Blue Quick Seal Connection

Similar documents
22. TenarisHydril Blue Thermal Liner Connection

ER Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

3SB Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

Wedge TenarisHydril Running Manual.. Premium connection approved thread compounds TSH-MD

SEC Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

Wedge 533 / 503 / 553

MS & MS XT/XC Connections

2. The power tong snub line should be attached to a back up post, leveled and positioned at a 90 angle to the power tongs.

Blue Series and Legacy Series Make up Acceptance

Initial Running Guidelines

Handling / Lift Plugs

1. Use slip type elevators for flush, near flush, integral, special clearance and special bevel coupled connections.

JFETIGER RUNNING MANUAL. Downloaded From JFETC.COM Thu, 20 Sep :15: JFETIGER. * valid at time of download * JANUARY 2015

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: May 1, 2013

JFEBEAR RUNNING MANUAL

OCTG Mill RUNNING AND PULLING PROCEDURE FOR TPS-MULTISEAL (ALL TYPES & GRADES) QP 05-16E Revision No. 7 Page 1 of 11

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: January 6, 2017

RECOMMENDED PRACTICE TKC FJ-150

Running Procedure. Rev.:2 VAGT.

Running Procedure. VAsuperior. Rev.:2.

RECOMMENDED PRACTICE SEAL-LOCK FLUSH/SEMI FLUSH CONNECTIONS

RECOMMENDED PRACTICE SEAL-LOCK HT

Running Procedure. VAroughneck. voestalpine Tubulars GmbH & Co KG Rev.: 0

SEAL-LOCK APEX ANCILLARY

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.

Drill Pipe Connection Care and Handling

Running Procedure. VAxplorer. Rev.:1.

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

RECOMMENDED PRACTICE TKC-4040 V.I.T. and HO-I

TKC CONVERTIBLE: 8 RD / NUE / EUE / BUTTRESS 4040 / 4040 HO / 4040 HO-B FS-150 ANCILLARY SPECIFICATION

Wedge /8" TO 13 5/8"

Running Procedure for Casing with GB Drilling with Casing Connections

Fishing Bumper Sub. Manual D450

Blue 2 3/8" TO 13 5/8"

SEAL-LOCK HT ANCILLARY SPECIFICATION

Blue 2 3/8" TO 13 5/8"

SEAL-LOCK HT-S (TIMED) ANCILLARY SPECIFICATION

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

GOOD CONDITION GUIDE SHOGUN

Contents. RE PS Revision 5

Application Tooling Specification Sheet

BAMBI BUCKET (ALL MODELS) QUICK REPAIR GUIDE 2014 VERSION B

TenarisXP Buttress 4 1/2" TO 16"

GOOD CONDITION GUIDE. Suzuki Financial Services

CLAMPS. A Cascade clamp for every application.

Application Tooling Specification Sheet

Lubrication. Extend the life of Circuit breakers and Switches. Presented by Phillip Serna

JANUS OILFIELD TECHNOLOGY

Product Instructions. Mixing Station. Features. Specifications. Materials

Application Tooling Specification Sheet

FIELD INSPECTION OF JFETIGER THREAD. Downloaded From JFETC.COM Fri, 16 Nov :49: * valid at time of download * JFETIGER.

GOOD CONDITION GUIDE THE AIM OF THIS GUIDE FINANCIAL SERVICES

SAFE USE AND HANDLING OF HOSES AND FLEXIBLE CONNECTIONS IN THE SOLVENTS INDUSTRY

Application Tooling Specification Sheet

Application Tooling Specification Sheet

Application Tooling Specification Sheet

PAPER ROLL DAMAGE REDUCTION. Deliver a perfect roll every time

Analysis of Aquawrap for use in Repairing Pipelines with a Dent / Gouge Defect

How it s done Fitting instructions for replacing brakes

* APPLICATION MODELS VARY. WE RECOMMEND TO VERIFY FITMENT BEFORE BEGINNING INSTALLATION PROCESS.

