EXCEPTIONS TO RELIABILITY RULES REVISION 4 MAY 8, 2015

Similar documents
EXCEPTIONS TO RELIABILITY RULES Revision 10 August 11, 2017

EXCEPTIONS TO NYSRC RELIABILITY RULES

EXCEPTIONS TO RELIABILITY RULES Revision 11 February 9, 2018

The New York State Bulk Power Transmission Facilities

SUMMARY OF NYISO INTERFACE LIMITS AND OPERATING STUDIES

NYISO OPERATING STUDY WINTER Prepared by Transmission Studies Staff New York Independent System Operator, Inc.

The Long-Range Transmission Plan

Power System Fundamentals

TRANSMISSION PLANNING CRITERIA

2017 Interim Area Transmission Review of the New York State Bulk Power Transmission System

2013 Intermediate Area Transmission Review Of the New York State Bulk Power Transmission System (Study Year 2018) DRAFT REPORT

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

NYISO OPERATING STUDY SUMMER Prepared by Operations Engineering Staff New York Independent System Operator, Inc.

NYISO Operating Study Winter A report from the New York Independent System Operator

2014 Intermediate Area Transmission Review Of the New York State Bulk Power Transmission System (Study Years 2015, 2019, 2024)

NYISO: Dynamic Line Rating in Real Time Markets

Hurricane Sandy. Preparations, Response & Recovery. Wes Yeomans Vice President Operations Management Committee Meeting November 2, 2012

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

2013 CARIS Phase 1 Report

NYISO Operating Study Summer 2018

NYISO Operating Study Summer 2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Illinois State Report

MINIMUM OIL BURN/AUTOMATIC FUEL SWAPPING CAPABILITY

Manual 3: Transmission Operations Updates Version 52

Local Transmission Plan. Rev. 1: April 2018

Manual 3: Transmission Operations Updates Version 52

2016 Load & Capacity Data Report

An Empirical Assessment of the Success of Financial Rights Auctions in PJM and New York

Sub Regional RTEP Committee Mid-Atlantic

NYCA LOLE Violations (Methods D and E )

Sub Regional RTEP Committee Mid-Atlantic

Power Systems Fundamentals

Western NY Public Policy Transmission Planning Report

COST ALLOCATION OF NEW INTERCONNECTION FACILITIES TO THE NEW YORK STATE TRANSMISSION SYSTEM

AC Transmission Public Policy Transmission Planning Report. A Report by the New York Independent System Operator

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

LOCAL TRANSMISSION PLAN

L d L, 2. i L. CHAPTER I The July 13, 1977 Bulk Power Transmission Failure and Con Edison System Collapse

100 MW Wind Generation Project

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

NYISO Dynamic Disturbance Recorder Location Study

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

New Jersey State Report

Reliability Analysis Update

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

Transmission Expansion Advisory Committee

National Grid s 2017 Local Transmission Plan

Highly Constrained Elements Within ATC Footprint

PG&E s 2012 Request Window Proposals

Margarett Jolly DG Manager, Consolidated Edison Company of New York, Inc

Updates and Modifications to Report

Sub Regional RTEP Committee Mid-Atlantic

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Reliability Analysis Update

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study

Northeast Wisconsin/Upper Peninsula Separation 11/14/01. Incident Investigation Report

Seabrook Substation Reliability Improvement Project

National Grid s 2018 Local Transmission Plan

Flowgate 10515, an OTDF flowgate, consists of the following elements:

Western NY Public Policy Transmission Report

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018)

Orange & Rockland Utilities, Inc. Marketer Meeting October 24, 2012

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Supplemental Report on the NCTPC Collaborative Transmission Plan

Transmission Planning for Wind Energy Resources in the Eastern United States. Dale Osborn

Sub-Regional RTEP Committee PJM South

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

PJM Regional Transmission Expansion Planning (RTEP) Process

Greater Albuquerque Area Monthly Housing Trends vs. 2011

No. CONSUMER PRICE INDICES. Information bulletin. Moscow 2019

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

McQuay Climate Control. Horizontal Water Source Heat Pump. CC, CG, CW Vintage C, D. Last Manufactured: 1986

