1 Table of Contents D. Air Modules...D-2 PV Series...D-2 1. Product Overview...D-2 2. Installation...D Master Module Installation... D Installing the PV1, PV2, and PV3 Master Modules... D Removing the PV1, PV2, and PV3 Master Modules... D Installing the PV4, PV5, and PV6 Master Modules... D Removing the PV4, PV5, and PV6 Master Modules... D Tool Module Installation... D Installing the PV Series Tool Modules... D Removing the PV Series Tool Modules... D-9 3. Operation...D-9 4. Maintenance...D Troubleshooting and Service Procedures...D Troubleshooting Procedures...D Service Procedures... D Master Side Self-Sealing Valve... D Rubber Bushing and Collar Replacement... D V-Ring Seal Replacement... D Serviceable Parts...D PV1, PV2, and PV3 Master Module Mounting Hardware... D PV4, PV5, and PV6 Master Module Mounting Hardware... D PV1, PV2, PV3, and PV6 Tool Module Mounting Hardware... D PV4 and PV5 Tool Module Mounting Hardware... D Specifications...D Drawings...D PV1 (PV3 is similar but has NPT ports)... D PV2... D PV4... D PV5... D PV6... D-24 D-1
2 D. Air Modules PV Series 1. Product Overview Air modules provide air and vacuum services when attached to the Master and Tool plates. When the Tool Changer is coupled, the Master module passes the air supply to the Tool module for use by the customer tooling. Significant forces are encountered when using these modules. Assistance from the robot may be required to overcome these forces when coupling the Tool Changer. NOTICE: The PV1, PV2, and PV3 Master modules contain self-sealing valves. Do not use self-sealing valves for vacuum utility. Depending on the model, the Master module contains self-sealing valves, which prevent air circuits from discharging and eliminate the need to close those circuits upstream. The Tool modules contain pass-through ports. Unlike self-sealing valves, pass-through ports release the air when the Tool Changer is uncoupled. Before uncoupling the Tool Changer, turn off the air pressure or supply for the pass-through ports. Refer to Figure 1.1, Figure 1.2, Figure 1.3, Figure 1.4, and the following table for services that are provided by different modules. Module Table 1.1 PV Series Vacuum and Air Modules Description Master Tool (2) G 3/8 (BSPP) self-sealing ports (S1, S2) 2) G 3/8 (BSPP) self-sealing ports (S1, S2) PV1 PV2 PV3 (2) G 3/8 (BSPP) pass-through air/vacuum ports (P1, P2) (2) G 3/4 (BSPP) vacuum ports (V1, V2) (2) G 3/8 (BSPP) self-sealing air ports (S1, S2) (6) G 3/8 (BSPP) pass-through air/vacuum ports (P1 - P6) (2) 3/8 NPT self-sealing air ports (S1, S2) (2) 3/8 NPT pass-through air/vacuum ports (P1, P2) (2) G 3/8 (BSPP) pass-through air/vacuum ports (P1, P2) (2) G 3/4 (BSPP) vacuum ports (V1, V2) (8) G 3/8 (BSPP) pass-through air/vacuum ports (S1, S2, P1 - P6) (2) 3/8 NPT self-sealing air ports (S1, S2) (2) 3/8 NPT pass-through air/vacuum ports (P1, P2) (2) 3/4 NPT vacuum ports (V1, V2) (2) 3/4 NPT vacuum ports (V1, V2) PV4 (8) 3/8 NPT pass-through air/vacuum ports (P1 - P8) PV5 (8) G 3/8 (BSPP) pass-through air/vacuum ports (P1 - P8) PV6 (12) G 1/4 (BSPP) pass-through air/vacuum ports (P1 - P12) axial connections. D-2
3 Figure 1.1 PV1 and PV3 Vacuum/Air Modules (The PV1 modules shown. The PV3 modules are similar but have NPT ports) P1 and P2, G 3/8 pass-through port connection for air/vacuum service S1 and S2, G 3/8 checked port connection for air service PV1 Master Module (2) Self-Sealing Port (2) Pass-Through Port with a Rubber Bushing and Collar V1 and V2 G 3/4 (BSPP) pass-through port connections for vacuum service (2) Vacuum Port and V-ring Seal (4) Pass-Through Port Common Mounting Feature S1 and S2, G 3/8 pass-through port connection for air service P1 and P2, G 3/8 pass-through port connection for air/vacuum service (2) Pass-Through Vacuum Port PV1 Tool Module V1 and V2 G 3/4 (BSPP) pass-through port connections for vacuum service Figure 1.2 PV2 Vacuum/Air Modules S1 and S2: G 3/8 (BSPP) checked connections for air service (2) Self-Sealing Ports P1 to P6: G 3/8 (BSPP) pass-through port connectors for air/vacuum service PV2 Master Module (8) Pass-Through Port (6) Pass-Through Port with a Rubber Bushing and Collar S1 and S2: G 3/8 (BSPP) pass-through port connections for air service Common Mounting Feature P1 to P6: G 3/8 (BSPP) pass-through port connectors for air/vacuum service PV2 Tool Module D-3
4 Figure 1.3 PV4 and PV5 Vacuum/Air Modules (The PV5 modules shown. The PV4 modules are similar but have NPT ports) P1 through P8: G 3/8 (BSPP) pass-through for air/vacuum service PV5 Master Module (8) Pass-Through Port with a Rubber Bushing and collar. (8) Pass-Through Port Common Mounting Feature P1 through P8: G 3/8 (BSPP) pass-through for air/vacuum service PV5 Tool Module Figure 1.4 PV6 Vacuum/Air Modules (12) Pass-Through Port with a Rubber Bushing P1 through P12: G 1/4 ( (BSPP) pass-through port connection for air/vacuum service (Not Shown) Common Ledge Mounting Feature PV6 Master Module (12) Pass-Through Port PV6 Tool Module P1 through P12: G 1/4 ( (BSPP) pass-through port connection for air/vacuum service (Not Shown) D-4
5 2. Installation Air modules are typically installed by ATI prior to shipment. Use the following steps to install or remove air modules. WARNING: Do not perform maintenance or repair(s) on the Tool Changer or modules unless the Tool is safely supported or placed in the tool stand, all energized circuits (e.g. electrical, air, water, etc.) are turned off, pressurized connections are purged and power is discharged from circuits in accordance with the customer s safety practices and policies. Injury or equipment damage can occur with the Tool not placed and energized circuits on. Place the Tool in the tool stand, turn off and discharge all energized circuits, purge all pressurized connections, and verify all circuits are de-energized before performing maintenance or repair(s) on the Tool Changer or modules. WARNING: All pneumatic fittings and tubing must be capable of withstanding the repetitive motions of the application without failing. The routing of electrical and pneumatic lines must minimize the possibility of over stressing, pullout, or kinking the lines. Failure to do so can cause critical electrical and/or pneumatic lines to malfunction and might result in injury to personnel or damage to equipment. CAUTION: Thread locker applied to fasteners must not be used more than once. Fasteners might become loose and cause equipment damage. Always apply new thread locker when reusing fasteners. 2.1 Master Module Installation Installing the PV1, PV2, and PV3 Master Modules Refer to Figure 2.1. Tools required: 3 mm and 4 mm Allen wrench (hex key), torque wrench Supplies required: Clean rag, Loctite Place the Tool in a secure location. 2. Uncouple the Master and Tool plates. 3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 4. Clean the mounting surfaces. 5. Place the module into the appropriate location on the Tool Changer or Utility Coupler body. Align the module with the Tool Changer using the dowel pins. 6. Apply Loctite 222 to the (3) M5 socket head cap screws. Using a 4 mm Allen wrench, install the (3) M5 socket head cap screws securing the module to the Tool Changer or Utility Coupler and tighten to 45 in-lbs (5.08 Nm). 7. Apply Loctite 222 to the (1) M4 socket head cap screws. Using a 3 mm Allen wrench, install the M4 socket head cap screws securing the module to the Tool Changer or Utility Coupler and tighten to 20 in-lbs (2.26 Nm). 8. Connect air plumbing to the module. Ensure that the connectors are clean. 9. After the procedure is complete, resume normal operation. D-5
6 Figure 2.1 Module Installation Use the dowel pins on the module to properly align the module on the mounting surface. (1) M4 Socket Head Cap Screw Tool Changer Master Module (3) M5 Socket Head Cap Screw Customer Air Connection(s) Removing the PV1, PV2, and PV3 Master Modules Tools required: 3 mm and 4 mm Allen wrench Supplies required: Clean rag 1. Place the Tool in a secure location. 2. Uncouple the Master and Tool plates. 3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). NOTICE: Debris can be expelled at high velocity during the purge, take all required safety precautions. 4. All customer plumbing connections to the module must be purged. a. Verify that the supply lines are turned off. b. Cover the valves with a rag for safety. c. Manually actuate the self-sealing valves to purge the line pressure. 5. Use a marker pen to indicate where the module is to be re-installed. 6. Disconnect air plumbing to the module. 7. Remove the (1) M4 socket head cap screw using a 3 mm Allen wrench. 8. Remove the (3) M5 socket head cap screw using a 4 mm Allen wrench. 9. Remove the module from the Tool Changer or Utility Coupler. D-6
