PROCESS PUMPS (INDIA) PVT LTD

Similar documents
PROCESS PUMPS (INDIA) PVT LTD

PROCESS PUMPS (INDIA) PVT LTD

PROCESS PUMPS (INDIA) PVT LTD

PROCESS PUMPS (INDIA) PVT LTD

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

SERIES PC INSTRUCTION AND OPERATION MANUAL

PROMAG SR SERIES SEAL-LESS CENTRIFUGAL PUMPS

Medium and high pressure pumps

Series Base mounted pump. Installation and operating instructions

HORIZONTAL SPLIT CASING PUMP

MAINTENANCE AND REPAIR INSTRUCTIONS

Series Base mounted pump. Installation and operating instructions

INSTRUCTIONS Installation Operation Repair

Installation Vertical Pump: Installation 'CM' and 'CDM' Style: Operation:

Routine Compressor Maintenance

END SUCTION CENTRIFUGAL PUMPS

INSTALLATION AND SERVICE INSTRUCTIONS FOR 1008 AND 1010 SERIES PUMPS

Impeller Replacement

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS

Table 6-1. Problems and solutions with pump operations. No Fluid Delivery

GT-200 GATE VALVES PN16, Screwed end

ISO 9001 CERTIFIED COMPANY INDUSTRIAL PUMPS. Installation & Operational Manual For BACK-PULL-OUT PUMP

SERIES G3DB/AG3DB ELEVATOR

Installation and Start-up Instruction. This instruction is valid for all standard low pressure pumps: LPD, ACD, ACE, ACG/UCG, ACF/UCF, LPQ and ABQ

INSTRUCTION MANUAL INTERNAL GEAR PUMP TITAN G-4124A SERIES=> FLANGED TITAN G-124A SERIES => FLANGED MODELS:

Installation & Operating Manual

AJAX PUMPS PUMPS AJAX. ~Pli~r. on s SYDNEY BRISBANE ADELAIDE PERTH. ~Pli~[ ODS ~ISTON PURPOSES

TILLOTSON LTD., CLASH INDUSTRIAL ESTATE, TRALEE, CO. KERRY, IRELAND PHONE: FAX:

Installation, Operation and Maintenance Manual Stancor SSD & SL Series Pumps

DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR LIQUID RING VACUUM PUMPS

NECO Pumping Systems

When installing the screwed end, socket weld & flanged end valves the following respective procedures shall be followed for better performance.

Principals of Operation... 1 Rotary Vane Priming Pump VPE and VPES... 2 Rotary Vane Priming Pump VPO and VPOS Priming Valve...

S3 General Installation

WORKSHOP MANUAL. Chainsaw GS35 GS350 MT350 MT3500

Operating Manual for Rotary Gear Pumps CMI, S.A. (Mendaro, Guipuzkoa, Spain)

TECHNICAL SERVICE MANUAL INSTALLATION, START UP, TROUBLESHOOTING, SERIES SG-04, SG-05 & SG-07 spur gear PUMPS


INSTRUCTION MANUAL AC2516 REVISION D INSTALLER: PLEASE LEAVE THIS MANUAL FOR THE OWNER S USE. Series 1580 In-Line Mounted Centrifugal Fire Pumps

NECO Pumping Systems

PR Series Positive Rotary Pumps

SERVICE MANUAL 200 SERIES MOTORIZED 20352, 20452, 20551, 20552, AND MODELS

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com W D0446-A 4/1/05 1

Penn Valley Pump Company Design Information for Double Disc Pumps

UNPACKING SAFETY GUIDELINES GENERAL SAFETY INFORMATION. Operating Instructions & Maintenance Manual

Thank you for selecting the GD submersible grinder pump.