ILLINOIS COMMERCE COMMISSION

New York s Mandatory Hourly Pricing Program

STATE OF NEW YORK PUBLIC SERVICE COMMISSION

Generation Deactivation Notification Update

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

VFT Response to a Breaker Trip and Runback Event

Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any

Knickerbocker to Pleasant Valley 345 kv Transmission Line Project (KB-PV)

Sub Regional RTEP Committee South

STATE OF NEW HAMPSHIRE Inter-Department Communication

Impact of Distributed Energy Resources on Transmission System Reliability

3.0 Radial Distribution Systems

Guideline for Parallel Grid Exit Point Connection 28/10/2010

SPP Notification to Construct

2015 WDC Disturbance and Protection Standards Overview

PET(S) FIRST & LAST NAME: January 2019

Solar Power. Demonstration Site. Annual Performance Report 2017

End-Customer Owned Decentralized Storage as a Part of the Smart Grid Volker Wachenfeld, SMA Solar Technology AG

PES Cook Islands KEMA Grid Study Final Report

Key to Status Fields in the Project List

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Greater Albuquerque Area Monthly Housing Trends vs. 2014

Large Scale Storage and Demand Resources - Enabler of Transmission Delivery? Paper Number: 14PESGM2398

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. LARGE MANUFACTURING SERVICE RATE SCHEDULES (November 2018)

Transcription:

1 NYPA Run Back of EXCEPTIONS RELIABILITY RULES REVISION 4 MAY 8, 2015 Post Contingency Flow on Marcy-New Scotland The post-contingency flow on the Marcy-New Scotland 18 line is allowed to exceed its LTE rating for the loss of the Edic-New Scotland 14 line by the amount of relief that can be obtained by tripping the Gilboa pumping load as a single corrective action. Also, the post-contingency flow on the Edic-New Scotland 14 line is allowed to exceed its LTE rating for either the loss of the Marcy-New Scotland 18 line alone, or the double-circuit loss of the Marcy-New Scotland 18 and Adirondack-Porter 12 lines, by the amount of relief that can be obtained by tripping the Gilboa pumping load as a single corrective action. Approved NYPP Operating Committee January 27, 1988. 2 NG Applicable Rating Post Contingency Flow on Volney-Clay and Nine Mile-Clay 3 NG Applicable Rating Run Back of The post-contingency flow on the Volney-Clay #6 line and the 9 Mile-Clay #8 line is allowed to reach its STE rating for "normal" transfers. Approved NYPP Operating Committee October 25, 1979 Post Contingency Flow on New Scotland-Leeds The post-contingency flow on the NS-Leeds line is allowed to reach its STE rating for transfers to NE & SENY, with sufficient generation at Gilboa. 4 NG Monitoring Monitoring of Transmission Transformer Approved NYPP Operating Committee October 25, 1979. National Grid is fully responsible for monitoring all National Grid 345/115 kv, 345/230 kv, and 230/115 kv transformer overloads and contingency overloads. The NYISO notifies National Grid of any overloads and contingency overloads it detects, but does not invoke these limits unless requested to do so by National Grid. Approved NYPP Operating Committee October 25, 1979. 1