7 2.1.3 Installing the PV4, PV5, and PV6 Master Modules Tools required: 3 mm Allen wrench (hex key), torque wrench Supplies required: Clean rag, Loctite Place the Tool in a secure location. 2. Uncouple the Master and Tool plates. 3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 4. Clean the mounting surfaces. 5. Place the module into the appropriate location on the Tool Changer or Utility Coupler body. Align the module with the Tool Changer using the dowel pins. 6. Apply Loctite 222 to the (4) M4 socket head cap screws. Using a 3 mm Allen wrench, install the (4) M4 socket head cap screws securing the module to the Tool Changer or Utility Coupler and tighten to 25 in-lbs (2.82 Nm). 7. Connect air plumbing to the module. Ensure that the connectors are clean. 8. After the procedure is complete, resume normal operation. Figure 2.2 Module Installation Use the dowel pins on the module to properly align the module on the mounting surface. Customer Air Connection(s) Tool Changer Master Module (4) M4 Socket Head Cap Screw D-7
8 2.1.4 Removing the PV4, PV5, and PV6 Master Modules Tools required: 3 mm Allen wrench Supplies required: Clean rag 1. Place the Tool in a secure location. 2. Uncouple the Master and Tool plates. 3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). NOTICE: Debris can be expelled at high velocity during the purge, take all required safety precautions. 4. All customer plumbing connections to the module must be purged. a. Verify that the supply lines are turned off. b. Cover the valves with a rag for safety. c. Manually actuate the self-sealing valves to purge the line pressure. 5. Use a marker pen to indicate where the module is to be re-installed. 6. Disconnect air plumbing to the module. 7. Remove the (4) M4 socket head cap screw using a 3 mm Allen wrench. 8. Remove the module from the Tool Changer or Utility Coupler. 2.2 Tool Module Installation Installing the PV Series Tool Modules See Figure 2.1. Tools required: 3 mm or 4 mm Allen wrench (hex key) (refer to step 6), torque wrench Supplies required: Clean rag, Loctite Place the Tool in a secure location. 2. Uncouple the Master and Tool plates. 3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 4. Clean the mounting surfaces. 5. Place the module into the appropriate location on the Tool Changer or Utility Coupler body. Align the module with the Tool Changer using the dowels in the bottom of the ledge feature. 6. Install the mounting fasteners. For PV4 and PV5 Tool modules, apply Loctite 222 to the (3) M4 socket head cap screws. Using a 3 mm Allen wrench, install the (3) M4 socket head cap screws securing the module to the Tool Changer or Utility Coupler and tighten to 25 in-lbs (2.82 Nm). For all other PV Tool modules, apply Loctite 242 to the (3) M5 socket head cap screws. Using a 4 mm Allen wrench, install the (3) M5 socket head cap screws securing the module to the Tool Changer or Utility Coupler and tighten to 45 in-lbs (5.08 Nm). 7. Connect air plumbing to the module. Ensure that the connectors are clean. 8. After the procedure is complete, resume normal operation. D-8
9 Figure 2.3 Module Installation Use the dowel pins on the module to properly align the module on the mounting surface. (3) M5 Socket Head Head Cap Screw (PV4 and PV5 have (3) M4 Socket Head Cap Screw.) Tool Changer Tool Module Customer Air Connection(s) 3. Operation Removing the PV Series Tool Modules Tools required: 3 mm or 4 mm Allen wrench (hex key) (Refer to step 6) 1. Place the Tool in a secure location. 2. Uncouple the Master and Tool plates. 3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 4. Use a marker pen to indicate where the module is to be re-installed. 5. Disconnect air plumbing to the module. 6. Remove mounting fasteners. For the PV4 and PV5 Tool modules, remove the (3) M4 socket head cap screws using a 3 mm Allen wrench. For all other PV Tool modules, remove the (3) M5 socket head cap screws using a 4 mm Allen wrench. 7. Remove the module. Air modules pass air utilities from the Master to the Tool for use by the customer s tooling. Unlike pass-through ports, self-sealing valves prevent the air circuits from discharging, which eliminates the need to close upstream circuits. Self-sealing valves and pass-through ports operate at a maximum pressure of 100 psi (6.9 bar). NOTICE: If the air pressure is not released from the Tool side of the pass-through port, debris can be expelled at high velocity when the Tool Changer uncouples. Take all required safety precautions. D-9
10 4. Maintenance Perform maintenance to maximize the operational life of the module. WARNING: Do not perform maintenance or repair(s) on the Tool Changer or modules unless the Tool is safely supported or placed in the tool stand, all energized circuits (e.g. electrical, air, water, etc.) are turned off, pressurized connections are purged and power is discharged from circuits in accordance with the customer s safety practices and policies. Injury or equipment damage can occur with the Tool not placed and energized circuits on. Place the Tool in the tool stand, turn off and discharge all energized circuits, purge all pressurized connections, and verify all circuits are de-energized before performing maintenance or repair(s) on the Tool Changer or modules. A preventive maintenance schedule and checklist are provided in the following tables: Table 4.1 Preventive Maintenance Schedule Inspection Schedule Action Required Weekly Clean and inspect 6 months or 500,000 cycles Seal replacement Table 4.2 Checklist Weekly Maintenance: гг Clean mating surfaces. гг Inspect modules for air leaks. Replace components as necessary. 6 months or 500,000 cycle Maintenance: гг гг гг гг On modules with self-sealing ports, remove and replace self-sealing valve O-rings and seals. During O-ring and seal replacement inspect components (valve stem, check valve piston, and spring) of the valve assemblies in the Master modules. See Section Master Side Self- Sealing Valve. Remove and replace the rubber bushings and collars. See Section Rubber Bushing and Collar Replacement. Remove and replace the V-ring seals. See Section V-ring Seal Replacement. Check that module mounting bolts are secure. See Section 2.1 Master Module Installation or Section 2.2 Tool Module Installation. D-10
11 5. Troubleshooting and Service Procedures The following section provides troubleshooting information to help diagnose conditions with the Tool Changer or air module and service procedures to help resolve these conditions. WARNING: Do not perform maintenance or repair(s) on the Tool Changer or modules unless the Tool is safely supported or placed in the tool stand, all energized circuits (e.g. electrical, air, water, etc.) are turned off, pressurized connections are purged and power is discharged from circuits in accordance with the customer s safety practices and policies. Injury or equipment damage can occur with the Tool not placed and energized circuits on. Place the Tool in the tool stand, turn off and discharge all energized circuits, purge all pressurized connections, and verify all circuits are de-energized before performing maintenance or repair(s) on the Tool Changer or modules. CAUTION: Thread locker applied to fasteners must not be used more than once. Fasteners might become loose and cause equipment damage. Always apply new thread locker when reusing fasteners. 5.1 Troubleshooting Procedures Refer to the following table for troubleshooting information: Table 5.1 Troubleshooting Procedures Symptom Possible Cause Correction Replace damaged or worn seals. See Section Seals are worn or damaged. Master Side Self-Sealing Valve or Section Rubber Bushing and Collar Replacement. Air leakage. Reduced air flow. Reduced vacuum flow. The modules are unable to couple. Debris blocking valve seal (for self-sealing valves). The valve piston is bent (for self-sealing valves). Corrosion. Flow path is blocked. Debris is blocking the valve seal (for self-sealing valves). The vacuum lines or connections are damaged or blocked. The V-ring seal is damaged. The valve piston and/or dowel pin is bent (for selfsealing valves) Clean in and around valve components. Ensure fluid stream is free of large particulates; filter as necessary. Replace the stem. See Section Master Side Self- Sealing Valve. Ensure the module is attached securely to the Tool Changer. See Section 2.1 Master Module Installation. Check the robot program and ensure the approach trajectory is parallel during Tool Changer coupling. Consult ATI Applications Engineering for assistance. Inspect valve components and supply/return lines for blockage. Clean/repair as necessary. Clean in and around valve components. Ensure the air stream is free of large particulates; filter as necessary. Inspect the supply/return hoses and connections for damage or blockage. Clean/repair/replace as necessary. Inspect the V-ring seal. Clean or replace as necessary. Refer to Section V-ring Seal Replacement. Replace the stem. See Section Master Side Self- Sealing Valve. Ensure the module is attached securely to the Tool Changer. See Section 2.1 Master Module Installation and Section 2.2 Tool Module Installation. Check the robot program and ensure the approach trajectory is parallel during Tool Changer coupling. D-11
