Installation instructions. Cascade unit. For wall hung gas-fired condensing boiler GB162-50/65/80/ TD UK/IE (2014/09)

Similar documents
INSTALLATION INSTRUCTIONS CASCADE UNIT FOR WALL HUNG GAS-FIRED CONDENSING BOILER GB162-65/80/ TD UK/IE (2011/07)

INTELLIGENT SOLAR MODULE ISM 1

GB162 Series Boiler TR & TL Cascade Kit Configurations

Spare parts catalogue GB 07/2008. Wall-hung boilers ecotec VU 466/4-5 VU 656/4-5

INSTALLATION AND OPERATING INSTRUCTIONS SOLAR HEATING PROGRAMMER TDS SD UK/IE (2010/04)

TIDALFLUX 2300 F Quick Start

OPTIFLUX 2000 Quick Start

VERSAFLOW MAG 4000 Quick Start

Tray Lift Assist Device. User Manual and Operating Instructions

POLY TIP-DOWN WINDSHIELD KIT

Light, highly flexible and low-vibration

Energy Chain Systems Triflex R Energy Tubes

SOLAR-LUX 6/12 INSTALLATION AND MAINTENANCE INSTRUCTIONS EVACUATED TUBE COLLECTOR FLAT ROOF INSTALLATION (30, 45 ) WALL INSTALLATION (45, 60, 90 )

Rack Mount Power Supplies

SOLAR-LUX 6/12 INSTALLATION AND MAINTENANCE INSTRUCTIONS EVACUATED TUBE COLLECTOR ROOF MOUNTING INSTALLATION UK/IE (2011/05) GB/IE

WARNING. Before the exhaust silencer is fitted to the pump, the pump must be secured as describe in the pump manual. WARNING

megaflo BSP Pressure Relief Vent

WATERFLUX 3070 Quick Start

Installation Instructions

In-ceiling mount NDA-FMT-DOME. en Installation manual

SI AT A22. English. Printed: Doc-Nr: PUB / / 000 / 01

CS Fiber Optic Splice Case. Instruction

FOG LAMPS INSTALL KIT

Supplementary instructions. Mounting accessories, pressure measurement technology. Document ID: 43478

Pilot-operated servo valve Type ICS

Type 0283, Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

T832 T842 ELECTRIC MOTOR OPTION ASSEMBLY MANUAL. Read & understand all instructions pertaining to this option prior to use!

MSC Manifolds - DIN for Steam Distribution and Condensate Collection Installation and Maintenance Instructions

Installation instructions, accessories - Electric engine block heater

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Ag Leader Technology. Combine Installation New Holland TC 57, 59. Monitor Installation

Pilot-operated servo valve Type ICS

Push-in RTD Temperature Probe with Connecting Cable

Max IV Rear Axle Replacement For models after Serial Number and all rear splined axle replacements.

VXE Easyfit 2-way Ball Valve (DN15 - DN50)

SI AT A22. English. Printed: Doc-Nr: PUB / / 000 / 03

Pilot controlled servo valves Type ICS - Solenoid Valves Pressure Regulating Valves. Technical leaflet MAKING MODERN LIVING POSSIBLE

Kunkle Bailey 756 safety relief valve

YARWAY HANCOCK Y-PATTERN FORGED STEEL GLOBE STOP VALVES SERIES 4000

Installation & Technical Guide. Domestic & Commercial.

Mobtown Offroad Toyota Tacoma Bolt On Rock Slider Installation Instructions

Series Direct contact, metal-to-metal seating, make the globe valve ideal for most shut-off applications. Features

Surepowr Series Sure 150

KRAL Screw Pumps. L Series. Catalog. L Series Edition 05/2011 Subject to change.

CCTV Rack Mount Power Supplies

Pilot-operated servo valve Type ICS

CCTV Rack Mount Power Supplies

Product overview. Joints. Circlips for ball seats DIN K0714. Quick plug couplings with radial offset compensation K0709. Page 837.

ACCESSORIES AND DIAPHRAGM SEAL

Worcester 18/19 Series. Modular Multi-Way Ball Valves

G4 Series. ...Extremely sensitive and accurate PILOT OPERATED PRESSURE REDUCING VALVES PRESSURE EQUIPMENT DIRECTIVE (PED) Adjusting Screw

GENUINE PARTS INSTALLATION INSTRUCTIONS

Liquid ring vacuum pumps with magnetic coupling

Type 3320, Service Manual. Serviceanleitung Service Manuel

Installation Instructions

Delivering unsurpassed quality, design and value.

