CHECK LIST FOR REGISTRATION FORM

Similar documents
ANNEXURE-I CHECK LIST FOR APPLICATION FORM

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR

London Hydro Connection Checklist

ODISHA ELECTRICITY REGULATORY COMMISSION PLOT NO.4, CHUNOKOLI, SAILASHREE VIHAR, BHUBANESWAR ********

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

Net +Plus Connection Code

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below:

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

Instruction/Guidelines regarding rooftop solar PV Grid interactive systems and Net metering.

To complete the process for a net metering interconnection, please follow the steps below:

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

Distributed Generation Interconnection Policy

Louisville Gas and Electric Company

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Definitions. Scope. Customer Generation Interconnection Requirements

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

Net Metering Interconnection Requirements. Customer Generation Capacity Not Exceeding 100 kw. Date: Version: 1

MEMBER RELATIONS POLICY NO SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES

GUIDELINES FOR OPERATING, METERING AND PROTECTIVE RELAYING FOR. NET METERED SYSTEMS UP TO 50 kw AND BELOW 750 VOLTS

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

Net Metering Program

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Net Metering Interconnection Requirements

REVISION NO.: 7 EFFECTIVE: 07/07/16

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

TERMS AND CONDITIONS

TILLAMOOK PEOPLE S UTILITY DISTRICT

RAJASTHAN ELECTRICITY REGULATORY COMMISSION

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Louisiana Net Metering Service. Customer Information Package

Noble County Rural Electric Membership Corporation

City Title. . Is System Owner interested in being contacted about energy efficiency opportunities at this site? Title. City. Site Contact.

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

White River Electric Association, Inc. Net Metering Information & Service Requirements

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

Technical Requirements for Renewable Energy Power System

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

BRPL SOLAR CITY INITIATIVE (SOLARIZE DWARKA)

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

Madhya Pradesh Policy for Net-Metered Renewable Energy Applications, 2016

Marina Bay Sands Guidelines for Electrical and Wiring Service

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Renewable Energy System - Electricity System Connection Application Form

Micro Embedded generation

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Application to Amend Net Metering Service under RS Appendix B. Revised RS 1289 Clean and Black-lined

MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

Enquiry Form for Micro and Small Generators 5MW and Less

Renewable sources of electricity a brief overview

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less)

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

NET METER REQUEST FORM

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

Record of Revision. Sr.No Revision. Technical Guidelines for Grid Tied Distributed Generation (Solar). i

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION

To complete the process for a net metering interconnection, please follow the steps below:

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy

Adopted: September 24, 2015 Version: Version 1.0

AS/NZS AS/NZS

Export limits for Embedded Generators up to 200 kva connected at Low Voltage

MISSOURI SERVICE AREA

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

In the MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015, the Eligible Consumer has been defined as under:

The following are the clarifications to the queries raised by various participants during the pre- bid meeting held on at CTC Complex.

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

GRID CONNECTION ISSUES FOR DISTRIBUTED GENERATION REVIEW & STANDARDS

REQUIREMENTS FOR GRID INTERCONNECTION OF RENEWABLE GENERATION SYSTEMS

S T A F F R E P O R T

To complete the process for a net metering interconnection, please follow the steps below:

Transcription:

NNEXUREII CHECK LIST FOR REGISTRTION FORM S. No. DOCUMENTS REQUIRED SUMITTED 1 Registration form signed by Registered consumer on each page with stamp 2 Detailed SLD of solar plant signed by Registered Consumer and Solar Plant Installer with stamp 3 Certificates of system such as IEC 61727, IEC 62116, etc. for Inverter, IEC 61215, IEC 61730, etc. for PV modules signed by Registered Consumer and Solar Plant Installer with stamp 4 Detailed list of components to be used in Renewable Energy System signed by Registered Consumer and Solar Plant Installer with stamp 5 Net Metering Connection greement on Rs.100/ non judicial stamp paper, duly attested by Notary public signed by Registered Consumer on each page with stamp 6 Solar Plant Installation Certificate signed by Registered Consumer and Solar Plant Installer with stamp, post installation of plant 7 MNRE certificate of Installer (for OnGrid system) Optional For any query call us on Solar Helpline No. 0113999 9707 (Ext. 9) or EMail us on netmetering.brpl@relianceada.com