12 5.2 Service Procedures The following service procedures provide instructions for component replacement and adjustment Master Side Self-Sealing Valve Parts required: See Section 8 Drawings. Tools Required: 2.5 mm Allen Wrench, torque wrench Supplies Required: Clean rag, Magnalube G lubricant 1. Place the Tool in a secure location. 2. Uncouple the Master and Tool plates. 3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). NOTICE: Debris can be expelled at high velocity during the purge, take all required safety precautions. 4. Purge and disconnect all customer plumbing connections to the module. a. Turn the supply lines off. b. Cover the valves with a rag for safety. c. Manually actuate the module s self-sealing valves to purge the line pressure. Note: Debris can be expelled at high velocity during the purge, take all required safety precautions. 5. Depending on the type of service or repair, connections to the module might also need to be disconnected. 6. Remove the valve stem using a 2.5 mm Allen wrench. Do not strip the hex on the valve stem during removal. 7. Remove the check valve piston and spring. Clean any lubrication from the check valve piston, valve stem, spring, and bore in the module housing using a clean rag. 8. Inspect the valve stem for straightness, and replace, if bent. 9. Inspect the o-rings and u-cup seal on the valve stem and check valve piston for wear and damage. Replace components that are damaged or worn. 10. Inspect the spring in the assembly and replace if damaged or worn. Figure 5.1 Master Self-Sealing Valve Valve Stem 2.5mm Allen Wrench Valve Stem (Inspect) Check Valve Spring (Inspect) O-Ring (Inspect) O-Ring (Inspect) U-Cup Seal (Inspect) O-Ring O-Ring (Face Seal) Check Valve U-Cup Seal Bore in Module Housing (Clean) D-12
13 11. Lubricate the bore in the module housing with Magnalube G (Teflon/Petroleum based grease). NOTICE: Do not lubricate the O-ring face seal until after installation. Lubricating the O-ring before installation can cause the O-ring to blow out during coupling and uncoupling. 12. If replacing seals, lubricate the valve stem O-ring and the check valve piston U-cup seal with Magnalube G (Teflon/Petroleum based grease). 13. Install the O-ring on the valve stem. 14. Install the U-cup seal on the check valve. Do not get lubrication in the face seal groove in the check valve. 15. Install the non-lubricated O-ring (face seal) into the check valve. 16. Install the spring into the bore in the module housing, seat the check valve on the spring. 17. If the threaded end of the valve stem does not have pre-applied adhesive, apply Loctite 7649 primer and then Loctite 222 or similar thread locker to the threaded end of the valve stem. If the module housing is stainless steel, also add Loctite 7649 primer to the housing threads. Figure 5.2 Master Self-Sealing Valve Installation Valve Stem O-Ring (Lubricate) Check Valve Spring O-Ring (Face Seal) (Lubrication after Installation) U-Cup Seal (Lubricate) Bore in Module Housing (Lubricate) Install U-Cup Seal as Shown 18. Install the valve stem. The check valve piston must be pushed down flush with the mating surface of the Master housing in order to install the threaded end of the valve stem. Do not damage the U-cup seal around the check valve piston. A small, flat-head screwdriver can be used to ensure that the U-cup seal is fully located in the recess and not folded over itself prior to screwing in the valve stem. Tighten the stem to 10 in-lbs (1.1 Nm). 19. Lubricate the installed O-ring (face seal) with Magnalube G (Teflon/Petroleum based grease). 20. After the procedure is complete, resume normal operation. D-13
14 5.2.2 Rubber Bushing and Collar Replacement Parts required: Refer to Section 8 Drawings. Tools required: Needle-nose pliers Supplies required: P80 lubricant Rubber bushings seal the ports in the Master and Tool plates. If the bushings are damaged, replace them. 1. Place the Tool in a secure location. 2. Uncouple the Master and Tool plates. 3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 4. Remove the bushing and collar. a. Use needle-nose pliers to remove the bushing from the module housing. NOTICE: The PV6 Master module does not have collar(s). b. If the collar remains in the module housing or inside the bushing, remove the collar. 5. Install the replacement bushing and collar. a. Apply a thin coat of P80 lubricant to the outer surface of the replacement bushing. b. Insert the beveled (chamfered) end of the bushing into the port. NOTICE: The PV6 Master module does not have collar(s). c. Insert the collar into the bushing. d. Seat the bushing completely in the bore. 6. After the procedure is complete, resume normal operation. Figure 5.3 Replacing the Bushing and Collar Collar Bushing D-14
15 5.2.3 V-Ring Seal Replacement Parts required: Refer to Section 8 Drawings. 1. Place the Tool in a secure location. 2. Uncouple the Master and Tool plates. 3. Turn off and de energize all energized circuits (e.g. electrical, air, water, etc.). 4. Purge and disconnect all customer plumbing connections to the module. Once the supply lines have been turned off, manually actuate the module s self sealing valves to purge the line pressure. Cover the valves with a rag prior to purging in order to keep the air from the impinging upon any person. Depending upon the service or repair being done connections up to the module may or may not need to be disconnected. 5. To remove the existing seal, pinch edge of the seal with fingers and gently pull the seal away from the vacuum valve on the Master. 6. To install a new seal, stretch the new seal over the shoulder of the vacuum valve. 7. Push the seal s hub down against the vacuum valve using finger tip. 8. After the procedure is complete, resume normal operation. Figure 5.4 Master Self Sealing Valve V-ring Seal Pinch edge of seal with fingers and gently pull away from the valve Stretch seal over the shoulder of the valve and push the seal hub down against the valve with finger tip V-ring Seal D-15
16 6. Serviceable Parts The following sections list the Master and Tool modules mounting hardware. Refer to Section 8 Drawings for additional serviceable parts. 6.1 PV1, PV2, and PV3 Master Module Mounting Hardware Table 6.1 PV1, PV2, and PV3 Master Module Mounting Hardware Part Number Qty Description M4 x 55 Socket Head Cap Screw, Class 12.9, Blue dyed Magni M5x50 Socket Head Cap Screw, Class 12.9, Blue dyed Magni PV4, PV5, and PV6 Master Module Mounting Hardware Table 6.2 PV4, PV5, and PV6 Master Module Mounting Hardware Part Number Qty Description A 3 M4X30 Socket Head Cap Screw, 12.9, ISO4762/DIN912, ES-ATI-007, YL M-spheres/IFI PV1, PV2, PV3, and PV6 Tool Module Mounting Hardware Table 6.3 PV4, PV5, and PV6 Master Module Mounting Hardware Part Number Qty Description M5x50 Socket Head Cap Screw, Class 12.9, Blue dyed Magni PV4 and PV5 Tool Module Mounting Hardware Table 6.4 PV4, PV5, and PV6 Master Module Mounting Hardware Part Number Qty Description A 3 M4X30 Socket Head Cap Screw, 12.9, ISO4762/DIN912, ES-ATI-007, YL M-spheres/IFI 525 D-16
