NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013

Similar documents
NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 3/28/2003

Night Work Specification

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAPLE STREET UNDERPASS BRIDGE (MM 106.0)

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/02/2004

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018

MANUAL OF ISSUANCE OF SPECIAL HAULING PERMITS ON WARREN COUNTY HIGHWAYS. Effective March 17, 2015 Revised January 2, 2018

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES

1. Highway Traffic Act Weight & Dimension Limitations

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 808 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY.

Policy: Traffic and Parking Regulations

PS 127 Abnormal / Indivisible Loads Policy

Work Zone Safety & New Interstate Resurfacing Provision

INDUSTRIAL HAUL AGREEMENT

AMENDED CULVERT POLICY WITH MAIL BOX POLICY

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

CHAPTER 72: STOPPING, STANDING AND PARKING

Purchasing Services 4202 East Fowler Avenue, SVC 1073 Tampa, Florida (813) Addendum No. 1

Act 229 Evaluation Report

Work Zone Changes Since We Last Met 2016 Louisiana Transportation Conference. Barry L. Lacy, P.E. Work Zone/Claims/Audit Engineer

HAZLETON POLICE DEPARTMENT TOWING SERVICE REQUIREMENTS

Permit No: , Rev 1

CITY of ALBUQUERQUE TWENTY-FIRST COUNCIL

Temporary Use of Right-of-Way Permit (TURP)

Removal of Underground Storage Tanks (UST) Encountered during Construction

ELMORE COUNTY HIGHWAY DEPARTMENT

WRONG WAY DRIVING. Ugonna U. Ughanze, P.E. Houston District

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

Type: Feature Still Other, please specify Music Video Documentary Commercial

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

Chapter 17 TRAFFIC AND VEHICLES. Adoption of Uniform Rules of the Road. Temporary Traffic Regulations.

THE CORPORATION OF THE TOWNSHIP OF MIDDLESEX CENTRE BY-LAW NUMBER

TRAFFIC REGULATION APPROVAL PROCESS

Special Specification 7010 Debris Removal and Disposal

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

Instructions for Submittal of a Request to Close a Public Street for Community Purposes (Not for Construction Projects)

COUNTY ROAD COMMISSION RULES FOR THE MOVEMENT OF OVERSIZE OR OVERWEIGHT VEHICLES AND LOADS

INSTRUCTIONS FOR SECONDARY EMPLOYMENT APPROVAL APPLICATION FOR PRIVATE BUSINESSES AND PUBLIC AGENCIES AND FOR SPECIAL EVENTS

HARDEE COUNTY ROAD AND BRIDGE DEPARTMENT Driveway-Culvert Installation Permit

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD:

HOUGHTON COUNTY ROAD COMMISSION GUIDELINES FOR THE MOVEMENT OF OVERSIZE OR OVERWEIGHT VEHICLES AND LOADS

Section 05: Oversize/Overweight Permits. Minnesota Trucking Regulations

SUMMARY REPORT City Council

STREET IMPROVEMENTS PROPOSAL BID ITEMS

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

We recommend you keep a copy of this ordinance with you while you are off-roading.

CONTRA COSTA COMMUNITY COLLEGE DISTRICT

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

For Conduit Inspections

ITEM 585 RIDE QUALITY FOR PAVEMENT SURFACES Description. Measure and evaluate the ride quality of pavement surfaces.

SECTION ONE: ADMINISTRATION AUTHORITY PARKING REGULATIONS DISABLED PARKING PARKING CITATION AUTHORITY...

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Applicable California Vehicle Code Sections, 2015 Edition

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

TITLE VII: TRAFFIC CODE 70. GENERAL PROVISIONS 71. TRAFFIC REGULATIONS 72. PARKING REGULATIONS 73. TRAFFIC SCHEDULES 74.

WHEREAS, Fees for parking meters, devices or timed parking systems have been historically approved by the City using the Ordinance process; and

LCDOT DETOUR PROCEDURES. and GUIDELINES

Otsego County Road Commission

Created by: St. Louis County

Louisiana s s Work Zone Task Force Work Zone Improvements

IC Chapter 5. Speed Limits

ORDINANCE NO

TxDOT Guidelines for Acknowledgment Signing

Lake County Building Department

Vista Municipal Code

VILLAGE OF NEW BADEN, ILLINOIS ORDINANCE NO A

CHAPTER 11 - TRAFFIC

ORDINANCE TOWN OF ALBANY. Revised 8/19/03 GREEN COUNTY WISCONSIN

NAME OF BIDDER MERCER GROUP INTERNATIONAL OF NJ, INC CALHOUN STREET CITY, STATE, ZIP TRENTON, NJ 08638

Final Recommendation on Parking Pilot Program. Transportation Commission Meeting April 23, 2018 Village Hall Council Chambers

City of Hammond Purchasing Department RFP # General Maintenance and Repair Service Contract City Generators

ARLINGTON COUNTY CODE. Chapter 14.3 IMMOBILIZATION, REMOVAL, TOWING AND STORAGE OF VEHICLES FROM PRIVATE PROPERTY*

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016

GENERAL PROVISIONS BLOCKING INTERSECTIONS OR MARKED SIDEWALKS.

