Mitsubishi Turbine: Hybrid XT Control Sensor Retrofit

Similar documents
Hybrid XT Retrofit GE 1.5 SLE Turbines

RNRG Hybrid XT Anemometer User s Manual. Author: RNRG Technical Services

ANZI Transfer Switch and Generator Wiring Installation Addendum

Hybrid MC Vane User s Manual. Author: NRG Technical Services

Installing Power Components

Installing and Removing Power Supplies

Hybrid MC Anemometer User s Manual. Author: NRG Technical Services

Product Manual MNX10015 / REV B MODEL SB142, SB242. Dual Output Series Switch Boxes

SAVE THESE INSTRUCTIONS

Infinity 1U 19 Converter Shelf Models: J L224-48V to +24V, L V to -48V

Instructions for Field Retrofit of a Model 98 Temperature Controller in place of a Model 85 Temperature Controller

INSTALLATION INSTRUCTIONS FOR EGA AND EGH SERIES ELECTRIC HEATERS IN V OR H SERIES UNITS

Air Conditioner for M915 A0/A1 Truck


INSTALLATION INSTRUCTIONS FUEL SURGE TANK KIT

SloanLED THINLED. Constant Current. Installation Guide

ACC Series Power Conditioner OPERATION & INSTALLATION MANUAL

I-BFV.KIT Butterfly Valve Gear Operator Replacement

RU SERIES UPGRADE TempAssure Compatible

Australian Wiring Instructions:

READ AND FOLLOW ALL SAFETY INSTRUCTIONS! SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION.

Technical Installation Manual

SAVE THESE INSTRUCTIONS

3 Phase Smart Controller

RE Generation II Troubleshooting Guide Section I Preliminary Information and Evaluation

50A Dual-Feed 5/5 GMT Total Front Access Fuse Panel

INSTALLATION INSTRUCTIONS

Hybrid XT Anemometer

INSTALLATION & OWNER S MANUAL

Tri-Spark Ignition System Installation Triple Cylinder TRI-0001

Installation, Operation and Maintenance Manual

INSTALLATION & OWNER S MANUAL

Electrical Installation

Illuminator System Series CM

SmartBob AO. BinMaster: Division of Garner Industries 7201 N. 98th St., Lincoln, NE

Agilent G3969A Transfer Line Interface for an Agilent 7697A HS Accessory

SX-16 Nightsun Searchlight Safety and Service Bulletin # SL

AquaLumin III - Nicheless Light Installation Guide IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Instructions for installing Extendable Replacement Mirrors for Ford HD vehicle.

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

DODGE RAM 24V 5.9L CUMMINS

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

ACSI MODEL 1406BB-04-AO POWER SUPPLY INSTALLATION INSTRUCTIONS

SAVE THESE INSTRUCTIONS

Florham Park, NJ USA Call (ASCO) for sales or service

Florham Park, NJ USA Call (ASCO) for sales or service

CM52 Network Protector with Arc Flash Reduction Module

Installation Instructions for Key Switch SNOWRATOR

Installation, Operation and Maintenance Manual

OWNER S MANUAL. Please read installation and operation instruction before using this Power inverter.

Installation, Operation and Maintenance Manual

INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS

3143 Production Drive Fairfeild, Ohio Model HA Installation and Service Manual

MODEL ELC-12/40-CVM-D BATTERY CHARGER

Motor. Document # Vari-Green Motor and Controls. Table of Contents. Features, Operation, Wiring and Troubleshooting

IMPORTANT SAFEGUARDS

Pressure Transmitter. Informational & Installation Manual

SPECTRACOOL Slim Fit Air Conditioners (Surface-Mount Units Only) Quick Start Operation Guide

WIRING THE HEATER POWER SUPPLY

Installation Instructions

Solid-State Compass with GPS Receiver

Installation Instructions

2005 and 09 Mustang install instructions Sequential / Chase Unit Partial Plug-N-Play Kit Meter4it Eng. Updated: 3/28/09

ThermoLite 40W Solar Panel Installation Instructions

Installation Instructions

A.C.E.S. Series ACES 3 & 6 MODULE PANELS. System Manual. Touch-Plate Lighting Controls. ACES 3 & 6 Module System Manual

Installation Instructions: HYPERION R-Lite SYSTEM

GTX UNIT SUBSTATION Installation, Maintenance & Operation Manual

SWX-100-INT-PCR Internal Isolation Switch

Connecting to DC Power

NEW. Datasheet. WMF 2.5 Terminal Series

Electronic Circuit Breaker ESS20-0..