17 7. Specifications Table 7.1 PV1 Vacuum/Air Modules Specifications Master: Anodized aluminum housing, stainless steel valve components, Materials of Nitrile seals, and brass collars. Construction: Tool: Anodized aluminum housing. Master: lbs (1.127kg) Weight: Tool: lbs ( kg) Self-Sealing Valves: Quantity 2 (2 pass-through ports on the Tool side) Air Pressure Maximum pressure of 100 psi (6.9 bar) Cv, Min 1.6 Customer Port Connection: G 3/8 (BSPP) Pass-Through Ports: Quantity 2 Air Pressure Supports positive pressure and vacuum flow conditions. Cv, Min 2.45 Customer Port Connection G 3/8 (BSPP) Vacuum Ports: Quantity 2 (2 pass-through ports on the Tool side) Air Pressure Cannot support positive pressure. Cv, Min 8.0 (estimate) Customer Port Connection G 3/4 (BSPP) Table 7.2 PV2 Vacuum/Air Modules Specifications Master: Anodized aluminum housing, stainless steel valve components, Materials of Nitrile seals, and brass collars. Construction: Tool: Anodized aluminum housing. Master: lbs (1.13 kg) Weight: Tool: lbs (0.94 kg) Self-Sealing Valves: Quantity 2 (2 pass-through ports on the Tool side) Air Pressure Maximum pressure of 100 psi (6.9 bar) Cv, Min 1.6 Customer Port Connection: G 3/8 (BSPP) Pass-Through Ports: Quantity 6 Air Pressure Supports positive pressure and vacuum flow conditions. Cv, Min 2.45 Customer Port Connection G 3/8 (BSPP) D-17
18 Table 7.3 PV3 Vacuum/Air Modules Specifications Master: Anodized aluminum housing, stainless steel valve components, Materials of Nitrile seals, and brass collars. Construction: Tool: Anodized aluminum housing. Master: lbs (1.13 kg) Weight: Tool: lbs (0.92 kg) Self-Sealing Valves: Quantity 2 (2 pass-through ports on the Tool side) Air Pressure Maximum pressure of 100 psi (6.9 bar) Cv, Min 1.6 Customer Port Connection: 3/8 NPT Pass-Through Ports: Quantity 2 Air Pressure Supports positive pressure and vacuum flow conditions. Cv, Min 2.45 Customer Port Connection 3/8 NPT Vacuum Ports: Quantity 2 (2 pass-through ports on the Tool side) Air Pressure Cannot support positive pressure. Cv, Min 8.0 (estimate) Customer Port Connection 3/4 NPT D-18
19 Table 7.4 PV4 Vacuum/Air Modules Specifications Materials of Master: Anodized aluminum housing, Nitrile seals, and brass collars. Construction: Tool: Anodized aluminum housing. Master: 2.08 lbs (0.94 kg) Weight: Tool: 1.72 lbs (0.78 kg) Pass-Through Ports: Quantity 8 Air Pressure Supports positive pressure and vacuum flow conditions. Cv, Min 2.45 Customer Port Connection 3/8 NPT Table 7.5 PV5 Vacuum/Air Modules Specifications Materials of Master: Anodized aluminum housing, Nitrile seals, and brass collars. Construction: Tool: Anodized aluminum housing. Master: 2.08 lbs (0.94 kg) Weight: Tool: 1.71 lbs (0.78 kg) Pass-Through Ports: Quantity 8 Air Pressure Supports positive pressure and vacuum flow conditions. Cv, Min 2.45 Customer Port Connection G 3/8 (BSPP) Table 7.6 PV6 Vacuum/Air Modules Specifications Materials of Master: Anodized aluminum housing, Nitrile seals, and brass collars. Construction: Tool: Anodized aluminum housing. Master: 3.34 lbs (1.51 kg) Weight: Tool: 2.93 lbs (1.33 kg) Pass-Through Ports: Quantity 12 Air Pressure Supports positive pressure and vacuum flow conditions. Cv, Min 1.03 Customer Port Connection G 1/4 (BSPP) D-19
20 8. Drawings PV1 (PV3 is similar but has NPT ports) P1, P2: 3/8G Pass-Thru S1, S2: 3/8G Checked V1, V2: 3/4G Pass-Thru PV1 Master Module (9120-PV1-M) 53.3 Note 4 / 10 in-lb Magnalube Magnalube after installation Magnalube 2 4 Magnalube bores 2 places where Valve Stem is used PV1-M Serviceable Parts ITEM NO. QTY. PART NO. DESCRIPTION O-Ring 14MM X 2MM Buna Mini U-Cup Seal 18mm ID x 22mm Buna O-Ring 6MM X 2MM Buna D SW-150A Master Fluid / Air Spring SS Collar for 3/8" Bushing Master Check Valve Piston, FA VALVE STEM, HIGH STRENGTH /8" Rubber Bushing. Nitrile V-Ring Seal Note: Service Kit 9120-F2-M-Kit consists of (1) each of items 1 thru 4. Note: Service Kit 9120-F4-M-Kit consists of (1) each of items 1, 2, 3, 4, 6, & 7. Rev. Description Initiator Date 04 ECO 14751; Added torque and Magnalube information, added Note 4, added information for 9120-F4-M-Kit, and updated Title Block. SZJ 9/22/2016 PV1 Tool Module (9120-PV1-T) Coupled (Approx.) 48 P1, P2: 3/8G Pass-Thru (Air/Vacuum Service) S1, S2: 3/8G Pass-Thru (Air Service) V1, V2: 3/4G Pass-Thru (Vacuum Service) Notes: Material of Construction: 1. Housings: Anodized Aluminum 2. Valve Components: Stainless Steel & Nitrile 3. Other: Brass 4. Replacement stem contains pre-applied thread locker. Use Loctite 7649 primer and Loctite 222 if reassembling with original stem. Operation: 5. Pneumatic Operation Only. 6. Checked Ports S1 & S2 do not support vacuum conditions. 7. Vacuum Ports V1 & V2 do not support positive pressures. 8. Checked ports can produce significant forces when under high supply pressures. These forces have to be overcome to achieve tool changer coupling. 9. For optimum performance inspect mating surfaces regularly to ensure they are free of debris. PV1-T No Serviceable Parts NOTES: UNLESS OTHERWISE SPECIFIED. DO NOT SCALE DRAWING. ALL DIMENSIONS ARE IN MILLIMETERS. DRAWN BY: CHECKED BY: P.Sparrow, 7/24/03 R. Heavner, 11/14/03 TITLE 1031 Goodworth Drive, Apex, NC 27539, USA Tel: info@ati-ia.com Fax: ISO 9001 Registered Company PROPERTY OF ATI INDUSTRIAL AUTOMATION, INC. NOT TO BE REPRODUCED IN ANY MANNER EXCEPT ON ORDER OR WITH PRIOR WRITTEN AUTHORIZATION OF ATI. PV1 Master & Tool Module Drawing 3rd ANGLE PROJECTION SCALE SIZE DRAWING NUMBER REVISION :2 B 04 PROJECT # SHEET OF PV1 D-20
21 PV2 Rev. Description Initiator Date P1-P6: 3/8G Pass-Thru S1, S2: 3/8G Checked PV2 Master Module (9120-PV2-M) 05 ECO 14751; Added torque and Magnalube information, added Note 4, added information for 9120-F4-M-Kit, and updated Title Block. SZJ 9/22/ PV2 Tool Module (9120-PV2-T) Coupled (Approx.) P1-P6: 3/8G Pass-Thru (Air/Vacuum Service) S1, S2: 3/8G Pass-Thru (Air Service) Note 4 / 10 in-lb 7 Magnalube Magnalube after installation 1 Magnalube Magnalube bores 2 places where Valve Stem is used Notes: Material of Construction: 1. Housings: Anodized Aluminum 2. Valve Components: Stainless Steel & Nitrile 3. Other: Brass 4. Replacement stem contains pre-applied thread locker. Use Loctite 7649 primer and Loctite 222 if reassembling with original stem. Operation: 5. Pneumatic Operation Only. 6. Checked Ports S1 & S2 do not support vacuum conditions. 7. Checked ports can produce significant forces when under high supply pressures. These forces have to be overcome to achieve tool changer coupling. 8. For optimum performance inspect mating surfaces regularly to ensure they are free of debris. PV2-M Serviceable Parts ITEM NO. QTY PART NUMBER DESCRIPTION O-Ring 14MM X 2MM Buna Mini U-Cup Seal 18mm ID x 22mm Buna O-Ring 6MM X 2MM Buna D SW-150A Master Fluid / Air Spring SS Collar for 3/8" Bushing Master Check Valve Piston, FA VALVE STEM, HIGH STRENGTH /8" Rubber Bushing. Nitrile Note: Service Kit 9120-F2-M-Kit consists of (1) each of items 1 thru 4. Note: Service Kit 9120-F4-M-Kit consists of (1) each of items 1, 2, 3, 4, 6, & 7. NOTES: UNLESS OTHERWISE SPECIFIED. DO NOT SCALE DRAWING. ALL DIMENSIONS ARE IN MILLIMETERS. 3rd ANGLE PROJECTION DRAWN BY: CHECKED BY: P.Sparrow, 7/24/03 R. Heavner, 11/18/03 TITLE SCALE SIZE DRAWING NUMBER PV2-T No Serviceable Parts 1031 Goodworth Drive, Apex, NC 27539, USA Tel: info@ati-ia.com Fax: ISO 9001 Registered Company PROPERTY OF ATI INDUSTRIAL AUTOMATION, INC. NOT TO BE REPRODUCED IN ANY MANNER EXCEPT ON ORDER OR WITH PRIOR WRITTEN AUTHORIZATION OF ATI. PV2 Master & Tool Module Drawing :2 B 05 PROJECT # SHEET OF PV2 REVISION D-21
22 PV4 PROPERTY OF ATI INDUSTRIAL AUTOMATION, INC. EXCEPT NOT TO BE REPRODUCED IN ANY MANNER ON OF ATI. ORDER OR WITH PRIOR WRITTEN AUTHORIZATION PV4 Master Module (9120-PV4-M) P1-P8: 3/8NPT Pass-Thru (Air/Vacuum Service) PV4-M Serviceable Parts I TEM NO. Q TY. P ART NUMBE R DESCRIPTIO N Collar for 3/8" Bushin g 3/8" Rubber Bushing Nitrile 92.4 Coupled Approx. Notes: Material of Construction: 1. Housings: Anodized Aluminum 2. Other: Nitrile & Brass Operation: 1. Pneumatic Operation Only. 2. For optimum performance to ensure they are free of inspect debris. mating surfaces NOTES: UNLESS OTHERWISE SPECIFIED DO NOT SCALE DRAWING. DRAWN IN SOLIDWORKS. ALL DIMENSIONS ARE IN MILLIMETERS. DRAWN BY: CHECKED BY: WEIGHT LBS: 3rd ANGLE PROJECTION ASSEMBLY REF: ev. escriptio R n r D Dat Initiato e Updated notes 0. ECO# S 1/4/200 P 5 PV4 Tool Module (9120-PV4-T) 50.8 P1-P8: 3/8NPT Pass-Thru (Air/Vacuum Service) PV4-T No Serviceable Parts regularly 1031 Goodworth Drive, Apex, NC 27539, USA Tel: info@ati-ia.com Fax: ISO 9001 Registered Company B. Digeso, P.Sparrow, /30/03 1/7/05 TITLE PV4 Module Drawing S CALE SIZ E DRAWING NUMBE R 1:2 B PV RODUCT RELEASE # P D ATE : SHEET O F D-22
