INSTRUCTION, GPTLR POWER DOWN HAND PUMP KIT

Similar documents
INSTRUCTION, GPT HAND PUMP KIT INSTALLATION GPT KIT P/N

INSTRUCTION, GPT HAND PUMP KIT (BUCHER PUMP) INSTALLATION

INSTRUCTION, CURRENT GPT HOSE RETROFIT KIT

INSTRUCTION, GPT HOSE RETROFIT KIT

INSTRUCTIONS, C2 TORSION SPRING REPLACEMENT

INSTRUCTION, LVTS KIT, GPTLR KIT P/N

INSTRUCTIONS, SLEEVED CABLE KITS BMRA (INCLUDES BMRA-CS) KIT P/N

INSTRUCTION, TRAIL CHARGER KIT P/N

INSTRUCTIONS, FLASHING LIGHT INSTALLATION KIT

INSTRUCTION, BMR AUXILIARY CONTROL

INSTRUCTIONS (DROP PIN KIT FOR REPLACEMENT CABLE)

INSTRUCTION, BMR STREET-SIDE CONTROL

INSTRUCTION, DODGE TRUCKS INSTALLATION KIT (C2 LIFTGATES)

INSTRUCTIONS, (FORD) SUPER DUTY INSTALLATION KIT (C2 PICKUP LIFTGATES)

INSTRUCTION, TE-33 DUAL STEP KIT

INSTRUCTIONS, RAM DUAL REAR WHEEL TRUCKS INSTALLATION KIT (C2 LIFTGATES)

INSTRUCTIONS, NISSAN TITAN TRUCK INSTALLATION KIT (C2 PICKUP LIFTGATES)

INSTRUCTIONS, (FORD) SUPER DUTY INSTALLATION KIT (C2 PICKUP LIFTGATES)

INSTRUCTION, HALDEX PUMP LVS KIT P/N

M REV. D APRIL 2008 INSTALLATION MANUAL GPTLR-25, GPTLR-33, GPTLR-44, & GPTLR-55

INSTRUCTIONS, ME2 BACKUP BAR KIT

INSTRUCTION, GPT LOW VOLTAGE THERMAL SWITCH (LVTS) INSTALLATION KIT P/N

M REV. A APRIL 2008 INSTALLATION MANUAL

M REV B SEPTEMBER 2017

M SEPTEMBER 2017

M REV. D APRIL 2008 MAINTENANCE MANUAL GPTLR-25, GPTLR-33, GPTLR-44, & GPTLR-55

M REV. J JUNE 2014 MAINTENANCE MANUAL GPTLR-25, GPTLR-33, GPTLR-44, & GPTLR-55

M REV. F AUGUST 2014 INSTALLATION MANUAL

INSTRUCTION PLASTIC BATTERY BOX & CHARGER KIT

INSTALLATION MANUAL TE-33, TE-33L & TEWR-33 M REV. K DECEMBER 2016

M JUNE 2008 MAINTENANCE MANUAL GPT-25, GPT-3, GPT-4 & GPT-5

INSTRUCTIONS, RA ROLLER REPLACEMENT

M JULY 2017 GPTLR Liftgate www. maxonlift.com PRODUCTS, TUK-A-WAY GPTLR Maintenance Manual PRODUCT DOCUMENTATION PARTS PORTAL TUK-A-WAY GPTLR