Pilot Controlled Servo Valves ICS

TOYOTA HIGHLANDER RUNNING BOARD HIGHLANDER HV Preparation

New products. The plastic silencer AGP The new standard

LIFTING MECHANISM PART NO SRM 965

Compact Easy Rollator M66739

Mounting and Operating Instructions EB 8091 EN. Pneumatic Control Valve Type and Type Type with 120 cm 2 actuator

FRAME AND BUMPERS 13-1 FRAME AND BUMPERS TABLE OF CONTENTS

These installation and maintenance instructions must be read in full and completely understood before the installation!

Installation Instructions

Welker Adjustable Probe with Check Valve and Welker Automatic Insertion Probe with Check Valve

Installation, Operation, and Maintenance Manual. Welker Automatic Insertion Corrosion Coupon Device Model AID-1CC

Electric pistol high torque nutrunner

SUT-450-I ASSEMBLY REQUIREMENTS

Pressure Reducing Valve Type 2114/2415

Manifold Isolation Valves

Rosemount 485 Annubar Pak-Lok Assembly

INSTALLATION & OWNER S MANUAL

Guidance to Installers of Viridian EV Charging Stations

INSTALLATION & OWNER S MANUAL

3/18 BC20002, Rev 7. Brakes ASSEMBLY CALIBRATION OPERATION REPLACEMENT PARTS. Page 1

brands you trust. CRANE - Cast Steel Valves

Oil pan, oil strainer and valve body, removing and installing

GRUNDFOS INSTRUCTIONS. Hydro MPC. Installation and operating instructions

M-8100EP. Installation Guide ENGINEERED PLASTIC MANIFOLD SERIES. Introduction. A. Assemble Manifold Components

Type 2000, 2002, 2012

Air Preparation Products 652 Series Filter Regulator (FR) for Process Industry Applications

Xerox 82xx/83xx Wide Format Printer

Rosemount 485 Annubar Flanged Assembly

CBC-A Air curtain cabinet

Universal Splice Tray Installation Instructions

VE4000 & VE5000 SERIES

Installation Instructions

Spring-Loaded MgO Thermocouple/ Thermowell Assemblies with Connection Heads (GP04, XP04, XP06)

- Wiring Brochure Mixing Expansion Module 440

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

2010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014

INSTALLATION & OWNER S MANUAL

Operating Instructions: Hand-operated, PTFE-lined butterfly valves, Series 22/23

Installation Instructions Spector compact Conductivity Transmitter System LRGT 16-1

REMOVAL AND INSTALLATION

Flue installation instructions. Air flue duct for use with ecomax and ecotec boilers. For the installer

PORTABLE TRASH PUMPS MTP200 MTP300 MTP400

2006 MINI Cooper SUSPENSION Wheels & Tires - Repair Instructions - Cooper (1.6L) R50/W10 & Cooper S

Pocket Quick. Reference Guide. On the TOSHIBA. R410A - VRF Range of equipment. Addressing / Commissioning

Transcription:

Installation instructions Cascade unit For wall hung gas-fired condensing boiler GB162-50/65/80/100 6 720 648 720-000.1TD UK/IE 6720813173 (2014/09)

Product overview Product overview 9 1 7 A2 5 A1 B2 B1 8 6 C2 2 10 3 4 A2 C1 C2 B2 B1 A1 A2 B2 B1 A1 C1 11 12 7214 6000-001.1TD Fig. 1 Overview of cascade frame [1] Supports [2] Connecting frame [3] Main gas pipe [4] Flow and return header [5] Gas connection kit TL-inline [6] Mounting bracket [7] Boiler connection set TL-inline [8] Boiler connection set TR-back-to-back [9] Boiler assembly connection kit [10] Gas connection kit TR-back-to-back [11] Flange [12] Low loss header 2 6720813173 (2014/09)

Contents Contents 1 Key to symbols and safety instructions.................. 3 1.1 Key to symbols................................. 3 2 General points....................................... 3 1 Key to symbols and safety instructions 1.1 Key to symbols Warnings Warnings in this document are framed and identified by a warning triangle which is printed on a grey background. 3 Items supplied with unit............................... 3 Electrical hazards are identified by a lightning symbol surrounded by a warning triangle. 4 Dimensions.......................................... 5 5 Cascade frame installation............................. 7 5.1 Boiler assembly and pump group installation........ 7 5.2 Installing the insulation.......................... 8 Keywords indicate the seriousness of the hazard in terms of the consequences of not following the safety instructions. NOTICE indicates that material damage may occur. CAUTION indicates that minor to medium injury may occur. WARNING indicates that serious injury may occur. DANGER indicates possible risk to life. Important information Important information in cases where there is no risk of personal injury or material losses is identified by the symbol shown on the left. It is bordered by horizontal lines above and below the text. Additional symbols Symbol Meaning a step in an action sequence a reference to a related part in the document or to other related documents a list entry a list entry (second level) Table 1 2 General points The installation instructions for cascade systems with GB162 appliances are provided to enable correct and easy installation. The modular cascade frame consists of a number of supports with connecting frames which are screwed together during installation. The compact dimensions of the individual cascade frame parts enable simple and quick installation. 3 Items supplied with unit Cascade frame ( fig. 1) Supports Connecting frame Main gas pipe Flow and return header Boiler connection kit Flange seals Low loss header Blank flanges Rubber pump seals Fixings Installation instructions. 6720813173 (2014/09) 3

