Adding Additional Vacuum Circuits

Similar documents
Adding Additional Gripper Circuits (SG3 & SG4)

N-084M and N-069M-DV Series Heat Exchanger Replacement

Electrical. The following slide shows the entire electrical overview. Take a moment to study the overview and become familiar with the components.

3/2-way Rocker Solenoid Valve for pneumatic systems

Mazda North American Operations Irvine, CA

APIKOL AAN INTAKE MANIFOLD INSTALLATION INSTRUCTIONS

Prodigy HDLV System Troubleshooting - Generation III

AGCO América do Sul (Factory Install) Installation Manual SP01

LIONEL No Gabe the Lamplighter Owner s Manual 6/01

Thermal Wraps. GT Exhaust Accessories Installation and Operation Manual. Rev. A. Copyright 2012 GT Exhaust, Inc. All Rights Reserved

Installation Tips For Crimestopper RS7 + Passlock-sl2(4) + DLRM + SPDT

OCTOPUS SELECTION & INSTALLATION GUIDE

DTC P1415 Secondary Air Injection (AIR) System Bank 1

TIP SHEET EVO-CHRT6(d) STAND-ALONE ADD-ON REMOTE STARTER

INSTRUCTIONS for the Model GVL GLASS-VU LOADER

ATTENTION. Custom Dynamics UTV Turn Signal Kit Installation Instructions

Installation. 1 User-supplied Equipment. 2 Installing the Slave Arm. 2.1 Preparing the Slave Arm Mounting Platform

MICRO EJECTORS. Micro ejector single unit (without solenoid valve) ME. Micro ejector with solenoid valve DC24V. Block-off plate ME MA-BP

Spray Height Controller

Pneumatic Manual 2008

S200-P Passport Series Fire Pump Service Parts List

Remote Process Actuation Control System AirLINE - Siemens ET 200S

Service Manual. Baytech Service Manual for 6.0L Application

Part # Series RidePro 4 Way Compressor System 3 Gallon Tank Analog Gauges

E E VDC COOLEDGE TILE INTERIOR INSTALLATION INSTRUCTIONS. Caution: Observe precautions for handling electrostatic sensitive devices.

I-234. Victaulic Styles 234/234S Restrained, Flexible Single-Gasket Couplings WARNING IMPORTANT INFORMATION ITEMS PROVIDED WITH SHIPMENT:

INSTALLATION INSTRUCTIONS 3-POSITION GATE VALVES SIZES Read All Instructions Prior To Installation

Tips for Installation, Calibration and Operation of SmartSwitch Tank Management Systems. Contents: Page

Cable Shift Linkage Kit

350 S. St. Charles St. Jasper, In Ph Fax

SingleShot. Installation and Operating Manual INTRODUCTION PREFACE SAFETY SPECIFICATIONS OPERATING CONDITIONS. Ambient Operating Temperature

I-BFV.KIT Butterfly Valve Gear Operator Replacement

DEMA 258BD-200C and 258BT-200C DRAIN MASTER Jr. INSTALLATION INSTRUCTION SHEET

INSTRUCTION MANUAL INSTALLATION, OPERATION, AND MAINTENANCE ACTUATOR MANIFOLD

C FORD F250 / F L POWERSTROKE DIESEL WITH AUTOMATIC TRANSMISSIONS ONLY

Installation and Service Instructions for 87,000 & 87,100 Series Self-Adjust Brakes (rev. B)

Finding and Fixing Vacuum Leaks on the LT5 Engine Marc Haibeck

1998 ENGINE PERFORMANCE. General Motors Corp. - Basic Diagnostic Procedures - 5.7L

INSTALLATION INSTRUCTIONS AIR/OIL SEPARATOR KIT

Installer: START HERE

Spray Height Controller

Pneumatic Control Module User s Guide

Cable Shift Linkage Kit

Section /4200 Series Printers

DEMA 951 FLUSH MANIFOLD WITH 24V DC VALVE INSTALLATION INSTRUCTIONS

IMPORTANT! READ BEFORE INSTALLING!

Cable Shift Linkage Kit

C WD 2 WHEEL LOW KIT FOR DODGE RAM 4WD VEHICLES

MI0559A OXY-BEVEL OPERATIONS MANUAL: Oxy-fuel contouring beveling head with manual tilt function.