23 PV5 PROPERTY OF ATI INDUSTRIAL AUTOMATION, INC. EXCEPT NOT TO BE REPRODUCED IN ANY MANNER ON OF ATI. ORDER OR WITH PRIOR WRITTEN AUTHORIZATION P1-P8: 3/8G Pass-Thru PV5 Master Module (9120-PV5-M) PV5-M Serviceable Parts I TEM NO. Q TY. PART NO. DESCRIPTIO N Collar for 3/8" Bushin g /8" Rubber Bushing. Nitril e ev. escriptio R n r D Dat Initiato e CO# 3690 Updated notes 03. E 1/4/200 PS PV5 Tool Module (9120-PV5-T) Coupled (Approx.) P1-P8: 3/8G Pass-Thru (Air/Vacuum Service) 43.1 Notes: Material of Construction: 1. Housings: Anodized Aluminum 2. Other: Nitrile & Brass Operation: 1. Pneumatic Operation Only. 2. For optimum performance to ensure they are free of inspect debris. mating surfaces regularly PV5-T No Serviceable Parts NOTES: UNLESS OTHERWISE SPECIFIED DO NOT SCALE DRAWING. DRAWN IN SOLIDWORKS. ALL DIMENSIONS ARE IN MILLIMETERS Goodworth Drive, Apex, NC 27539, USA Tel: info@ati-ia.com Fax: ISO 9001 Registered Company 3rd ANGLE PROJECTION DRAWN BY: CHECKED BY: WEIGHT ASSEMBLY LBS: REF: B. Digeso, P.Sparrow, /30/03 11/19/03 TITLE PV5 Master & Tool Module S CALE SIZ E DRAWING NUMBE R 1:1 B Drawing PV RODUCT RELEASE # P D ATE : SHEET O F D-23
24 PV6 PROPERTY OF ATI INDUSTRIAL AUTOMATION, INC. EXCEPT NOT TO BE REPRODUCED IN ANY MANNER ON OF ATI. ORDER OR WITH PRIOR WRITTEN AUTHORIZATION PV6 Master Module (9120-PV6-M) P1-P12: 1/4G Pass-Thru PV6-M Serviceable Parts I TEM NO. QTY. PART NUMBE R DESCRIPTIO N /4" NPT Rubber Bushing, Nitril e ev. escriptio R n r D Dat Initiato e 3 CO# 3690 Updated notes 0. E S 1/4/200 P 5 PV6 Tool Module (9120-PV6-T) Approx. Coupled Notes: Materials 1. Housing 2. Other of Construction: Anodized Aluminum Nitrile P1-P12: 1/4G Pass-Thru (Air/Vacuum Service) Operation: 1. Pneumatic Operation Only. 2. For optimum performance to ensure they are free of inspect debris. mating surfaces regularly PV6-T No Serviceable Parts NOTES: UNLESS OTHERWISE SPECIFIED 1031 Goodworth Drive, Apex, NC 27539, USA DO NOT SCALE DRAWING. DRAWN IN SOLIDWORKS. Tel: info@ati-ia.com ALL DIMENSIONS ARE IN MILLIMETERS. Fax: ISO 9001 Registered Company 3rd ANGLE PROJECTION DRAWN BY: CHECKED BY: WEIGHT ASSEMBLY LBS: REF: B. Digeso, P.Sparrow, /30/03 1/7/05 TITLE PV6 Module Drawing CALE SIZ S E DRAWING NUMBE R 1:1 B PV RODUCT RELEASE # P D ATE : SHEET O F - - D-24
Table of Contents. D. Air modules...d-2 AQ2 Air module...d-2 1. Product Overview...D-2 2. Installation...D Operation...D-5 4. Maintenance...
Table of Contents D. Air modules...d-2 AQ2 Air module...d-2 1. Product Overview...D-2 2. Installation...D-3 2.1 Module Installation... D-3 2.2 Module Removal... D- 3. Operation...D-5. Maintenance...D-5.1
More informationTable of Contents D. Fluid/Air Modules...2 F34, FA2...2
Table of Contents D. Fluid/Air Modules...2 F34, FA2...2 1. Product Overview...2 2. Installation...3 2.1 Installation...3 2.2 Removal...3 3. Operation...3 4. Maintenance...4 4.1 F34-T and FA2-M-V1...4 4.2
More informationTable of Contents. B. Base Utility Coupler...B-4 G2x/G5x Series Utility Couplers with Integrated Compliance...B-4 1. Product Overview...
Table of Contents B. Base Utility Coupler...B-4 G2x/G5x Series Utility Couplers with Integrated Compliance...B-4 1. Product Overview...B-4 1.1 G2x/G5x Compliant Utility Coupler Master... B-5 1.2 G2x/G5x
More informationTable of Contents. B. Base Utility Coupler...B-3 GKx Series Compliant Utility Coupler...B-3 1. Product Overview...B Installation...
Table of Contents B. Base Utility Coupler...B-3 GKx Series Compliant Utility Coupler...B-3 1. Product Overview...B-3 1.1 9123-GKx Compliant Utility Coupler Master... B-5 1.2 9123-GKx Compliant Utility
More informationTable of Contents. B. Base Utility Coupler...B-4 GLx Series Utility Couplers with Integrated Compliance...B-4 1. Product Overview...
Table of Contents B. Base Utility Coupler...B-4 GLx Series Utility Couplers with Integrated Compliance...B-4 1. Product Overview...B-4 1.1 GLx Compliant Utility Coupler Master... B-5 1.2 GLx Utility Coupler
More informationTSS Tool Stand. Installation and Operation Manual. Document #:
TSS Tool Stand Installation and Operation Manual Document #: 9610-20-1068 Engineered Products for Robotic Productivity Pinnacle Park 1031 Goodworth Drive Apex, NC 27539 Tel: +1-919.772.0115 Fax: +1-919.772.8259
More informationRobotic Collision Sensor SR 81, SR 101, SR 131, SR 176, SR 221 Manual
Robotic Collision Sensor SR 81, SR 101, SR 131, SR 176, SR 221 Manual U.S. Patent Nos. 6069415 and 6690208 Document #: 9610-60-1004 Engineered Products for Robotic Productivity Pinnacle Park 1031 Goodworth
More information2007 CATALOG. Robotic Rotary Joint. Unlimited rotation of robotic tooling
27 CATALOG Robotic Rotary Joint Unlimited rotation of robotic tooling ROBOTIC ROTARY JOINT Product Description The Rotary Joint device allows electrical and pneumatic lines from the robot to feed through
More informationDeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT
DeZURIK 20 144" BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT Instruction D10373 April 2017 Instructions These instructions provide information about the 20 (250 F2 model only) and the 24-144 BAW
More informationParallel Grippers- DPDS DIRECTCONNECT Modular Series
Courtesy of CMA/Flodyne/Hydradyne Motion Control Hydraulic Pneumatic Electrical Mechanical (8) 426-548 www.cmafh.com 1.134 Parallel Grippers- DPDS DIRECTCONNECT Modular Series Mounting Information: Grippers
More informationSERVICE INSTRUCTIONS. Material Pump
TM TM SERVICE INSTRUCTIONS Material Pump 9618 DESCRIPTION Model 9618 is designed for pumping petroleum products from the original container to a desired location. Due to its non-corrosive (aluminum and
More informationAF0465-XX SERVICE KITS GENERAL DESCRIPTION MODEL DESCRIPTION CHART OPERATING AND SAFETY PRECAUTIONS THIS MANUAL COVERS THE FOLLOWING MODELS
OPERATOR S MANUAL INCLUDING: SERVICE KITS, TROUBLESHOOTING, PARTS LIST, DISASSEMBLY & REASSEMBLY. 4-1/4 AIR MOTORS AF044X-XX (4 STROKE) and AF046X-XX (6 STROKE) Also covers 637489 service kits AF044X-XX
More informationNEW 2005 CATALOG. Robotic Rotary Joint Unlimited rotation of robotic tooling
NEW 2005 CATALOG Robotic Rotary Joint Unlimited rotation of robotic tooling ROBOTIC ROTARY JOINT Product Description The Rotary Joint device allows electrical and pneumatic lines from the robot to feed
More informationService Handbook. High-Pressure Washer Pump
Pump 629 9/28/01 3:22 PM Page 1 Service Handbook High-Pressure Washer Pump 3.532-629.0 10.00 Pump 629 9/28/01 3:22 PM Page 2 Pump 629 9/28/01 3:22 PM Page 3 TROUBLESHOOTING OVERVIEW How to Use This Manual
More informationINSTALLATION INSTRUCTIONS REPAIR SEAL KIT PowerSurvivor 160E
INSTALLATION INSTRUCTIONS REPAIR SEAL KIT PowerSurvivor 160E PURPOSE OF THE KIT The Repair Seal Kit should be installed after 500 hours of operation. It should be installed regardless of whether or not
More informationPage 1 of 26 Oteco Inc. Houston, Texas
Page 1 of 26 Page 2 of 26 1.0 OVERVIEW CONTENTS 2.0 INSTALLATION GUIDELINES 2.1 Preferred Valve Orientation 2.2 Pressure Rating and Orientation of Discharge line 2.3 Reaction Forces and Anchoring of Reset
More informationINSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D-275 SERIES PUMPS (Idler Cup and Hydrostatic Thrust Designs)
TM INSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D-275 SERIES PUMPS (Idler Cup and Hydrostatic Thrust Designs) WARNING This Instruction Manual and General Instructions Manual, CA-1, should be read thoroughly
More informationSTRAIGHT FITTING ORIFICE DISK MUFFLER MANIFOLD MOUNTING PLATE MULTI-FUNCTION IMPACT SEAL CYLINDER TUBE 1/4 BSPP ELBOW FITTING HEAD ASSEMBLY
Disassembly OF THE CYLINDER 1) WARNING: All air pressure in the unit must be exhausted prior to disassembly of stretch rod cylinder. 2) Remove valve from manifold (valve not shown). 3) Remove mufflers,
More informationBETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR CB-SR-S SEISMIC SPRING RETURN SERIES PNEUMATIC ACTUATORS
BETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR CB-SR-S SEISMIC SPRING RETURN SERIES PNEUMATIC ACTUATORS PART NUMBER: 102264 REVISION: "C" DATE: November 2000 Page 1 of 11 1.0 INTRODUCTION 1.1
More informationMAINTENANCE MANUAL UPE/SPE PART EJECTORS LST/SST PART POSITIONERS
ENGINEERED PRODUCTS ISO 9001 REGISTERED MAINTENANCE MANUAL UPE/SPE PART EJECTORS LST/SST PART POSITIONERS TIP PLATE SIDE PLATE CAM SLOT UPE/SPE WORLD SWITCH (INTEGRATED) WORLD SWITCH (BOX-STYLE) SHROUD
More informationAssembly and operating manual AGE-W Angular Compensation Unit
original manual Assembly and operating manual AGE-W Angular Compensation Unit Imprint Imprint Copyright: This manual is protected by copyright. The author is SCHUNK GmbH & Co. KG. All rights reserved.