Items supplied with unit Boiler ( fig. 2) (to be ordered from your supplier) Mounting bracket Boiler Siphon Installation instructions. Worcester supplies cascade systems in TL and TR configurations: TL: Inline installation All boiler assemblies are in a line enabling an easy-to-monitor installation in a narrow room. TR: Back-to-back installation The boiler assemblies are located on both sides of the frame and are installed back-to-back to create a compact installation which ideally suits rectangular rooms and which ensures the best possible access to all boilers. Depending on the desired output, a choice can be made between different types. Fig. 2 Items supplied with the boiler assembly pump group ( fig. 3) (to be ordered from your supplier) Connection kit Installation instructions. The connection kit consists of: Maintenance valves Drain cock Gas isolation valve Pressure relief valve Non-return valve Pump Pressure gauge. 6 720 648 720-001.1TD Boiler assembly connection kit The connection kit can be used for the 50-kW, 65-kW, 80-kW and 100-kW version. The connection kit includes a pressure relief valve, a non-return valve, a pump and isolating valves. Low loss header TL-configuration (inline) TR-configuration (back-to-back) 2½" TL2, TL3 TR2 3" TL4 TR3, TR4 4" TL5, TL6, TL7, TL8 TR5, TR6, TR7, TR8 Table 2 Low loss header configuration Bend sets with low loss header The GB162 cascade system can be installed in various configurations ( fig. 4). By using the bend set the low loss header can be installed at an angle to the boilers. The gas pipe is reversible so that the gas connection can be at the other side of the boilers to the flow and return connections to the header. 7214 6000-004.1TD Fig. 4 Cascade system configuration varieties 6 720 648 720-002.1TD Fig. 3 Items supplied with pump group 4 6720813173 (2014/09)

2 1 3 0 4 Dimensions 4 Dimensions 525 A 288 1 3 4 L1 810 510 B B3 B1 2 X1 Y1 575 525 147 497 1722 675 B2 4 F1 1 2 3 4 6 720 648 720-003.1TD Fig. 5 Dimensions of cascade systems 1 [A] TL-inline configuration [B] TR-back-to-back installation [1] Flow and return header [2] Low loss header with bend set [3] Low loss header, straight [4] Enclosed welding flanges 6720813173 (2014/09) 5

Dimensions Cascade system Length X1 + Y1 Width TR2 575 + 38 = 613 992 TR3, TR4 1100 + 42 = 1142 992 TR5, TR6 1625 + 45 = 1670 992 TL7, TR8 2150 + 45 = 2195 992 Table 3 TR-back-to-back configurations CAUTION: The dimensional tolerance is ± 5%. Cascade System Length X1 + Y1 Width TL2 1100 + 38 = 1138 575 TL3 1625 + 38 = 1663 575 TL4 2150 + 42 = 2192 575 TL5 2675 + 45 = 2720 575 TL6 3200 + 45 = 3245 575 TL7 3725 + 45 = 3770 575 TL8 4250 + 45 = 4295 575 Table 4 TL-inline configurations Cascade system Header [inch] Length B1 B2 B3 L1 F1 [flange dimension in mm] TL2, TL3, TR2 2½ " straight 488 488 Blank flange C2631 37.2 NW right-angled 213 213 621 133 65/76.1 PN6 TL4, TR3, TR4 3" straight 571 571 Blank flange C2631 37.2 NW right-angled 252 252 728 157 80/88.9 PN6 TL5, TL6, TL7, TL8, TR5, TR6, TR7, TR8 Table 5 Header dimensions 4" straight 651 651 Blank flange C2631 37.2 NW right-angled 313 313 849 198 100/114.3 PN6 992 180 328 247 92 1710 71 310 7214 6000-006.1TD Fig. 6 Dimensions of cascade systems 2 6 6720813173 (2014/09)