4000 SYSTEM OPERATING MANUAL

TPM Fuse Panel Installation Guide. Document INS-727XXXXXXX This manual covers the following part numbers- Trimm 727XXXXXXX Family

Installation Instructions

CONTROL FEATURES AVAILABLE OPTIONS

5001TCP SPEED CONTROLLER

ELECTRIC HEAT ACCESSORY INSTALLATION INSTRUCTION. 20, 30 & 40 kw for 15 Ton Split System Air Conditioners Models: LB180 & LL A-0102

INSTALLATION & OWNER S MANUAL

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

INSTALLATION INSTRUCTIONS HIGH OUTPUT 2 SPEED RAD FAN ASSEMBLY

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B

GENUINE PARTS INSTALLATION INSTRUCTIONS

Application Specification Circular Plastic Connector (CPC) Series 45 System 05 AUG 14 Rev D

Users Manual. Cobra Plus Stand-By Emergency Lighting Inverter. Technical Manual # Revision B

Installation Instructions For Motor Control Center (MCC) Units

Installation Instructions for Foam Marker INTERMEDIATE also applies: JR, JR36

SAVE THESE INSTRUCTIONS

4500 Series Electric Exit Devices Request to Exit (RX) Installation Instruction Grade 1 I-ED00368

Fused Disconnect Terminal Blocks for Miniature Fuses with CAGE CLAMP connection, Series

Electronic Circuit Breaker ESS20

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

materials and workmanship for 2 years. Should the centrifuge require warranty or Phone: or Fax:

3143 Production Drive Fairfeild, Ohio Model HA-45. Installation and Service Manual

Backside License Plate Mount for Jeep JK Wrangler

SPACESAVER EC-300 A ELECTRICS

TOYOTA TUNDRA TVIP V4 Preparation

Installation, Operation and Maintenance Manual

RANGER 900 POWER STEERING KIT

Transcription:

Mitsubishi Turbine: Hybrid XT Control Sensor Retrofit NIPPON ANEMOMETER TO HYBRID XT ANEMOMETER RETROFIT KIT, MITSUBISHI, NEI (9370) NIPPON YAW VANE TO HYBRID XT VANE RETROFIT KIT, MITSUBISHI, NEI (9371) Introduction Instructions for replacing original Nippon Electric Inc (NEI) wind vane and anemometer on Mitsubishi turbines with Hybrid XT Sensors (XTs) are provided below. Users should be familiar with the operation of the Hybrid XT vane and anemometer prior to performing this retrofit. RNRG mount converters adapt the NEI sensor flange mounts to the RNRG XT mount with captive connectors and cable. The RNRG sensor cables connect to the same junction box connections as the NEI sensors, with minor changes. To provide the increased heating capability for the XTs, a power supply is added to the control cabinet, fed from the same AC supply that formerly supplied the NEI bearing heaters. The supply is fed to the new sensors using the existing cabling. The XT sensor power and signal wiring uses the existing NEI sensor cabling to the control cabinet. The controller connections are modified to connect the XTs signal directly to the controller. Users should be familiar with the operation of the Hybrid XT anemometer and vane prior to performing this retrofit. Product manuals and instructions for retrofits on other turbines can be obtained by contacting Renewable NRG Systems at info@rnrgsystems.com. Always power the heater on your Hybrid XT sensor! Failure to maintain constant heating may lead to corrosion or inferior sensor performance. Constant heating prevents condensation from forming on the bearings, enabling the sensor to achieve a 10 year service cycle. If the sensor is used without the heater, the warranty will be void. This procedure requires: Access to nominal 220V AC mains power Access to sensor mast This procedure should only be performed by qualified personnel, in accordance with onsite safety protocols. Sensor surfaces (particularly the head and the upper body) can become quite hot and may burn you; especially in warm ambient conditions. Use caution when the heater power is on. HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 1

