Due Diligence Review of Proposed Roads Pavement Rehabilitation in Baiyin District. PRC: Gansu Baiyin Urban Development Project

Similar documents
CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

PRC: Southern Gansu Roads Development Project

800 Access Control, R/W Use Permits and Drive Design

PROJECTS $500K AND OVER FOR 2012

5 SPEED LIMIT REVISIONS ON REGIONAL ROADS JANUARY UPDATE

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

City of Houston Fondren Road Paving and Drainage

EXCEPTION TO STANDARDS REPORT

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

4 SPEED LIMIT REVISIONS ON REGIONAL ROADS

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1

Ex-Ante Evaluation (for Japanese ODA Loan)

Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153

Public Information Workshop

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

CHAPTER 15 STREET LIGHTING TABLE OF CONTENTS

Purpose and Need Report

Priority Transport Projects in Republic of Armenia. 10th Eastern Partnership transport panel Brussels, 11 May 2016

Dixie Transportation Planning Office

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN

Sri Lanka. Area = 65,610 sq. km. Population = 21.2 million Per Capita GDP US$ 3,835 GDP US$ 81.3 Billion GDP Growth 4.4%

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Rolling Road (Route 638) Widening Project

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING. Underground Vault

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

EMERGING REQUIREMENTS

This letter summarizes our observations, anticipated traffic changes, and conclusions.

PUBLIC INFRASTRUCTURE PROJECTS

1 Downtown LRT Connector: Draft Concept

Crestmont Development Update 2017 AGM

Submission to Greater Cambridge City Deal

Mississauga Bus Rapid Transit Preliminary Design Project

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman

ECONOMIC AND FINANCIAL ANALYSIS

Stormwater and sanitary sewer lines 8 inches in diameter or greater

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

Available online at ScienceDirect. Procedia Engineering 137 (2016 ) GITSS2015

CURRENT STATUS OF ROAD TRANSPORT POLICIES, SYSTEMS AND PROJECTS IN BHUTAN

TRAVEL DEMAND FORECASTS

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

SCAN Land Use and Transportation Committee Report June 10, 2015

PUBLIC TRANSPORTATION

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council:

Planning of the HSR Network

Recommendations for AASHTO Superelevation Design

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Purpose: General Provisions:

Forest Hill Street Clutter study

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8

City of Grand Forks Staff Report

Pace Bus Depot Location Analysis

ECONOMIC AND FINANCIAL ANALYSIS

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

Rural Planning. Highway Projects - CULLMAN COUNTY

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

Attachment D Environmental Justice and Outreach

Appendix F-1 Description of the Long-Term Alternatives

Technical Memorandum

RESTRICTIONS ON PARKING; POSTED LIMITATIONS.

2. ELIGIBILITY REQUIREMENTS

San Antonio Municipal Code Selected Sections

Characterization of Combined Use of County Road Segment

Construction Realty Co.

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

5 June 12, 2013 Public Hearing APPLICANT: BARTON HERITAGE, LLC T/A SANDBRIDGE BEACH BUGGIES PROPERTY OWNER: LOWER 40, LLC

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

Transport Demand Management Policies in Beijing. CAI Jing Beijing Transport Energy and Environment Center April 2016 in New Delhi

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

Best Practices in Planning and Implementing BRT in China

INDUSTRIAL DEVELOPMENT SITE DLH PARCEL #34 +/ GROSS ACRES DLH PARCELS #114 & #115 +/ GROSS ACRES

10 May 14, 2014 Public Hearing

Construction Staging Area 4 Avenue Road

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

HCM will expand the production capacity and sales support, such as dealer empowerment, etc. in Chinese market.

Construction Noise Memorandum

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Prince George CNG Operations and Maintenance Facility Project BC Transit

APPLICATION FOR PERMIT TO INSTALL A DRIVEWAY ON A COUNTY TRUNK HIGHWAY

Mannheim/Higgins. Lee/Touhy. Municipal. Alternate 1), Village of Rosemont (Eastbound. Major Considerations:

Chapter PARKING REGULATIONS

Citizens Committee for Facilities

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

Information Meeting Transfer Station Options. September 30, 2014

2.0 Development Driveways. Movin Out June 2017

Transcription:

Resettlement Planning Document Addendum to the Resettlement Plan Document Stage: Final Project Number: 40051 May 2011 Due Diligence Review of Proposed Roads Pavement Rehabilitation in Baiyin District Under PRC: Gansu Baiyin Urban Development Project Prepared by Baiyin Housing and Urban-Rural Development Bureau Gansu Province, PRC The resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB s Board of Directors, Management, or staff and may be preliminary in nature.