WARMAN PUMPS ASSEMBLY, OPERATING AND MAINTENANCE INSTRUCTIONS PART 2C SERIES A SOLUTION PUMPS TYPE S AND SH PC2C

BOILER FEED SYSTEM OPERATION AND MAINTENANCE MANUAL

The ELM Series Slurry Pump Installation and Operating Manual

1750 RPM Centrifugal Pumps

I-3 INSTALLATION, OPERATION & MAINTENANCE MANUAL. I Series Pumps. Model

INSTRUCTION, INSTALLATION, MAINTENANCE AND REPAIR MANUAL MODEL 3310

OPERATION & MAINTENANCE MANUAL POLDER PUMP. A Mark of Quality

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

Agri KAM INSTALLATION, OPERATION AND MAINTENANCE MANUAL. A View of KBL Dewas Manufacturing Plant. A Kirloskar Group Company KIRLOSKAR BROTHERS LIMITED

Operation Manual Model: PPSSS Submersible Slurry Pump

TECHNICAL SERVICE MANUAL HEAVY-DUTY BRACKET MOUNTED PUMPS SERIES 120 and SERIES 124 MODELS J, K, KK, L, LQ, LL AND LM

Farval. Dualine Installation System Start-Up. Bulletin DL300 BIJUR DELIMON INTERNATIONAL

OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP

SERIES FE MAGNETIC COUPLED PUMPS

Butterfly valves Figure 56 Installation & Maintenance Instructions

CHAPTER 20: Operation and maintenance

DEWATERING PUMP. Instruction, Installation, Operation and Maintenance Manual. A Mark of Quality. ISO 9001 Certified Company

OPERATION & MAINTENANCE MANUAL HANGZHOU FLYING TECHNOLOGY CO., LTD.

UNPACKING SAFETY GUIDELINES GENERAL SAFETY INFORMATION. Operating Instructions & Maintenance Manual

MET-PRO. Fybroc series 1600 horizontal pumps. Global Pump Solutions I N S T A L L A T I O N M A N U A L

WORKSHOP MANUAL. 63,4 cm³ chainsaws

END SUCTION CENTRIFUGAL PUMPS

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com

INSTALLATION AND OPERATING INSTRUCTIONS


SAM TURBO INDUSTRY LIMITED

MODEL 442 MODEL 492 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS HORIZONTAL SPLIT CASE SPLIT CASE FIRE PUMP FOR

Installation and Service Instructions 1018, 1020, 1022, & 1024 Size Pumps

Ni-HARD SUBMERSIBLE PUMP

Model 3656/3756. Installation, Operation and Maintenance Instructions. Table of Contents. Owner s Information

Installation, Operation and Maintenance Manual SCP/SFP SELF PRIMING PUMPS

Installation and Maintenance Instructions JSE1-0128MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

Installation, Operation and Maintenance Instructions

TECHNICAL SERVICE MANUAL GENERAL PURPOSE BRACKET MOUNTED PUMPS SERIES 115 MODELS G, GX2, H and HX4

Installation and Service Instructions 1012, 1014, 1015, & 1017 Size Pumps

series 1500 horizontal pumps

SAFETY AND OPERATING MANUAL

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

SELF PRIMING CHEMICAL SERVICE PUMPS

METERING/DOSING PUMP CLOSE-COUPLED B4015D, B4050D, B4100D, B4190D, B2400D, AND B4400D MODELS

Installation, Operation, and Maintenance Manual Self-Priming

NATIONAL TURBINE CORPORATION INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Installation and Maintenance Instructions JSE MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

Installation and Maintenance Instructions JSE2-0241MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

OWNER S MANUAL EVOLUTION 3500, 4500, 5500, & 8500 SERIES PUMPS

NSR PUMPS Installation, Operation and Maintenance Manual

3" & 4" Cast Iron Self-Priming Centrifugal Pump Instruction Manual

JET PUMP INSTALLATION MANUAL. motralec SHALLOW WELL JET PUMPS

Installation and Service Instructions. ST Series Pumps

Operating and Maintenance Manual Gas/Diesel Engine Powered Self-Priming Centrifugal Pumps Series

