Main Aspects of Lebanon s Wind Power Purchase Agreements Overview of the 1 st Round and Perspectives on the Second

Similar documents
Introduction to Veja Mate Offshore Project

Guidelines for Solar Grid Power Projects

METRO CNG Program Phase I Update. Customer Service Committee April 2014

JEA Distributed Generation Policy Effective April 1, 2018

Workshop on International Good Practices of Sustainable Energy Technologies. Beirut Energy Forum 9-11 Sep 2015

Independence- Freedom- Happiness No.: 96/2012/TT-BTC

Tank Farm Additional Storage Site Layout

Overview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only

Economic and Social Council

Commissioning Director for Environment. Officer Contact Details Lisa Wright; Summary

PG&E California Solar Initiative (CSI) & Net Energy Metering (NEM) Interconnection Webinar. March 26, 2009

Introduction of the Digital Tachograph

New EU Regulation on General Safety. Implementation of Tyre Aspects

Solar-Wind Specific Request for Proposals

Cushman & Adams Substations MOU March 28, Cushman & Adams Substations April, 1937

Smart Grid Subcommittee Report

Oakey Solar Farm Community Consultation

Army Sustainability Workshop

RENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017

CRE Presentation on Emerging Technology Guidance

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

ELECTRIC VEHICLE, PLUG-IN HYBRID ELECTRIC VEHICLE, ELECTRIC VEHICLE SUPPLY EQUIPMENT, AND ELECTRIC BIKE GROUP DISCOUNT PROGRAM

Toronto Parking Authority Fleet Vehicle Replacement

Draft Guideline for the connection of smallscale inverter based distributed generation. EEA Asset Management Forum 22 June 2016 Dr Richard Strahan

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE

DG Enterprise and Industry. CARS 2020 Sherpa meeting. CARS 2020 Process: Implementation of the commitments

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

Reducing Noise Emissions. Commission legislative proposal

Reactive Power Compensation for Solar Power Plants. Andy Leon IEEE PES Chicago Chapter December 12 th, 2018

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update

1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

The EU funded EuroMed Transport Support Project

Interconnection Process Simplification Webinar

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

Recharge Kick-off Meeting Recharge Activity Review Process for

Transit Project Delivery Status Report. Significant Issues

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

THE ELECTRICAL POWER SECTOR IN THE REPUBLIC OF BULGARIA

MA SMART The EDC Perspective. Chris Porter - National Grid Brian Rice - Eversource

Preliminary market consultation session

Virginia Offshore Wind Port Readiness Study

Capacity Market Rules for Energy Storage Resources

K2 Wind Community Liaison Committee Meeting #2 Wednesday, May 28, 2014

Ministry of Transportation of Ontario's Off-Peak Deliveries Initiative and Noise By-law

ESIA Study for 1,050MW Coal Fired Power Plant, Lamu County, Kenya Need for the Project. 3 Need for the project... 2

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors

CALL FOR APPLICATIONS FOR THE SELECTION OF MEMBERS OF THE TACHOGRAPH FORUM

STAFF REPORT ACTION REQUIRED

ELECTRIC VEHICLE CHARGER FOR RAUMATI BEACH

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Land Transport Rule Traction Engines [2008]

REVISED REQUEST FOR QUOTATIONS FOR PRINTING SERVICES Food and Nutrition Technical Assistance Project III (FANTA)

GC108: EU Code: Emergency & Restoration: Black start testing requirement

2018 Product Training

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective

Article 2.- The benefits offered by this Agreement to the automotive industries are aimed at:

Experiences with policy instruments and IPP procurement processes for grid-connected RE in the ECOWAS region