More information3M Overhaul Service Kit
SERVICE INSTRUCTIONS FOR 3M 12,000 RPM 5 in. (127 mm) and 6 in. (150 mm) RANDOM ORBITAL SANDERS 3M Overhaul Service Kit The part number 20347, 3M Overhaul Service Kit, contains all the replacement parts
More informationQuick-Change System SWS-001
Original Manual Quick-Change System SWS-001 Installation and Operating Manual Superior Clamping and Gripping Imprint Imprint Copyright: This manual remains the copyrighted property of SCHUNK GmbH & Co.
More informationPRODUCT SERVICE MANUAL For G6D-187, 218, 250, 275 and 312 PUMPS
PRODUCT SERVICE MANUAL For G6D-187, 218, 250, 5 and 312 PUMPS WARNING This Instruction Manual and General Instructions Manual, SRM00046, should be read thoroughly prior to pump service, installation, operation
More information3M Overhaul Service Kit
SERVICE INSTRUCTIONS FOR 3M 12,000 RPM 3 in. (77 mm) RANDOM ORBITAL SANDERS 3M Overhaul Service Kit The part number 20346, 3M Overhaul Service Kit, contains all the replacement parts that naturally wear
More informationIMT Bead Breaker 1000
Manual Part Number 99903638 IMT Bead Breaker 000 Revised 2050423 Copyright 204 Iowa Mold Tooling Co., Inc. All rights reserved IOWA MOLD TOOLING CO., INC. PO Box 89 Garner, IA 50438 Tel: 64-923-37 FAX:
More informationINSTRUCTION AND MAINTENANCE MANUAL FR95 PRESSURE REGULATOR
Enidine / Conoflow 105 Commerce Way Westminster, SC 29693 Tel: (864) 647-9521 Fax: (864) 647-7993 WARNING Conoflow s products are designed and manufactured using materials and workmanship required to meet
More informationDisassembly and Reassembly for CBB (Double Acting) Series Pneumatic Actuators
MECATORK S.A.S Release: May 2012 Disassembly and Reassembly for CBB (Double Acting) Series Pneumatic Actuators MECATORK S.A.S Table of Contents May 2012 Table of Contents Section 1: Introduction 1.1 General
More informationGH-BETTIS SERVICE INSTRUCTIONS DISASSEMBLY & REASSEMBLY FOR MODELS HD521-M4, HD721-M4 AND HD731-M4 DOUBLE ACTING SERIES PNEUMATIC ACTUATORS
GH-BETTIS SERVICE INSTRUCTIONS DISASSEMBLY & REASSEMBLY FOR MODELS HD521-M4, HD721-M4 AND HD731-M4 DOUBLE ACTING SERIES PNEUMATIC ACTUATORS WITH HYDRAULIC CONTROL PACKAGE PART NUMBER: SE-023 REVISION:
More informationPO Box 645, Stockton, Missouri, FAX superiorgearbox.com
I000-7000-D0447-A 4/7/05 1 SAFETY PRECAUTIONS CAUTION Please read this entire document prior to operating the gear drive. Gear drive failure and / or injury to operators may be caused by improper installation,
More informationSachs shock manual. ( ) 2 & 4 Stroke RR Enduro. ( ) RS Dual Sport
Sachs shock manual (2013 2015) 2 & 4 Stroke RR Enduro (2014-2015) RS Dual Sport 1 Introduction The procedures in this manual must take place in a clean environment using professional tools and some specific,
More informationSAE STANDARD BOLT ASSEMBLY NUMBER 60020_IR4 INSTALLATION AND OPERATIONS MANUAL
SAE STANDARD BOLT ASSEMBLY NUMBER 60020_IR4 INSTALLATION AND OPERATIONS MANUAL CONTENTS Important! Read Carefully... 1 Safety and Warnings... 2 Warning Rotating Equipment Hazard... 2 Warning Pinch Point
More informationCUSTOM COMBINATION AIR VALVE
INSTALLATION / OPERATION / MAINTENANCE CUSTOM COMBINATION AIR VALVE INTRODUCTION This manual will provide you with the information to properly install and maintain this valve to ensure a long service life.
More informationSingle-end Porting Head 1 ITEM A/R 2 A/R A/R A/R
MXP50N Internal Bearing 50mm ( inch) Bore Models: MXP50NTP MXP50NGP MXP50NNP MXP50NST MXP50NSG MXP50NSN Both Metric and Inch models Parts Sheet 000_0_MXP5 0 5 7 5 9 0 5 7 9 0 Singleend Porting Head Return
More informationGH-BETTIS OPERATING & MAINTENANCE INSTRUCTIONS DISASSEMBLY & ASSEMBLY FOR THE T80X-M4-S DOUBLE ACTING SERIES HYDRAULIC ACTUATORS
GH-BETTIS OPERATING & MAINTENANCE INSTRUCTIONS DISASSEMBLY & ASSEMBLY FOR THE T80X-M4-S DOUBLE ACTING SERIES HYDRAULIC ACTUATORS -S INDICATES CYLINDERS ARE IN TANDEM PART NUMBER: 100121 REVISION "A" ECN
More informationINSTALLATION INSTRUCTIONS REPAIR SEAL KIT PowerSurvivor 40E
INSTALLATION INSTRUCTIONS REPAIR SEAL KIT PowerSurvivor 40E PURPOSE OF THE KIT The Repair Seal Kit should be installed after 1000 hours of operation. It should be installed regardless of whether or not
More informationAudi-Larm TM Audible Alarm: AirHawk II Air Mask
Audi-Larm TM Audible Alarm: AirHawk II Air Mask MAINTENANCE AND REPAIR MSA 011 (L) Rev. 0 MSA 2010 Prnt. Spec. 10000005389(I) Mat. 10104323 Doc. 10104323 REPLACEMENT KITS AND PARTS LIST Item P/N Description
More informationCylinder Maintenance & Repair Instructions
Cylinder Maintenance & Repair Instructions PENINSULAR CYLINDER CO. Model HP High Pressure Hydraulic Cylinders Proximity Switch & Non Proximity Switch Designs - High Pressure NFPA Hydraulic Cylinder ( 5,000
More informationPRODUCT SERVICE MANUAL. BK6DHZ(C)-250, 275, 312 and 400 PUMPS
PRODUCT SERVICE MANUAL BK6DHZ(C)-250, 275, 312 and 400 PUMPS WARNING This manual, and the GENERAL INSTRUCTION MANUAL, SRM00046, should be read thoroughly prior to pump installation, operation or maintenance.
