MITIGATE ARC EFFECTS WITHIN AN E-HOUSE

Similar documents
Arc Flash Detection and Mitigation

5kV to 38kV, 630 Amp to 4000 Amp Indoor or Outdoor Application

NEXT STEP B) SAFETY :

Ultra Fast Earthing Switch UFES retrofit Overview

Air-insulated switchgear UniGear type ZS1

AIR INSULATED EXTENDABLE SWITCHGEAR UP TO 12KV GUIDE

B kv Gas-insulated Substations

PIX-H Metal-clad switchgear up to 17.5kV

AIR INSULATED METAL ENCLOSED SWITCHGEAR AND CONTROLGEAR

E-12 Low-voltage Switchboard

Item 1: Contents of the complete training & CV of the lecturer

SYSclad switchboard equipped with draw out type vacuum circuit breaker closed dooroperationoperation. SYSclad 12 17,5kV A.

MAHALAKSHMI ENGINEERING COLLEGE TIRUCHIRAPALLI

Switchgear and Distribution Systems for Engineers and Technicians

GE Arc Vault TM Protection System. By Mark Clapper GE Specification Engineer. Introduction. What Variables Contribute To An Arcing fault?

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

Retrofit for gas-insulated high voltage switchgear (GIS) - 8D1 and 8D2

ABB AG - EPDS. Ultra-Fast Earthing Switch UFES active internal arc protection

Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards

Electrical network protection VIP30, VIP35. User s manual 12/2008

Cost Benefit Analysis of Faster Transmission System Protection Systems

2006 IEEE PES General Meeting June 2006, Montreal, Canada Paper 06GM0613. Fault Current Limiters - Report on the Activities of Cigre WG A3.

UniPack compact secondary substations (CSS) upto 36 kv For safe, reliable and space saving power distribution solutions

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Chapter 6 Generator-Voltage System

SWITCHGEAR OPERATING PERSONNEL SAFETY UPGRADE SOLUTIONS FOR AGED INSTALLED BASE

Medium-voltage fuses 3 kv 40.5 kv, 0.4 A 315 A

ETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy

UniGear. Technical Guide

Protection and control VIP30, VIP35. Relays technical manual

Gas Insulated Metal-clad Switchgear, HMGS!

General. Main electric circuits Fuses compartment Operating mechanisms Cables connection compartment

Extra-High-Voltage SF 6 Gas-Insulated Switchgear

The specialist in Medium Voltage

HD4. Gas insulated MV circuit-breakers kv A ka

GE Consumer & Industrial Power Protection. New. SecoGear kV Metal-clad Switchgear. GE imagination at work

E-12 Low-voltage Switchboard

CGMCOSMOS. Reliable innovation. Personal solutions. Fully gas insulated modular and compact (RMU)system.

NXPLUS C Single busbar. Maintenance-free for lifetime

Low Voltage Switchgear Type WL Low Voltage Metal-Enclosed Switchgear

Medium Voltage Metal-Enclosed Switches

The Key Link for all your Distributions Needs. A Comprehensive Range for All Your Needs

Medium Voltage Distribution PIX. Air Insulated Switchgear up to 24 kv PARS TABLEAU

Documents and Addresses

www. ElectricalPartManuals. com Section 13 Switchgear Low Voltage

Descriptive bulletin. ReliaGear ND ANSI narrow frame metal-clad switchgear

TECHNICAL SPECIFICATION OF 11KV SF6 / VCB METAL ENCLOSED, INDOOR (PANEL TYPE) / OUTDOOR RING MAIN UNIT (RMU). (IEC standard equipment)

Using new Magnetically Actuated Vacuum Interrupter technology for safe and reliable medium voltage circuit breaker switching in mines

Type SIMOPRIME A4, up to 24 kv, Air-Insulated Medium-Voltage Switchgear

One-Fit,UFES, Reyrolle LM

School of Electrical and Information Engineering. ELEC High Voltage. University of Sydney. Dr Keith Mitchell. Engineering

Breaking new ground. A circuit breaker with the capacity to switch 15 large power plants

Close-Open (Short-Circuit) Time Results Interpretation

Learning Module 6: Medium Voltage Power Circuit Breakers. 101 Basic Series

Marc ZELLAT, Driss ABOURI, Thierry CONTE and Riyad HECHAICHI CD-adapco

SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS)

Not all Low Voltage Switchgear is created equal

SafeGear TM Motor Control Center Arc resistant metal-clad construction Motor Control Center Descriptive bulletin

MEDIUM VOLTAGE CE-B36 METAL CLAD SWITCHBOARDS. CE - B36 - C - en - REV

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.