2016 Product Training

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

Economic and Social Council

EXPRESSION OF INTEREST EOI NO. P&R Mobile Food Services Pilot Project

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

System Status Briefing

AGENDA ITEM 1 F Consent Item

REQUEST FOR PROPOSALS (RFP) FOR THE PURCHASE OF SOLAR ENERGY

NATIONAL GRID ELECTRICITY TRANSMISSION plc THE CONNECTION & USE OF SYSTEM CODE TABLE OF CONTENTS

ILLINOIS COMMERCE COMMISSION

NURZAT MYRSALIEVA. Distributed solar technologies: trends and scenarios in the Mediterranean Region

Yukon s Independent Power Production Policy

Providing Options: Program Design Focusing on Customer Choice

SECONDARY FUEL TESTING ARRANGEMENTS

Ayeyarwady Integrated River basin Management Project (AIRBM)

United Community Services Board of Directors Minutes 9.5 linear feet (9 SB, 1 MB) United Community Services of Metropolitan Detroit

CIVITAS FORUM September 29 th Gdynia (PL) CTM Spa Cagliari - Italy

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

TORONTO TRANSIT COMMISSION REPORT NO.

National Committee Kosovo. SEERC October 2017 Istanbul

CMP260: TNUoS Demand charges for 2016/17 during the implementation of P272 following approval of P322 and CMP247 Justification of Urgent Status

EarthSpark International 1616 H St. NW Suite 900 Washington, DC USA REQUEST FOR QUOTES REPAIRS TO THE LES ANGLAIS GRID. To Whom It May Concern:

The EU funded EuroMed Transport Support Project

GC108: EU Code: Emergency & Restoration: Black start testing requirement

Weight Allowance Reduction for Quad-Axle Trailers. CVSE Director Decision

Connecting your home or small business generation

Developing Toronto s Transit Network Plan to Public Information Meeting June 21, 2016

Broken Hill Solar Plant. Community Information Session 9 September 2015

City-wide LED Street Light Conversion Program

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, July 2001 Item 3 (b) of the provisional agenda

PAME Working Group. Emission reductions in shipping. Soffia Gudmundsdottir, PAME Executive Secretary

AIR POLLUTION AND ENERGY EFFICIENCY. Report of the Working Group on Air Pollution and Energy Efficiency. Part 2

Economic and Social Council

Utility Community Solar: Program Development & Implementation

Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd

Metal Bulletin Conference

Alert: Electromobility infrastructure

Ayeyarwady Integrated River Basin Management (AIRBM) Project. Procurement Plan

Understanding design patent practice through the Jaguar Land Rover case

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Transcription:

Main Aspects of Lebanon s Wind Power Purchase Agreements Overview of the 1 st Round and Perspectives on the Second By Rani Al Achkar, Director Engineering & Planning International Beirut Energy Forum 2018 IBEF2018 Day 2 Session 5B September 27, 2018 Le Royal Hotel, Dbayeh, Lebanon

Presentation Outline I. Timeline and Background on the 1 st Round II. Main Aspects of the 1 st Wind Power Purchase Agreement 2

I. Timeline and Background on the 1 st Round Source: UNDP - CEDRO (Modified)

Preparation Inter-Ministerial Committee (MEW, MoF, MoE, MoJ, PCM, EDL, LCEC) + International Consultant 2 + International Consultant 3 + RCREEE Negotiation (Technical and Financial) Call for Expressions of Interest (EOI) launched in September 2012 4 offers received in June 2013 Preliminary approval by the Council of Ministers in July 2017 Request for Proposals (RFP) issued in March 2013 3 Offers were qualified (All in Akkar area). Proposed capacities: 62.1 MW, 62.1 MW & 82.5 MW Final approval and licenses by the CoM in November 2017 (Decision 43) Ministerial Committee (MEW, EDL, LCEC) + International Consultant 1 Evaluation MEW / LCEC + International Consultant 3 + RCREEE

Negotiation (Legal and Fiancial) Signature of the Power Purchase Agreements (PPA) in February 2018 Deadline for Conditions Satisfaction August 2019 Final approval and licenses by the CoM in November 2017 (Decision 43) Interim Conditions Satisfaction Date July 2018 Deadline for Commercial Operation February 2021 MEW / LCEC + Legal Advisors + RCREEE