Table of Contents Introduction... 1 Safety considerations... Error! Bookmark not defined. Tools required... 3 Kit contents... 3 Procedure... 4 Wire power for sensor heaters... 4 Sensors and mounting... 6 Install XT sensors... 7 Update TVS for anemometer... 8 Prep and connect new sensor cable connections... 8 Connect the wires as shown in the tables: Table 1 Hybrid XT sensor wiring tables... 8 Control signal retrofit... 9 System startup... 10 Reference wiring diagrams... 11 Before retrofit... 11 After retrofit... 12 HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 2

Tools required 1) 10mm socket and ratchet. Torque wrench is recommended. 2) Wire strippers for 22 14 AWG wire 3) Crimp tool for ferrules for 22 14 AWG wires 4) Crimp tool for lugs on 18 14 AWG wires Kit contents 9370 Hybrid XT Anemometer Retrofit Kit Mitsubishi NEI 10021 Mounting adaptor for Mitsubishi 9234 Assembly-Cable,300V,10m,Connector,Power,Signal,WithMountingBolt 9365 - Hybrid XT Anemometer, 4-20mA Output, 60 m/s 9371 Hybrid XT Vane Retrofit Kit Mitsubishi NEI 10021 Mounting adaptor for Mitsubishi 9234 Assembly-Cable,300V,10m,Connector,Power,Signal,WithMountingBolt 9362 -- Hybrid XT Vane, 4-20mA Output, CCW 9376 Hybrid XT Heater Power Kit Mitsubishi Turbines Wiring Kit Heater Power Supply HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 3

Procedure Wire power for sensor heaters Heater power for the XTs is provided by a power supply added to the control cabinet. The power supply unit (PSU) and heater fuses will be mounted to the available DIN rail space in the upper control cabinet, next to transformer AC/DC-51. For best access, connect the wiring to the components before attaching them to the rail. Open the control cabinet. For best access, remove the door grounding straps and remove the cabinet doors. 1) Open breaker BL54. LOTO the breaker. Remove the existing wires U45 and W45 from the load side (bottom) of BL54. Cap the wires with wire nuts and tuck them out of the way. 2) Connect the AC feed from BL54 to the PSU. Wire From To Notes 18 AWG Red BL54 Load Side Line (lower Left) Power Supply, Input L (bottom terminals) Route through wiring channel 18 AWG White BL54 Load Side Neutral (lower right) Power Supply, Input N (bottom terminals) Route through wiring channel 3) Secondary wiring for heater power a. Connect short jumper wires from the two PSU + output terminals to the two sensor heater fuses. Use crimp ferrules on these connections. Wire From To Notes 18 AWG Red Approx. 6 PSU Output + terminal First Fuse Block, bottom (hinge) end Wire approx. 6 long 18 AWG Red PSU Output + terminal First Fuse Block, bottom (hinge) end Wire approx. 6 long Approx. 6 b. Disconnect the existing wires U45 from TB-11 terminal 49 and 51 (White wires, red terminals). c. Disconnect the existing wires W45 from TB-11 terminal 50 and 52 (White wires, black terminals). Cap the removed wires with wire nuts and tuck them out of the way. Do NOT change the existing connections to cables C-70 and C-72 (Black/White 2 conductor cables). HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 4

d. Connect the new heater power to these existing heater cables which feed to the sensor junction box. Use crimp ferrules on these connections, except use a fork terminal to connect to the frame ground screw. From Wire To Notes First Fuse Block, Top 18 AWG Red TB-11, terminal 50 Wind Vane Heater Power end Second Fuse Block, 18 AWG Red TB-11, terminal 52 Anemometer Heater Power Top end PSU Output - 18 AWG Black TB-11, terminal 49 terminal PSU Output - 18 AWG Black TB-11, terminal 51 These two wires are stacked terminal together in one of the PSU PSU Output - 18 AWG Green Frame ground, see output - terminals terminal note below Note: The side of the heater power supply is grounded to frame ground. The easiest frame ground point to access is to stack this connection with the existing frame ground screw at the left side of the panel divider shelf. Add the new terminal to the screw; leave the existing (white) wire connected as well. 4) Mount the heater power supply parts a. Working left to right, latch the two heater fuse blocks onto the rail next to transformer AC/DC-51, then latch the PSU onto the rail. The finished installation will look similar to this photo. The exact type of PSU may vary. HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 5

