Goldwind Americas. Construction Kickoff: Landowner Presentation. Construction Kickoff Presentation April 26th 2017

Similar documents
TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

K2 Wind Community Liaison Committee Meeting #2 Wednesday, May 28, 2014

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT

GOLDWIND 2.5MW PERMANENT MAGNET DIRECT-DRIVE (PMDD) WIND TURBINE

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

NEW DATES NEW DATES. GPS Training for Trimble & TOPCON January Excavation & Site Layout January 14 25

Michigan Thumb Loop Transmission Line Project

SunZia Southwest Transmission Project

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector

SunZia Southwest Transmission Project

Wind Turbine Gearbox Services. ZF Services North America, LLC

Above. Ahead. Always.

Ingenuity for Life Wind Power Morten Pilgaard Rasmussen. Restricted Siemens AG 2016

DEVELOPMENTS & STATUS IN PAKISTAN WITH CASE STUDY OF

GERMAN AMERICAN WIND ENERGY BUSINESS CONFERENCE Trends in Supply Chain and After Sales fr a Component Manufacturer s Perspective

Structure of Wind Supply Chain Onshore to Offshore. Ed Weston Director, GLWN Copyright 2012 GLWN A WIRE-Net Initiative

Siemens Gamesa Renewable Energy Unlocking Vietnam s Nearshore Wind Potential

THE PROTEAN AND POC-MAST DESIGN

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED

LOUIS BERGER POWER JANUARY - DECEMBER 2016

Smart Wind Turbine Solutions 2MW Platform


1 GENERAL Project Description Labrador Island Transmission Link (LIL) Language and Units Site Climate Data...

TABLE OF CONTENTS FIGURES:

CTA Capital Construction Update December 12, 2006

Product Guide Americas Edition 2007

Pedro Nunes. July 2016

NORDEX Light Wind Specialist. Montevideo Jun 2015

ABB Next Level Big shift in power attractive opportunities

ABB Wind Power Solution

For your SAFETY. Click Before You Dig, Drill or Excavate. Plan ahead. Dangers of hitting underground lines. May/June 2018

Operating & Installation Manual

Contemporary technological solutions

Glengowrie Depot Upgrade. Nick Marciano, Manager Tram Maintenance, PTS

Your Guide to Shipping Flatbed A STRIVE TRANSPORTATION BRIEF

CTA Capital Construction Update May 17, 2007

Appendix D Noise Data

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

ZheJiang SenWei Wind Turbine CO., Ltd

7. Residential Single-Family and Duplex Buildings (Dwellings)

First published June 2007 Copyright China Trend Building Press Limited

INNOVENTUM IN SIX(TY) MINUTES

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on

U.P. Energy Summit February 16, 2017

GRAND RENEWABLE ENERGY PARK PROJECT DESCRIPTION REPORT. Attachment C. Turbine Specifications

portable telescoping towers

LIFECYCLE SERVICE SOLUTIONS

LIFECYCLE SERVICE SOLUTIONS

Powering Sydney s Future

Transmission s Future Today. High Capacity High Efficiency Low Profile

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

EZY-LIFT. We Lift North America

Wind Turbine Guidebook. For HYenergy HY-400, HY-600, HY-1000, HY-2000, HY-3000 Off-grid Models

Northeast Ohio AWWA October 26, 2017

GEM Green Energy in Motion CLEAN MOBILE SCALABLE ENERGY SOLUTION

Engineering Considerations. Glenn Stapleton - Senior Electrical Design Engineer Lines

Crane Inspection Log. Mailing Address: P.O. Box Tulsa, OK Phone: (918) Fax: (918)

For Conduit Inspections

AH-5kW pitch controlled wind turbine on grid system

Commercial Electric Service Handbook

CARTER WIND SNAPSHOT. as of July, LIKE COMPETITORS

Tehachapi Renewable Transmission Project 3.1 OVERVIEW OF PROPOSED PROJECT

Monthly promotions. October 2018 Puget Sound Energy bill inserts and information. Download inserts

Technology Innovation in the Mining Sector. October, 2018

Power From Shore: An introduction to HVDC Light Offshore

Looking Towards the Future: Advantages of 765-kV Transmission Technology

CT DEMHS ESF #3 Quick Reference Guide for Public Works Resource Typing

Wind Power Services. One Standard for Safety, Quality & Repairs Across North America INTEGRATED POWER SERVICES

OPERATIONAL EXCELLENCE ALL TERRAIN CRANE AC 1000

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014

GE Renewable Energy. GE s 3 MW Platform POWERFUL AND EFFICIENT.