II. Main Aspects of the 1 st Wind Power Purchase Agreement 6

II.a Before Conditions Satisfaction Date Signature of the Power Purchase Agreements (PPA) in February 2018 Deadline for Conditions Satisfaction August 2019 Final approval and licenses by the CoM in November 2017 (Decision 43) Interim Conditions Satisfaction Date July 2018 Deadline for Commercial Operation February 2021

II.a Before Conditions Satisfaction Date Final independent energy yield assessment including wind measurements according to MEASNET standards for a minimum of six (6) months Final site layout and coordinates for each wind turbine generator Final and Complete Grid Capacity Study and Network Connection Study Network Connection Requirements by EDL 8

II.a Before Conditions Satisfaction Date Guaranteed Facility Power Curve of the selected wind turbine generators Implementation Schedule and Project Program Decommissioning plan Environmental and Social Impact Assessment (approved by MoE) Bird Migration Protocol 9

II.b Before Commercial Operation Date Signature of the Power Purchase Agreements (PPA) in February 2018 Deadline for Conditions Satisfaction August 2019 Final approval and licenses by the CoM in November 2017 (Decision 43) Interim Conditions Satisfaction Date July 2018 Deadline for Commercial Operation February 2021

II.b Before Commercial Operation Date Construction of the Facility and CLIENT s Assets Factory Acceptance Tests, Cold Commissioning Testing and Start-up and Operational Testing Reliability Test Run for each Wind Turbine Generator (normal operation for a cumulative period of 168 hours + exported power for at least 72 hours without Interruption) 11

II.b Before Commercial Operation Date Facility Reliability Test (Facility operates as a whole continuously for a period of 240 hours without Interruption of the Facility, in which time the Facility has exported power for an aggregate period of at least 120 hours and operated at 70% of its installed capacity for at least 5 hours.) Initial Charge Rate (ICR) = 0.5 x Charge Rate (CR) 12

II.c After Commercial Operation Date (commercial operation phase 20 years) Signature of the Power Purchase Agreements (PPA) in February 2018 Deadline for Conditions Satisfaction August 2019 Final approval and licenses by the CoM in November 2017 (Decision 43) Interim Conditions Satisfaction Date July 2018 Deadline for Commercial Operation February 2021

II.c After Commercial Operation Date Operation of the Facility Performance Test (within 9 months after COD, to verify the Guaranteed Power Curve for the Wind Turbine Generators, output above or equal to 95% of that of the Guaranteed Power Curve, at least 2 Wind Turbine Generators) Guaranteed Power Curve can be updated once at the end of the 1 st year, and once a the end of the 3 rd year Tolerance limit for underperformance is 8% in the 1 st year, 6% in the 2 nd and 3 rd years, 4% in the rest of the Term 14

II.c After Commercial Operation Date Damage Rate (DR, for underperformance) = 0.5 x CR Delay Costs = 78% x Total Electricity Deemed to be Delivered x CR - Initial Electricity Payment Excess Charge Rate = 0.5 x CR Deemed Delivered Electricity Payment = (PF x Total Electricity Deemed to be Delivered x CR) Delivered Electricity Payment PF = 0.9 in the 1 st 9 months, and for the rest of the Term PF = actual electricity output /guaranteed electricity output for the last 12 months Close Proximity (1.5 km upwind of the Facility and 0.5 km in other directions)

Final Thought The Alternative Energy Revolution 16

Source: https://xkcd.com/556/

Thank You! By Rani Al Achkar, Director Engineering & Planning #IBEF2018 @LCECTweets @alachkarani Lebanese Center for Energy Conservation Ministry of Energy and Water 1 st Floor, Room 303 Corniche du Fleuve, Beirut 2079 6707 - Lebanon Email: rani.alachkar@lcec.org.lb Tel/fax: +961 (0)1 565 108 +961 (0)1 569 102