Sensors and mounting 1) Remove NEI sensors and cables a. Open the wind sensor junction box b. Disconnect the cables to the two wind sensors from the junction box c. Remove the existing wind sensors from the mounting flanges 2) Install mount converters a. Install the XT mount converters to the sensor flanges, using the same process as for replacing an NEI sensors. The anemometer and wind vane converters are the same b. Apply sealant to the flanges as normal for a sensor replacements c. Re-connect the grounding lugs as they were before. The completed conversion will will look similar to this photo. HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 6

3) Trim, label and install new cables a. Cut each XT cable to approx. 15 feet long b. Label one cable at each end with the provided Anem labels and the other with the provided Vane labels c. Prep the shield braid at the connector with a #10 ring lug d. Remove the bolt and washer and flag nut from the Vane cable, thread the cable down through the converted Vane boom (on the right side of the machine, facing the rotor) *Important*: Orient the connector with its notch, and the Toward Rotor label turned toward the rotor. Note the Toward Rotor label in this photo: e. Install the bolt and washer from the front side, and put the nut plate in place on the back side, finger tight. f. Repeat this installation for the Anemometer cable on the left side of the machine. Install XT sensors 1) Install the Model 9362 XT Vane (4 ~ 20mA, Counter-Clockwise) on the right side mast, labelled. Observe the Toward Rotor label to orient the sensor correctly Vane 2) Plug the sensor onto the mount a. The nut plate slides into the notch on front side the sensor, with the washer and bolt head on the back side of the sensor toward you 3) Tighten the mounting bolt to 27 in-lbs torque (10 mm wrench) 4) Repeat this process to install the Model 9365 XT Anemometer (4 ~ 20mA, 0 ~ 60 m/s) on the left side mast, labelled Anem HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 7

Update TVS for anemometer 1) In the wind sensor junction box, remove the two MOV surge protectors (Black disc shaped components) from the junction box terminals 1 and 2, which are connected together at terminal 3 2) Install the suppled TVS Diode surge protectors to terminals 1 and 2 with the common leads to terminal 3, replacing the MOVs Prep and connect new sensor cable connections 1) Thread the new cables though the cable grommets into the wind sensor junction box 2) Strip the cable jackets and prep each wire except the yellow wires with a fork terminal NOTE: The yellow wires are not used 3) Prep the cable shield with a large fork terminal Connect the wires as shown in the tables: Table 1 Hybrid XT sensor wiring tables Anemometer Cable Function Wind Sensor Junction Box Notes Black Wire Signal Ground terminal 1 White Wire Signal terminal 2 Wind speed signal Red Wire Sensor +24 V terminal 7 with Red wire from Vane. power Yellow Wire Not used Not connected Trim, and or coil out of the way Orange with Black Stripe Heater + terminal 13 Heater Power +24 V Orange with White Stripe Heater - terminal 12 Heater Power ground Cable Shield Braid Shield terminal 4 Shield Ground, Earth ground Vane Cable Function Wind Sensor Notes Junction Box Black Wire Signal Ground terminal 5 White Wire Signal terminal 6 Wind direction signal Red Wire Sensor +24 V terminal 7 with Red wire from Anemometer. power Yellow Wire Not used Not connected Trim, and or coil out of the way Orange with Black Stripe Heater + terminal 11 Heater Power +24 V Orange with White Stripe Heater - terminal 10 Heater Power ground Cable Shield Braid Shield terminal 9 Shield Ground, Earth ground HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 8