Buhler Versatile 23XX/24XX, Versatile 9X80, and New Holland Versatile 9X8X SmarTrax MD Installation Manual. P/N Rev A 04/16 E23635

Remote Process Actuation Control System AirLINE - Rockwell 1734 Point I/O System

MAGNETIC FIELD DUE TO A CURRENT CARRYING CONDUCTOR

ELITE SERIES SURGICAL TABLES

Miniature Venturi Vacuum Pump with Pneumatic Blow-off and Silencer

TIP SHEET T0937. Installation Tips For RS00/PS00 + ADS-TBSL-PL + SPDT

Manifold-Mounted to Flange-Mounted Solenoid Valve Conversion

INSTALLATION INSTRUCTIONS:

Pregis Intellipack Corp E. Marshall Street, Suite Tulsa, OK (918)

Replacing Your 2nd Generation Battery Pack

Installation Tips for your Crimestopper/ProStart Remote Start system (add-on for GM vehicles) v1.02 updated 1/16/2013

hercules Commercial CPL400 CPL600 CPL800 CPL1000 CPL1200 CPL1400 INSTALLATION & OWNER S MANUAL Commercial Vertical Platform Lifts

PARTS LIST CONTROL PANEL COMPONENTS

G2 INSTALLATION MANUAL

Val-Matic Air / Oil Hydraulic Panel Pump Control System. Operation, Maintenance and Installation Manual

LED REVEALS - INSTALLATION INSTRUCTIONS

348002K/348012K Manifold Block Style Service Manual 12/2000

5.2L and 5.9L ENGINE PROCEDURE

TIP SHEET T0937. Installation Tips for RS00 + Passlock-sl2(4) + SPDT

Your Steering Column Specialist

Instructions for the Replacement of CWP ROMA s and Repair of Lower Support Frame.

YA12. SURFACE AND FLUSH MOUNTED LIFT (000 SERIES) lb. Capacity (6000 lbs. per axle)

INQUIRY: HYROBOTICS CORP SAM LEE ( ) 5988 MID RIVER MALL DR. ST.CHARLES MO TEL : FAX :

Instruction Manual LongArm ABL3 Remote Operator for Medium Voltage Allen-Bradley Centerline** Motor Control Center Units

Dynojet Research, Inc. All Rights Reserved. Air Fuel Ratio Module Installation and User Guide.

Kuhnke Technical Data. Contact Details

Installation and Service Instructions for 87,000 & 87,100 Series Self-Adjust Brakes (rev. B)

Depending on which elastic support you have you can secure the V2 power unit to the following seat bracket tubes: EXTERNAL DIAMETER 27.

Exercise 1-1. Lockout/Tagout Procedure EXERCISE OBJECTIVE DISCUSSION. Become familiar with the Industrial Controls Training System.

2005 FIRST Pneumatic Manual

Rogator Passive Roll (2012+) 3 Height Sensors Installation Manual RG10

John Deere (4730 & 4830) with Proportional Main Lift Installation Manual JD08

INSTALLATION MANUAL & OPERATING INSTRUCTIONS

Hush-O-Matic MRS Control Package

TD80 LEVEL GAUGING & OVERFILL PREVENTION SYSTEM PRODUCT MANUAL. TPM 001 Revision 0.1

Condition. Correction

Installation Tips for your Crimestopper/ProStart Remote Start system (for GM vehicles) v1.01 updated 2/27/2012

DODGE SRT-4 PART NUMBER P (with Turbo Toys) P (without Turbo Toys) P (Stage 2 to Stage 3R Upgrade Kit)

Advantage-D. Operating Instructions and Maintenance Manual. Central Vacuum Systems (Expandable/Modular Models) (Ver.

Statim G4 Error Codes

The LED Driver Expert

Installation Suggestions

TIP SHEET. Installation Tips for SP-404/SP EVO-ALL + SPDT Remote Start/Alarm T1642

How to Replace Old Style Control Manifold with New Style Manifold on AS-Series Pumps

North American Automatic Manual Reset and Motorized Valves

Thunder Power Tarp Kit Operation. Dual Arm Curb Side Stowing Single Arm Curb Side Stowing Flex Arm Curb Side Stowing.