GD series Submersible Grinder Pump

Designed to Meet Your Specifications! USER MANUAL INSTALLATION OPERATION MAINTENANCE

Table of Contents Illustrations

Service Manual #67. Installation and Service Instructions 6000, 7000 & 8000 Series Magnetically Coupled Pumps

Transcription:

HYDRODYNAMIC SEAL NON METALLIC PUMP INSTALLATION, OPERATION AND MAINTENANCE MANUAL PROCESS PUMPS (INDIA) PVT LTD Plot No.86, III Phase, Peenya Industrial Area, Bangalore 560058 Phone: 91-80-28395327/28 Fax: 91-80-28395807 WEBSITE: www.process-pumps.com E-mail: contact@process-pumps.com `

CONTENTS CROSS SECTIONAL DRAWINGS AND SPARES DETAILS DETAILS OF BEARINGS, OIL SEALS O RINGS AND SHAFT SLEEVS 1.0 INTRODUCTION 2.0 SCOPE OF SUPPLY 3.0 STORAGE AND HANDLING 3.1. RECEIVING THE MATERIAL 4.0 ERECTION 4.1. FOUNDATION 4.2. ALIGNMENT 4.3. FINAL CHECK 5.0 PIPE WORK INSTALLATION 5.1. SUCTION CONDITION 5.2. AUXILLARY PIPE CONNECTIONS 6.0 STARTING THE PUMP 6.1. PRE START CHECK UP 6.2. PRIMING 7.0 OPERATION OF THE PUMP 8.0 CORROSION 9.0 STOPPING THE PUMP 10.0 DIRECTION OF ROTATION 11.0 MAINTENANCE 11.1. RENEWING THE GLAND PACKING 11.2. MECHANICAL SEALS 11.3. BEARING LUBRICATION 12.0 REVERSE ROTATION 13.0 ROUTINE MAINTENANCE SCHEDULE 14.0 TROUBLE SHOOTING 15.0 MAINTENANCE PRACTICE DATE:12.12.2014 2

3

TABLE A Details of bearings, oil seals, O rings and shaft sleeves used in pumpsgroup wise Group No Model Location Bearings Oil Seals O-ring Sleeve OD 1 PPLL-P3, PPLL-P3M,PPLL-P4 D.E 6308 35 X 47X 10 90 X 3 31.75 F.E 6307 30 X 42 X10 80 X 3 1.0 Introduction 4

The PPLL series pump is a Hydrodynamic, single stage; end suction centrifugal pump fitted with either a closed or semi open impeller. For handling clear liquids a closed impeller is used whereas for handling liquids containing solids a semi open impeller is preferred. We have 5 different types of groups available Starting with Group-0 to Group-IV. According to the head and flow rate we have divided in to 5 different groups. All the pumps in one group will have the same bearing housing, Shaft and sleeve etc. We have given the cross sectional drawing for all the groups from Figure No: 1 to Figure No: 5. The pumps are designed to ISO 2858 standard and the back pullout design allows for the easy removal of the rotating assembly without disturbing the existing pipeline. The drive from the electric Motor is transmitted to the pump through a spacer type flexible coupling. Advantages of Hydrodynamic Seal Pump: Unique secondary impeller design to achieve very low gland leakage (less than 3 drops / min.) Well suited for clear liquids and slurries. Low gland maintenance (once in nine months). High performance to price ratio. Very low maintenance cost and down time. 2.0 Scope of Supply The pump is supplied with the following accessories as a standard practice. 5

a) Gland packing or Mechanical seal depending on the customer s choice b) Flexible coupling c) M.S. coupling guard d) M.S. fabricated base plate 3.0 Storage & Handling 3.1 Receiving the Material a) As soon as the material is received the packages should be checked from the delivery challan to ensure that all the items are received and are intact. Discrepancies, if any, must be immediately reported. b) Packages should not be dropped and are to be handled carefully to avoid damage to the pump and motor c) The place of storage should be well ventilated but free from dust, heat moisture. 4.0 Erection All external parts of pump and motor must be thoroughly cleaned before erection begins. 4.1 Foundation The pump assembly must be firmly mounted on the foundation bed secured by means of foundation bolts. The foundation must be strong enough to support the unit and dampen any vibration when the pump is in operation (it is preferable to use a spirit level placed on cleaned machined surface of the pump while erecting the pump). The level can be adjusted by inserting steel packers between the bedplate and the foundation bolt accompanied by a gentle tightening of the bolt and should be cemented prior to erection. 6