Cascade frame installation 5 Cascade frame installation 2 4 6 CAUTION: Make sure that the surface the cascade system is to be installed on is flat. Use a spirit level when installing the cascade system. Check that the load-bearing capacity of the floor is sufficient for the weight of the installation (approx. 100 kg for each boiler with accessories). Fix the frame onto the first leg of the cascade unit. Use the M8 x 70 screws for this. CAUTION: Make sure that the slots for the boiler mounting bracket are at the top of the frame. Now fix the next leg and continue fitting until the cascade unit is complete. Position the frame into its final position. Adjust the frame so that it is in the right position and so that it is level both horizontally and vertically. Fit additional washers under the leg until level. Secure the frame to the floor. Ensure bolts are aligned to the legs. Do not bend or place the leg under stress to make it fit. Install the main gas pipe. Use the M8 x 70 screws for this. Do not fully tighten the screws yet. Install the header pipe. Use the M8 x 70 screws for this. Do not fully tighten the screws yet. Fit the boiler mounting brackets on the top of the frame. Install the nuts at the rear of the frame. The underside of the bracket should be level with the underside of the frame. Use the M8 x 65 screws for this. CAUTION: For TR-back-to-back configurations, both boiler mounting brackets are fitted simultaneously, using the same screws. Only use M8 x 65 screws to secure the mounting brackets. 5.1 Boiler assembly and pump group installation Hang the first boiler on the cascade frame as shown in fig. 7 or fig. 8. You must observe the installation sequence indicated in fig. 7 and fig. 8 when installing the boilers. 3 1 3 Fig. 8 Installation sequence for TR-back-to-back configuration Put the boiler in the correct position and level it horizontally and vertically. Use the set screws on the lower rear of the boiler to adjust it. Connect the pump group ( GB162 Installation and service instructions). Remove the protective yellow caps from the main gas pipe. Apply PTFE tape to the screw thread connections. Connect up the gas connection pipe between the gas valve and the main gas pipe. Use PTFE tape to create a perfect seal. Remove the protective caps from the header. Remove all red paint and unevenness from the flow and return connections of the header. Install the flow pipe(s) between the header and the pump group. Install the return pipe(s) between the header and the pump group. Repeat the above steps to install all boilers. If required, seal off any unused connections of the main gas pipe and the header. Install the condensate drain pipe. Use the pre-assembled mounting brackets on the supports for this. When installing a cascade with an angled low loss header, install the set of bends between the header and the low loss header. Fit the enclosed flange seals in between. Use the corresponding screws. 2½ " low loss header M12 x 50 3" low loss header M16 x 55. Install the low loss header with the corresponding flange seals. Use the corresponding screws. 2½ " low loss header M12 x 50 3" low loss header M16 x 55. 5 7214 6000-008.1TD CAUTION: Do not install the pump group cover until pressure has been supplied to the boiler system and the gas pipe. Check the cascade system for leaks. 7214 6000-007.1TD Fig. 7 Installation sequence for a TL-inline configuration 6720813173 (2014/09) 7

Cascade frame installation 5.2 Installing the insulation CAUTION: First start up the cascade system and test the system for leaks. Then install the insulation. Install the rear insulation over the header [1]. When an angled low loss header has been installed, fit the insulation around the bends. Install the rear insulation part over the low loss header [2]. If required, trim the insulation so that it is straight [3]. 4 1 3 2 7214 6000-009.1TD Fig. 9 Low loss header For 2½" and 3" low loss header: install the inserts in the outer insulation. For a 2½" low loss header: install the reducing inserts in the outer recesses [2]. For a 3" low loss header: install the reducing inserts in the inner groves [1]. 2 1 1 2 7214 6000-010.1TD Fig. 10 Outer insulation with inserts Click the insulation together. Install the front insulation of the low loss header. If required, trim the insulation so that it is straight ( fig. 9, [3]). Install the end cover over the header ( fig. 9, [4]). 8 6720813173 (2014/09)

Notes 6720813173 (2014/09) 9

Notes 10 6720813173 (2014/09)

Notes 6720813173 (2014/09) 11

WORCESTER, BOSCH GROUP: TECHNICAL SUPPORT: 0330 123 3366 APPOINTMENTS: 0330 123 9339 SPARES: 0330 123 9779 LITERATURE: 0330 123 9119 TRAINING: 0330 123 0166 SALES: 0330 123 9669 Worcester, Bosch Group Cotswold Way, Warndon, Worcester WR4 9SW. Tel. 0330 123 9559 Worcester, Bosch Group is a brand name of Bosch Thermotechnology Ltd. worcester-bosch.co.uk 6720813173