PRODUCT DOCUMENTATION PARTS PORTAL RAILIFT & DMD MAXON

M REV. E JUNE 2009 OPERATION MANUAL GPTLR-25, GPTLR-33, GPTLR-44 & GPTLR-55

INSTALLATION MANUAL DMD-22 & DMD-33

M REV. L AUGUST 2012

M REV. M SEPTEMBER 2013

M REV. B FEBRUARY 2016

M OCTOBER 2017 MAXON

TE-20 & INSTALLATION MANUAL M REV. F SEPTEMBER 2015

INSTALLATION MANUAL RA-35 & RA-45 M REV. D SEPTEMBER 2017

M REV. B APRIL 2008 MAINTENANCE MANUAL GPT-25, GPT-3, GPT-4 & GPT-5

M OCTOBER 2016

M REV. B AUGUST 2010 INSTALLATION MANUAL GPTWR-3

M REV. J APRIL 2012 OPERATION MANUAL GPTLR-25, GPTLR-33, GPTLR-44 & GPTLR-55

M REV. C AUGUST 2017

RCM-1250 C RCM-1250 C AB RCM-1600 RCM-1600 C AB

M REV. C MARCH 2011 OPERATION MANUAL GPSLR-33 & GPSLR-44

M REV. A AUGUST 2008 OPERATION & MAINTENANCE MANUAL

OPERATION MANUAL RA-35 & RA-45

INSTALLATION MANUAL M REV. G AUGUST 2016

M REV. C AUGUST 2008

M REV. D JANUARY 2003

M REV. A FEBURARY 2005 MAINTENANCE MANUAL GPTLR-25 & GPTLR-33

Form No , 9 5, 6. Parts List for: X1A1 AIR DRIVEN WITH REMOTE CONTROL HYDRAULIC PUMP. Max. Capacity: 10,000 PSI

OPERATION MANUAL. Me2-Series C LB CAPACITY C LB CAPACITY C LB CAPACITY

M REV. E APRIL 2011 MAINTENANCE MANUAL 2011 MAXON LIFT CORP.

M REV. A DECEMBER 2016

INSTALLATION AND PARTS MANUAL

INSTALLATION INSTRUCTIONS

MAINTENANCE MANUAL RCM-1250C RCM-1250C AB RCM-1600C RCM-1600C AB Slauson Avenue Santa Fe Springs, CA (800)

M REV. B JANUARY 2013 OPERATION & MAINTENANCE MANUAL

M REV. H OCTOBER 2005

LI-ION BATTERY UPFIT KIT

M REV. G JANUARY 2003

M AUGUST 2018 MAXON

2017 MAXON LIFT CORP. M REV B NOVEMBER 2017

Parts Manual HLF 2500, 3000, 4000 & 5000 lb. Capacity Flipaway Liftgates

M APRIL 2012 INSTALLATION MANUAL DMD-22 & DMD-33

CHEMICAL MIXING SYSTEM OPERATING AND INSTALLATION INSTRUCTIONS

Installation Instructions

Parts Manual EM and EMTC 2500 lb. and 3300 lb. Capacity Flipaway Liftgates

Boxer 700HDX Parts Manual

M REV. J JULY 2008 MAINTENANCE MANUAL RC-2B RC-3B RC-4B RC-5B RC-6B RC-6K

C-10 Rear 4Link

1 set. Bulkhead Fitting, flat seal, washer & lock nut. 1 ea. Grommet Adapter. 1 ea. ½ male quick connect. 5 ea. Wire clamps.

Patriot Jack Systems OEM INSTALLATION MANUAL

M REV. D APRIL 2010 BMR-44 PARTS MANUAL

Scion xa & xb Rear Kit Part No Please read these instructions completely before proceeding with installation

P/N Instr Rev Page 1 of 11

INSTALLATION INSTRUCTIONS

M-5230-V6 Mustang V6 Dual Exhaust Kit INSTRUCTION SHEET

REARVIEW MIRROR AND BACKUP CAMERA KIT

INSTALLATION INSTRUCTIONS

Hydrostatic Zero-Turn Commercial Riding Mower

M REV. K SEPTEMBER Parts Manual Contains: Warranty Information Warnings Parts Ordering Information Exploded View Parts Breakdowns

HYDRAULIC LANDING GEAR REPLACEMENT

Fits AGCO, Challenger, & Massey Ferguson Tractor Models:

TDR-44, 55, 66 OWNERS MANUAL/PARTS LIST

LEFT HAND SIDE BROOM OPTION

INSTALLATION OF FRONT MOUNTING KIT 2008 FORD F-250/350 4X4

M REV. M SEPTEMBER 2013

Form No Parts List for: RWP55 RWP55-4 MODEL C HYDRAULIC PUMP AIR DRIVEN WITH REMOTE CONTROL GENERAL ASS'Y SIDE VIEW SECTION A-A

