NET TOLL REVENUE REINVESTMENT GRANT PROGRAM. South Bay Service Council

Similar documents
May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes

Key Project Elements Status Report

CEDAR AVENUE TRANSITWAY Implementation Plan Update

5. OPPORTUNITIES AND NEXT STEPS

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Tempe Streetcar. March 2, 2016

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Mobility Corridor Updates. Transit & Active Transportation Projects

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12

Restoration of Historic Streetcar Services in Downtown Los Angeles

I-405 Corridor Master Plan

Restoration of Historic Streetcar Services in Downtown Los Angeles

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

HOT Lanes: Congestion Relief and Better Transit

Construction Management Association of America (CMAA) Thursday, August 18, 2011 Frank Quon, PE Lan Saadatnejadi, PE

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

L. A. Metro s Parking Management Program Principles Applied. October 17, 2011 Rail-Volution, Washington D.C.

METRO Orange Line BRT American Boulevard Station Options

Develop ground transportation improvements to make the Airport a multi-modal regional

A Transit Plan for the Future. Draft Network Plan

Redefining Mobility. Randy Iwasaki. Executive Director Contra Costa Transportation Authority January 18, 2018

Los Angeles County Metropolitan Transportation Authority. Paid Parking Pilot Program Parking Management

Call for Projects Congestion Mitigation and Air Quality (CMAQ) Emissions Formulas Technical Advisory Committee

Service Quality: Higher Ridership: Very Affordable: Image:

Balancing the Transportation Needs of a Growing City

CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE ELEMENT

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Making Mobility Better, Together

FREQUENTLY ASKED QUESTIONS

Mobility Corridor Updates. Transit & Active Transportation Projects

Metro Green Line to LAX Alternatives Analysis. March 2012

ALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002

LOS ANGELES COUNTY CONGESTION REDUCTION DEMONSTRATION PROGRAM: STATUS REPORT

RAA Member Panel. Federal Election 2016

Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019

I-26 Fixed Guideway Alternatives Analysis

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Introducing Metro ExpressLanes The how-to guide for a faster commute on the 110 and 10 freeways

Kenosha-Racine-Milwaukee (KRM)

Committee Report. Transportation Committee. Business Item No

The Implications of Automated Vehicles for the Public Transit Industry

Sales and Use Transportation Tax Implementation Plan

Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

Connected Vehicle and Autonomous Vehicle (CV/AV) Mobility and Technology

San Francisco Transportation Plan

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

TransNet Dollars Keep San Diego Moving

Metropolitan Freeway System 2013 Congestion Report

Green Line Extension to Torrance Supplemental Alternatives Analysis. 2. Purpose and Need 2. PURPOSE AND NEED

Waco Rapid Transit Corridor (RTC) Feasibility Study

DRAFT Evaluation Scores. Transit

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

East San Fernando Valley Transit Corridor. Community Meetings April/May, 2012

Application of Autonomous Driving Technology to Transit

Transportation: On the Road to Cleaner Air Did you know?

Crenshaw/LAX Transit Corridor. Transit Coalition Meeting June 26, 2012

Crenshaw-Prairie Transit Corridor Study Public Meetings

Click to edit Master title style

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

ExpressLanes cmc 2011 lacmta

Measure R Funded Transit Projects

LEADING GATEWAY FOR U.S.-ASIA TRADE

Redefining Mobility Ready or not: Autonomous and connected vehicle planning and policy, now and in the future

Efficient Transportation Six Case Stories

Southern California - CHSRA

ExpressLanes cmc 2011 lacmta

The Future of Rail in Maryland. Kevin B. Quinn, Jr. Administrator

Federal Way Link Extension

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

ExpressLanes cmc 2011 lacmta

Over 74 Years of Dedicated Service to the South Bay Community. October 2014 City of Torrance, California

METRO Light Rail Update

Transportation Highway Engineering Conference February 24, 2015

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Reston Transportation Strategy July 9, 2018

Introducing the Solution to LA s Airport Congestion Problem

THE CITY OF CHATTANOOGA SMART TRANSPORTATION SYSTEMS

Metropolitan Council Budget Overview SFY

3.15 SAFETY AND SECURITY

The Georgia CMAQ Program. Practice Makes Perfect

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

West Broadway Reconstruction/LRT Design. March 19, 2015

Brainstormed Solutions - Passenger

Leadership NC. November 8, 2018

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike

The RoadMAP to ELectric Vehicle Adoption. Model policies and programs to accelerate EV adoption at the state and local level.

REALIZING THE AIR QUALITY BENEFITS OF PORT INFRASTRUCTURE PROJECTS. A Case Study of the Alameda Corridor

ExpressLanes cmc 2011 lacmta

Strategies to keep people and goods moving in and through Seattle

engineering phase and during the procurement of design build contracts.

