Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

Similar documents
Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

EV Charging Station Submittal Requirements

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

Electric Vehicle Charging System Guidelines for Residential Buildings

Permitting, Installation and Inspection Residential EV Chargers Be aware that there are different types of Electric Vehicle (EV) Chargers.

City of Perris Development Services Building & Safety

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT

Expedited Permitting Process for Electric Vehicle Charging Stations

RESIDENTIAL GUIDELINE FOR ELECTRICAL VEHICLE (EV) CHARGER INSTALLATION

Residential and Non-Residential Checklist for Permitting Electric Vehicles and Electric Vehicle Service Equipment (EVSE)

STREAMLINED SOLAR CHECKLIST Owner Name:

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

Title 24: Building Codes for Plug-in Electric Vehicles September 22, 2015 Webinar Questions

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

Managing Electric Vehicle Supply Equipment (EVSE) Installations

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

CHAPTER V RESIDENTIAL WIRING

City of Palo Alto (ID # 8028) City Council Staff Report

ELECTRIC VEHICLE CHARGING FOR BUILDINGS

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

TRANSMITTAL THE COUNCIL SEP THE MAYOR TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED. ERIC GARCET Mayor.

ENGINEERING SPECIFICATION

Applicant and Site Information Job Address: Permit #:

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

2016 California Green Building Standards Code (CALGreen)

Application for Service Residential Subdivision / Development

City of Manhattan Beach Community Development

Solar PV Standard Electrical Plan

mandates, including the California Governor's Executive Order S calling for an 80 percent

ADVANCED CALCULATIONS

Electric Vehicle Appendix Notes

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Electric Vehicle Charging Station

Be it ordained by the People of the City and County of San Francisco:

Electric Plug-In Vehicle/Electric Vehicle Status Report

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

HydroGenerations PROGRAM HANDBOOK

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Photovoltaic Solar Plan Review

California Department of Housing and Community Development (HCD) 2016 CALGreen

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

Residential Application for New Electric Service

INSTALLATION GUIDE AND USER MANUAL

Electric Drive Vehicle Infrastructure Training. Instructor s Manual. National Alternative Fuels Training Consortium

EV Charging Stations: Permitting and Inspection

INSTALLATION GUIDE AND USER MANUAL

ELIGIBILITY CHECKLIST FOR EXPEDITED SOLAR POOL HEATING PERMITTING

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

G R E E N B U I L D I N G R E A C H C O D E U P D A T E S

CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1

Circuit Concepts (Residential)

Solar PV Standard Electric Plan

User Manual. Solar Charge Controller 3KW

Appendix G - Danvers Electric

The following permits are required to install a solar PV system with a maximum power output of 10 kw or less:

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

INSTALLATION AND OPERATING INSTRUCTIONS

2016 Photovoltaic Solar System Plan Review List

Solar Power Installation Application

Electric Vehicle Charging Station Installation Best Practices: A Guide for San Diego Region Local Governments and Contractors

Please Refer to Attached Sample Form

ECET Circuit Design Motor Loads. Branch Circuits. Article 210

Chapter CALIFORNIA GREEN BUILDING STANDARDS CODE. Palo Alto Municipal Code

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

Job Address: Permit #:

GE Energy Industrial Solutions. EV Charging Station. Application Guide. imagination at work

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Burnaby Electric Vehicle (EV) Charging Infrastructure Technical Bulletin Requirements and Guidelines for EV Charging Bylaw

CITY OF SONOMA - TOOLKIT DOCUMENT #1

Connecting your home or small business generation

Please Refer to Attached Sample Form

TABLE OF CONTENTS. About the Mike Holt Enterprises Team... xviii CHAPTER 1 ELECTRICAL THEORY... 1

SOLAR PV standard Plan-Simplified Central/String Inverter Systems for One and Two Family Dwellings

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

San Joaquin Valley Plug-in Electric Vehicle Coordinating Council

2. Fire Department Inspections are required and available by appointment on Tuesdays and Wednesdays. See item number four for fees.

NET METERING APPLICATION

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Access California. New Regulations for Electric Vehicle Charging Stations. presented to The City of Palo Alto, California

ORDINANCE NO WHEREAS, the City Council wishes to advance the use of electric vehicles; and

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

Solar*Rewards Frequently asked questions system size and customer usage

8300 Series Installation Guidelines

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

City of Manhattan Beach Community Development

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

TABLE OF CONTENTS CHAPTER 1 ELECTRICAL THEORY About This Textbook...xi. Passing Your Exam...xiv. How to Use the National Electrical Code...