EXCEPTIONS RELIABILITY RULES (CONT D.) 5 NYPA Applicable Rating Run Back of 6 NYPA Special Protection 7 CE Run Back of 8 CE Special Protection Post Contingency Loading on Gilboa-Leeds The post-contingency flow on the Gilboa-Leeds (GL-3) line is allowed to reach its STE rating with four generators on at Gilboa. Post Contingency Loading on L33P and L34P Approved NYPP Operating Committee December 7, 1983. The post-contingency flows on the L33P line and the L34P line are allowed to reach their STE ratings, provided there is sufficient generation rejection selected at the Saunders generating station in Ontario, or sufficient control remaining on the phase angle regulators to return the flows to LTE within 15 minutes. Approved NYPP Operating Committee December 14, 1994. Operational Control of Feeder 21192 for Loss of Feeders 21, 22, and A21191 The loss of the common tower carrying feeders 21 and 22 results in Arthur Kill generator 3 feeding into the remaining 345/138 kv Fresh Kills transformer. To avoid overloading this transformer (Feeder 21192), the output of Arthur Kill 3 must be reduced so that the transformer is below its STE rating within 5 minutes and below its LTE rating within 10 minutes, post contingency. Approved NYPP Operating Committee December 6, 1984. Post Contingency Flow on Buchanan-Millwood W97 or W98 The post-contingency flow on line W97 for the loss of W98 may exceed its LTE rating up to its STE rating if the contingency loss of lines W98 and Y88 does not cause resultant flows on any other feeder to exceed Normal Transfer Criteria. The post-contingency flow on line W98 for the loss of W97 may exceed its LTE rating up to its STE rating if the contingency loss of lines W97 and Y88 does not cause resultant flows on any other feeder to exceed Normal Transfer Criteria. This exception does not apply if either W97, W98, Y88, Indian Point 3, or the overload relay system is out of service. Approved NYPP Operating Committee May 30, 1985. * B-R1 & * 2

EXCEPTIONS RELIABILITY RULES (CONT D.) 9 10/15/09 10 NYPA Special Protection 11 NYPA Special Protection Post Contingency Flow on Marcy AT-1 Transformer The post-contingency flow on the Marcy AT-1 bank is allowed to exceed its STE rating for the loss of the Marcy AT-2 bank, provided that the overload relay protection on the AT-1 bank is in-service. Approved NYPP Operating Committee November 20, 1986. Post Contingency Flow on Plattsburgh-Vermont PV20 Line The post-contingency flow on the Plattsburgh-Vermont PV20 tie-line is allowed to reach its STE rating so long as NYPA can ensure that the Overload Mitigation system is available on a manual or automatic basis to reduce the flow to below the LTE rating immediately following the actual occurrence of the contingency. 12 NYPA Monitoring Post Contingency Flow on Marcy Transformer T2 Approved NYPP Operating Committee February 15, 1995. The post-contingency flow on the Marcy Transformer T2 is allowed to exceed its LTE rating up to its STE rating following the loss of Marcy Transformer T1. Approved NYPP Operating Committee July 23, 1987. * * 3

EXCEPTIONS RELIABILITY RULES (CONT D.) 13 NYPA Run Back of 14 9/14/12 15 Post Contingency Flows on Niagara Project Facilities For the following Niagara Project facilities, the post-contingency flows are allowed to reach their STE ratings, if NYPA can ensure that sufficient generation can be reduced at Niagara to return the flows to less than their STE ratings within 5 minutes and to less than their LTE ratings within 10 minutes from the initial overload: Niagara Project transformers Lines connected directly to the Niagara Project Initially Approved by NYPP Operating Committee August 19, 1993. Revision Approved by Executive Committee February12, 2010. 3/7/2013 16 CE Monitoring East 13 th Street and East River Load Pocket Con Edison is responsible for operating for contingencies resulting from the loss of any East 13 th Street 345/138 kv transformer, or the 345/69 kv transformer. These facilities provide radial support to the East 13 th Street and East River load pocket and are not part of the bulk power system. Approved NYPP Operating Committee August 27, 1997. 4