Application Instructions. Application Instructions

OEM APPROVED AND USED

Table of Contents Visual Inspection and Neutralizing... 3 Disassembly

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

Product Engineering Bulletin

START HERE FRONT BUMPER REMOVAL. 1) Turn off engine and chalk tires with stop block. Open Hood. Disconnect Battery.

Application Tooling Specification Sheet

Сontents. RE PS Revision 5

Amsted Rail POCKET INSPECTION GUIDE. Freight Railcars

INSTRUCTION MANUAL IM-422 For HTC/COUPLING ASSEMBLY HC-8088

Installation Instructions

QUALITY CONTROL PROCEDURES

GB Connection Performance Properties Sheet Rev. 3 (10/07/2015) E N G I N E E R I N G T H E R I G H T C O N N E C T I O N S TM

LT Valve Technical Manual

SERVICE BULLETIN FLIGHT CONTROLS - INSTALL FLAP INSPECTION ACCESS PANELS ON CERTAIN AERO CENTER PRODUCTS

Hollister-Whitney Elevator Corporation

Statoil Multi Dope Yellow

CHAPTER 9 : TYPE II TEST ON SI ENGINES (VERIFYING CARBON MONOXIDE EMISSION AT IDLING)

CP2000 Ballast - Replacing Thyristor Instruction Sheet

DA Series Diaphragm Valve

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

COMPRESSORS REPLACEMENT PROCEDURE

BENNETT CNG DISPENSER MAINTENANCE SCHEDULE

Hub Installation and Bearing Adjustment. Hub Installation and Bearing Adjustment. Hub Preparation Prior to Installation

Belt Drive Preventive Maintenance Manual

(W) INSTALLATION INSTRUCTIONS 3 BULL BAR

Tapecoat. Application Guideline

Installation and operating instructions for Brake DT XXX FEM/FEA ST/NC. E e. Schaberweg Phone

15. Bearing Handling Storage Fitting A-97

G-SERIES PAPER ROLL CLAMP. Rugged. Reliable. Ready when you are.

Stuck Draft Gear Procedure Manual Derived from AAR Manual of Standards and Recommended Practices Book B-II, RP , Pages 57 98

Rotary feed-through DDF-S/-KS

0-500 PSI Soft Seat Fluid Pressure Regulator

Low Profile Service Jack

2014 Subaru of America, Inc. All rights reserved. SERVICE BULLETIN. Service Procedure to Address a Wind Rushing Sound from the Front Door Sash Area

Tiger Lifting Home of the Tiger hoisting range & Tiger subsea lifting products

Transcription:

IDM Code GDL00370/3 / March 2018 TenarisHydril Blue Quick Seal Connection Scope These guidelines apply specifically to the use of TenarisHydril Blue Quick Seal connections. This document should be used in conjunction with the TenarisHydril Running Manual, which is the main document applicable to the running of all TenarisHydril premium connections. References. TenarisHydril Running Manual.. Premium Connection Approved Thread Compounds TSH-MD-00.0002.. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG 13-005. Equipment, Material & Documents 1. Verify the appropriate thread compound is available. 2. Refer to document TSH-MD-00.0002 for a list of compounds approved by Tenaris. 3. Latest version of the specific Product Data Sheet can be obtained from Tenaris web site. In case this is unavailable, request the data sheet from the local Technical Sales representative or contact-tenarishydril@tenaris.com. TenarisHydril RUNNING MANUAL 1

TenarisHydril RUNNING MANUAL Pre-Running 1. Never move or handle pipe without the correct thread protectors securely in place. 2. Ensure connections are cleaned and free of all debris and / or contaminants. Cleaning methods employed should conform to the recommendations contained within the TenarisHydril Running Manual. 3. Verify all pipe and accessories have genuine TenarisHydril manufactured connections. 4. Visually inspect threads and seal areas prior to running, ensuring no damage is evident. 5. Check condition of pin and box Dopeless coating ensuring no peel off or degradation has occurred. 6. Verify the compatibility of the Blue Quick Seal connection with accessories such as cement heads, safety valves, cross overs, etc. 7. Connection weight interchange compatibility is indicated in the TenarisHydril premium connections catalogue. 8. Verify material grade of all accessories ensuring compatibility with main string. 2