Installation Instructions Rotation Control Kit

Installation Instructions

Part # Lincoln Level 2 Air Suspension Package

M REV. D AUGUST 2010 OPERATION MANUAL GPT-25, GPT-3, GPT-4, GPT-5, & GPTWR-3

INSTALLATION INSTRUCTIONS

AIR INTAKE EMERGENCY SHUT-OFF VALVE PH2 C50204 AIR INTAKE SHUT-OFF VALVE DODGE 6.7L CUMMINS.

Transcription:

LIFT CORPORATION Sht. 1 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 INSTRUCTION, GPTLR POWER DOWN HAND PUMP KIT GPTLR KIT P/N 283332-01 HAND PUMP MOUNT BRACKET P/N 282381-01 QTY. 1 HAND PUMP HANDLE MOUNT BRACKET P/N 282329-01 QTY. 2 HAND PUMP, SAE #4 PORTS P/N 266588-01 QTY. 1 HOSE ASSEMBLY, 3/8, LP, 26 LG P/N 251855-03 QTY. 1 HOSE ASSEMBLY (15-3/4 LG), 3/8 MP, SAE #6 P/N 282389-01 QTY. 2 LOCK VALVE, WITH OVERRIDE P/N 283333-03 QTY. 1 HOSE CLAMP, SCREW P/N 251854 QTY. 2 SPRING CLIP HOLDER P/N 227681 QTY. 2 HAND PUMP HANDLE P/N 251407-02 QTY. 1

LIFT CORPORATION Sht. 2 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 ELBOW, SAE #6 9/16-18 O-RING MALE TO 11/16-16 FS MALE P/N 906707-01 QTY. 1 ELBOW, 90 DEGREE 1/4M-3/8 P/N 251853 QTY. 1 ELBOW, STRAIGHT THREAD P/N 906818-01 QTY. 1 ADAPTER 1/4 O-RING P/N 906756-01 QTY. 1 FITTING, SAE #6 STRAIGHT O-RING P/N 906751-01 QTY. 1 FITTING, #6 906817-01 QTY. 1 NEEDLE VALVE, ADJUSTABLE, SAE #6 P/N 906739-01 QTY. 1 BRANCH TEE, SAE #6, O-RING P/N 906754-01 QTY. 1 LOCK NUT, 5/16-18 P/N 901001 QTY. 2 HEX NUT, THIN HEAD 1/4-20 P/N 901016-2 QTY. 2 CAP SCREW, 5/16-18 X 3/4 LG, GR8 P/N 900009-3 QTY. 2 SOCKET SCREW, 1/4-20 X 1-3/4 LG, GR8 P/N 900025-7 QTY. 2

LIFT CORPORATION Sht. 3 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 FLAT WASHER,1/4 P/N 902000-2 QTY. 2 RIVET 3/16 DIA. X.565 DOME P/N 904002-2 QTY. 4 RIVET 5/16 DIA. X.415 DOME P/N 904004-2 QTY. 2 PLASTIC TIE, 7 LG (50 LB) P/N 205780 QTY. 2

LIFT CORPORATION Sht. 4 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 GPTLR POWER DOWN HAND PUMP HYDRAULIC SCHEMATIC FIG. 4-1

LIFT CORPORATION Sht. 5 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 1. Lower the platform to a comfortable work height (FIG. 5-1). Then, use jack under the ICC bumper to support the platform (FIG. 5-1). Refer to Operation Manual for detailed operating instructions. ICC BUMPER JACK SUPPORTING PLATFORM WITH JACK FIG. 5-1! WARNING To prevent personal injury and equipment damage, make sure power is disconnected from Liftgate while installing hydraulic electrical parts. NEGATIVE (-) BATTERY CABLE NUT NEGATIVE (-) BATTERY TERMINAL 2. Disconnect power from Liftgate by disconnecting negative (-) battery cable from negative (-) battery terminal (FIG. 5-2). DISCONNECTING POWER FIG. 5-2

