FOX TrimAway INSTALLATION AND OPERATING INSTRUCTIONS FAMILIARIZE YOURSELF WITH THE SYSTEM COMPONENTS

Similar documents
Pneumatic Conveying Systems. Division of

D-Series Blowers and Exhausters

User s Manual D-Series Blowers and Exhausters

WELDING FUME EXHAUSTERS & ARMS

HALLMARK INDUSTRIES INC

NECO Pumping Systems

SimpLok Shaft Holders. Holders Unwind and rewind modules Skew adjustment Lateral adjustment Skew and lateral adjustment Web guided modules

Kit INSTALLATION GUIDE. 5 psi Low Pressure Sensor (Single Gauge)

Installation Instructions Pro Bandit Shifter Fits: GM Powerglide Automatic Transmissions

Kit psi Low Pressure Sensor (Dual Gauge)

BD Dual Transmission Cooler Dodge (68RFE, 518, 47RH, 47RE & 48RE) Ford (5R110) & Chevy (Allison 1000) Transmissions

INSTALLATION AND USER MANUAL

WARCO CHEMAG SERIES GH FILTERS

Arch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide

Rotrex C-type Superchargers. Setup and maintenance

Installation & Operating Manual

INSTALLING THE NEUTRAL SAFETY SWITCH WIRES

NSGV EVE-ER I, O, & M MANUAL

EGR heater plate removal and installation procedure has been added.

NSGV PT-1000 PORTABLE WELDING STATION I, O & M MANUAL

Visit our web site at AMR LS-3000, LS-3010 & LS-3020 BELT SLIP/SEQUENCE CONTROL INSTALLATION AND SETUP INSTRUCTIONS

Professional Series 1/2HP 2 YEAR WARRANTY CONVERTIBLE JET PUMP REPAIR PARTS

Instant Chat off the main page of Or simply call our tech team at

Ventilation Blowers 09. Introduction Heavy Duty Radial Blowers Radial Blowers In-Line Blowers

Rollers and Roller Assemblies. Idler Rolls Dancer Roll Assembly Nip Roll Assembly S-Wrap Feed Roll Assembly Heated Roll

BD Transmission Cooler Dodge (68RFE, 518, 47RH, 47RE & 48RE) Ford (All) & Chevy (Allison) Transmissions

SERIES PC INSTRUCTION AND OPERATION MANUAL

PRODUCT OPERATING MANUAL

ADM Performance 6079 Mapleshade Lane Dallas, Texas (214)

BD Dual Transmission Cooler Dodge (68RFE, 518, 47RH, 47RE & 48RE) Ford (5R110) & Chevy (Allison 1000) Transmissions

Model SMA3-A SLUDGEMASTER

RADIAL ALUMINUM LOW PRESSURE

Operating Manual for Rotary Gear Pumps CMI, S.A. (Mendaro, Guipuzkoa, Spain)

Low Profile J Series Power Unit with Vane Pump

Philapack, LLC. Filler Machine Division

To ensure proper installation, digital pictures with contact information to before startup.

STIH) Technical Information New Backpack Blowers STIHL BR 450, BR 450 C-EF Series Product description

ALL PURPOSE CNC/HEAVY DUTY

SUPERHONE Installation * Operation * Maintenance * Replacement Parts

ELECTRIC FUEL PUMPS P/N , , & FUEL PRESSURE REGULATOR P/N

Subaru Front Mount Intercooler Kit STI Subaru Front Mount Intercooler Kit STI

RADIAL ALUMINUM LOW PRESSURE

Installation & Operating Manual

INSTALLATION INSTRUCTIONS MODELS S S SHALLOW WELL & CONVERTIBLE JET PUMPS PAGE 3 PAGE 8

Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators

Kit INSTALLATION GUIDE. 5 psi Low Pressure Sensor (Single Gauge)

MODEL NUMBER: MEDIUM DUTY ONBOARD AIR SYSTEM

PowerAir Compressor Installation

2015 Corvette Supercharger System Instructions

WPS-104 Heater. Installation Instructions

ShaftLok Safety Chucks

HOT WASHER MODEL NO: KING 125 OPERATION & MAINTENANCE INSTRUCTIONS PART NO: LS1009

2 Model 826 Dispensing Valve User Guide

Commercial Spa Blowers

PROMAX INSTRUCTION MANUAL

Installation Manual v2.2: Twin CP3 Fuel Injection Kit Dodge 5.9L

INSTALLATION, OPERATING AND SERVICE MANUAL

Model SLUDGEMASTER SMA3-A

Procharger Stage II Intercooled Supercharger System (11-14 GT)

Thermo-Bob 1 Installation Manual: Kawasaki Concours

Kits and Single Gauge Analog Compressor Systems

These instructions were written for reference only and the use of a factory service manual is recommended.