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N

City of Pacific Grove

2018 Federal Priorities One Region One Voice

Section 5.8 Transportation and Traffic

Transcription:

NET TOLL REVENUE REINVESTMENT GRANT PROGRAM South Bay Service Council MARCH 13, 2015

NET TOLL REVENUE REINVESTMENT PROGRAM Metro ExpressLanes toll revenues fund: Direct program expenses (Operations & Maintenance) Operating subsidies to transit partners A 3-5% program reserve fund Remaining Net Tolls are designated for the Metro ExpressLanes Net Toll Revenue Reinvestment Program In September 2014, the Metro Board of Directors approved 20 projects to receive up to $19,854,458 in Net Toll Revenue Reinvestment Grants 2 2

NET TOLL REVENUE REINVESTMENT PROGRAM Funds allocated for awards in I-110 and I-10 corridors based on tolls collected during pilot period I-110: $15,945,193 I-10: $4,784,265 Toll Grant Criteria Project lies within 3 miles of the ExpressLanes facility 3 Project Categories: Transit Improvements, Highway Improvements, System Connectivity/Active Transportation Projects scored in 7 categories 3 3

NET TOLL REVENUE REINVESTMENT 4 4

NET TOLL REVENUE REINVESTMENT 5 5

NET TOLL REVENUE REINVESTMENT 6 6

I-110 NET TOLL REVENUE GRANT Line 1X Expand Transit Bus Service on I-110 Freeway Sponsor: City of Gardena Project Category: Transit Improvements Funds Awarded: $842,482 Re-instate mid-day transit service between Harbor Green Line station and downtown LA 32.5% increase in weekday vehicle service hours on Line 1X 7 7

I-110 NET TOLL REVENUE GRANT Commuter Express Service Expansion to Alleviate Congestion on Harbor Freeway Sponsor: City of Los Angeles Project Category: Transit Improvements Funds Awarded: $724,000 Bus purchase, add and expand service from Aviation/LAX park & ride to Green Line Redondo Beach Station park & ride 8 8

I-110 NET TOLL REVENUE GRANT Dodger Stadium Express Harbor Gateway (DSE-HG) Sponsor: LACMTA Project Category: Transit Improvements Funds Awarded: $1,292,604 Expansion of the Dodger Stadium Express Bus on I-110 to Harbor Gateway Transit Center 9 9

I-110 NET TOLL REVENUE GRANT Torrance Transit Expansion of Line #1 and Line #4 High- Occupancy Toll Lane Service Sponsor: Torrance Transit Project Category: Transit Improvements Funds Awarded: $2,235,991 Purchase of 5 Compressed Natural Gas (CNG) buses and expansion of mid-day and weekend service on Lines 1 and 4 10 10

I-110 NET TOLL REVENUE GRANT Dominguez Channel Bike & Pedestrian Path Sponsor: City of Carson Project Category: Active Transportation/System Connectivity Funds Awarded: $1,259,000 1.3-mile bicycle and pedestrian path along the Dominguez channel 11 11

I-110 NET TOLL REVENUE GRANT Active Streets Los Angeles Budlong Avenue Sponsor: City of Los Angeles Project Category: Active Transportation/System Connectivity Funds Awarded: $1,176,185 Install traffic calming striping and infrastructure along 3 miles in South LA, and event programming 12 12

I-110 NET TOLL REVENUE GRANT My Figueroa Project (Marketing & Safety) Sponsor: City of Los Angeles Project Category: Active Transportation/System Connectivity Funds Awarded: $150,000 Marketing, evaluation and education elements of the My Figueroa project in downtown Los Angeles 13 13

I-110 NET TOLL REVENUE GRANT I-110 HOT/ExpressLanes Improvements Sponsor: Caltrans Project Category: Highway Improvements Funds Awarded: $1,020,039 Replacement and/or improvement of ExpressLanes roadway elements, including overhead guide signs, rumble strips, surface treatments, median LED lighting and flashing beacons 14 14

I-110 NET TOLL REVENUE GRANT Automated Traffic Surveillance and Control Infrastructure Communication Systems Enhancement along I-110 Sponsor: City of Los Angeles Project Category: Highway Improvements Funds Awarded: $1,425,000 Installation of a new communications fiber and conduit path and its data/video transport system between two existing City yards 15 15

I-110 NET TOLL REVENUE GRANT South Bay Arterial Performance Measurement Project Sponsor: County of Los Angeles Project Category: Highway Improvements Funds Awarded: $504,000 Install vehicle detection systems for data collection on major arterials parallel to the Metro ExpressLanes 16 16

I-110/I-10 NET TOLL REVENUE GRANT ExpressLanes CNG-Fueled MV-1 Program Sponsor: Access Services Project Category: Transit Improvements Funds Awarded: $816,000 ($408,000 in I-110 corridor) Purchase 15 CNG fuel vehicles for existing service to disabled persons in LA County 17 17

I-110/I-10 NET TOLL REVENUE GRANT ExpressLanes Corridors Incident Management Improvements Project Sponsor: Caltrans Project Category: Highway Improvements Funds Awarded: $480,000 ($240,000 in I-110 corridor) Enhance advanced transportation management system (ATMS), improve data collection and sharing system, install new detection technology 18 18

I-110/I-10 NET TOLL REVENUE GRANT Bikeshare Downtown Los Angeles Project Sponsor: LACMTA Project Category: Active Transportation/System Connectivity Funds Awarded: $3,792,892 Install 84 bicycle stations and 840 bicycles for deployment of bikeshare facilities within 1 mile of rail stations 19 19

QUESTIONS + COMMENTS 20 20