RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

Similar documents
Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

White River Electric Association, Inc. Net Metering Information & Service Requirements

TERMS AND CONDITIONS

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

BC Hydro Rate Schedules Effective: August 1, 2015 Fourth Revision of Page 30

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Application to Amend Net Metering Service under RS Appendix B. Revised RS 1289 Clean and Black-lined

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

To complete the process for a net metering interconnection, please follow the steps below:

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

SCHEDULE NO. ACG33 NET METERING SERVICE

To complete the process for a net metering interconnection, please follow the steps below:

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

Net +Plus Connection Code

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Net Metering Program

JEA Distributed Generation Policy Effective April 1, 2018

Noble County Rural Electric Membership Corporation

Umatilla Electric Cooperative Net Metering Rules

Consumer Guidelines for Electric Power Generator Installation and Interconnection

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 3rd Revised CPUC Sheet No. 137 Canceling 2nd Revised CPUC Sheet No.

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

24. SOLAR INCENTIVE PROGRAM II

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

Definitions. Scope. Customer Generation Interconnection Requirements

Louisville Gas and Electric Company

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

To complete the process for a net metering interconnection, please follow the steps below:

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

S T A F F R E P O R T

Buy All Sell All Rider for Interconnection of Renewable Generation

Net Metering Service. Customer Information Package

MISSOURI SERVICE AREA

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

Adopted: September 24, 2015 Version: Version 1.0

RATE 765 RENEWABLE FEED-IN TARIFF

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

Distributed Generation Interconnection Policy

Douglas Electric Cooperative Roseburg, Oregon

Contents. Solar Select TM Frequently Asked Questions

Overview of S.L Competitive Energy Solutions for North Carolina

Senate Substitute for HOUSE BILL No. 2101

HydroGenerations PROGRAM HANDBOOK

MISSOURI SERVICE AREA

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Schedule SP SOLAR PURCHASE (Experimental)

London Hydro Connection Checklist

CITY OF SASKATOON ADMINISTRATIVE POLICY

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

Renewable Net Metering Program Appendix ESD APX 001 1

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

MEMBER RELATIONS POLICY NO SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

EAU CLAIRE ENERGY COOPERATIVE FALL CREEK, WI Issue Date: 05/28/2014 Subject: New Distributed Generation Post May 28, 2014

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

ELECTRIC DIVISION CUSTOMER-OWNED RENEWABLE GENERATION INFORMATION PACKAGE

TILLAMOOK PEOPLE S UTILITY DISTRICT

COMMERCIAL RATE SCHEDULES

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488

Electrical District No. 3 SOLAR Q & A

NET ENERGY METERING RIDER Rider NEM. Certain words, when used in this Rider NEM shall be understood to have the following meanings:

SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

INTERCONNECTION REQUIREMENTS POLICY

RIDER NM NET METERING

Louisiana Net Metering Service. Customer Information Package

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

ROANOKE ELECTRIC COOPERATIVE RATE SCHEDULES

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

NET METER REQUEST FORM

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Technical Requirements for Renewable Energy Power System

Net Metering Policy Framework. July 2015

Transcription:

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

Outline 1. Introduction 2. Legal Basis 3. Scope, Applicability & Qualification 4. Interconnection Set-Up 5. Pricing Methodology 6. Net-Metering Charge 7. Billing Charge 8. Net-Metering Interconnection Standards 9. Net-Metering Agreement template 2

Introduction Resolution No. 9, Series of 2013 - A Resolution Adopting the Rules Enabling the Net-Metering Program for Renewable Energy Components: Rules Enabling the Net-Metering Program (Annex A) Net-Metering Interconnection Standards (Annex A-1) Net-Metering Agreement Template (Annex A-2) Approved on May 27, 2013 Effectivity on July 24, 2013 3

Legal Basis Section 10 of R.A. 9513 and Section 7 of its IRR provides that the ERC, in consultation with NREB, shall establish the net-metering interconnection standards and pricing methodology. 4

Scope, Applicability & Qualification Applicable to on-grid systems. Only for installation of < 100kW. For eligible RE Technologies such as wind, solar, biomass or biogas or other RE systems capable of being installed in the QE s premises. End-user should be in good credit standing in the payment of electric bills to the DU. The RE System must be compliant with the standards set in the PEC, PDC, DSOAR and the Net- Metering Interconnection Standards.