4.2 Alignment To check the alignment of the pump and motor a straight edge is placed across the respective half coupling as shown in the FIG.1 FIG.6: CHECKING THE ALIGNMENT OF THE PUMP AND MOTOR When pump is in correct alignment the straight edge will touch all the points, which can be checked against light. For correct alignment the gap between the two halves of the coupling must be uniform throughout the circumference and can be checked with feeler gauges. Proper alignment can be achieved by inserting metal shims under the appropriate feet of the motor. After the cement hardens the foundation bolts are drawn up tight and the alignment of the pump and motor rechecked as explained above. The alignment can be checked using a dial gauge to ensure vibration free operation. 4.3 Final Check The final check for correct alignment is to turn the coupling by hand. The shaft should rotate freely, with no resistance in any of the position. 7

5.0 Pipe work Installation All piping should be supported by hangers or independent supports. Care must be taken to ensure that no piping strains are transmitted to the pump as this may cause misalignment. FIG.7: PIPING SUPPORT 5.1 Suction Condition Elbows should not be employed immediately before the pump inlet since they cause non-uniform condition of entry in to the impeller. If an elbow cannot be avoided a straight pipe section of length equal to at least twice the pipe diameter should be fitted before the pump inlet. 8

Adequate care must be taken to ensure that the joints of the suction pipe are airtight, otherwise air leaks in to the suction line reducing the capacity of the pump or if the amount of the air drawn-in is considerable the pump will fail to the lift the liquid at all. The suction line should be as short as possible and must have least number of elbows in it. The minimum depth of submergence of the strainer, if used, should be approximately three times the suction pipe Dia, measured from upper row holes in the strainer. The distance of the bottom from the strainer and the floor of the pump or reservoir should not be less than twice the pipe diameter. FIG.8: POSITION OF STARINER IN SUCTION SUMP 9

FIG.9: OFFSET TAPER PIPE AT PUMP INLET It is preferable to use the suction and discharge piping of one size larger diameter than the pump suction and delivery sizes respectively. In such cases an offset taper pipe transition should be used as shown in the fig. When there is no foot valve on the suction side a non return valve should be fitted in the delivery pipe to protect the pump from water hammer and to safe guard the pump and the motor against rotation in the reverse direction when the pump suddenly stops e.g. due to power failure. 5.2 Auxiliary Pipe Connections The following pipe connections should be made if required a) Jacketed stuffing box. b) Mechanical seal flushing/quenching connections. c) Cooling connection to bearing housing. 6.0 Starting the Pump 10

6.1 Pre Start Check up a) Wiring the motor terminals and starter should be checked. Direction of rotation if incorrect must be corrected by reversing two of the starter leads. b) MECHANICAL SEALS: If pump is fitted with mechanical seal, the manufacturer s instructions are to be carried out. c) BEARING: The pumps are dispatched without oil and the bearing housing must be filled with oil of SAE 80 grades to the required height indicator. 6.2 Priming The pump is filled with water or liquid through the priming funnel or the delivery pipe. Priming can also be accomplished by employing a vacuum pump to evacuate the air. Priming is not required for installations with positive suction. The delivery valve should be closed before starting the pump. On acid service or organic liquid service the pump should not be run with the delivery closed for more than a few seconds because the increase in the temperature of acid or volatile liquid may be harmful. The pressure indicated in the delivery gauge should go up steadily. Otherwise it can be assumed that there is air in the pump. Should the ammeter on the starter comeback almost to zero, it means that the pump has lost its priming and in such cases repriming is a must. 7.0 Operation of the Pump 11