TRAFFIC AND PARKING PROCEDURES

Ramsey, Minnesota, Code of Ordinances >> PART II - CODE OF ORDINANCES >> Chapter 54 - TRAFFIC AND VEHICLES >> ARTICLE IV. - RECREATIONAL VEHICLES >>

OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES

Q10. What are the payment terms? A10. Payment terms vary per participating agency. Refer to Page 16 of bid document.

Questions and Answers from March 1 st, 2016 Roadbuilders Introduction Webinar

EL PASO ELECTRIC COMPANY SCHEDULE NO. 08 GOVERNMENTAL STREET LIGHTING SERVICE RATE

CHAPTER 20.1 WASTEWATER HAULING. Section Definitions. For the purposes of this article, the following definitions shall apply:

RESTRICTIONS ON PARKING; POSTED LIMITATIONS.

Construction Staging Area 4 Avenue Road

801-R-xxx LAW ENFORCEMENT OFFICER FOR WORK ZONE SAFETY. (Adopted xx-xx-17)

SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC

60 70 Guidelines. Managing Speeds. Work Zones

REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

PERFORMANCE ACTIVITY 603 SIGNS

City State Zip Code City State Zip Code

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

TOWN OF BRIDGTON TRAFFIC ORDINANCE

Construction Noise Memorandum

Transcription:

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013 Control 6237-93-001 Project RMC - 623793001 Highway US0075 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned project. Included in the attachment is an adendum notification which details the changes the respective proposal pages which were added / or changed. Except for new bid insert pages, it is unnecessary to return any of the pages attached. Bid insert pages must be returned with the bid proposal submitted to the Department, unless your firm is submitting a bid using a computer print out. The computer print out must be changed to reflect the new bid item information. Contractors material suppliers, etc. who have previously been furnished informational proposals are not being furnished a copy of the addendum. If you have a subcontractor on the above project, please advise them of this addendum. Acknowledgment of this addendum is not requested if your company has been issued a proposal stamped This Proposal Issued for Informational Purposes. You are required to acknowledge receipt of this addendum on the Addendum Acknowledgement form contained in your bid proposal by placing a mark in the box next to the respective addendum. Failure to Acknowledge receipt of this addendum in your bid proposal will result in your bid not being read. 04/99

SUBJECT: PLANS AND PROPOSAL ADDENDUMS PROJECT: RMC - 623793001 CONTROL: 6237-93-001 COUNTY: DALLAS LETTING: 05/07/2013 REFERENCE NO: 0503 PROPOSAL ADDENDUMS ------------------ _ PROPOSAL COVER X BID INSERTS (SH. NO.: SHEET 1-1 ) X GENERAL NOTES (SH. NO.: SHEET E31 ) _ SPEC LIST (SH. NO.: ) _ SPECIAL PROVISIONS: ADDED: DELETED: _ SPECIAL SPECIFICATIONS: ADDED: _ OTHER: DELETED: DESCRIPTION OF ABOVE CHANGES (INCLUDING PLANS SHEET CHANGES) INCREASED QUANTITY FOR BID ITEM 6834-2001-002 FROM 193 TO 882 DAYS. REVISED GENERAL NOTES SHEET 3E1 UNDER ITEM 6834. REPLACED PLAN SHEETS 3A-3E WITH 3A1-3E1. 1-1

PROJECT RMC - 623793001 COUNTY DALLAS PROPOSAL SHEET PROPOSAL SHEET TxDOT FORM 234-B I-61-5M ALT ITEM NO ITEM-CODE DESC CODE S.P. NO. UNIT BID PRICE ONLY. WRITTEN IN WORDS UNIT APPROX QUANTITIES DEPT USE ONLY 429 2009 008 CNC STR REP (BRDG DECK)(PARTIAL DEPTH) 429 2010 008 CNC STR REP (BRDG DECK)(FULL DEPTH) 438 2002 009 CLEAN AND SEAL EXIST JOINTS 454 2001 SEALED EXPANSION JOINT (4 IN)(SEJ-A) 454 2007 003 HEADER TYPE EXPANSION JOINT SF 8,776.700 1 SF 2,177.500 2 LF 3,003.000 3 LF 516.000 4 CF 389.500 5 454 2008 JOINT SEALANT 500 2001 011 MOBILIZATION LF 14,126.000 6 LS 1.000 7 502 2056 051 OFF-DUTY UNIFORM POLICE OFFICER 6834 2001 002 PORTABLE CHANGEABLE MESSAGE SIGN HR 1,637.000 8 DAY 882.000 9 1-1