ONBOARD AIR HOOKUP KIT

4. Remove (4) 10mm and (1) 7mm bolt that holds fascia at front corners, on each side

Installation Instructions

NATIONAL TURBINE CORPORATION INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

UNPACKING SAFETY GUIDELINES GENERAL SAFETY INFORMATION. Operating Instructions & Maintenance Manual

INSTRUCTION MANUAL (For Professional Use Only) T5020 MIST APPLICATOR

UNPACKING SAFETY GUIDELINES GENERAL SAFETY INFORMATION. Operating Instructions & Maintenance Manual

INSTALLATION INSTRUCTIONS

L Ford Power Stroke Intercooler Pipe Upgrade

JABSCO & Series 1½ 80 SIZE UTILITY Pump

AUTO REWIND AIR HOSE REEL

Mizer Single Pump and Starter Box

VSCP Vertical Suspended Column Pump Operation & Maintenance Manual

2015+ EcoBoost F150 & Raptor Intercooler Install

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 6.7L

Operating Instructions for the. In Line Conveyor System West Cabot Boulevard Langhorne, PA w w w.empire-airblast.

READ THIS FIRST. Read and Save These Instructions AIR CURTAINS INSTALLATION INSTRUCTIONS S-XHD SERIES. TMI, LLC Managing Environments

Edelbrock EFI Universal Fuel Sump System - Adjustable Part #36031, INSTALLATION INSTRUCTIONS

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS

SLR / SLR-S/N. Instruction Manual. Walrus America Inc

SVE BULLETIN F-Series Super Duty with Aftermarket Auxiliary AC System Control

Installation, Operating, Maintenance and Safety Instructions JABSCO & Series 1 40 SIZE UTILITY Pump

PumpAgents.com - Click here for Pricing/Ordering Fuse Size (A) Open Flow GPM (LPM)

LED PURGE VALVE KITS P/N 16028NOS (5 lb. bottle) & 16029NOS (10 lb. bottle) Instruction Sheet P/N 199R10412

How to install shifter style lever (Gen 1 & Gen

Installation Instructions and Owner s Manual

MASTERsine Inverter PXA Series Installation Guide

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 5.9L

For BLOWER INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

MODEL 10LH SPECIFICATION

These instructions were written for reference only and the use of a factory service manual is recommended.

Service Manual Air Plus Second Stage

Prodigy HDLV System Troubleshooting - Generation III

INSTALLATION MANUAL BULLET PROOF OIL COOLER KIT F-SERIES

SELF PRIMING CHEMICAL SERVICE PUMPS

OPERATION MANUAL NT50 NOMAD TRANS-FLO AIR-OPERATED DOUBLE DIAPHRAGM PUMPS. A JDA Global Company. 7/11 rev. 1

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: October 2012 SUBJECT: REFERENCES TO THE TURBOCHARGER PURGE ROUTINE

SERVICE & INSTALLATION

Transcription:

FOX TrimAway INSTALLATION AND OPERATING INSTRUCTIONS FAMILIARIZE YOURSELF WITH THE SYSTEM COMPONENTS Check your shipment against the packing list, the original quote and the following drawings. Contact us immediately if there is any shortage. Contact us at cac@epix.net OPERATING PRINCIPLE The FOX TrimAway system utilizes the venturi principle combined with a powerful regenerative blower. The output of the blower is piped into the venturi, there the venturi creates suction at the intake point and pressure at the discharge point (click here to see drawing number 18503-12). The trim or matrix is allowed to pass through the venturi and be discharged to the waste collection area without being chopped. WIRING THE BLOWER We recommend the blower be wired by a licensed electrician or an experienced plant mechanic. If the blower is 3-phase, an appropriately sized motor starter, fused not to exceed maximum blower amps (as indicated on blower) will be required. Install the blower inlet filter, using the filter mounting assembly as shown in the following system layout drawings before start-up. Following the diagram on the motor plate, wire for low or high voltage. Be sure the motor is turning in the proper direction (this can be determined by following the directional arrow or imprinted on the blower or by looking directly into the backside of the cooling fan and checking for clockwise rotation). If the rotation is backwards, shut off the power and reverse any two (except ground) wires. AFTER CONNECTING THE VENTURI PROPERLY (SEE "VENTURI CONNECTIONS & MOUNTING" in this document), MEASURE THE CURRENT/AMPS. DO NOT EXCEED THE MAXIMUM BLOWER AMPS. IF THE CURRENT/AMPS EXCEEDS THE MAXIMUM BLOWER AMPS THE VENTURI OPTIMIZATION MUST BE DECREASED (SEE "VENTURI ADJUSTMENT" in this document). ANY BLOWER FAILURE CAUSED BY EXCEEDING THE MAXIMUM BLOWER AMPS WILL VOID WARRANTIES.

