SUBSTATION INTERLOCKING SCHEMES

Similar documents
National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

Engineering Instruction

Technical Guidance Note 287. Third-party guidance for working near National Grid Electricity Transmission equipment

33kV Connection up to 90MVA

Toro Sprayer Calibration Tool

POWER SYSTEM OPERATING INCIDENT REPORT: TRIP OF 837 TARONG MT. ENGLAND 275 KV LINE AND MT. ENGLAND NO KV BUSBAR ON 30 OCTOBER 2011

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

B kv Gas-insulated Substations

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010

Instructions for VCP-W Simple Electrical Ground & Test Device (SEG&TD) with simplified interlock scheme - bottom terminal set version

Controlling the Speed of Tilting Trains Through Curves

Track Circuit Assister Configuration for Rail Vehicles

Mechanical Trainstop Systems

www. ElectricalPartManuals. com Instructions for Field Testing of Ground Fault Systems Utilizing Cutler-Hammer Magnum DS Circuit Breakers

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Guidelines for connection of generators:

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Compatibility Between Electric Trains and Electrification Systems

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

TECHNICAL SPECIFICATION

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

Power System Operating Incident Report Trip of Murray Lower Tumut No kv Transmission Line at Murray End Only on 18 November 2013

Guidance for Low Voltage Electrical Installations

UK Power Networks Use of System Charging Methodology

GC0023 Protection Fault Clearance Time & Back-Up Protection

Low Voltage Power Supplies in Electrified Areas

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF B 220 KV BUSBAR AT GEORGE TOWN ON 27 NOVEMBER 2012.

Reference Number PDS 18 - (RIC Standard: EP SP)

TECHNICAL SPECIFICATION

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide.

1000mA - 650mA Phase Dimmable LED Driver

To complete the process for a net metering interconnection, please follow the steps below:

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

GHA. Gas-Insulated Switchgear. Gas-Insulated Switchgear. Switchgear extension and replacement of a panel

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

Equipotential Bonding of Rail Vehicles to Running Rail Potential

INTERNATIONAL STANDARD

To complete the process for a net metering interconnection, please follow the steps below:

Installation Instructions for Interlocking Trip Indicator with Remote Reset for Magnum Low Voltage Circuit Breakers

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

NATIONAL GRID ELECTRICITY TRANSMISSION plc THE CONNECTION & USE OF SYSTEM CODE TABLE OF CONTENTS

SWITCHGEAR FOR SERVICE UP TO 36kV (CABLE AND OVERHEAD CONDUCTOR CONNECTED)

DALI 650mA LED Driver

POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012

650mA Phase Dimmable LED Driver

How to get started. with. Kongsberg XP Auto systems. Serial number: Please Read This First

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

XXXXX. Kokish River Hydroelectric Project. Interconnection Facilities Study and Project Plan

Dublin Airport Chauffeur Code of Conduct Dublin Airport Chauffeurs Code of Conduct. Dublin Airport Parking

High Voltage Operating Rods

Removal/installation instructions for Series NRX (IZMX) drawout levering (racking) mechanism

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

PVI 1800/PVI Residential/Commercial Grid-Tied Photovoltaic Inverter WARRANTY MANUAL. Subject to Change REV , Solectria Renewables

WARRANTY POLICY. Grid-Tied Photovoltaic Inverters. Revision D. 2014, Solectria Renewables, LLC DOCIN

Electric vehicle charging system

Interconnection Process for Generation Systems

Risk Management of Rail Vehicle Axle Bearings

Instruction Booklet IB E. Contents

CMP294: National Grid Legal Separation changes to CUSC Section 14. CUSC Modification Proposal Form

PVI 60KW, PVI 82KW, PVI 95KW

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

DEEP SEA ELECTRONICS PLC

Substation Lightning Protection. Document Number: 1-11-FR-11

NPS/003/016 Technical Specification for 48V and 110V Battery and Charger Systems

Gas Turbine Aircraft Engines

Requirements for Secondary Voltage Revenue Metering (750 V and less)

AS/NZS 3112:2004 AS/NZS

Factory Authorized Mechanism Enhancement (FAME)

Comparison of price incentive models for locally matched electricity networks. Appendix C: Private Wires - Legal Definitions

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

AVE MARIA STEWARDSHIP COMMUNITY DISTRICT

Service and Rehabilitation Electrical Power Systems

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

TECHNICAL SPECIFICATION

Advanced Test Equipment Rentals ATEC (2832)

POWER SYSTEM OPERATING INCIDENT REPORT LIGHTNING STRIKES IN TASMANIA AND PACIFIC ALUMINIUM POTLINE LOAD REDUCTIONS 21 MARCH 2013

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

BP OIL -- TOLEDO REFINERY

Service & Installation Rules

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600

B kv T&D GAS INSULATED SWITCHGEAR

3-way multi-family drawout cable interlock kit - type 32 - RF

The Use of Electricity In Mines Regulations

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP)

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims

User s Manual TX MHz Powercaster TM Transmitter

New Machinery Directive

Gisborne District Traffic and Parking Bylaw DOCS_n144966

Revision 34 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 1 st April 2009.