pplication for Registration Of the Scheme for Renewable Energy System To, The Nodal officernet metering cell Renewables Department, 2 nd floor, Clock SES hawan, Nehru Place ehind DTC us Terminal New Delhi110019 SES Rajdhani Power Limited I intend to register for the scheme for Renewable Energy System, in compliance of Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) Regulations, 2014. 1 Name of Registered Consumer 2 ddress of Registered Consumer 3 C No Sanctioned load as per latest Electricity ill 4 Netmetering pplication No. NM I (Name of Consumer) undertake that ownership of the roof/land where solar PV system is installed is with me. I shall comply with the terms and condition of Model Connection greement.i agree to pay the Registration charges (details as provided below) as stipulated under Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) Regulations, 2014 once this application for registration is approved. lso, I agree to pay registration charges & all other applicable charges raised by the DISCOM through my electricity bill. Sr. No. Capacity (KWp) Charges(Rs) Please tick any one as per your plant capacity 1 1 to 10 1000/ 2 >10 to 50 3000/ 3 > 50 to 100 6000/ 4 >100 to 300 9000/ 5 >300 to 500 12000/ 6 >500 15000/ Supply voltage (230V, 415V, 11kV, 33kV, 66kV) 5 Mobile No. of Consumer: Mobile No. of Installer: 6 EMail ID of Consumer ( In Capital letters ) 7 EMail ID of Installer (in Capital letters) 8 Renewable Energy Source type (solar / wind / other) Capacity of Renewable Energy System 9 Name of solar plant Installer Proposed date of completion of the installation Enclosure: Documents as per Checklist of Registration form (annexure II) Place: Date: FOR OFFICE USE ONLY Signature of Registered Consumer with stamp Registration Number: Registration Date: For any query call us on Solar Helpline No. 0113999 9707 (Ext. 9) or EMail us on netmetering.brpl@relianceada.com

L1 L2 L3 N C OUTPUT 3ɸ WITH SPD & FUSES LIGHTNING RRESTOR FOR SOLR SYSTEM SINGLE LINE DIGRM FOR ROOF TOP SOLR SYSTEM75KW INSTLLER'S DETILS: CLIENT NME & DDRESS: DC SOLR CLES OX J INTERNET CLE WITH 3ɸ SPD &4P63MC OX C D C DC GRID TIED SOLR INVERTER SMSTP25000TL (25 KW C OUTPUT) G.I.MOUNTING STRUCTURE RRY1 L1 L2 L3 N C OUTPUT 3ɸ WITH SPD & FUSES LIGHTNING RRESTOR FOR SOLR SYSTEM DC SOLR CLES OX INTERNET CLE C DC GRID TIED SOLR INVERTER SMSTP25000TL (25 KW C OUTPUT) G.I.MOUNTING STRUCTURE RRY2 E L1 L2 L3 N C OUTPUT 3ɸ WITH SPD &FUSES LIGHTNING RRESTOR FOR SOLR SYSTEM DC SOLR CLES OX INTERNET CLE C DC G.I.MOUNTING STRUCTURE GRID TIED SOLR INVERTER SMSTP25000TL (25 KW C OUTPUT) RRY3 SOLR METER SES USR 200 EXISTING L.T.PNEL NET METER SES CONNECTED TO SES GRID 100 PNELSVIKR SOLR ELDORGRND300Wp 100 PNELSVIKR SOLR ELDORGRND300Wp 100 PNELSVIKRM SOLR ELDORGRND300Wp WITH 3ɸ SPD & 4P63 MC WITH 3ɸ SPD & 4P63 MC J J C D C D CLE SIZE 4*35 SQMM (L) CLE SIZE 4*35 SQMM (L) CLE SIZE 4*35 SQMM (L) CLE SIZE 4*70 SQMM (L) OX OX STRING 1 STRING 2 STRING 3 STRING 4 STRING 5 STRING 6 STRING 1 STRING 2 STRING 3 STRING 4 STRING 5 STRING 2 STRING 6 STRING 1 STRING 3 STRING 5 STRING 4 STRING 6 TOTL CPCITY OF MODULES : 90 KWp TOTL CPCITY OF INVERTERS : 75 KW SMPLE