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

TABLE II Electrical Permit Fees

Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast

Transcription:

Checklist for Multi-Family Residential Electric Vehicle Charging Station Article 625 2016 California Electrical code (CEC) General Requirements: Level 1 Charger: 110V dedicated 20 amp circuit No electrical plans required Level 2 Charger: 220V dedicated circuit Cut sheets for equipment are required Load calculations are required o If installing an EVSE (electric vehicle supply equipment) that is listed with a cord/plug connection, then only the cut sheets and the load calculations need to be provided. o If installing an EVSE that is hardwired with or without a time of use meter then all of the following are required: 1. Equipment cut sheets. 2. Load calculations (complete load calculations worksheet). 3. Site plan (show structures, service, EVSE, and (N) meter if applicable). 4. Single line diagram (show the service size, EV breaker size, EV conductor size, number of conductors, EVSE, time of use meter (if applicable). If the scope of work only includes installing a time of use meter for an existing EVSE then no plans are required. Verify that the original EVSE installation was permitted. Checklist for Multi-Family Residential EVCS Page 1 of 5

Specific Requirements: Check One Type of Charging Station(s) Proposed Power Levels (proposed circuit rating) Level 1 110/120 volt alternating current (VAC) at 15 or 20 Amps Level 2-3.3 kilowatt (kw) (low) 208/240 VAC at 20 or 30 Amps Level 2 7.2kW (medium) 208/240 VAC at 40 Amps Level 2 10kW (high) 208/240 VAC at 50 Amps Level 2-19.2kW (highest) 208/240 VAC at 100 Amps Other (provide detail) PERMIT APPLICATION REQUIREMENTS 1) Is the permit application complete with the following information: Project address, parcel #, builder/owner name, contractor name, valid contractor license #, phone numbers and any other requirement? 2) Does the application include electric vehicle charging station model number, manufacturer's specs and installation guidelines? ELECTRICAL LOAD CALCULATION WORKSHEET 1) Is an electrical load calculation worksheet included? (Article 220 2016 CEC) 2) Based on the load calculation worksheet, is a new electrical service panel upgrade required? a. If yes to Q2, do plans include the electrical service panel upgrade? b. If yes to Q2, has the Healdsburg Electric Department reviewed and approved the installation and confirmed the necessary utility work? 3) Is the charging circuit appropriately sized for a continuous load? Overcurrent protection for circuits supplying electric vehicle supply equipment shall be sized for continuous duty and shall have a rating of not less than 125% of the maximum load of the EVSE (i.e. if the maximum load of the charger is 40A then a 50A breaker is required). 4) If charging equipment proposed is a Level 2 10kW station with a circuit rating of 50 Amps or higher, is a completed circuit card with electrical calculations included with the single line diagram? Checklist for Multi-Family Residential EVCS Page 2 of 5

SITE PLAN & SINGLE LINE DRAWING 1) Is a site plan and electrical plan with a single-line diagram included with the permit application? Not Applicable a. If mechanical ventilation requirements are triggered for indoor venting requirements (CEC 625.29(D)), is a mechanical plan included with the permit application? Not Applicable 2) Is the site plan fully dimensioned and drawn to scale? a. Showing location, size, and use of all structures? b. Showing location of electrical panel to charging system? c. Showing type of charging system and mounting? d. Is the type of mounting for charging system included if the charging system is not wall-mounted? Not Applicable COMPLIANCE WITH 2016 CALIFORNIA ELECTRICAL CODE 1) Does the plan include EVCS manufacturer's specs and installation guidelines? 2) Does the electrical plan identify the amperage and location of existing electrical service panel? a. If yes to Q2, does the existing panel schedule show room for additional breakers? b. Are sizes for the conduit and conductor included? 3) Is the charging unit rated more than 60 amps or more than 150V to ground? a. If yes to Q3, are disconnecting means provided in a readily accessible location in line of site and within 50 of EVCS? (CEC 625.23) 4) Does the charging equipment have a Nationally Recognized Testing Laboratory (NRTL) approved listing mark? (UL 2202/UL 2200) 5) If trenching is required, is the trenching detail called out? a. Is the trenching in compliance with electrical feeder requirements from structure to structure? (CEC 225) b. Is the trenching in compliance of minimum cover requirements for wiring methods or circuits? (18 min. cover over conduit per CEC 300) COMPLIANCE WITH 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE 1) Do CAL Green EV Readiness installation requirements apply to this project? a. Do the plans demonstrate conformance with mandatory measures for 3% of total parking spaces, but no less than one, for new multifamily dwellings with 17+ units that must be EV capable? (4.106.4.2) Checklist for Multi-Family Residential EVCS Page 3 of 5