Micromatic TM M17B. PARTS LIST Advance model: (5)

7401 Micro-Jet Fogger

Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly

Rectangular Door L-VAT with pneumatic actuator double acting

2/2- or 3/2-way- Rocker Solenoid Valve

Transcription:

1.) Turn On your robot and sign into your designated Level of Access 2.) Go into Function>>>Function Set>>>Advanced>>>Output List 3.) On the first page of the Output List, on the far right column, there will be Spare 1 Output (SP1) and Spare 2 Output (SP2). Next to SP1 there will be a number value that should read 27 ; and next to SP2, there will be a number value that should read 28. These numbers are your Output Values. SP1 & SP2 Values 4.) While on the Output List select Next to view the second page of robot outputs. 5.) In the middle column of Output List Page 2, There will be Vacuum 3 Output (SV3) and Vacuum 4 Output (SV4). Their Output values should be 40 and 41, respectively. Change these Output Values to 27 and 28, so that SV3 is now reading Output 27 and SV4 is now reading Output 28. You can change the output values by selecting the output you would like to change and inputting the correct value as listed. Insert SP1 & SP2 Values into the SV3 & SV4 Output values, respectively 1

6.) Once you have changed the Output Values, go back to the robot s main page and select Manual. Once in Manual, turn on SV3 and SV4, lights DO11 and DO12 will light up. When SV3 is turned on, DO11 should light, and when SV4 is turned on DO12 should light. Once this has been confirmed, move on to the next step. When SV3 is turned on DO11 should light. When SV4 is turned on DO12 should light 7.) Remove both rectangular manifold covers. Manifold Covers 2

8.) Replace those covers with the provided 1-way FESTO directional valves. (Before valves are installed it is recommended to install the 6mm elbows and port plugs). Be sure to use the gaskets and bolts provided with the valves. 9.) Now with the manifolds installed, attached the solenoid plugs to the solenoid outlet on the 1-way directional valve. Terminate both the RED wires into a 24Vdc termination point on the adjacent terminal strip. Terminate each of the red solenoid wires into the 24Vdc termination point on the terminal strip 10.) Now with the 24Vdc wires properly terminated, wire the black wires into a spare output terminal. If there is no spare termination point, locate (2) spare light-blue wires either wrapped around the black multi-wire insulation or inside the black insulation. Make note of the number(s) located on the outside of the chosen light-blue wire, or the wire leading into the termination point on the terminal strip. (If there are no wires present, then (2) small gauge wires need to be ran from the solenoid location to the motion controller). Spare Wire wrapped around Black Insulation (or may cut be inside black insulation) Spare termination points on terminal strip 3

11.) With the BLACK wires terminated to (2) specific & separate wires, terminate those separate wires into DO11 & DO12. Remember DO11 is SV3, and DO12 is SV4, therefore when SV3 of 4 is turned on, the energized wire coming out of DO11 or 12 will light up the corresponding solenoid on the 1-way valve. The other ends in which the BLACK solenoid wires were terminated. Terminate selected wires into DO11 & DO12 to send the output signal to the 1-way valve s solenoids. 12.) Once the 1-ways valves are wired, test the connections by bringing the robot into Manual mode and turning on SV3 & SV4. The solenoids in which DO11 & DO12 are wired to should illuminate, as with the respective DO11 & DO12 output indicator light on the motion controller. 13.) With the valves wired and tested, attach your Venturi Vacuum Generator into a safe and desired location, preferably near the original vacuum generators inside the robot s carriage housing. 14.) With the vacuum generators installed, connect (1) 6mm air line from each valve into the Pressured or P port of each vacuum generator. 15.) Now attach (2) separate air lines into each Vacuum or V port on each vacuum generator. 4

16.) Run both of those 6mm air lines through the plastic cable management wire ways. Be careful that the lines are not pinched or kinked anywhere throughout the run. Pull the air lines up and down through the vertical arm until they are protruding out of the end of the vertical arm. Verify the airlines are not stretched and installed properly. 17.) Now test the vacuum for SV3 and SV4 once again in Manual mode. Label each line SV3 and SV4 according to their vacuum response. If you need further assistance with this installation call ARI at 508-792-4305 or email our Service Department at service@absoluterobot.com. Thank You! Procedure: 10005 5/2016 Rev. 1 5