Sheet: 3A1 GENERAL NOTES: General: This project consists of performing Bridge Joint Maintenance at various locations on US 75, IH 635, IH 35E, US 67, LP 12, SH 180 in Dallas County as detailed on the Bridge Locations Sheets as directed by the Engineer. Coordinate work through the following Area Engineer s for: West Dallas County East Dallas County David T. Lott, P.E. Paul E. Williams, P.E. 4777 E. Highway 80 4777 E. Highway 80 Mesquite, Texas 75150 Mesquite, Texas 75150 214-319-6512 214-320-6241 Attention is directed to the possible presence of overhead, underground, or suspended utilities owned by the Texas Department of Transportation (irrigation, signal, illumination surveillance, communication, control) on the right of way. Call the Department for locates at 214-320-6682 214-320-6205 48 hr. in advance. Contact the appropriate department of the local, city, or town a minimum of 48 hr. in advance. Contact Mr. Willie Bolden in the West Dallas Area Office at 214-319-6552 before starting work on LP 12. If overhead or underground power lines need to be de-energized, contact the electrical service provider to perform this work. Cost associated with de-energizing the power lines or other protective measures required are at no expense to the Department. If working near power lines, comply with the appropriate sections of Texas State Law Federal Regulations relating to the type of work involved. Item 2: This project includes plan sheets that are not part of the bid proposal. Order plans from any Reproduction Company listed at: http://www.dot.state.tx.us/business/contractors_consultants/repro_companies.htm Sheet 3A1

Sheet: 3B1 View or download plans at: http://www.txdot.gov/business/plansonline/plansonline.htm Item 3: After written notification, work will be continuously prosecuted to completion. Item 8: Working days will be charged in accordance with Section 8.3.C.2.b., Nighttime Work Daytime Work Requiring Inspector. The Lane Closure Assessment Fee is shown on the following table. The fee applies to the Contractor for closures or obstructions that overlap into restricted hour traffic for each hour or portion thereof, per lane, regardless of the length of the lane closure or obstruction. For Restricted Hours subject to Lane Assessment Fee, refer to Item 502 Barricades, Signs, Traffic Hling. Table 1 Lane Closure Assessment Fee Table Roadway Amount Per Lane Per Hour US 75 $7,000 IH 635 $6,000 IH 35E $4,500 US 67 $500 LP 12 $400 SH 180 $300 Item 429: Repair concrete structure in accordance with this item the details shown in the plans. Item 438: Sheet 3B1

Sheet: 3C1 Clean seal existing joints in accordance with this item the details shown in the plans. Item 454: Contractor will be limited to a minimum of 15 lb. pneumatic hammer during removal of any header or concrete material. Avoid cutting, stretching, or damaging exposed reinforcing steel by direct impact of these power tools. Repair or replace reinforcing steel damaged during the concrete removal process at no additional expense to the Department. Furnish, install, repair bridge expansion joints in accordance with this item the details shown in the plans. During operations involving metal cutting, when the probability of grass fire exist, Contractors will take care to control such fire by personnel continuously monitoring grassy areas being equipped to extinguish any fire ignited by molten metal sparks. Item 502: Provide traffic control in compliance with the latest editions of the Texas Manual on Uniform Traffic Control Devices (TMUTCD), the Traffic Control Stards Sheets (TCSS), as directed. Provide proposed lane closure information to the Engineer by 1 P.M. on the day prior to the proposed closures. Furnish information for Monday closures or closures following a national or state holiday on the last office workday prior to the closures. Do not close lanes if the above reporting requirements have not been met. Sheet 3C1

Sheet: 3D1 Table 2 Category of Work Placement of CTB & Bridge Beams, Pavement Markings, Full Depth Roadway Repair, Bridge or Similar Demolitions* Adjacent Construction, Lanes for Construction Traffic or Similar Operations Numbe r of Rdwy Lanes per directio n Freeway Lane Closures Peak Times Monday-Friday 6 A.M. - 9 A.M. 3:30 P.M. - 7 P.M. Major Events Major Holidays** Off Peak Times Monday-Friday 9 A.M. - 3:30 P.M. 7 P.M. - 10:30 P.M. Saturday 5 None 2 3 4 None 2 3 3 None 1 2 2 None 1 2 5 None 1 2 4 None 1 2 3 None 1 1 2 None None 1 Lowest Volume Time Monday-Friday 10:30 PM - 6 A.M. Sunday Additional lanes may be closed during Off Peak Times or Lowest Volume Times with written permission of the Engineer. Lane Closures during Off Peak Times may be started earlier or be extended later with written permission of the Engineer. Traffic Control Plans with Lane Closures causing backups of 20 minutes or greater in duration will be modified by the Engineer. Sheet 3D1

Sheet: 3E1 Erect barricades signs in locations not obstructing the traveling public s view of the normal roadway signing or necessary sight distance. Equipment materials will not be left within 30 ft. of the travel lane during non-working hours. When moving unlicensed equipment on or across pavement or public highways, protect the pavement from all damage using an acceptable method. Provide full time, off-duty, uniformed, certified peace officers, patrol cars may be required for assistance with traffic control for lane or ramp closures or other situations that dictate the need for additional traffic control as directed. Off-duty uniform officers will have transportation jurisdiction full police powers. Peace officers will be able to show proof of certification by the Texas Commission on Law Enforcement Officers Stards Education (TCLEOSE). Item 6834: Portable Changeable Message Sign (PCMS) units will be paid for by the day by the each in place as directed by the Engineer. PCMS will be placed 7 days prior to the lane closures. Sheet 3E1