All words and phrases with initial capitals have the meanings given to them in clause 13 of these General Terms and Conditions.

A MODEL SYLLABUS FOR THE TRAINING OF TECHNICIANS INVOLVED IN THE EXAMINATION, TESTING, MAINTENANCE AND REPAIR OF PETROLEUM ROAD TANKERS

Company Directive STANDARD TECHNIQUE: SD4O/1. Standard HV Connection Arrangements

Simple Electrically Operated Ground & Test Device For use in Type VCP-W Switchgear rated up to 15kV, 25 and 40kA UPPER TERMINAL SET VERSION

Interface between Rail Vehicle Weights and Underline Bridges

Transcription:

SUBSTATION INTERLOCKING SCHEMES This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses arising under or in connection with this information. This limit on liability applies to all and any claims in contract, tort (including negligence), misrepresentation (excluding fraudulent misrepresentation), breach of statutory duty or otherwise. This limit on liability does not exclude or restrict liability where prohibited by the law nor does it supersede the express terms of any related agreements." TABLE OF CONTENTS PURPOSE AND SCOPE... 1 PART 1 TECHNICAL REQUIREMENTS... 1 1 GENERAL REQUIREMENTS... 1 2 GENERAL REQUIREMENTS... 3 3 FORMS AND RECORDS... 3 PART 2 - DEFINITIONS AND DOCUMENT HISTORY... 3 4 DEFINITIONS... 3 5 AMENDMENTS RECORD... 4 6 IMPLEMENTATION... 4 PART 3 - GUIDANCE NOTES AND APPENDICES... 4 7 REFERENCES... 4 PURPOSE AND SCOPE This document describes the technical requirements of interlocking schemes for User s equipment directly connected to the England and Wales Transmission system and located within NGET s busbar protection zone operating at nominal voltages of 400 kv, 275 kv, 132 kv and 66 kv unless otherwise agreed with the user as defined in the Bilateral agreement. The principles of this document apply to equipment connected at other voltages. PART 1 TECHNICAL REQUIREMENTS 1 GENERAL REQUIREMENTS 1.1 Common Requirements 1.1.1 So that operators do not compromise the integrity of the Transmission System in England and Wales by incorrect or inadvertent operation of equipment, substations shall be provided with a full interlocking scheme to ensure that all disconnectors, fixed earthing switches (or other interlocked earthing devices) and where required circuit-breakers, are operated in the correct sequence. 1.1.2 In substations where NGET is a joint occupier and/or has operational responsibility for switchgear then the interlocking shall also be designed with consideration of personnel safety. 1.1.3 Interlocking schemes shall cover the following conditions:- (a) Interlocking between circuit breakers and disconnectors to ensure disconnectors do not operate outside their rating i.e. make or break load currents. (b) Interlocking between disconnectors and earthing switches to ensure that earthing switches cannot be closed on to a locally energised circuit and cannot be energised, when closed, by operation of disconnectors. Uncontrolled When Printed Page 1 of 5