Detail list of components to be used in Renewable Energy System C No:, Sanction Load KW, Contact no of Consumer: ddress: Company name of installer: Contact no of inataller: Details of Solar Capacity: Existing : KW, Proposed : KW, Total: KW Sr no Name of equipment Make Model no Serial no Capacity Quantity Standards / Certification ttachments 1 Solar Inverter 2 Solar PV modules 3 Structure 4 Solar cable 5 C cables 6 Switches/ Circuit reakers/ Connectors 7 Earthing 8 Connector & Conduits 9 Junction oxes/ Enclosures for Charge Controllers/ Luminaries I/We (Name of Consumer) shall comply with the terms and condition of Model Connection greement. I/We also undertake to comply with any subsequent amemdment to these standards of Technical Compliance as notified by competent authority and any other technial standards relevant for compliance in respect to solar plant to be connected to RPL distribution system. Signature of Installer with stamp Signature of Registered consumer with stamp

(On Rs.100/ non judicial stamp paper, duly attested by Notary public) Net Metering Model Connection greement For Renewable Energy This greement is made and entered into at New Delhi on date between the Registered consumer name C no & applied solar capacity ( in KW) residing at as first party and SES Rajdhani Power Ltd. (herein after called as Discom) and having its registered office at SES hawan, Nehru place, New Delhi, 110019 as second party of the agreement. 1. Eligibility 1.1 Eligible consumer is required to be aware, in advance, of the standards and conditions his system has to meet for being integrated into grid/distribution system. 1.2 Eligible consumer agrees that connection of Photovoltaic system to Discom s distribution system shall be bound by requirements of state Distribution Code and/or Discom s conditions of service and Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) Regulations, 2014. The grid shall continue to perform with specified reliability, security and quality as per the Central Electricity uthority (Grid Standard) Regulations 2010 as amended from time to time. 2. Technical and Interconnection Requirements 2.1 Eligible consumer agrees that he has installed or will install, prior to connection of Photovoltaic system to Discom s distribution system, an isolation device (both automatic and inbuilt within inverter and external manual relays) and agrees for the Discom to have access to and operation of this, if required, for repair and maintenance of the distribution system. 2.2 Eligible consumer agrees that in case of a power outage on Discom s system, photovoltaic system will shut down, unless special transfer and isolating capabilities have been installed on photovoltaic system. 2.3 Technical specification of net meter and renewable energy meter should be in compliance to Discom. 2.4 ll the equipment connected to distribution system must be complaint with relevant International (IEEE/IEC) or Indian standards (IS) and installations of electrical equipment must comply with Indian Electricity Rules, 1956 and Central Electricity uthority (Technical Standards for Connectivity of the Distributed Generation. Page 1 of 5

2.5 Eligible consumer agrees that Discom will specify the interface/interconnection point and metering point. 2.6 Eligible consumer agrees to adhere to following power quality measures as per International or Indian standards and/or other such measures provided by Commission / Discom.. Harmonic current: Harmonic current injections from a generating station shall not exceed the limits specified in.. Synchronization: Photovoltaic system must be equipped with a grid frequency synchronization device. Every time the generating station is synchronized to the electricity system, it shall not cause voltage fluctuation greater than / 5% at point of connection. C. Voltage: The voltageoperating window should minimise nuisance tripping and should be under operating range of 80% to 110% of the nominal connected voltage. eyond a clearing time of 2 seconds, the Photovoltaic system must isolate itself from the grid. D. Flicker: Operation of Photovoltaic system shouldn t cause voltage flicker in excess of the limits stated in the relevant sections of IEC 61000 standards or other equivalent Indian standards, if any. E. Frequency: When the Distribution system frequency deviates outside the specified conditions (50.5 Hz on upper side and 47.5 Hz on lower side), the Photovoltaic system must isolate itself from the grid beyond a clearing time of 0.2 seconds. F. DC Injection: Photovoltaic system should not inject DC power more than 0.5% of full rated output at the interconnection point or 1% of rated inverter output current into distribution system under any operating conditions. G. Power Factor: While the output of the inverter is greater than 50%, a lagging power factor of greater than 0.9 should operate. H. Islanding and Disconnection: The Photovoltaic system in the event of voltage or frequency variations must island/disconnect itself within the stipulated Period as per applicable IEC standards / Central Electricity uthority (Technical Standards for Connectivity of the Distributed Generation. I. Reconnection: The photovoltaic (PV) system shall be equipped with a voltage and frequency sensing and timedelay function to prevent the PV system from energising a deenergised circuit and to prevent the PV system from reconnecting with electricity system unless voltage and frequency is within the prescribed limits and are stable for at least sixty seconds. J. Overload and Overheat: The inverter should have the facility to automatically switch off in case of overload or overheating and should restart when normal conditions are restored. K. Paralleling device: Paralleling device of Photovoltaic system shall be capable of withstanding 220% of the nominal voltage at the interconnection point. Page 2 of 5