Interconnection Set-Up Import Meter (delivered energy) REC Meter Export Meter (received energy) Either 2 uni-directional meters or one bidirectional meter. Third meter may also be installed to measure total RE generation. 6

Pricing Methodology Interim pricing for export energy is the DU s monthly charge based on its blended generation cost. This cost shall be automatically included in the DU s total generation cost to be recovered from all its customers. 7

Pricing Methodology P5.6580 Generation Transmission Distribution End-User P5.6580 P1.1839 SL: P0.4723 DSM: P1.9112 Subs: P0.1093 Tax: P0.9046 UC: P0.1188 + + = P11.1106/kWh 8

Net-Metering Charge Net-metering charge is equivalent to PhP/customer/month supply and metering rates; plus the ERC-approved PhP/kWh metering rate based on export energy. DUs may file for a different net-metering charge, if necessary.

Billing Charge Billing Charge: PhP for import energy Less: PhP export energy PhP credited in previous month TOTAL If positive: QE shall pay this amount to DU If negative: DU shall credit this amount to QE s next bill

Net-Metering Interconnection Standards Annex A-1 11

Interconnection Standards General Guidelines Application for Interconnection System Parameters System Protection Operations & Maintenance Metering Testing & Commissioning

General Guidelines Design, installation, operations and maintenance shall be in consultation with the DU, since all specifications shall be of DU s standards. System requirements shall be met at the Connection Point. The DU shall only allow interconnection of RE facilities with up to 100kW capacity per QE account. The DU shall conduct inspections and shall remove the generation from DU system at any time due to maintenance, test, repair and emergency conditions. QE to be liable for any damages of the DU should the QE execute changes to the RE facilities without first informing the DUs.

Application for Interconnection QE to send a letter requesting DU for interconnection. DU to provide information to QE. QE to complete and file an application. provide results of study. DU, with QE to conduct on-site inspection. DU to determine If yes: whether DIS DU shall Pro forma agreements Application and/or form Description DAS is of proposed connection Relevant necessary. Standard Planning Data Other data required by DU Completion QE date and DU Technical requirements to enter Specifications into a Net- Listing of certified Metering equipment Application fee Agreement. information Applicable rate schedules Metering requirements DU to acknowledge within 10 business days from receipt.

System Parameters Voltage Level - should be the same level as the DU with automatic method of disconnecting. Frequency 60 Hz with automatic method of disconnecting. Power Quality Limitation of DC injection not to inject current greater than 0.5% of the full load rated output current at connection point. Flicker severity not to exceed 1.0 unit for ST and 0.8 units for LT. Harmonics within limits in Sec. 3.2.4 of PDC Power Factor not less than 85% lagging measured at the Connection Point.

System Protection Synchronization QE to provide synchronizing devices with typical limits in the NM Standards. Islanding QE system should detect islanding and disconnect within 2 seconds from formation. Integration with DU s Distribution System Grounding shall be grounded in accordance to PEC. Protective Control Devices Disconnect device visible for use by the DU within 10 feet from connection point. Protective relays protective relays provided in NM Standards Reclosing immediate disconnection from the DU system when the system is down.

Operations & Maintenance Facility should operate in parallel with the DU. QE must inform the DU if it is going to synchronize. If the DU system is down, the facility should automatically disconnect. QE to provide DU with contact numbers. QE shall maintain the facility in a safe manner as approved by the DU.

Metering MSP shall own and shall be responsible for the operations and maintenance of the meter in accordance with Sec. 2.11 of DSOAR. QE to provide space for the metering facilities. Metering facilities shall be installed in an accessible and visible area for reading and testing of both QE and DU.

Testing and Commissioning Commissioning test shall be conducted after the interconnection system is installed. DU has the right to witness the testing and commissioning. RE facility shall be equipped with whatever equipment is required to perform the test. Commissioning Test shall include the following: Verification and inspections Production Test Response to abnormal voltage Response to abnormal frequency Synchronization Unintentional islanding functionality test Cease-to-energize functionality test

Net-Metering Agreement Annex A-2 20

Net-Metering Agreement Parties: DU and Qualified End-user Mirrors the provision in the Rules Enabling the Net- Metering Program (i.e. Compliance Standards, Interconnection Set-Up, DU Inspection, Meter Readings, Pricing and Other Charges). To be submitted to ERC, DOE & NREB within 5 days from execution. Deemed approved and effective upon submission to ERC.

ISSUES Annex A-2 22

ISSUES 1. DUs are not precluded under the Rules from paying our in cash its accumulated peso credit at the end of each calendar year. 2. That QE is an entity distinct from that of an SGF and IPP, thus: It is not covered by the imposition of the universal charge required of SGF. Shall apply for COC as QE. 3. Customer who intends to install beyond 100kW: Must comply with the PDC and DU Standards Must apply for COC as SGF Must enter into PSA with a DU for ERC s approval

THANK YOU www.erc.gov.ph 24