Unitole UP kv Primary substations Motor control centres

GHA. Gas-Insulated Switchgear. Gas-Insulated Switchgear. Switchgear extension and replacement of a panel

Medium Voltage Metal-Enclosed Switches

ZX2.2 Gas-insulated medium voltage switchgear

Medium voltage switchgear SafeGear HD 63 ka arc resistant metal-clad switchgear. ABB Group February 25, 2015 Slide 1

Regulatory frameworks for Dynamically Positioned vessels operating in closed bustie mode: the grey zone

Metal-Enclosed Switches. Medium Voltage. Medium Voltage Metal-Enclosed Switches Contents

Recent Trades in Distribution System

Low and medium voltage service. Power Care Customer Support Agreements

Electric Vehicles Coordinated vs Uncoordinated Charging Impacts on Distribution Systems Performance

6/4/2017. Advances in technology to address safety. Thomas A. Domitrovich, P.E., LEED AP VP, Technical Sales Eaton

The vacuum circuit breaker for commercial buildings, industrial plants and utilities

High voltage products PASS M0S 252 kv Innovative solution for transmission substation up to 252 kv

SF 6 Gas Insulated Switchgear Type SDH314 / SDHa314 for 72.5 to 145 kv

B kv T&D GAS INSULATED SWITCHGEAR

Low voltage Direct Current Network. Compact NSX DC PV. Circuit breakers and switch disconnectors for solar application.

FUSE: SAFE & RELIABLE

MV Air Insulated Switchgear TAP17. Technical Data TGOOD

VOLUME: IIIC SCHEDULE IIIC/4 11 KV AND 3.3 KV SWITCHGEARS

A comparison of metal-enclosed load interrupter (ME) switchgear and metal-clad (MC) switchgear

Abstract. 1 Description of the Problem

PASS M0. Innovative solutions for distribution substations up to 170 kv

Switchgear Type SIMOSEC, up to 24 kv, Air-Insulated, Extendable

MEDIUM VOLTAGE CE-B METAL CLAD SWITCHBOARDS. CE-B-C-en-REV

ABB POWER SYSTEMS CONSULTING

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Study of Fault Clearing by A Circuit Breaker In Presence of A Shunt Capacitor Bank

MEDIUM VOLTAGE AIR INSULATED ARC-RESISTANT LOAD BREAK AND DISCONNECT SWITCHES

This small footprint makes a BIG impact

Unitole UP kv Primary substations Motor control centres

Voltage Rated operating voltage [kv] Rated power frequency withstand voltage [kv] Rated lightning impulse withstand voltage [kv]

Arc flash hazard mitigation

METAL ENCLOSED STANDARDIZED MEDIUM VOLTAGE SWITCHBOARDS, INSULATED IN AIR AND SF6 GAS UP TO 36KV

Power systems Protection course

SafeGear Motor Control Center Arc Resistant Metal-Clad Construction Descriptive Bulletin

SafeGear Motor Control Center Arc Resistant Metal-Clad Construction Brochure

ZX2 Gas-insulated medium voltage switchgear

The safest, most reliable Switchgear in the market today

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

Low Voltage Systems MNS platform

Transcription:

MITIGATE ARC EFFECTS WITHIN AN E-HOUSE Jérôme DOUCHIN Anthony BROWN Juha RINTALA Schneider Electric France Schneider Electric Singapore Schneider Electric Finland Jerome.douchin@ Anthony.brown@ juha.rintala@ schneider-electric.com schneider-electric.com schneider-electric.com Alain CLAVEL Schneider Electric France Alain.clavel@ schneider-electric.com ABSTRACT This paper illustrates how the simulation can be used to assess the internal arc performance of an E-house. This one can be difficult to define for the engineer. Often, the Switchgear is classified as per the IEC 62271-200; but during the test, the pressure rise of the room (represented by two walls only) can t be measured. This point is essential in an E-House which has a compact installation, and should be assessed beyond the standard; while the possibility to test the entire e-house is out of reach for economical reasons. The article shows simulated pressure results, in relation with E-houses structural basic technologies. The impact of absorber technologies, as well as protection system, is demonstrated. INTRODUCTION When an arc occurs within a medium voltage metal enclosed switchgear, it produces a large quantity of hot gases. Such an accident is rare and can be caused by different causes, from miss-operation to equipment failure, or a combination of both. The IEC 62271-200 standard [1] propose an internal arc classification, defining a type-test to validate rated performance of a switchgear. This type test aims to check especially the medium voltage enclosure tightness to the hot gases, as well as the effectiveness of the gas evacuation system. If the gases are relived in the switching room however, their impact is only partially addressed, as only two walls are simulated. The pressure rise within the room is then never recorded. Gases evacuation systems often are made of ducts, evacuating the gases outside the switching room. Such an arrangement prevents the relief of gases within the switching room; however, at the duct exhausts, flames are expected in case of arc event. Such an arrangement is then not suitable to meet fire, blast and IECEx protection requirements. E-Houses designed to meet these requirement are then made without any possible release of hot gases outside the building, but still may be fitted with overpressure vents for internal overpressure greater than 1.5kPa. Such E-House s shall then be designed to withstand the pressure rise caused by the hot gases released within the room volume in case of internal arc. As the arc is continuously vaporizing solid raw material around itself, and there is no venting at all, the pressure rises until it is extinguished. The level of pressure reach in the room is linked to the arc duration, and therefore the effectiveness of the protection system. In order to mitigate the effects of the hot gases in the room, dedicated passive devices, so-called absorbers, have been introduced [2]. They constitute an obstacle to the flow, thus slow-down gas speed; and absorb partly the gas energy. One technology of absorber is commercially available associated with primary Air Insulated Switchgear, successfully type-tested. It implies a ceiling height of 4m minimum. In this paper, a new generation of absorber is presented, in the objective to save some height. PRESENTATION OF THE E-HOUSE STUDIED AS AN EXAMPLE Layout Fig. 1 E-House layout including neighborhood 1/5

The dimensions are: 34m (length) x 8m (width) x 4m (height). The E-House has two rooms (MV/LV). There are three free openings between the two rooms. The medium voltage switchgear has a total length of 21,5m. The two incomers are in the middle of the panel. The rated short-circuit currant is 31,5kA. In the original design, the gases evacuation system is made of a collecting duct, venting gases to the outside. For the purpose of this article, this is changed to an exhaust within the switching room through one absorber, located on the top of the collecting duct, above the incomer cell (figure 2) This is a type-tested arrangement for this switchgear range. Fig. 3 : 16m² areas defined for pressure post-processing 31,5kA 1s arc fault : results (reference) Fig. 4 : space-averaged pressure on given surfaces. Fig. 2 : view of a standard absorber on the gas duct top PRESENTATION OF THE INTERNAL ARC SIMULATION METHODOLOGY CFD basics The methodology used in this paper has been described in several papers [3], [4]. It is based on Computational Fluid Dynamics (CFD) software see [5] to check how CFD is applied in internal arc studies. It implies a 3D model of all air volumes, the switchgear compartments, the collecting gas duct, and the switching room. Pressure field is then spatially-defined, and can be post-processed at any time during the event. An arc fault is simulated within the breaker compartment of the incomer cell, just below the absorber. This is the most severe fault location, the arc being close to the switchgear vent. The pressure is post-processed on 16m² surfaces, located respectively on the ceiling straight above the absorber, on the side wall aside the absorber, and on the end wall of the E-House (figure 3). DEDICATED ARC FLASH SYSTEM APPROACH This section describes the operating principles of a certain existing state-of-the-art arc-flash protection system. Most likely other systems also operate under similar principles. Althoughh the basic functionality is fairly simple, the complete arc protection system consists of several components. One of the key ideas is to provide selective protection by dividing the installations into protection individual sections which are referred as zones. Figure 9 presents a scheme of a rather complicated setup with different parts of the installation marked as different protection zones. The arc protection system mainly consists out of the following four different types of components: Sensors (light or current) I/O units Central units Communication cables DETECTION In addition, the system naturally needs for example battery-backed auxiliary power supply system and other components; these however are not that relevant in this context and have been left out for the sake of simplicity. 2/5