LIFT CORPORATION Sht. 6 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 3. Unfasten and remove pump cover (FIG. 6-1). POWER UNIT (REF) PUMP COVER HOLDER FLATS FLAT WASHERS KNOB UNFASTENING PUMP COVER FIG. 6-1

LIFT CORPORATION Sht. 7 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 4. Measure and mark holes, on pump mounting plate, for hand pump bracket and for the spring clip brackets (FIG. 7-1). 5. Use 11/32 bit to drill 2 holes for the hand pump bracket (FIG. 7-1) and #10 bit to drill 4 holes for the for the spring clip brackets (FIG. 7-1). HOLE PATTERNS FOR MOUNTING BRACKETS & SPRING CLIP BRACKETS FIG. 7-1

LIFT CORPORATION Sht. 8 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 6. Bolt hand pump bracket (Kit item) to mounting plate. Then, bolt hand pump (Kit item) to bracket (FIG. 8-1). MOUNTING PLATE 5/16-18 LOCK NUT 1/4-20 SOCKET SCREW HAND PUMP 5/16-18 CAP SCREW 1/4-20 HEX NUT BOLTING ON HAND PUMP BRACKET & HAND PUMP FIG. 8-1 7. Rivet each handle mount bracket in the holes on the mounting plate (FIG. 8-2). 8. Rivet the spring clips to the handle mount brackets (FIG. 8-2). 3/16 DIA. RIVET (4 PLACES) HANDLE MOUNT BRACKET SPRING CLIP HOLDER 5/32 DIA. RIVET RIVETING HANDLE MOUNT BRACKETS & SPRING CLIPS FIG. 8-2

LIFT CORPORATION Sht. 9 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 CAUTION Keep dirt, water and other contaminants from entering the hydraulic system. Before opening the hydraulic fluid reservoir filler cap, drain plug and hydraulic lines, clean up contaminants that can get in the openings. Also, protect the openings from accidental contamination. 9. Place a 5-gallon bucket under the pump to catch fl uid. Disconnect pressure line from fi tting on pump mounting plate and from elbow on manifold (FIG. 9-1). Then, remove plug from hand pump port. HAND PUMP PORT PLUG FITTING ELBOW PRESSURE LINE DISCONNECTING LINE & REMOVING PLUG FIG. 9-1

LIFT CORPORATION Sht. 10 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 NOTE: Position the needle valve so the fl ow arrow points to the tee (Kit item). The hand pump will not work if the needle valve is reversed. 10. Connect the hand pump hydraulic lines, needle valve, and fi ttings (Kit items) (FIG. 10-1). First install elbows and adapters in correct position on hand pump and manifold. Next, connect tees, fi ttings and hoses hand-tight. Then, position and tighten all connections and hose clamps securely. ELBOW (REF) MANIFOLD (REF) ELBOW #6 (P/N 906707-01) MED. PRESSURE HOSE (15-3/4 LG.) FITTING #6 (P/N 906817-01) BRANCH TEE #6 (P/N 906754-01) HOSE CLAMP ELBOW STRAIGHT THREAD (P/N 906818-01) NEEDLE VALVE FITTING STRAIGHT (P/N 906751-01) ELBOW 90 DEGREE (P/N 251853) HAND PUMP HOSE CLAMP ADAPTER 1/4 (P/N 906756-01) LOW PRESSURE HOSE (26 LG.) CONNECTING HAND PUMP LINES & FITTINGS FIG. 10-1

LIFT CORPORATION Sht. 11 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 11. Remove original lock valve from RH lift cylinder and hose assembly (FIG. 11-1). CABLE ASSEMBLY RH CYLINDER STRAIGHT CONNECTOR ORIGINAL LOCK VALVE HOSE ASSEMBLY ADAPTER REMOVING LOCK VALVE FIG. 11-1