2.7 s per Central Electricity uthority (Technical Standards for Connectivity of the Distributed Generation, measurement of Harmonic current injection, Direct Current injection and flicker shall be done with calibrated meters before the Commissioning of the project and once in a year in presence of the parties concerned. 2.8 Eligible consumer agrees to furnish all the data such as voltage, frequency, and breaker, isolator position in his system, as and when required by the Discom. He shall also provide facilities for online transfer of the real time operational data. 3. Safety 3.1 Eligible consumer shall comply with the Central Electricity uthority (Measures Relating to Safety and Electricity Supply) Regulations 2010. 3.2 Eligible consumer agrees that the design, installation, maintenance and operation of the photovoltaic system are performed in a manner conducive to the safety of the photovoltaic system as well as the Discom s distribution system. 3.3 Due to Discom s obligation to maintain a safe and reliable distribution system, eligible consumer agrees that if it is determined by Discom that eligible consumer s photovoltaic system either causes damage to and/or produces adverse effects affecting other distribution systems consumers or Discom s assets, eligible consumer will have to disconnect photovoltaic system immediately from the distribution system upon direction from the Discom and correct the problem at his own expense prior to a reconnection. 4. Clearances and pprovals 4.1 The eligible consumer agrees to attain all the necessary approvals and clearances (environmental and grid connected related) before connecting the photovoltaic system to the distribution system. 5. ccess and Disconnection 5.1Discom shall have access to metering equipment and disconnecting means of photovoltaic system, both automatic and manual, at all times. 5.2 In emergency or outage situation, where there is no access to a disconnecting means, both automatic and manual, such as a switch or breaker, Discom may disconnect service to the premise. 6. Liabilities 6.1 Eligible consumer and Discom will indemnify each other for damages or adverse effects from either party s negligence or intentional misconduct in the connection and operation of photovoltaic system or Discom s distribution system. 6.2 Discom and eligible consumer will not be liable to each other for any loss of profits or Page 3 of 5

revenues, business interruption losses, loss of contract or loss of goodwill, or for indirect, consequential, incidental or special damages, including, but not limited to, punitive or exemplary damages, whether any of the said liability, loss or damages arise in contract, or otherwise. 6.3 Discom shall not be liable for delivery or realization by eligible consumer for any fiscal or other incentive provided by the central government. 7. Commercial Settlement 7.1 ll the commercial settlement under this agreement shall follow the Net metering regulations of Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) Regulations, 2014. 8. Conditions For System Connectivity 8.1 The parties shall abide by the Central Electricity Regulatory Commission Regulations in respect of procedure of grant of Connectivity. The consumer shall submit the following documents to discom for the grant of connectivity: Synchronization Circuit Details Safety Report Protection Circuit Details Test Certificates of System Schematic diagram of Renewable Energy system 9. Connection Costs 9.1 The eligible consumer shall bear all costs related to setting up of photovoltaic system including metering and interconnection costs as per estimate by RPL. The eligible consumer agrees to pay the actual cost of modifications and upgrades to the distribution facilities required to connect photovoltaic system in case it is required. 9.2 Cost for interconnection equipment including the isolators, meters etc. are also to be borne by the eligible consumer. 10. Termination 10.1 The eligible consumer can terminate agreement at any time by providing Discom with 90 days prior notice. 10.2 Discom has the right to terminate greement on 30 days prior written notice, If eligible consumer breaches a term of this greement and does not remedy the breach within 30 days of receiving written notice from Discom of the breach. Page 4 of 5