More informationMAINTENANCE DESCRIPTION. Specifications Information and Repair Parts Manual &
Please read and save this Repair Parts Manual. Read this manual and the General Operating Instructions carefully before attempting to assemble, install, operate or maintain the product described. Protect
More informationHydraulics. Part B, Section 1. This section covers the following unit configurations. 3700V 3800V 3900V
Part B, Section 1 Model Voltage Pump Manifold Control This section covers the following unit configurations. 3500V 3700V 3800V 3900V All Piston (F) 4-Port (A) 6-Port (B or C) -Port (S or T) Vista Standard
More informationSERVICE MANUAL. PVR15-Manifold Series Pump. J Design Series INSTALLATION. Ordering Code PVR15 - _ RM - _ - - J
SERVICE MANUAL PVR15-Manifold Series Pump Installation, Startup, Operating Instructions, Parts Pages, Repair Procedures J Design Series This service manual applies to products with Ordering Codes like
More informationP-600. Technical Manual. Troubleshooting Repairs Replacements
P-600 Technical Manual Troubleshooting Repairs Replacements Table of Contents P-600 Lift Symptoms and Problems Finding the Problem Before Getting Inside 3 Pneumatic Systems 4 Electrical Systems 5 Mechanical
More informationKysor On/Off Rear Air Fan Drive
. Proper precautions must be taken to prevent personal injury from contact with moving parts, unintended engine start, or other hazards present when working with powered equipment. Refer to the vehicle
More informationDATA SHEET 6K151CT2, 6K151CT4, 6K201CT2, 6K201CT4, 6K301CT4, 6K401CT4 OPEN IMPELLER CENTRIFUGAL PUMPS. Stainless Steel Models: SPECIFICATIONS FEATURES
DATA SHEET OPEN IMPELLER CENTRIFUGAL PUMPS Stainless Steel Models: 6K151CT2, 6K151CT4, 6K1CT2, 6K1CT4, 6K31CT4, 6K1CT4 FEATURES Model 6K1CT2 Shown 34 SS Liquid-end construction offers corrosion resistance
More informationPRODUCT SERVICE MANUAL FOR _G3D -350 and 400 SERIES PUMPS (Idler Cup and Hydrostatic Thrust Designs)
PRODUCT SERVICE MANUAL FOR _G3D -350 and 400 SERIES PUMPS (Idler Cup and Hydrostatic Thrust Designs) WARNING The Imo General Installation Operation, Maintenance, and Troubleshooting Manual, (No. SRM00046),
More informationSafety, Operation and Maintenance Instructions For Long & Short Nose Upholstery Air Stapler (NS10 & NS11)
Safety, Operation and Maintenance Instructions For Long & Short Nose Upholstery Air Stapler (NS10 & NS11) Important: Drop 3 drops of oil into the stapler air inlet BEFORE first use. See page 2. Please
More informationPRODUCT SERVICE MANUAL FOR BK12DHZ PUMPS
PRODUCT SERVICE MANUAL FOR BK12DHZ PUMPS WARNING This manual, and the GENERAL INSTRUCTION MANUAL SRM00046, should be read thoroughly prior to pump installation, operation or maintenance. Manual No. SRM00095
More informationOWNER S MANUAL. ROTARY SURFACE CLEANER Models 105C, 105F, 105CW, & 105FW. Revision 2.01
OWNER S MANUAL ROTARY SURFACE CLEANER Models 105C, 105F, 105CW, & 105FW Revision 2.01 ROTARY SURFACE CLEANER WARNING HIGH PRESSURE CAN CAUSE SERIOUS INJURY, MAXIMUM WORKING PRESSURE IS 4000 P.S.I. Any
More informationFlow Line Controls. Installation & Operations Manual SERIES 20/21 Pneumatic Actuators
Flow Line Controls Installation & Operations Manual SERIES 20/21 Pneumatic Actuators Flow Line Controls, Inc. P.O. Box 677 Schriever, LA 70395 Phone: 985-414-6003 Toll Free 1-800-815-9226 Fax 985-414-6072
More informationScope. Applicability. Caution. I & M CV3000 Series. Storage. Installation & Maintenance Instructions for Marwin CV3000 Series Three Piece Ball Valves
I & M CV3000 Series 3170 Wasson Road Cincinnati, OH 45209 USA Phone 513-533-5600 Fax 513-871-0105 marwin@richardsind.com www.marwinvalve.com Installation & Maintenance Instructions for Marwin CV3000 Series
More informationBIG BLASTER Air Cannon Maintenance Instructions
BIG BLASTER Air Cannon Maintenance Instructions Go to BIG BLASTER Air Cannon Maintenance Instructions web page BIG BLASTER HURRICANE Air Cannon BIG BLASTER XHV Air Cannon with MARTIN TORNADO Exhaust Valve
More informationMAINTENANCE MANUAL LP SERIES RAIL SLIDES
ENGINEERED PRODUCTS ISO 9001 REGISTERED MAINTENANCE MANUAL LP SERIES RAIL SLIDES PNEUMATIC CYLINDER SHROUD SIDE SHROUD SIDE SHROUD LP1 SOLID STATE CYLINDER SWITCH CARRIAGE PLATE LP2 LUBE ACCESS PORT SHOCK
More informationREAD INSTRUCTIONS COMPLETELY BEFORE BEGINNING INSTALLATION
INSTALLATION INSTRUCTIONS Hot Fox In-Tank Fuel Warmer READ INSTRUCTIONS COMPLETELY BEFORE BEGINNING INSTALLATION Models covered by these instructions include: HFG 0-0 HFG 0- SHFT--0- SHH--0 TWHF 0- HFG
More informationPowers Controls 656 Powermite Valve with 3-inch Top Rebuilding
Powers Controls 656 Powermite Valve with 3-inch Top Rebuilding Technical Bulletin Document No. 155-240P25 TB 233 Description This Technical Bulletin describes the recommended method of rebuilding the 656
More informationHIGH PRESSURE CONTROL VALVE PISTON BALANCED
PISTON BALANCED All Rights Reserved. All contents of this publication including illustrations are believed to be reliable. And while efforts have been made to ensure their accuracy, they are not to be
More informationDisassembly and Reassembly for CBB-SR (Spring Return) Series Pneumatic Actuators
Part Number: VA001-196-31, Rev. 0 Release: May 2012 Disassembly and Reassembly for CBB-SR (Spring Return) Series Pneumatic Actuators Table of Contents Part Number: VA001-196-31, Rev. 0 May 2012 Table of
More informationSurface CIMV, Low Flow, HTV, Manual
Industries 5000 psi Operations and Maintenance Manual DOC-03715 Rev A Pioneering an Industry TABLE OF CONTENTS About SkoFlo... 2 General Information... 2 Hydraulic Ratings... 3 Storage... 3 Installation...
More informationSTRETCH ROD CYLINDERS for Krones Stretch Blow Molding Machines
PACKAGING COMPONENTS PLASTIC GROUP BCK STRETCH ROD CYLINDERS for Krones Stretch Blow Molding Machines Quality Delivery Support SOLUTIONS A division of PHD Simplified Pneumatic System Easy Maintenance Better
More informationHydraulics. Part B, Section 1. This section covers the following unit configurations. 3400V 3500V 3700V
Part B, Section 1 This section covers the following unit configurations. Model Voltage Pump Manifold Control 3100V 3400V 3500V 3700V All Piston (E) 4-Port (A) 6-Port (B or C) 2-Port (S or T) Vista Standard
More informationService Bulletin. HIITMill (X) Brake Lever Drift
HIITMill (X) Brake Lever Drift Applies to: HIITMill (9-4590) + HIITMIll X (9-4640) On some HIITMill and HIITMill X units, the brake lever can drift when the user is Rev. A applying load to the belt. This
More informationProduct Service Manual For DLH12DHT SERIES PUMPS
Product Service Manual For DLH12DHT SERIES PUMPS Pump Size Bill of Material Assembly Drawing 275 3217 / 568 - DLH12DHTX-275 Figure 3 312 3220 / 561 - DLH12DHT 312 Figure 3 3220 / 567 - DLH12DHT - 312 P
More informationDISPLACEMENT PUMP INSTRUCTIONS-PARTS LIST Rev. K. Model , Series A Model , Series B Model , Series A
INSTRUCTIONS-PARTS LIST INSTRUCTIONS This manual contains important warnings and information. READ AND KEEP FOR REFERENCE. DISPLACEMENT PUMP 308190 Rev. K 3000 psi (210 bar) MAXIMUM WORKING PRESSURE Model
More informationSTYLE 3463 FireFox. With Position Feedback Potentiometer
STYLE 3463 FireFox INSTALLATION, OPERATING and MAINTENANCE INSTRUCTIONS With Position Feedback Potentiometer The following is intended to provide the basic instructions for installation, operating and
More informationHydraulics. Part B, Section 1. This section covers the following unit configurations. 3700V
Part B, Section 1 Model Voltage Pump Manifold Control This section covers the following unit configurations. 3500V 3700V 3860 3890 3930 3960 All Piston (D) 4-Port (A) 6-Port (B or C) 2-Port (S or T) Vista
More informationDR Series Radial Diaphragm Valves
DR Series Radial Valves Service Instructions Valves with Plastic Actuators (1/2 through 1 inch) Valves with Aluminum Actuators (1/2 through 2 inch) Manual model Pneumatic model Manual model Pneumatic model
More informationService Manual for Hydraulic Vane Pumps Flange Mounted
Industrial Hydraulics Electric Drives and Controls Linear Motion and Assembly Technologies Pneumatics Service Automation Mobile Hydraulics Service Manual for Hydraulic Vane Pumps Flange Mounted SM PSCF/07.03
More informationMAINTENANCE MANUAL DS3 DOUBLE SHEAR LOCKOUT UNIT
ENGINEERED PRODUCTS ISO 9001 REGISTERED MAINTENANCE MANUAL DS3 DOUBLE SHEAR LOCKOUT UNIT 70mm BORE PNEUMATIC CYLINDER DOUBLE ROD SHOWN LOCKOUT DISK* SOLID STATE CYLINDER * *OPTIONAL SHEET 1 REV 2/14/2018
More informationINSTRUCTION MANUAL IM-422 For HTC/COUPLING ASSEMBLY HC-8088
No Revision 2/22/18 INSTRUCTION MANUAL IM-422 HTC/COUPLING ASSEMBLY The Riverhawk Company reserves the right to make changes updating this document without dissemination or notice. The latest revision
More information1 ½-Inch High Pressure Pumps Refer to pump manual for General Operating and Safety Instructions.
Specifications Information and Repair Parts Manual 4783, 4787, 4788, and 4789 Please read and save this Repair Parts Manual. Read this manual and the General Operating Instructions carefully before attempting
More informationThrottling Pendulum Gate O-ring Replacement Procedure Rev. A, May 2012
Throttling Pendulum Gate O-ring Replacement Procedure Rev. A, May 2012 This procedure covers the replacement of the gate O-ring of the Nor-Cal Pendulum Gate Valve, with the gate valve housing installed
More informationSAFETY MANUAL READ FIRST!