LIFT CORPORATION Sht. 12 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 12. Install lock valve with override (Kit item) on RH lift cylinder (FIG. 12-1). CABLE ASSEMBLY RH CYLINDER LOCK VALVE WITH OVERRIDE HOSE ASSEMBLY ADAPTER INSTALLING LOCK VALVE WITH OVERRIDE FIG. 12-1 NOTE: If 1/8 thick shim stock is available, it can be used to set 1/8 clearance between lock valve coil and cylinder. The shim must be removed after tightening the lock valve in position. 13. Position lock valve with 1/8 clearance from cylinder (FIG. 12-2). Tighten fi ttings and hose connections (FIG. 12-1). PLASTIC NUT COIL POSITIONING LOCK VALVE WITH CLEARANCE FIG. 12-2

LIFT CORPORATION Sht. 13 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 NOTE: Ensure pressure release valve is closed on the hand pump (turn clockwise) before raising platform. 14. Close needle valve by turning knob fully clockwise (FIG. 13-1). Then, close hand pump release valve, by turning valve clockwise with handle. NEEDLE VALVE RELEASE VALVE HAND PUMP HANDLE CLOSING NEEDLE VALVE & HAND PUMP RELEASE VALVE FIG. 13-1

LIFT CORPORATION Sht. 14 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 NOTE: Allow coil to hang from cable assembly until lock valve is reset (locked). 15. Remove plastic nut and slide coil from lock valve on RH lift cylinder (FIG. 14-1). COIL LOCK VALVE PLASTIC NUT REMOVING NUT & COIL FROM LOCK VALVE FIG. 14-1 16. Ensure valve is closed to locked (reset) position by turning lock valve shaft fully clockwise (FIG. 14-2). LOCK VALVE SHAFT ENSURING LOCK VALVE IS CLOSED FIG. 14-2

LIFT CORPORATION Sht. 15 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 17. Lower and remove fl oor jack (FIG. 15-1). JACK REMOVED FIG. 15-1 18. Override (open) lock valve by turning shaft fully counterclockwise (FIG. 15-2). SHAFT LOCK VALVE OVERRIDING LOCK VALVE FIG. 15-2

LIFT CORPORATION Sht. 16 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 19. Lower platform 1/2 the distance to ground (FIG. 16-1) by turning hand pump release valve counterclockwise with handle (FIG. 16-2). Turn release valve fully clockwise to stop platform from lowering (FIG. 16-2). PLATFORM LOWERING PLATFORM WITH HAND PUMP FIG. 16-1 HAND PUMP HANDLE OPENING/CLOSING RELEASE VALVE FIG. 16-2

LIFT CORPORATION Sht. 17 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 20. Reset (close) lock valve by turning valve fully clockwise, (FIG. 17-1) so that it locks. LOCK VALVE SHAFT RESETTING LOCK VALVE FIG. 17-1 21. Reinstall coil and plastic nut (FIG.17-2). LOCK VALVE COIL NUT REINSTALLING COIL & NUT ON LOCK VALVE FIG. 17-2

LIFT CORPORATION Sht. 18 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 22. Reconnect the negative (-) battery cable to the negative (-) battery terminal (FIG. 18-1). Tighten nut. NEGATIVE (-) BATTERY CABLE BATTERY (-) TERMINAL BATTERY (+) TERMINAL RED (+) FUSED CABLE NUT BLACK (-) CABLE CAUTION The hand pump is only intended for stowing CAUTION the platform if the power unit does not work. Do not use for repeated loading and unloading of vehicle. RECONNECTING POWER FIG. 18-1 23. Open the needle valve by turning knob fully counterclockwise (FIG. 18-2). NEEDLE VALVE OPENING NEEDLE VALVE FIG. 18-2

LIFT CORPORATION Sht. 19 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 24. Use the control switch to LOWER platform to the ground (FIG. 19-1). 25. Unfold platform and fl ipover (FIG. 19-2). LOWERING PLATFORM TO GROUND WITH CONTROL SWITCH FIG. 19-1 FLIPOVER PLATFORM UNFOLDING PLATFORM & FLIPOVER FIG. 19-2

LIFT CORPORATION Sht. 20 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 26. Use the control switch to RAISE platform to bed height (FIG. 20-1). RAISING PLATFORM TO BED HEIGHT WITH CONTROL SWITCH FIG. 20-1 27. Repeat step 24 and step 26 until all air has been bled from the system. 28. Refer to the GPTLR Maintenance Manual for instructions on checking hydraulic fl uid.