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

Wind Power Services. One Standard for Safety, Quality & Repairs Across North America INTEGRATED POWER SERVICES

PLEASE NOTE: BATCH TRUCK

Overview Gas Insulated Switchgear Modular and flexible, kV. ABB Group April 17, 2009 Slide 1

LC & SD Report for Transnet 232 D45 Locomotive Project

MTU Maintenance Zhuhai. The passion for perfection. MTU Maintenance Zhuhai An MTU Aero Engines Company

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY

ADDENDUM No. 1 Prospective Bidders

Engineers Ireland Site Visit 23 rd March 2010

CAT DV43 RTCH Commerce Street P.O. Box 575 Fairview, OK USA (PHONE) (FAX)

PLEASE NOTE: BATCH TRUCK

PV Aggregation Results from Germany

CENTURY MONTHLY DEVELOPMENT UPDATE JUNE 2018

Innovative Axial Flux Air Cored Permanent Magnet Generator suitable for Slow, Medium Speed and Direct Drive Wind Turbines

Cobra-S. Catalog Cobra-S

SL2000 Series Wind Turbine

ELECTRICAL SAFET Y FOR CONTRACTORS

E-RTG TM RTG Electrification

Vestas Product Offering V MW at a Glance. Renato Loureiro Gonçalves Wind & Site Engineer

RIKT Isothermal Turbocompressors. With integrated cooling

Page 1 August, Siemens AG / Service Renewables All rights reserved E S SR WP

Mulch products weigh between 400 to 800 lbs. per cubic yard. Compost weighs between 1,000 to 1,600 lbs. per cubic yard.

SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS

The Capital Grid Project:

cable management Pit / Vault System Series

China's Sany Electric completes first US wind project

DRAG-A-BOX BRAND MATERIAL SPREADERS

Shunt reactors Proven history for future success

Generator Rebuild and Unit Refurbishment for the Wells Hydroelectric Project. NWHA Spokane October 30, 2014

Transcription:

Goldwind Americas Construction Kickoff: Landowner Presentation Construction Kickoff Presentation April 26th 2017

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

Goldwind at a Glance World Leader in PMDD Technology No.1 Globally Goldwind is the world s largest WTG manufacturer according to 2015 installations No.1 PMDD Industry leader in Permanent Magnet Direct-Drive turbine technology 98+% Goldwind s fleet-wide turbine availability is 98+% 32GW More than 32 gigawatts installed worldwide with a fleet of more than 19,000 turbines 20+years Over 20 years of experience in wind

WORLD LEADER IN PMDD TECHNOLOGY Established in 1998, Goldwind pioneered the Chinese wind market by becoming one of the first companies to explore the potential of wind power. Today, Goldwind is a leader in the global wind industry with mature manufacturing capabilities, innovative permanent magnet direct-drive (PMDD) technology, and a proven track record. More than 6,000 employees around the world, of which approximately 1,000 employees dedicated to R&D and technical development Public ally traded on 2 stock exchanges Shenzhen A share: 002202 Hong Kong H share:2208 More than 32 GW of installed wind power capacity More than 19,000 of Goldwind's wind turbines have been installed around the world, with more than 15,000 units utilizing PMDD

Goldwind Americas North American Headquarters Chicago, IL Established in 2005 and currently employing approximately 100 people in a full-time capacity, Goldwind Americas is responsible for sales and service of Goldwind turbines in North and South America. 2005 2017 Our U.S.-based leadership team has over 150 cumulative years experience in wind and renewable energy related industries.