(c) (d) (e) (f) Interlocking between disconnectors and adjacent earthing switches to permit operation of the disconnector when earthing switches are closed on both sides of the disconnector. Such interlocking is not required for equipment rated at 145kV and below. To ensure correct sequence of on load busbar transfer switching operations at multiple busbar substations. To ensure that a bus-coupler or bus-section circuit breaker is only closed with its associated disconnectors are both open or both closed. For equipment at sites where NGET is the Occupier, to restrict access to areas of the substation where safety clearances may be infringed unless appropriate safety measures, such as isolation and earthing, have been taken. 1.1.4 The interlocking of switching sequences involving only power operated switchgear shall be by electrical means. The correct interlocking status shall be confirmed automatically on initiation of an operation from any control position or from auto-switching or sequentialisolation equipment. 1.1.5 The interlocking of switching sequences involving manually operated switchgear may be by electrical or mechanical means. The interlocking shall be designed such that the correct interlocking status must be confirmed immediately before an operation. 1.1.6 Interlocking systems shall, where reasonably practicable, be fail-safe. They shall not be defeated without the use of tools, clip leads etc. or a purpose designed override facility. 1.1.7 Interlock override facilities shall be lockable with a unique lock or shall be lockable by means of a safety padlock. 1.1.8 Partial interlocking of earthing switches at circuit-entries to the substation is acceptable where it is not reasonably practicable to extend the interlocking to the remote end disconnectors. Any partially interlocked earthing switch shall be provided with a warning label stating 'WARNING, THIS EARTHING SWITCH IS NOT FULLY INTERLOCKED'. 1.1.9 Interlocking shall be effective for switching and operating sequences when they are being followed in either direction (for example; if an earthing switch must be closed before an access gate can be opened then the gate must be secured closed before the earthing switch can be opened). 1.1.10 Interlocking schemes shall, where reasonably practicable, provide the maximum operational flexibility and shall not unnecessarily impose fixed operating sequences. 1.1.11 Where an interlocking scheme is being supplied for an extension to an existing substation at the same operating voltage then, unless otherwise agreed by NGET, the interlocking philosophy shall match that existing. 1.1.12 Interlocking for a substation extension shall be fully interfaced with the existing interlocking scheme to achieve the functional requirements specified in this document. 1.1.13 Interlocking may, in certain circumstances, have to be by-passed by auto-reclose schemes. The requirements for these are specified in TS 3.24.16. (RES). 1.2 Mechanical Interlocking 1.2.1 Mechanical interlocking systems shall be designed to provide a level of security and reliability comparable with equipment specified in Clauses 1.2.2 to 1.2.6 below. 1.2.2 Mechanical interlocking shall be by key operated systems Uncontrolled When Printed Page 2 of 5

1.2.3 Interlock keys shall be of a non-masterable design (i.e. no master key can be supplied or manufactured). Differs shall not be repeated on the same substation site. Note: Differ is the term for the difference in a key which prevents it being interchangeable with another. 1.2.4 Interlock keys shall be engraved with an identifying reference which shall be unique to that substation site. The identifier shall, where appropriate, include the system number of the switching device where the key is located during normal operation. Key locations shall be marked with the identifier of the required key. 1.2.5 Where key exchange boxes are provided they shall be located in convenient positions with regard to normal substation operating sequences. 1.2.6 Where mechanical key interlocking is fitted to disconnector and earthing switch mechanisms the requirements specified in TS 3.2.2 (RES) shall apply. 1.3 Electrical Interlocking 1.3.1 Electrical interlocking systems shall be designed to provide a level of security and reliability comparable with equipment specified in Clauses 1.3.2.and 1.3.3 below. 1.3.2 A facility shall be provided to allow the interlock system of each disconnector or earthing switch to be defeated without disturbing wiring. The facility shall meet the requirements of Clause 1.1.7 above. Note This may take the form of a self-resetting switch or push-button to bypass electrical circuits. 1.3.3 Disconnector and earthing switch mechanisms which form part of electrical interlocking schemes shall meet the requirements of TS 3.2.2 (RES). 2 PERFORMANCE REQUIREMENTS Mechanical and hard-wired electrical interlocking schemes shall operate satisfactorily under the full range of environmental conditions specified for the associated primary equipment. 3 FORMS AND RECORDS None. PART 2 - DEFINITIONS AND DOCUMENT HISTORY 4 DEFINITIONS None. Uncontrolled When Printed Page 3 of 5

5 AMENDMENTS RECORD Issue 1 Date February 2018. Summary of Changes / Reasons New document Author(s) Andrew Ridley Policy Development Approved By (Inc. Job Title) 6 IMPLEMENTATION 6.1 Audience Awareness Audience Purpose Compliance (C) / Awareness (A) Notification Method Memo / letter / fax / email / team brief / other (specify) 6.2 Training Requirements Training Needs / Informal / Workshop / Formal Course Training Target Date Implementation Manager 6.3 Compliance 6.4 Procedure Review Date 5 years from publication date. PART 3 - GUIDANCE NOTES AND APPENDICES 7 REFERENCES The following TS (RES) documents are relevant to Substation Interlocking and should be read in conjunction with this document as appropriate. TS 1 (RES) TS 2.1 (RES) TS3.2.2 (RES) Ratings and general requirements for plant, equipment, apparatus and services for the National Grid System and connection points to it. Substations. Disconnectors and Earthing Switches Uncontrolled When Printed Page 4 of 5

Copyright National Grid plc 2011, all rights reserved All copyright and other intellectual property rights arising in any information contained within this document are, unless otherwise stated, owned by National Grid plc or other companies in the National Grid group of companies. No part of this publication may by reproduced in any material form (including photocopying and restoring in any medium or electronic means and whether or not transiently or incidentally) without the written permission of National Grid plc This information should not be forwarded to third parties Uncontrolled When Printed Page 5 of 5