Loan from Asia Development Bank Urban Development Project of Baiyin City of Gansu Province in China Statement of Land Use of Newly Added Roads In Baiyin District Baiyin Housing and Urban-Rural Development Bureau April, 2011

1. Background of newly added project roads Due to many years operation, the existing roads in the urban area of Baiyin District have been partly collapsed and severely damaged, which severely affects the urban traffic and needs maintenance or restoration. Through road investigation and analysis and determined by Baiyin Bureau of Real Estate and Urban and Rural Construction, surfaces of the 6 road sections will be repaired. See Table 1 on the project information. Road name Chengxin Avenue Gong nong Road Western Railway Plaza Park Road Western Sector of Yejin Road Dongshan Road Project Section Table 1 Chang an Road-109 National Highway Jianshe Road-Wangxian West Road Western Sector of Beijing Road Municipal No.1 Middle School-South Circle Road Kangle Street-Renmin Road Silong Road-Wangxian East Road Length (m) Project information Width (m) Area (m2) 690 80 30300 2386 36 60900 465 18 8300 2006 36 62698 890 40 27300 1190 36 35500 Project description drainage drainage drainage, lightening sidewalk sidewalk sidewalk Cost (CNY10 4 ) 642.16 955.99 288.81 804.9 432.44 597.18 Total 7627 225,000 3721.48 2. Description of newly added project roads 2.1 Chengxin Avenue Chengxin Avenue built in 2001 is 2653 meters long and 80 meters wide, including 30 meters wide of main traffic lane, 6.5*2 meters wide of non-motorized vehicle traffic lane, 28 meters wide of sidewalk and 4.5*2 meters wide of lane separator. Due to increased construction vehicles, motorized vehicles and heavy-duty vehicles, forestation water penetration, pipeline damage, raised underground water level and etc., partial roadbed of Chengxin Avenue is collapsed and the road surface is damaged. It is planned to overhaul and resurface the road with full length of 690 meters from No.109 National Highway and Chang an Road sector, with reconstruction road area of 30300 square meters, mat coat of 15050 square meters, curb of 4740 1

meters and project budget of 6.4216 million yuan. Figure 1 Reconstruction schematic diagram of Chengxin Avenue 2.2. Gongnong Road Gongnong Road is 2386 meters long, and the main traffic road is 12 meters wide, which was reconstructed in 2003. Since various construction vehicles, motorized vehicles and heavy-duty vehicles pass through Gongnong the Road surface collapsed and suffered severe damage, which affect the urban traffic. The planned road overhaul area is 60900 square meters with 3770 meters of curb, 2 road lamp switching boxes, 1000 meters of cable and 122 sets of lamps are replaced. The project budget is 9.5599 million yuan. Figure 2 Reconstruction schematic diagram of Gongnong Road 2.3 Road surrounding Western Railway Station Plaza Road surrounding the Western Railway Station Plaza will be reconstructed into circular forms. The road length is 465 meters, and the road width is about 18 meters. The road was reconstructed in 1996 and has been operated for 15 years. Due to rising of the underground water level and unsmooth drainage system, the road is severely damaged and collapsed and needs overhaul and maintenance. Reconstruction area surrounding Beijing Road and the Western Railway Station Plaza 2

is 8300 square meters with improvement of 465 meters of road marked line, marks and the drainage pipeline network. In addition, 33 sets of road light will be installed. The project budget is 2.8881 million yuan. Figure 3 Reconstruction Road diagram Surrounding the Western Railway Station Plaza 2.4 Gongyuan Road The Gongyuan Road is 3560 meters long. The main traffic road is 14-21 meters wide and the non-motorized road is 3*2 meters. The total length from Chengjian Cross to No.109 National Highway is 1210 meters; aperture from No.109 National Highway to the Express Highway is 1300 meters long, which was built in 2002. The construction vehicles, motorized vehicles and heavy-duty vehicles are so many, and the southern section of the Gongyuan Road is severely collapsed and damaged. Overhaul area of the entire road is 40200 square meters. 9860 meters of curb and 2 sets of road lamp switching boxes will be installed. 3000 meters of cables and 204 sets of lamp will be replaced. The project budget is 8.049 million yuan. Figure 4 Reconstruction schematic diagram of the Park Road 3

2.5 The Western Section of Yejin Road The Western Section of Yejin Road (Kangle Street-Panxuan Road) is 900 meters long. The main traffic road is 12 meters wide, which was reconstructed in 2003. Since the construction vehicles, motorized vehicles and heavy-duty vehicles pass through Yejin the road is collapsed and damage is severe, and the road needs overhaul and maintenance. It is planned to overhaul the western section with area of 27300 square meters, and the project budget is 4.3244 million yuan. Figure 5 Reconstruction diagram of the Western Section of Yejin Road 2.6 Dongshan Road Dongshan Road is 1190 meters long, and the main traffic road is 15 meters wide, which was expanded and reconstructed in 2001 and has been operating for 10 years beyond the service life; plus damage and leakage of the aging pipeline network and severe collapse and damage of Dongshan the road shall be overhauled. The overhaul road area is 35500 square meters, and the project is 5.9718 million yuan. Figure 6 Reconstruction schematic diagram of Dongshan Road 4

3. Land Use by newly added project Intermediate or overhaul project of the newly added road in Baiyin District is the reconstruction project of the existing road surface. Reconstruction and maintenance of the original road does not require increasing width of the road and will not involve land acquisition and resettlement. In addition, it is unnecessary to move ground attachment, such as street trees on both sides of the road and the power supply and telecommunication facilities. The construction materials are prepared at the material field base and will be transported to the construction site, so no land or road will be occupied temporarily. To minimize influences on the urban road traffic, section construction method (200 meters to 300 meters for 1 section) will be carried out to ensure that shops along the street can perform business during the construction period. Meanwhile, the road will kept semi-opening during construction period. The construction of each road section will be controlled within half a month to reduce influences on shops and local traffic. 4. Conclusion The newly added project in Baiyin District does not involve any land acquisition and resettlement impacts. No involuntary temporary land occupation is expected. Measures will be taken to minimize construction disturbance on business and local traffic as well. 5