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

This is a construction site Things to keep in mind Long, wide and heavy trucks will be delivering parts and cranes to the site. Cement trucks will be lined up to pour concrete foundations. Equipment will be on the road forklifts, rubber-tire cranes, aerial man lifts, etc. Stay away if ice is present Do not approach the turbine if trucks are present Do not park near work areas Do not contact Underground Collector System Limit deep ripping to no more than 36- inches Do not contact overhead wires Do not contact junction boxes Call before you dig Call if anything seems wrong Goldwind Americas

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

Rattlesnake Construction Schedule April-Roads April- Foundations August- O&M Building August- Underground Electrical August- Substation September- Transmission Line October Turbine Delivery and Installation April 2018 Commercial Operation Goldwind Americas

Rattlesnake Layout Goldwind Americas

Rattlesnake Layout Goldwind Americas

Daily Progress Updates Goldwind Americas

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

Road Construction April 2017-October 2017 Turbine String Road Construction New access roads (approx. 21 miles) Wide travel path to accommodate crane walks 16 wide permanent graveled surface Culvert and low water crossing installation Fence and gate and cattle guard installation Goldwind Americas

Road Construction Goldwind Americas

Road Construction Goldwind Americas

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

Foundation Installation April 2017- July 2017 Typical GW 2.5 MW Foundation: 58 6 circular footprint 10 deep at Pedestal 412 cubic yards of Concrete 35 tons of Steel Backfilled to ensure positive drainage away from foundation Concrete produced on site batch plant Goldwind Americas

Foundation Installation Goldwind Americas

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

Collection Line Installation August 2017- February 2018 Underground cable Approx. 39 miles of 3-phase 34.5kV cable installed between turbines and back to substation 4ft trench depth at 4ft below ground surface. Trench excavation with heavy rock trenchers Fiber optic and ground cable run in the same trench Fine screening of excavated material for cable bedding Backfilled to the surface and reclaimed to blend in with surroundings Short spans of overhead collection Goldwind Americas

Collection Line Installation Goldwind Americas

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

Turbine Delivery and Erection Goldwind Americas

Turbine Erection and Delivery October 2017- February 2018 64 x Goldwind 2.5MW turbines 90m (300ft) hub height, 109m (360ft) rotor diameter Four piece steel tubular tower Delivery rate of 8 complete turbines per week, staged at each turbine location Multiple crane activities Two 300T-class crawler cranes for setting lower tower sections and building rotors Two 600T-class crawler cranes for erecting turbines Up to ten rough-terrain hydraulic cranes to unload and provide assists Crane walks and breakdowns Goldwind Americas

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

The GW109/2.5 MW Turbine Product Cut-in Wind Speed Rated Wind Speed Max Tip Speed 2.5MW 3 m/s (7 mph) 10.3 m/s (23 mph) 174 mph Turbine Height 300 Foot Tubular Steel Tower Total Height 474 Feet Foundation Volume 709 cy (536.7cm) of Concrete 79 tons (71,667.6kg) of Steel 102 Tons Goldwind Americas

Goldwind 2.5 MW Turbine Product Summary Copyright Goldwind Americas

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

Substation Construction August 2017- January 2018 LCRA s Bow Wood Substation goes online 04/28/2017 Energization of the Rattlesnake Substation January 2018 Goldwind Americas

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

Transmission Line Construction September 2017- January 2018 Approximately 16 miles in length Runs from the Rattlesnake Substation to Bow Wood Substation Poles approx. every 800-1000ft Steel monopole construction Limited use of guy wires Goldwind Americas

1 Introduction to Goldwind 2 Site Safety Awareness 3 Construction Schedule 4 Road Construction 5 Foundation Construction 6 Collection Line Installation 7 Turbine Delivery & Erection 8 Turbine Information 9 Substation Construction 10 Transmission Line Construction 11 Additional Q&A

Project Contact Information Site Office Trailers 775 CR146 Melvin TX (1.4 mile north of CR128) Keith Kurtz Project Development & Asset Manager kkurtz@goldwindamericas.com (312) 858-0383 James Blount Site Construction Manager jblount@goldwindamericas.com (903) 517-6417 Goldwind Americas

点亮世界, 创造更多资源 Innovating for a Brighter Future Copyright Goldwind Americas 版权所有新疆金风科技股份有限公司 34

THANK YOU.