The gland nuts should be tightened excessively in case of pumps with gland packing. Liquid should not be allowed to leak from the stuffing box at the rate of 30 to 60 drops per minute. This cools the shaft and reduces friction. Packing should be replaced periodically when it gets worn away. The desired capacity is to be set by throttling the discharge valve. Observing the pressure gauge, ammeter, voltage and speed for satisfactory suction conditions. The level of the oil in the bearings must be checked. The temperature of the oil should not exceed 60 Deg C, above ambient temp. If the oil gets darker the same should be replaced with fresh oil after flushing out the bearing housing. The drive end bearing cover is provided with six bolts altogether in pumps above 250 mm impeller diameter. It can be seen that three of the bolts are fully tightened to secure the bearing cover to the bearing housing and the other three are left untightened. These three bolts are meant only for adjusting the axial movement of the impeller and should never be mistaken for untightened bolts. 8.0 Corrosion 12

The material of construction of the pump has been selected after careful study of the liquid to be handled, its composition, its corrosiveness, specific gravity, ph, temperature, solid content, particle size, viscosity, etc. A slight variation in any of the above factor can cause severe corrosion of the wetted parts. Therefore it is necessary that ample care be taken to ensure with every fresh batch of liquid that its properties are the same for which the pump originally is meant. When numbers of pumps with different materials of construction have been supplied for different duty conditions great care must be taken to ensure that the right pump is put in to service. Operating the pump at the point other than the specified duty point might also have an adverse effect as far as the corrosion is concerned. Spare parts of the same original material are to be used while parts are replaced to avoid the formation of galvanic cell, which initiates corrosion. 9.0 Stopping the Pump Before stopping the pump the discharge valve must be closed. The motor is switched off and the sealing fluid to the gland / seal should be left open in case of crystallizing liquid being pumped. The liquid remaining in the impeller casing should drained off by means of the drain plug provided. 10.0 Direction of Rotation 13

FIG.10: VIEW FROM MOTOR SIDE The pump should always be run in the direction indicated by the arrow provided on the bearing housing. The pump has to rotate in the clockwise direction when viewed from the motor side. While checking the direction of the rotation the pump should be filled with liquid in order to prevent it from running the packing or seal dry. Dry running of the pump can cause immediate failure of the mechanical seal. 11.0 Maintenance Depending on the operating conditions, the pump should be dismantled and inspected at suitable intervals. Only experience can tell how frequently these overhauls are necessary. 11.1 Renewing the Gland Packing Packing of the correct size of square section suitable for the liquid to be handled is to be used. Packing should be cut accurately to size. The following steps must be followed for renewing the packing: a) Motor should be isolated from the supply. b) Suction and the discharge valve must remain closed. 14

c) The packing to be slid away from the stuffing box after opening the gland cover. d) The gland packing is removed. e) The shaft sleeve to be examined for scoring or cording and, if necessary a new sleeve is to be fitted. f) The same sequence of packing as is originally employed by the manufacturer is to be followed. g) The gland is inserted and secured in position. The gland cover is tightened. Note: A provision for flushing is provided in stuffing box if flushing fluid is available and if you would like to use flushing remove the plug and use a nipple of quarter inch plug for flushing. 11.2 Mechanical Seals In case of pumps with mechanical seal, care should be taken to fit the seals exactly as per manufacturer s instructions. Mechanical seal parts of Teflon should be used for only one installation. Reusing of such parts is not recommended. 11.3 Bearing Lubrication Pumps are supplied with oil-lubricated bearings. The housing is provided with an oil level indicator and only a quick glance is required to 15