IDM Code GDL00370/3 / March 2018 Inspection 1. Inspection criteria for all TenarisHydril connections is as outlined in the Field Service Operative Guideline FSOG 13-005. 2. Pay particular attention to seal areas. 3. Ensure the pin nose has no tears, gouges or raised metal. 4. Ensure the pin and box torque shoulders have no dents, tears or raised material which would interfere with correct assembly. TenarisHydril RUNNING MANUAL 3

TenarisHydril RUNNING MANUAL Blue Quick Seal Configuration 4

TenarisHydril RUNNING MANUAL IDM Code GDL00370/3 / March 2018 3 TPI Twin Start Thread Seal Torque Shoulder Dope Pocket 5

TenarisHydril RUNNING MANUAL Blue Quick Seal Dopeless 1. Minor rust or discolouring of the pin connection can be removed with the use of a clean, dry rag ensuring the Dopeless coating remains intact. 2. Minor rust or discolouring of the box connection can be removed with the use of a non abrasive plastic scouring pad and a clean, dry rag ensuring the Dopeless coating remains intact. 3. Dopeless connections do not require the application of thread compound for make up. 6

IDM Code GDL00370/3 / March 2018 If for whatever reason dope has to be applied to Blue Quick Seal Dopeless connections whether both pin and box are Dopeless or when mixing a doped connection with a Dopeless, apply thread compound as indicated below. Non Dopeless pin into Dopeless box. Apply a thin coating of thread compound on all pin threads, seal and pin nose.. Apply a thin coat of thread compound to box internal seal and torque shoulder.. Do not fill dope pocket with thread compound. Dopeless pin into standard box. Apply a very thin coating of thread compound on all pin threads only.. Do not dope pin seal or box connection. Dopeless pin into Dopeless box. Apply a very thin layer of thread compound on all pin threads only.. Do not dope pin seal or box connection. Dopeless Pin Standard Pin Standard Box Dopeless Box Dope Pin Threads Only Dope Pin Threads Only See page 8 Dope Pin Threads, Seal & Shoulder. Dope Box Seal. RUNNING MANUAL If applying thread compound to Dopeless connections use doped variant torque values. Contact Tenaris for torque values. TenarisHydril 7

TenarisHydril RUNNING MANUAL Thread Compound Application If two non Dopeless connections are to be assembled apply thread compound as indicated below. 1. Apply a thin coating of thread compound on the pin and box connections, fully covering all threads, seals, pin nose and box torque shoulder, the thread form should be fully visible. 2. Use approximately 50% of the quantity applied to the pin when doping the box. 3. Do not fill the dope pocket. 4. For Tenaris approved thread compounds, apply the friction factor indicated in TSH-MD-00.0002. For thread compounds other than those listed, apply the thread compound manufacturers indicated friction factor. 8

IDM Code GDL00370/3 / March 2018 Thread Lock Application For non Dopeless connections apply thread lock as indicated below. Connections must be clean and dry when applying thread lock. 1. Apply a thin coating of thread lock on 50% of the pin threads furthest from the pipe body. 2. Do not apply thread lock on the seal or torque shoulder. 3. Apply thread compound to the box seal and torque shoulder. TenarisHydril RUNNING MANUAL 4. Apply the thread lock manufacturers indicated friction correction factor. 9

TenarisHydril RUNNING MANUAL Blue Quick Seal Dopeless Thread Lock 1. Ideally when running a Dopeless string the connections to be thread locked should be the non Dopeless variant with the connections cleaned of thread compound and completely dried, then thread lock and dope applied as per page 9. 2. When thread locking Dopeless connections remove the Dopeless coating from the threads on the pin connection where the thread lock is to be applied. 3. Leave the Dopeless coating on the pin seal, torque shoulder and threads where no thread lock is to be applied. 4. Dopeless boxes should be washed with hot water then dried prior to thread locking. 5. Thread lock should be applied to 50% of the pin threads immediately behind the seal area, as per the diagram in page 9. 6. When assembling Dopeless connections with thread lock, apply the non Dopeless torque values taken from the standard product data sheet. 7. Apply the thread lock manufacturers indicated friction factor. 8. The application of thread dope is not required. 9. Contact Tenaris for further information on the thread locking process. 10

