US 10 Corridor Performance

Similar documents
Current Corridor Characteristics. MN 62 Corridor Performance

I-394 Corridor Performance

Population Trends. US 12 Corridor Performance

Transitways. Chapter 4

Sales and Use Transportation Tax Implementation Plan

Total Three Months 8. Breastfed Two Weeks 5. Total Twelve Months 12. Breastfed Twelve Months 13. Total Two Weeks 4. Initiated Breastfeeding 3

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Transportation accomplishments

MPO Staff Report Technical Advisory Committee: July 12, 2017

Operating & Maintenance Cost Results Report

Metro Transit Service Improvement Plan

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Metropolitan Freeway System 2013 Congestion Report

Corridor Sketch Summary

Residential Real Estate Activity Report 2000 Edition

Kentucky Highway District 6

District 7 10-Year Capital Highway Investment Plan ( )

I-35W Past, Present, and Future: METRO Orange Line

Committee Report. Transportation Committee. Business Item No

Metropolitan Freeway System 2007 Congestion Report

2015 ANNUAL REGIONAL PARK-AND-RIDE SYSTEM REPORT

Introduction. Assumptions. Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Chapter 2. Description of the Regional Transit System

EXCEPTION TO STANDARDS REPORT

2016 Congestion Report

The range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives:

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

C LINE: LONG-TERM GLENWOOD REALIGNMENT STUDY

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Bi-County Transitway/ Bethesda Station Access Demand Analysis

2017 Total 2017 Calendar Year Unduplicated Minnesota WIC Participation Count by City of Residence Minnesota WIC Information System

2016 Regional Solicitation Application Scoring ROADWAY EXPANSION

Contents. Executive Summary...1 Introduction...2 Operating Plan...4 System Connectivity...5

5. OPPORTUNITIES AND NEXT STEPS

ACTION TRANSMITTAL. TAC Funding and Programming Committee Anoka County

2008 Max Vehicles in Service: 1,475 Total

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Highway Safety Update

Purpose and Need Report

Information Item. The below table summarizes the total number of applications and total funding applied for.

Community Advisory Committee. October 5, 2015

Slow Down! Why speed is important in realizing your Vision Zero goals and how to achieve the speeds you need

WELCOME. Transit Options Amherst - Buffalo Public Workshops

Highway Transitway Corridor Study

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Business Advisory Committee. July 7, 2015

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Metropolitan Council Transit Capital Improvement Plan. September 23, 2009

Tracker. Operate a reliable and COnvenient transportation system. Becky Allmeroth, Chief Safety and Operations Officer

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP

HIGHWAY SAFETY RESEARCH GROUP. Safety Analysis Tools Used for Coalitions and Districtwide Safety Investment Plans

Develop ground transportation improvements to make the Airport a multi-modal regional

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Nonprofit Insurance Trust (NIT) Preferred Shop Network

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Revised Evaluation Scores. System Preservation

Background Information for MPRB Community Advisory Committee for 2010 Southwest Light Rail Transit Project DEIS Comment Letter Section 2

Navigating in Different Rivers

SUMMARY OF COMMENTS AT PUBLIC OPEN HOUSES SCOPING OF ALTERNATIVES GATEWAY CORRIDOR ALTERNATIVES ANALYSIS

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Metropolitan Council Metro Transit Project Description Budget Year

Population Trends. US 71 Corridor Performance

Tracking the Blue Line Extension

West Broadway Reconstruction/LRT Design. March 19, 2015

Maryland Gets to Work

FREQUENTLY ASKED QUESTIONS

2018 Corridors of Commerce Final Scoring

Safety Audits in Iowa

ACTION TRANSMITTAL No

STH 60 Northern Reliever Route Feasibility Study Report

Fatal and Serious Injury Crashes by Roadway Jurisdiction. Unknown. Township Road. County Highway

Andrew Lee, House Fiscal 1 of 12 4/1/ :36 PM

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview

R A M S E Arden Hills

NCDOT Report on Improving Safety on Secondary Roads

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

METRO Blue Line LRT Extension (BLRT) 5514 West Broadway Avenue, Suite 200, Crystal, MN

More than $9 Million coming to Central Valley for transportation

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

Appendix A. Community Workshop Results PUBLIC REVIEW DRAFT

4.5 TRANSPORTATION AND CIRCULATION

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

State Avenue Corridor Bus Rapid Transit (BRT)

Central Loop Bus Rapid Transit

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

Leadership NC. November 8, 2018

Tracking the Blue Line Extension

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Recommended Transportation. Capital Improvement Program

WAKE TRANSIT PLAN Summer 2018

2016 North Trunk Highway 65 Corridor Coalition Manufacturers Survey

Transcription:

Corridor Context The corridor runs northwest 18 miles from I-35W to the edge of Anoka County. The corridor connects the cities of Ramsey, Anoka,, Mounds View, and Blaine. Current Corridor Characteristics Highway: US 10 2009 AADT: 41,000 97,000 2009 HCADT:6,100 8,100 Number of lanes: 4-8 Key highway connections: I-35W, MN 65, MN 610, US 169 Public Transit Rail Park and Rides: Ramsey Town Center, /Riverdale, Anoka Northstar Stations: Coon Rapids/Riverdale, Anoka BNSF line (Twin Cities to North Dakota) US 10 Corridor Performance Measure Result Infrastructure Preservation Statewide Result City Bridge Bridge Condition--% Good and satisfactory (by deck area) Bridge Condition--% Poor (by deck area) Population Trends 100% 0% 86.9% 3.2% Population 2000 2010 Anoka 18,076 17,142 Blaine 44,942 57,186 61,607 61,476 Mounds View 12,738 12,155 Ride Quality Good--% of miles 71.7% 70.2% Ramsey 18,510 23,668 Ride Quality Poor--% of miles 0% 3.7% 155,873 171,627

101³ Wright Co. 101³ Rogers Sherburne Co. tu 10 Ramsey Dayton tu 169 Anoka US 10 Existing Conditions - Safety Safety Needs CMSP Problem Locations CMSP Problem Segments Trunk Highways County Highways Class 1 Railroads County Boundaries Toward Zero Deaths Efforts County TZD Safe Roads Grant TZD Enforcement Grant Andover Anoka Co. TZD Region Year Established (ATP) County Safety Plan Completion Date Hennepin No Yes Metro, Planned (ATP 5) Sept. 2011 Ramsey No Yes Metro, Planned (ATP 5) Jan. 2013 Sherburne Yes Yes East Central 2011 (ATP 3) Oct. 2010 Ham Lake Measure Fatal and Serious Injury Crashes in Corridor Percent of All Severe Crashes in Corridor Top Four Driver Related Crash Issues Speed Related 13 35.1% Unbelted Crash* 12 32.4% Young Driver 10 27.0% Impaired Driver* 5 13.5% Lane Departure Crashes 14 37.8% Intersection Crashes 10 27.0% Head-on Crashes 3 8.1% Corridor Comparison to State Crashes Fatal and Serious Injury Crashes In Corridor Statewide for Trunk Highways 37 2,440 Miles 19 10,980 Fatal and Serious Injury Crashes per Mile US 10 Corridor Safety Performance (I 35W to Elk River) Top Three Infrastructure Related Crash Issues 1.95 0.22 * Crashes may be under reported as this number is according to officer's first impression. Note. Data presented include all fatal and serious injury crashes betw een 2006-2010. Map S 65 ³ Champlin Blaine See District Highway Safety Plan for additional issues Hennepin and strategies Co. tu 169 Metro To Be Completed May tu 10 Circle Pines E 0 Maple Grove Osseo 610³ Brooklyn Park 47 ³ 0.5 1 2 3 4 Miles Mounds View Ramsey Co. 35W Shoreview

US 10 s Investment Area Length (Miles) Fiscal Year Planning Corridor Improvements 3 $ 1.3 3.2 2013 $ 4.4 $ 3.1 5.5 2015 $ 7.8 : $16.2 ADA Mill and Overlay, Pave Shoulders Anoka/Sherburne Co. Line to Elk River Reconstruct Intersection Mill and Overlay, ADA Improvements, Other s Anoka to Planned Transit Investments New Ramsey Station for Northstar Line Anoka Station Park and Ride Expansion US 10 Adjacent s Investment Area Other Infrastructure Other Infrastructure Traffic Management System Fridley to East Bethel Traffic Management System Brooklyn Park to Length (Miles) Route Fiscal Year 23 MN 65 $ 1.4 7 MN 610 $500,000 $1.9 $ 13.2 $ 11 $ 24.2

Corridor Performance Based Needs (2016-2021) Bridge Preservation Preservation Culvert Preservation Pipe Replacement Safety Improvements* 1 Bridge 10 miles of poor pavement No Culverts 12 poor pipes 2 CMSP Locations 0 CMSP Segments *Assumes completion of 12-15 STIP projects. *Systematic safety improvements are included as part of most highway projects. Refer to safety map for additional safety information

Recent Transit Investment Description Northstar Commuter Rail Construction of Northstar Commuter Rail, five suburban park and ride stations (Big Lake, Elk River, Anoka,, and Fridley), and Target Field Northstar Station in Downtown Minneapolis $ 334 Recent Investments (2002-2011)* Description 2009: Add 3rd lane, replace bridges, noise wall and guardrail (Egret Blvd to Hanson Blvd in Coon Rapids) $ 9.1 s 2009: Mill and Overlay, guardrail (TH 65 to I-35W) 2006: Mill and Overlay, Bus shoulders (Jarvis St to Fairoak Ave) 2002: Shoulder Rehab for bus use (Thurston Ave to Foley Blvd) $ 7.4 Other Infrastructure 2009: Fiber Optic Installation *Only includes projects over $500,000. Systematic safety improvements are routinely included as part of most highway projects $ 970,000 $ 17.4 $ 334