10.3 Eligible consumer agrees that upon termination of this greement, he must disconnect the photovoltaic system from Discom s distribution system in a timely manner and to Discom s satisfaction. In the witness, where of Mr. for and on behalf of (Registered consumer) and Mr for and on behalf of SES Rajdhani Power Limited agree to this agreement. Date : Name & Signature of Registered Consumer Signature of Head Net Metering SES Rajdhani Power Limited Page 5 of 5

ll Pages to be Printed on Letter Head of Installer and signed by installer with stamp & consumer with stamp (if applicable) Solar Plant Installation Certificate Registered Consumer Name ddress RPL C Number RPL Sanction Load RPL Supply Voltage Consumer Mobile No Consumer Email ID Installer Email ID Total Cost of solar plant Installation (Rs.) Net Metering pplication No Solar Capacity Solar Plant Connecting Voltage Solar Plant Installation Date Warranty Period Installer Mobile No Financial model (CPEX/ RESCO) The system has been installed with equivalent standards which correspond to the required technical & interconnectivity specifications as per nnexure III (important clauses related to the technical & interconnection requirements) of Guidelines under DERC (Net Metering for Renewable Energy) Regulations, 2014 as under: Parameter Reference Requirement Installer Remarks Overall conditions of Service Overall Grid Standards Equipment Meters Safety and Supply Harmonic Current Synchronization State Distribution/Supply Code Central Electricity uthority (Grid Standard) Regulations 2010 IS / IEC / IEEE Central Electricity authority (Installation & operation of meters) Regulation 2006 Central Electricity uthority (Measures of Safety & Electricity Supply) Regulations, 2010 Reference to State Distribution Code Reference to regulations Reference to standards Reference to regulations and additional conditions issued by the Commission. Reference to regulations Harmonic current injections from a generating station shall not exceed the limits specified in Renewable Energy System must be equipped with a grid frequency Synchronization device. Every time the generating station is synchronized to the electricity system. It shall not cause voltage fluctuation greater than / 5% at point of connection. Page 1 of 2

Voltage Flicker Frequency DC Injection Power Factor Islanding and Disconnection Overload and Overheat Paralleling Device for Connectivity of the Distributed Generation Resources) Regulations for Connectivity of the Distributed Generation Resources) Regulations The voltageoperating window should minimize nuisance tripping and should be under operating range of 80% to 110% of the nominal connected voltage. eyond a clearing time of 2 second, the Renewable Energy system must isolate itself from the grid. Operation of Renewable Energy System should not cause voltage flicker in excess of the limits stated in IEC 61000 standards or other Equivalent Indian standards, if any. When the Distribution system frequency deviates outside the specified conditions (50.5 Hz on upper side and 47.5 Hz on lower side), There should be over and under frequency trip functions with a clearing time of 0.2 seconds. Renewable Energy System should not inject DC power more than 0.5% of full rated output at the interconnection point or 1% of rated inverter output current into distribution system under any operating conditions. While the output of the inverter is greater than 50%, a lagging power factor of > 0.9 operates. The Renewable Energy System in the event of fault, voltage or frequency variations must island/disconnect itself within IEC standard on stipulated period. Inverter has the facility to automatically switch off in case of overload or overheating and restarts when normal conditions are restored. Paralleling device of Renewable Energy System is capable of withstanding 220% of the normal voltage at interconnection point. The system has been installed and tested for grid stability, grid protection and specified environmental influences and is found to have equivalent standards which correspond to the required technical & interconnectivity specifications as per nnexure III (important clauses related to the technical & interconnection requirements) of Guidelines under DERC (Net Metering for Renewable Energy) Regulations, 2014 as under: Solar Installer Name, Signature with stamp Consumer Name, Signature with stamp (if applicable) Page 2 of 2