VENTURI CONNECTIONS AND MOUNTING Motive Connection Connect the blower output adapter (barbed hose fitting) into the OUT port of the blower. Attach the proper length of motive hose (neoprene impregnated construction) between the blower and venturi motive connector (see following system layout drawings). Use hose clamps to clamp motive hose in place. Typically the motive distance is not critical. Avoid any elbows by using flexible neoprene hose for bends. Make sure there are no air leaks between blower and venturi. CHECK the suction at the venturi inlet and pressure from the discharge end. If you are getting no, or very little, suction/pressure, proceed to the Venturi Adjustment section of these operating instructions. Venturi Mounting STANDARD ONE PICK UP OR TWO PICK UP SYSTEM Mount the venturi in a position which affords the straightest, shortest path from the trim pick up points. Vertical mounting of the venturi is preferable. MATRIX REMOVAL SYSTEM The standard matrix removal system is supplied with a special venturi mounting bracket. It is designed to mount directly to the existing 3 inch diameter matrix rewind shaft. It will be necessary to lock the rewind shaft so it does not rotate. The venturi should be mounted in the special venturi clamp and the matrix should follow its standard threading pattern (click here to see drawing number 18503-11). Intake Connection KEEP ALL INTAKE DISTANCES AS SHORT AS POSSIBLE WITH NO BENDS. TWO PICK UP SYSTEM Connect an intake hose length on the venturi inlet and the center leg of the wye connection. Connect two legs of intake hose to lead from pick up points to the wye. Try to keep both legs equal in length so the wye is located in the center. Attach the trim pick up nozzles to the intake hose legs with hose clamps (click here to see drawing number 18503-09). ONE PICK UP SYSTEM Connect an intake hose length on the venturi inlet. Attach the trim pick up nozzle to the intake hose (click here to see drawing number 18503-10).

MATRIX REMOVAL SYSTEM Using the Venturi/Pick up nozzle coupler, connect the pick up nozzle (click here to see drawing number 18503-11). Discharge Connection Slip the discharge hose over the discharge end of the venturi and secure it with a hose clamp. Route the discharge hose to your collection point, use flexible steel hose (supplied) for all bends. Use rigid pipe for long, straight discharge lengths. Collection Containers Your collection container should allow for the free discharge of air and material. If it does not allow adequate air ventilation or is designed so the material can build up to the discharge line, back pressure will affect the performance of the system. Please contact us at cac@epix.net if you have any questions on this. VENTURI ADJUSTMENT THE VENTURI HAS BEEN FACTORY PRESET FOR OPTIMUM SUCTION AND PERFORMANCE. IT SHOULD NOT BE NECESSARY TO ADJUST THE VENTURI, HOWEVER, IF OPTIMUM PERFORMANCE IS NOT REQUIRED OR THE VENTURI HAS COME OUT OF ADJUSTMENT, ADJUST THE VENTURI AS DESCRIBED BELOW. The venturi inlet nozzle is threaded into the venturi body. After loosening the set screw(s) located around the venturi body, the inlet nozzle should easily rotate to open or close the venturi gap (click here to see drawing number 18503-12). TO OPTIMIZE THE VENTURI Rotate the inlet nozzle counter clockwise so most of the threads are exposed. Slowly rotate the inlet nozzle clockwise, you will feel the suction increase, as you continue to rotate the nozzle clockwise you will feel the suction start to decrease, back the nozzle out to the point of greatest suction. TO DECREASE VENTURI OPTIMIZATION- Rotate the inlet nozzle counter clockwise until desire suction / pressure is acquired. DO NOT DECREASE THE VENTURI OPTIMIZATION BY ROTATING THE VENTURI INLET NOZZLE CLOCKWISE (CLOSING THE GAP) AS THIS WILL PUT UNNECESSARY STRAIN ON THE BLOWER MOTOR AND MAY CAUSE DAMAGE.

BE EXTREMELY CAREFUL, THE VENTURI THREADS ARE ALUMINUM AND VERY EASY TO CROSS. IF THE VENTURI THREADS GET CROSSED DO NOT FORCE THE VENTURI INLET NOZZLE TO ROTATE, CONTACT THE FACTORY IMMEDIATELY. INSTALLATION AND OPERATING TIPS 1) For maximum performance, keep all hose lengths (especially intake) to a minimum. All bends should have a gently sweeping radius. 2) Locate the pick up nozzles as close as possible to the material pick up point(s). 3) Be careful when tightening the high torque hose clamps. They will crimp the metal hose causing air leakage if over tightened. 4) Do not be concerned if the blower, motive air hose and venturi become hot to the touch. This is normal and they are designed to withstand high temperatures. CONVERTER ACCESSORY CORPORATION Web Handling Technology... CAC Engineered & Manufactured Phone: (800) 433-2413 To view our products, download drawings 201 Alpha Road Phone: (610) 863-6008 and specification sheets or request more Wind Gap, PA 18091 Fax: (800) 709-1007 information, please visit our website: Email: cac@epix.net Fax: (610) 863-7818 www.handleyourweb.com