IDM Code GDL00370/3 / March 2018 Torque Application 1. The use of computer make up analysis equipment is strongly recommended when assembling Blue Quick Seal connections. 2. Shoulder points for Blue Quick Seal connection.. Minimum 15% of optimum.. Maximum 85% of optimum. 3. Reference torque should initially be set at 5% of optimum. 4. The dump valve should be set at optimum torque, verify correct operation on the pipe body prior to first make up. 5. Set the computer turns to 2 initially then adjust as necessary to attain good graph depiction. 6. Refer to the TenarisHydril running manual, make up acceptance section for further explanation. 7. The computer graph make up profile for Blue Quick Seal connections should be similar to the ones below. TenarisHydril RUNNING MANUAL 11

TenarisHydril RUNNING MANUAL TORQUE * 1000 ft-lbs TORQUE * 1000 ft-lbs 4.8 3.6 2.4 1.2 0 4.8 3.6 2.4 1.2 0 OPT 48500 MAX. SHL 41225 MIN. SHL 7275 OPT 48500 MAX. SHL 41225 8. Blue Quick Seal connections have limited same size / weight interchange capability, if mixing weight /grade ensure compatibility of design and apply the lower torque values of the two connections. 9. Dopeless connection torque values should be taken from the latest Dopeless variant product data sheet. 10. When mixing standard doped and Dopeless connections apply doped variant torque values. 11, Contact Tenaris for torque values. MAX. 49800 MIN. 46015 0.32 0.64 0.96 1.28 TURNS MAX. 49800 MIN. 46015 MIN. SHL 7275 0 0 0.32 0.64 0.96 1.28 TURNS 12

IDM Code GDL00370/3 / March 2018 Running 1. The use of a stabbing guide is strongly recommended. 2. The use of a weight compensator is strongly recommended for large OD or heavy pipe. 3. To avoid cross threading stab pipe in a smooth controlled fashion ensuring the pipe is vertical when doing so, continue to support and stabilise the pipe throughout the stabbing and make up operation. 4. Upon commencement of initial rotation use low RPM (5 RPM or below) in order to ensure the pipe has not cross threaded during stabbing. 5. If cross threading is evident, immediately reverse rotate the pipe, completely disassemble, clean and inspect both connections. 6. Maximum spin in speed should not exceed 10 RPM. 7. Apply power tong at low RPM (do not exceed 5 RPM) for final make up. TenarisHydril RUNNING MANUAL 13

TenarisHydril RUNNING MANUAL Pulling 1. Automatic stabbing system or stabber is highly recommended to maintain the pipe in a vertical position. 2. The use of a stabbing guide is recommended to assist in centralising the pin to prevent hang up. 3. A weight compensator is strongly recommended for large OD and heavy pipe. 4. Apply the back up tong jaw on the lower part, over the mill end of the coupling. 5. Apply power tong in low RPM (3-5 RPM) to break the connection, ensuring the pipe is stabilized during the break and spin out process. 6. Do not exceed 10 RPM during spin out. 7. Visual inspection is recommended to classify the thread condition. Any rejected connections should be clearly marked and segregated for further investigation. 8. For any non Dopeless connections apply clean, dry thread protectors after applying storage compound on clean, dry connections. 9. Storage / thread compound should always be applied to standard connections post job, even rejects. 10. Do not apply storage compound to Dopeless connections. 11. For long term storage of Dopeless connections, refurbishment by qualified personnel is recommended. 12. Ensure clean, dry, Dopeless protectors with seal rings correctly in place are installed. 14