LIFT CORPORATION Sht. 21 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 29. Stow the pump handle in the spring clips on pump mounting plate (FIG. 21-1). MOUNTING PLATE POWER UNIT (REF) HANDLE CLIP PUMP COVER HOLDER FLATS FLAT WASHERS KNOB REINSTALLING PUMP COVER FIG. 21-1 30. Reinstall and fasten pump cover (FIG. 21-1). Hand-tighten knobs.

LIFT CORPORATION Sht. 22 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 GPTLR HAND PUMP OPERATION INSTRUCTIONS CAUTION The hand pump is only intended for stowing the platform if the power unit does not work. Do not use for repeated loading and unloading of vehicle. POWER UNIT (REF) 1. Unfasten and remove pump cover (FIG. 22-1). PUMP COVER HOLDER FLATS FLAT WASHERS KNOB REMOVING PUMP COVER FIG. 22-1

LIFT CORPORATION Sht. 23 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 CAUTION The manual override option is intended for emergency use only. Do not use for continuous operation. 2. To use hand pump for backup operation, close the needle valve by turning knob fully clockwise (FIG. 23-1). NEEDLE VALVE CLOSING NEEDLE VALVE FIG. 23-1

LIFT CORPORATION Sht. 24 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 NOTE: Allow coil to hang from cable assembly when using hand pump during emergency or backup operation. 3. Remove plastic nut and slide coil from lock valve on RH lift cylinder (FIG. 24-1). COIL LOCK VALVE PLASTIC NUT REMOVING NUT & COIL FROM LOCK VALVE FIG. 24-1 4. Override (open) lock valve by turning shaft fully counterclockwise (FIG. 24-2). SHAFT OVERRIDING LOCK VALVE FIG. 24-2

LIFT CORPORATION Sht. 25 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 5. Lower the platform by opening the hand pump release valve 1/2 turn counterclockwise with the handle (FIGS. 25-1 & 25-2). Close the release valve (FIG. 25-1) by turning fully clockwise to stop platform from lowering (FIG. 25-2). HANDLE RELEASE VALVE CLOSE OPEN OPENING RELEASE VALVE TO LOWER PLATFORM FIG. 25-1 LOWERING PLATFORM FIG. 25-2

LIFT CORPORATION Sht. 26 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 6. Use the handle with hand pump to raise the platform (FIGS. 26-1 & 26-2). HANDLE USING HAND PUMP TO RAISE PLATFORM FIG. 26-1 PLATFORM RAISING PLATFORM FIG. 26-2

LIFT CORPORATION Sht. 27 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 7. Reset (close) lock valve by turning valve fully clockwise, (FIG. 27-1) so that it locks. SHAFT RESETTING LOCK VALVE FIG. 27-1 8. Reinstall coil and plastic nut (FIG. 27-2). LOCK VALVE COIL NUT REINSTALLING COIL & NUT ON LOCK VALVE FIG. 27-2

LIFT CORPORATION Sht. 28 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 9. For normal Liftgate operation with power unit, open the needle valve by turning knob fully counterclockwise (FIG. 28-1). NEEDLE VALVE OPENING NEEDLE VALVE FOR NORMAL OPERATION FIG. 28-1

LIFT CORPORATION Sht. 29 of 29 DSG# M-09-18 Rev. ~ Date: 03/05/14 10. Stow hand pump handle in the spring clips on pump mounting plate (FIG. 29-1). MOUNTING PLATE POWER UNIT (REF) HANDLE CLIP PUMP COVER HOLDER FLATS FLAT WASHERS KNOB STOWING PUMP HANDLE & REINSTALLING PUMP COVER FIG. 29-1 11. Reinstall and fasten pump cover (FIG. 29-1). Hand-tighten knobs.