b. Do the construction documents indicate the location of the proposed EV spaces where at least one is located in common use areas and available to all residents for use? (4.106.4.2.1) 2) When EV chargers are installed, EV spaces required by Section 4.106.4.2.2 item 3 shall comply with at least one of the following options: a. The EV space shall be located adjacent to an accessible parking space that complies with California Building Code Chapter 11-A, to allow use of the EV charger from the accessible parking space. b. The EV space shall be located on an accessible route, as defined by California Building Code Chapter 2, to the building. c. EV charging space(s) comply with Section 4.106.4.2.2, items 1, 2 and 3 (below). The minimum length of each EV space shall be 18 feet (5486 mm). The minimum width of each EV space shall be 9 feet (2743 mm). One in every 25 EV spaces, but not less than one, shall also have an 8-foot (2438 mm) wide minimum aisle. A 5-foot (1524 mm) wide minimum aisle shall be permitted provided the minimum width of the EV space is 12 feet (3658 mm). o Surface slope for this EV space and the aisle shall not exceed 1 unit vertical in 48 units horizontal (2.083 percent slope) in any direction. STATEMENT OF COMPLIANCE By my signature, I attest that the information provided is true and accurate. Job Address: Signature: Date: In addition to this document, you will also need to provide a copy of the manufacturer s installation literature and specifications for the Level 2 charger you are installing. Note: This is a voluntary compliance alternative and you may wish to hire a qualified individual or company to perform a thorough evaluation of your electrical service capacity in lieu of this alternative methodology. Use of this electrical load calculation estimate methodology is at the user s risk and carries no implied guarantee of accuracy. Users of this methodology and these forms are advised to seek professional assistance in determining the electrical capacity of a service panel. Checklist for Multi-Family Residential EVCS Page 4 of 5

Electrical Load Calculation Worksheet 2016 C.E.C 220.82 (100 AMP Minimum) Permit # Date: Contractor/Owner: Size of service panel**: AMPS Job Address: Total SF: Phone # Email: ITEM WATTS EXAMPLES FOR A/C AND HEATER WATTS* Sq.Ft. @ 3 watts per Sq.Ft. 1) - A/C with gas heat 20 amp appliance circuits @ 1,500 watts each - compressor 20 amps Range (NPR - nameplate rating) Gas: Yes No - fan(s) 5 amps Oven (NPR) Gas: Yes No TOTAL 25 amps x 240 volts = 6,000 watts Cooking Units (NPR) Gas: Yes No 2) - A/C with 5 kw electric heater Water Heater (NPR) Gas: Yes No - compressor 20 amps Dishwasher (NPR) - fan(s) 5 amps Disposal (NPR) TOTAL 25 amps x 240 volts = 6,000 watts Washer @ 1,500 watts (min) Gas: Yes No - 5,000 watt heater x 65% = 3,250 watts Dryer @ 5,000 watts (min) - Use larger of A/C or heater - i.e. - 6,000 watts Motors (NPR) 3) - A/C with 10 kw electric heater Electric vehicle supply equipment (NPR) - compressor 20 amps Other (NPR) - fan(s) 5 amps Other (NPR) TOTAL 25 amps x 240 volts = 6,000 watts SUBTOTAL: - 10,000 watt heater x 65% = 6,500 watts - Use larger of A/C or heater - i.e. - 6,500 watts 1st 10,000 watts of SUBTOTAL @ 100% 4 ) - A/C with heat pump Remaining watts @40% - compressor 20 amps Largest of A/C or electric heater or heat pump* - fan(s) 5 amps TOTAL WATTS: SUBTOTAL 25 amps x 240 volts = 6,000 watts - 5,000 watt heat strips @ 65% = 3,250 watts TOTAL WATTS DIVIDED BY 240 VOLTS = AMPS** TOTAL 9,250 watts * Use largest of 100% of air conditioner or 65% of the heater or when residence has a heat pump, add 65% of auxiliary heat strips to 100% of air conditioner / heat pump ** The calculated load must be less than the existing electrical service otherwise the service will need to be upgraded. Checklist for Multi-Family Residential EVCS Page 5 of 5