966-05-XX SAFETY MANUAL READ FIRST! IMPORTANT: READ THESE WARNINGS AND SAFETY PRECAUTIONS PRIOR TO INSTALLATION OR OPER- ATION. FAILURE TO COMPLY WITH THESE INSTRUC- TIONS COULD RESULT IN PERSONAL INJURY
More informationEURO BEAD BREAKER MODEL # Instruction Manual Parts Breakdown
EURO BEAD BREAKER MODEL #10107 Instruction Manual Parts Breakdown Operation WARNING The optional air/hydraulic pump is capable of generating fluid pressure up to 10,000 PSI. Keep both hands on the handles
More informationMAINTENANCE MANUAL MPE PART EJECTOR MST PART POSITIONER
ENGINEERED PRODUCTS ISO 9001 REGISTERED MAINTENANCE MANUAL MPE PART EJECTOR MST PART POSITIONER WORLD SWITCH MPE MST STANDARD SHROUD PNEUMATIC CYLINDER SOLID STATE CYLINDER SWITCH SHEET 1 REV 4/29/2016
More informationLEAK TEST PROCEDURE MRTALPCH611LDC REMOTE READY LIFTERS W/ 3 BUTTON CONTROL APPLICABLE TO LIFTERS WITH SERIAL NUMBERS GREATER THAN #
LEAK TEST PROCEDURE MRTALPCH611LDC REMOTE READY LIFTERS W/ 3 BUTTON CONTROL APPLICABLE TO LIFTERS WITH SERIAL NUMBERS GREATER THAN # 20100742 TESTING AND MAINTENANCE MUST BE DONE BY A QUALIFIED PERSON
More information( Versions Available)
STYLE 494 ELECTRIC LADDER PIPE INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS ( Versions Available) The following is intended to provide the basic instructions for installation, operating and maintenance
More informationPRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY
PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY All Rights Reserved. All contents of this publication including illustrations are believed to be reliable. And while efforts have been
More informationMaintenance Information
80234313 Edition 1 June 2006 Air Grinder, Die Grinder, Sander and Belt Sander Series G1 (Angle) Maintenance Information Save These Instructions WARNING Always wear eye protection when operating or performing
More informationPRODUCT SERVICE MANUAL
PRODUCT SERVICE MANUAL FOR AM322ICX-325AE, 350AN and 400A PUMPS WARNING This Special Instruction Manual and General Instructions Manual, SRM00046, should be read thoroughly prior to pump installation,
More informationService manual. English. F5 Corpus
Service manual English F5 Corpus Introduction The Service Manual is intended for technical personnel who maintain and repair power wheelchairs. It is important that anyone who performs maintenance and
More informationMandatory X Information Recommended Change. Series/Parts Affected: LS40D, LS40TD, LS50TD and LS60TD Concrete Pumps
Service Bulletin No. CP20060428 Subject: Remix Shaft Coupler Retrofit Kit Model: LS40D, LS40TD, LS50TD & LS60TD Product Group: Concrete Pump Date: April 28, 2006 SERVICE BULLETIN Group: CP Mandatory X
More informationOPERATION MANUAL NT50 NOMAD TRANS-FLO AIR-OPERATED DOUBLE DIAPHRAGM PUMPS. A JDA Global Company. 7/11 rev. 1
OPERATION MANUAL NT50 NOMAD TRANS-FLO AIR-OPERATED DOUBLE DIAPHRAGM PUMPS A JDA Global Company 7/11 rev. 1 CAUTION SAFETY POINTS TEMPERATURE LIMITS: Neoprene -17.8 C to 93.3 C 0 F to 200 F Buna-N -12.2
More informationPump Operating and Maintenance Manual - Models
Pump Operating and Maintenance Manual - Models 78-00111 - 78-0057 Thank you for purchasing the SDI Diaphragm Pump manufactured by Comet Pump. Comet produces quality products which are safe, efficient and
More informationD-15/G-15 Maintenance
D-15/G-15 Maintenance NOTE: The numbers in parentheses are the Reference Numbers on the exploded view illustrations found later in this manual and in the Parts Manual. Daily Check the oil level and the
More informationWARNING NOTICE CAUTION ASSEMBLY INSTRUCTIONS
MODEL 284 EZ-GLIDE SYSTEM 10' HIGH CUBE VAN DRIVER SIDE ALUMINUM DROP DOWN LADDER RACK ATTENTION Read and understand all instructions and warnings before operating or using this product. WARNING This product
More informationINSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D_-187, 218, 250 and 312 SERIES PUMPS
INSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D_-187, 218, 250 and 312 SERIES PUMPS WARNING This Instruction Manual and General Instructions Manual, CA-1, should be read thoroughly prior to pump installation,
More information69-74 VW Beetle IRS Rear Kit Part No
www.airliftcompany.com 69-74 VW Beetle IRS Rear Kit Part No. 75615 MN-476 (01102) ECN 3455 Please read these instructions completely before proceeding with installation A C B E D AA F F ITEM QTY. PART
More informationDome-Loaded Pressure Reducing BD-Series
Dome-Loaded Pressure Reducing BD-Series *Parts will differ for high pressure valves. Load Piston - Piston - U-cup U-cup Piston 1. Carefully place the u-cup over the neck of the piston. Load Cylinder -
More informationI-317. AWWA Check Valves WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS SERIES 317 WARNING
Read and understand all instructions before attempting to install, remove, adjust, or perform maintenance on any Victaulic piping products Wear safety glasses, hardhat, and foot protection. Failure to
More informationSERVICE GUIDE 8540-B 8549-B C. High-Pressure Lubricant Pump DESCRIPTION. Pump Assembly. Specifications
SERVICE GUIDE 8540-B 8549-B1 8549-C DESCRIPTION The major components of the high-pressure pump models in this series consist of a(n): air-operated motor lubricant pressure controller (pressurtrol) double-acting
More informationROTEX SERVICE INSTRUCTIONS FOR MODELS DRS SERIES DRSB TO DRSM PNEUMATIC ACTUATOR
ROTEX SERVICE INSTRUCTIONS FOR MODELS DRS SERIES DRSB TO DRSM PNEUMATIC ACTUATOR REVISION: 0 DATE: OCT 2010 ROTEX CONTROLS Page 1 of 8 SECTION 1 - INTRODUCTION 1.1 GENERAL SERVICE INFORMATION 1.1.1 This
More informationDiscount-Equipment.com
REQUIRED TOOLS LS Series Remix Shaft Installation Instructions /8", /6", /2" Allen Wrenches Snap Ring Pliers (Light Duty) /" Combination Wrench Loctite #22 Blue /" Socket w/ /8" Ratchet Electric Drill
More informationOperation and Maintenance Manual Model.75,, 3, 5, 8, 0, 0, 5, 35, 50 http://www.torsionx.com Use the MaxDrv Series Square Drive Torque Wrench Model.75,, 3, 5, 8, 0, 0, 5, 35, 50 to install and remove threaded
More informationIDMHDV-120. Lever Operated Diaphragm Valve. User Manual
IDMHDV-120 Lever Operated Diaphragm Valve User Manual www.intertronics.co.uk/idmhdv-120 17 Station Field Industrial Estate Banbury Road, Kidlington Oxfordshire, England OX5 1JD t 01865 842842 e sales@intertronics.co.uk
More informationService Sheet SSJ0452P. J0452 Coupler with Pump API Coupler
Sheet:, 17/04/12, Rev: 2 As a part of a continuous commitment to product development the company reserves the right to alter the specification of its products without prior notice J0452 Coupler with Pump
More informationTECHNICAL SERVICE BULLETIN: TSB
TECHNICAL SERVICE BULLETIN: TSB2015-007 To: From: Global Service Organization, ichem VELOCITY and iricell Distributors Iris Diagnostics Service and Support Date: 10 June 2015 Subject: STRIP PROVIDER MODULE
More informationTooling List 10mm Socket 3 Extension Ratchet Large Jaw Pliers Needle Nose Pliers
Thank you for purchasing! The CorkSport Binary VTA BPV provides features and performance to suit stock cars and on up to big turbo high power setups. The CorkSport Binary VTA BPV holds 50psi, responds
More informationOPERATOR'S MANUAL FOR DOUBLE ACTING PISTON HAND PUMP
OPERATOR'S MANUAL FOR DOUBLE ACTING PISTON HAND PUMP OPERATION AND SERVICE GUIDE JAN. 00 Refer to Bulletin P-0 and Parts List P-9990. SAFETY PRECAUTIONS. This manual contains important information for
More informationRepair Parts Sheet Turbo II Air Hydraulic Pump Model 10500, 10502, (AHP-15T, AHP-25TP, AHP-35T))
Repair Parts Sheet Turbo II Air Hydraulic Pump Model 10500, 10502, 10504 (AHP-15T, AHP-25TP, AHP-35T)) Rev. 0506 Install all kit components to insure optimum performance of the repaired unit. NOTE: Storing
More informationMaintenance Information
04581245 Edition 2 May 2014 Air Grinder, Die Grinder and Sander Series G2 (Angle) Maintenance Information Save These Instructions Product Safety Information WARNING Failure to observe the following warnings,