In both cases, the hot gas flow is simulated 200ms further to the arc extinction, in order to check possible pressure peaks occurring later. Absorber technology A new generation of absorber is used instead of the standard one. It is implemented in a different way: several smaller units are distributed along the plenum (figure 6). Figure 5. An example of dedicated arc-flash protection system of a MV substation On the left hand side of the Figure 5 the light is detected by point sensors, while on the right hand side the installation has been equipped with fibre optic sensors. I/O units are reading the sensors and sending the sensor information to the common communication pathway. The point sensors are connected to I/O units in the Zone 2 (A) and the fibres are connected to an I/O unit in Zone 3 (B). I/O units can perform a local trip based on the information from the sensors connected to the I/O device itself or based on the signal from any other I/O unit on the same zone. All the light sensors connected to one I/O unit can only belong to one particular zone. A total of five zones are available, one of which is always reserved for transferring over current information. Current can be measured by current transformers connected either directly to the arc protection central unit (C) or to current I/O unit (D). All units are linked to the central unit by the communication cables (E). Circuit breakers get their trip command from the central unit or from the I/O units via the circuit breaker wiring (F). The system architecture is centralized and the central unit is always required. The central unit monitors the system (self-supervision) and maintains the communication. It can also perform a trip based on the light sensors connected to the central unit itself or based on the information received from the I/O units. In addition, the central unit is able to communicate with SCADA systems by using various standard protocols. ALTERNATIVES SIMULATED Arc durations In addition to the 1s arc duration, a standard requirement in contracts, two shorter durations have been studied : - 300ms : consistent with a fault clearing time by a standard protection system, including a tripping delay for coordination with a downstream breaker. - 80ms: consistent with the implementation of dedicated arc detection system as described IV. Fig. 6 : implementation of the new absorber on the plenum, CFD model The new absorber technology is metallic foam. A 3D pattern is reproduced in the 3 directions of space, as a nest of bee (figures 7). A phenomenon of local compression decompression with turbulences occurs at each step, which fosters heat transfer to the metal, and allows the control of gas speed, as well as of the pressure drop across the absorber. Fig. 7 : metal foam absorber, top side RESULTS : PRESSURE ON THE E-HOUSE WALLS - IMPACT ON CONSTRUCTION TECHNOLOGY Pressure results : summary Pressure (hpa)(2m²/16m²) Ceiling Side wall End wall 80ms existing absorber 5,3/2,3 2,8 3,3 New absorber 5,3/4 3,7/2,7 3,5 300ms existing absorber 7 7 7 New absorber 6,5 5,5 5,5 1000ms existing absorber 19 19 19 New absorber 13 13 13 3/5

