROPEAN NEW CAR ASSESSMENT PROGRAMME (Euro NCAP) CAR SPECIFICATION, SPONSORSHIP, TESTING AND RETESTING PROTOCOL EUROPEAN NEW CAR ASSESSMENT PROGRAMME (Euro NCAP) CAR SPECIFICATION, SPONSORSHIP, TESTING AND RETESTING PROTOCOL Version 2.1 June 2007 CAR SPECIFICATION, SPONSORSHIP, TESTING AND RETESTING PROTOCOL 1.

More information

Recover Light Vehicles Using Advanced Winching Techniques

Recover Light Vehicles Using Advanced Winching Techniques IMIRR05 Recover Light Vehicles Using Advanced Winching Techniques Overview This standard is about recovering vehicles using advanced winching techniques. For the purpose of this standard light vehicles

More information

E/ECE/324/Rev.1/Add.57/Rev.3 E/ECE/TRANS/505/Rev.1/Add.57/Rev.3

E/ECE/324/Rev.1/Add.57/Rev.3 E/ECE/TRANS/505/Rev.1/Add.57/Rev.3 30 November 2017 Agreement Concerning the Adoption of Harmonized Technical United Nations Regulations for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and

More information

APPLICATION OF STAR RATINGS

APPLICATION OF STAR RATINGS APPLICATION OF STAR RATINGS Version 1.1 Euro NCAP October 2013 EUROPEAN NEW CAR ASSESSMENT PROGRAMME Copyright October 2013 Euro NCAP - This work is the intellectual property of Euro NCAP. Permission is

More information

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Australian Capital Territory Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Disallowable instrument DI2016 189 made under the Utilities Technical Regulation

More information

COMMISSION REGULATION (EU) / of XXX

COMMISSION REGULATION (EU) / of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2017) XXX draft COMMISSION REGULATION (EU) / of XXX implementing Regulation (EU) No 595/2009 of the European Parliament and of the Council as regards the determination