EXCEPTIONS RELIABILITY RULES (CONT D.) 17 CE Special Protection 18 CE Applicable Rating Run Back of 19 Ramapo to Buchanan 345 kv Feeder Outages During times when 345kV feeder Y94 - Ramapo to Buchanan is out of service, allow post-contingency loading for the loss of 345kV feeder W93 to exceed STE ratings on Transformer TA-5 and 138kV feeder 95891; and during times when 345kV feeder W93 Buchanan to Eastview is out of service, allow post-contingency loading when 345kV feeder Y94 is open ended at Ramapo to exceed STE ratings on Transformer TA-5 and 138kV feeder 95891. If the stated event occurs during the specified outages, there is automatic overload protection installed to trip Buchanan 138kV breaker F7. Eastview to Sprainbrook 345 kv Feeder W79 Outages Approved NYRSC Executive Committee May 9, 2003. During an outage to either feeder Y94/95891 or feeder W79, post-contingency loadings shall be allowed to exceed the STE rating of Eastview transformer 2N for the loss of W79 or Y94/95891, respectively, provided Indian Point #2 generation can and will back down post-contingency to reduce flows through transformer 2N within applicable limits, i.e., less than STE within 5 minutes and less than LTE within 10 minutes from the initial overload. Approved NYRSC Executive Committee May 10, 2002. B-R1 & * 1/31/10 20 CE Applicable Rating PS&G Tie Feeders A2253, B3402, and C3403 Con Edison operates to post-contingency STE ratings on underground circuits based on the ability to reduce the loading to LTE ratings within 15 minutes and not exceed LTE ratings on any other facilities. The following PSE&G tie feeders are operated to post-contingency LTE ratings: A2253 Linden-Goethals 230 kv B3402 Hudson-Farragut 345 kv C3403 Hudson-Farragut 345 kv Approved NYRSC Executive Committee September 10, 1999 5

EXCEPTIONS RELIABILITY RULES (CONT D.) 21 CE Applicable Rating F30, F31, F36, F37, W64, 69, 70, W72, W79, W80, W81, W82, W85, Y86, Y87, Y 88, Y89, W90, W93, Y94, and W99 Above Normal Rating Operation The following feeders on the Consolidated Edison have STE ratings which are limited by disconnect or wavetrap restrictions and not by conductor sagging limitations. These feeders will be operated above Normal ratings and up to LTE ratings (for 4 hours) without changing their STE ratings: F30 Pleasant Valley-Wood St. W80 Wood St.-Millwood West F31 Pleasant Valley-Wood St. W81 Wood St.-Millwood West F36 Pleasant Valley-East Fishkill W82 Millwood West-Eastview (Winter Rating Period Only) F37 Pleasant Valley-East Fishkill W85 Millwood West-SprainBrook (Winter Rating Period Only) W64 Eastview-SprainBrook (Winter Rating Period Only) Y86 Wood St.-Pleasantville (Winter Rating Period Only) W65 Eastview-SprainBrook Y87 Wood St.-Pleasantville 69 Ramapo-South Mahwah Y88 Ladentown-Buchanan South 70 Ramapo-South Mahwah W89 Pleasantville-Dunwoodie W72 Ramapo-Ladentown W90 Pleasantville-Dunwoodie W79 Eastview-SprainBrook W99 Millwood West-Eastview (Winter Rating Period Only) W93 Buchanan North-Eastview Y94 Ramapo-Buchanan North Approved NYRSC Executive Committee September 10, 1999 Revision Approved NYRSC Executive Committee May 8, 2015 6

EXCEPTIONS RELIABILITY RULES (CONT D.) 22 CE Applicable Rating W97 and W98 Above Normal Rating Operation 23 NG Special Protection The following feeders on the Consolidated Edison have overload relay protection. These feeders will be operated above Normal rating and up to LTE rating (for 4 hours) without changing their STE ratings: W97 Buchanan South-Millwood West W98 Buchanan South-Millwood West Generation Rejection at Athens Approved NYRSC Executive Committee September 10, 1999 When the Athens Generation Special Protection is active, the postcontingency flows on the Leeds-Pleasant Valley 345kV line #92 or the Athens- Pleasant Valley 345kV line # 91 are allowed to reach their STE ratings following the loss of the parallel #91 or #92 circuit respectively, provided that there is sufficient generation dispatched and selected for rejection/runback at the Athens generating station and that SPS rejection/runback actions take no more than three minutes in order to ensure that flows are returned to or below LTE ratings within 15 minutes. Approved NYRSC Executive Committee March 9, 2007 * * See s & Compliance Manual Section B Introduction for note on SPSs. 7