Peak values are reported. One remark s that as the room is closed, the pressure is rapidly uniform in space within the volume, which is usually not the case when there is an opening through the wall, such as a ventilation grid. Qualitative analysis E-House construction techniques pressure withstand Typical examples of E-House construction techniques are given in this sub-chapter, associated with an indicative level of pressure sure withstand. This highlights the stakes of arc effect mitigation in the E-House basic engineering choices. - Sandwich panel: 1000 1500 Pa. Portal frame structure with Sandwich panel directly frame mounted 0.7mm internal and external galvanized sheet with polyurethane core Fig. 8 : pressure rise at ceiling, case with standard absorber, for 1s and 80ms arc durations. The figure 8 shows the pressure development of the case with the standard absorber, focusing on the 300 first milliseconds. One see s that the first transient peaks occur until 100ms, and that the pressure stays in the same order of magnitude until about 200ms, due to the large room dimensions. Pressure is still not uniform within the room, as shown figure 9. In case the arc is extinguished after 80ms, one see s that the pressure goes down after 150ms. On the contrary, when the arc last until 300ms, the amount of gas accumulated within the plenum makes the pressure in the room continues to rise slightly after arc extinction. The absorber technology has few impacts on the first transient peaks, which are of low magnitude. Indeed, at that instant, the pressure is the result of wave propagation, and hot gases have not start to cross the absorbers, so the heat exchange do not actually produce effects. One starts to observe the effect of the heat absorption later, starting at 300ms, and especially if the arc last until 1s. - Skeletal: 3500 4200 Pa. stud wall at 400mm centers and bracing to all faces. Portal frame with light gauge internal and external cladding. - Interlock: 3000 3500 Pa. Interlocking wall and roof panel - Fully welded: 18000 22000 Pa. Heavy duty portal frame structure crimped mild steel plate fully welded Flat plate roof welded to structural secondary steel Internal lining mild steel sheet TEST MEASUREMENTS COMPARED TO SIMULATION RESULTS Real internal arc tests have been carried out on a primary medium voltage Air Insulated Switchgear, so to characterize the absorbers. It is rated : trip-phase 12,5kA 0,5s The testing configuration is shown in [6]. Pressure sensors have been installed both sides of the compartments (figure 10). Figure 10 : pressure sensor locations Fig. 9 : Pressure field 80ms after arc ignition, case with new absorber. The figure 11 illustrates the impact of the standard absorber technology on the pressure inside the switchgear, by comparison with the same shot without absorber. 4/5

Saving in the E-house construction techniques could be achieved assessing properly the pressure level thanks to the simulation package, however the major benefit is to the end user due to safety in design for fire rated, ATEX/IEC Ex, and blast rated applications. 0,5s could be considered as consistent arc duration for type-tests, for E-House equipped with dedicated arc detection systems, the standard protection system acting then as a back-up. Fig. 11 : pressure measurements, shot without absorber, and shot with standard absorber technology. II. REFERENCES Front face, near the arc, the pressure reach almost 0.3bar relative in 10ms. Near the exhaust rear side, pressure rise is delayed, and is limited to 0.05bar. Pressure distribution is then non-uniform within the compartment. After 70ms, pressure is back to zero everywhere. Figure 12 shows the calculated pressure in comparison with the measured one, for the standard absorber test. The curves match is correct. [1] IEC 62271-200, 200, High Voltage switchgear and control gear Part 200 : metal enclosed switchgear and control gear for rated voltage above 1kV and below 52kV, 2011 [2] H. El Ouadhanne & al, 2011, Solutions for internal arc protection according to IEC 62271-200 with pressure relief into the switchgear room for gas and air insultaed medium voltage switchgears, 21th internal conference on electricity distribution (CIRED), paper 1137 [3] J. Douchin & al, 2015, Modeling and simulation extrapolated internal arc test results : a coupled fluid-structural transient methodology, CIRED, paper 0517 Fig. 12 : Comparison between measurements and simulation results, shot with standard absorber technology I. CONCLUSION The importance of the pressure question within the E- House is related to the size of the E-house on one hand, and to the short-circuit level on the other hand. For small and compact E-House associated with a high short-circuit level, which is often a wish for off-shore applications, the criticality is the highest. [4] J. Douchin, F. Gentils, 2013, Pressure rise in switchgear room in case of internal arc in AIS MV switchboards : importance of room design and simplified calculation method, CIRED, paper 1301 [5] CIGRE Technical brochure 602, working group A3.24, 2014, Tools for the simulation of the effects of the internal arc in transmission and distribution switchgear. [6] J. Douchin & al, 2017, Mitigate gas combustion in case of internal arc, CIRED, paper 0371 Shorten arc duration provides significant saving in pressure. Still one has to cope with the first transient peaks, that can hardly be avoided, but that should be easily manageable in most of the cases. They are in the range of 5 hpa in our example. In addition, the improved absorber technology is also an effective passive pressure mitigation system for longer arc durations. It can be combined with fast arc detection systems. 5/5