know whether proper lubrication is provided. Oil is to be flushed out through the drain plug and fresh oil to be filled through the oil breather provided at the top of the bearing housing. Oil of SAE 80 must be used for lubrication. 12.0 Reverse rotation When there is power cut to the pump driver clubbed with malfunctioning of check valve at the discharge line. Subsequent to the power cut, the pump speed reduces very rapidly causing rapid reduction in flow arriving to a point where no flow could be pushed against the existing head. The flow of fluid tends to reverse its direction and pass through the pump chamber from discharge to suction and it makes impeller to rotate in reveres direction, Due to this reverse rotation of the impeller driven by the fluid flow The following are the effects Bearing failure in the pump Mechanical seal failure in the pump Damage to the pump shaft, impeller and wearing Subsequent damage to the bearing housing and stuffing box 13.0 Routine Maintenance Schedule 16

1) The Pump has to be checked daily for sign of leakage, bearing temperature, suction and discharge pressure, undue noise or vibration and cooling liquid. 2) Weekly checking of the glands, mechanical seal, and oil level has to be carried out. 3) Once in three months the bearing oil has to be changed and the gland packing renewed. 4) Every six months the coupling alignment is to be checked. 5) Every two years the pump has to be dismantled and the following checks should be carried out to avoid any extensive damage or replacements or total breakdown at a later stage: To be checked for loose fitting of the bearing and the extent of looseness determined should not be more than 0.05 mm on diameter. Same way using a dial indicator check should be carried out for shaft bend, sleeve concentricity and the indicator movement should not exceed 0.05 mm. Excessive internal thrust and bearing looseness may allow the shaft to move axially under certain conditions. The dial indicator is mounted on the base frame and the shaft given a gentle tap with a soft hammer and the reading should not exceed 1.0 mm. Also the bearings, shaft, shaft sleeve, impeller, impeller casing, coupling etc. should be examined against any sign of wear, damage, corrosion etc. Use Loctite 630 thread lock adhesive while refitting impeller nut 6) After all the above checks have been carried out the pump reassembly are taken up. While reassembling care must be taken to ensure that there are 17

no nicks, burrs, dirt or other foreign material on any mating surfaces which would cause uneven mating. 14.0 Trouble Shooting In the event of failure of any component or assembly, the primary cause of failure should be established before renewing the defective parts. 18

Symptom Possible Cause Remedy 1. Pump fails to start a) No supply to motor or Power failure b) Seizure of pump or motor Check power supply Dismantle and overhaul as necessary 2. Pump fails to lift the liquid a) Leakage in the suction line b) Available NPSH low c) Clogging of the suction or discharge line. Check for leakage in the suction line Charge installation as necessary Clear the suction and discharge line 3. Pump fails to maintain discharge pressure a) Pump running at low speed b) Suction valve not fully Check speed of motor Check suction valve open 4. Pump delivers insufficient capacity a) Low speed b) Suction valve not fully opened c) Pump not primed d) Air leak in pump or suction system e) Excessive impeller clearance Check speed of motor Check suction valve opening Prime the pump Check for leak in suction Adjust the impeller clearance 5. Excessive leakage from stuffing box a)gland packing fitted incorrectly b) Gland packing worn out Repack the gland correctly Renew the gland packing 19

6. Excessive Motor vibration 7. Bearing overheating HYDRODYNAMIC SEAL NON METALLIC PUMP c) Mechanical seal component defective d) Mechanical seal component fitted incorrectly Renew the seal/ component Reinstall the mechanical seal a) Cavitation Check suction condition b) Rotating assembly out Dismantle and overhaul as of balance necessary Eg: wearing impeller c) Holding bolts loose Tighten the bolts d) Misalignment between Check alignment motor and coupling e) Bearing defective Renew bearing f) Foreign material trapped Remove foreign material g) Incorrectly supported Check the pipe work pipe work a) Insufficient lubricant in Check bearing lubricant bearing housing b) Bearing defective Renew the bearing c) Misalignment Check the alignment 15.0 Maintenance Practice Pump Model Pump Sl. No. Mech. Seal No. Bearing No Oil Seal No. O Ring No. Motor HP RPM Frame Size 20

21