Control signal retrofit 1) Remove 4-20 ma converters a. In the control cabinet, unlatch and remove the K-Unit signal conditioners at MMMX-106D and MMMX-106S. These two units are no longer needed. b. Temporarily unlatch and remove the K-Unit signal conditioner at MMMX-103. This unit is removed to gain access to the wiring behind it and will be replaced later 2) Remove old sensor signal wiring a. In the control cabinet, disconnect the following wires from the back row of TB-10. Cap each wire with a wire nut and tuck it out of the way. i. Remove wire 106D/1 from TB-10 53 ii. Remove wire 106D/2 from TB-10 54 iii. Remove wire 106D/3 from TB-10 55 iv. Remove wire 106S/1 from TB-10 71 v. Remove wire 106S/2 from TB-10 72 b. Disconnect the following wires from CNTB-13. Cap each wire with a wire nut and tuck it out of the way. i. Remove wire NA/01+ from CNTB-13 1 ii. Remove wire NA/01- from CNTB-13 2 iii. Remove wire NAI/04+ from CNTB-13 13 iv. Remove wire NAI/04- from CNTB-13 14 3) Connect new sensor signal wiring a. In the control cabinet, add the following connections. Use crimp Ferrules for connections to TB- 10 and CNTB-13. Use fork terminals to connect to the screw terminals on the empty socket for MMX-106 S. From Wire To Notes TB-10 terminal 71 22 AWG Black TB-10, terminal 53 Two wires connect to TB-10 socket for MMX-106 S, screw terminal 8 22 AWG Black terminal 53. Put both wires into one ferrule for ease of connection. socket for MMX-106 S, screw terminal 8 CNTB-13 terminal 14 22 AWG Black 22 AWG Black CNTB-13, terminal 2 Two wires connect CNTB-13, terminal 2. Put both wires into one ferrule for ease of connection. socket for MMX-106 S, 22 AWG Red TB-10, terminal 53 screw terminal 7 TB-10, terminal 54 22 AWG White CNTB-13, terminal 1 TB-10, terminal 72 22 AWG White CNTB-13, terminal 13 4) Reinstall yaw position converter MMMX-103 into its socket and latch it in place HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 9

5) Test heater power a. Follow site specific procedures to Un-tag Breaker BL-54 b. Open both heater fuse blocks by hinging the fuse carriers open c. Turn on Breaker BL-54. The DC OK LED on the PSU should light. d. Insert the fuses for sensor heat by closing the fuse blocks. The DC OK LED on the PSU should stay on. e. At the wind sensor junction box, measure DC voltage from terminal 11 (+) to 10 (-). Voltage should be approximately 24 V DC. f. At the wind sensor junction box, measure DC voltage from terminal 13 (+) to 12 (-). Voltage should be approximately 24 V DC. 6) Test anemometer signal a. At the wind sensor junction box, measure DC voltage from terminal 7(+) to 1(-). Voltage should be approximately 24 V DC. b. Using the local terminal connection, verify the correct wind speed is displayed. (If the wind is very low during this procedure, spin the anemometer by hand to verify that wind speed data is read by the controller). 7) Verify yaw position signal a. Using the local terminal connection, verify that the nacelle angle is correctly displayed. 8) Test vane signal a. At the wind sensor junction box, measure DC voltage from terminal 7(+) to 5(-). Voltage should be approximately 24 V DC. b. Using the local terminal connection, verify the correct wind direction is displayed. Use the nacelle angle and the reported wind direction to verify that the vane is read correctly by the controller. If possible, move the vane by hand to verify that the wind direction data is read by the controller. 9) Close out a. Replace the cover on the wind sensor junction box b. Route the two sensor cables to provide drip and service loops c. Replace the doors on the control cabinet, reconnect the door grounding straps d. Secure the control cabinet System startup 1) Verify Startup and Yaw a. After exiting the turbine, start the turbine as usual b. Verify that the turbine yaws in the correct direction into the wind c. Compare the turbine direction to the neighboring machines d. Verify that the turbine starts and reconnects to the grid without errors 2) Verify Anemometer scaling and Wind Speed in SCADA HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 10

Reference wiring diagrams Before retrofit HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 11

After retrofit HybridXT_Retrofit_Mitsubishi_AppNote Rev 4.0 16 January 2017 support@rnrgsystems.com 12