SPICES BOARD (Ministry of Commerce & Industry, Govt. of India) Palarivattom.P.O. N H By Pass Kochi

Similar documents
UNIVERSITY OF CALCUTTA Centre for Research in Nanoscience and Nanotechnology JD-2, Sector-III, Salt Lake City Kolkata

INDIAN INSTITUTE OF TECHNOLOGY, KANPUR DEPARTMENT OF ELECTRICAL ENGINEERING

Three Phase UPS Systems Range: 10 to 500kVA

THE ORIENTAL INSURANCE CO.LTD. REGIONAL OFFICE: IDA Building 4 th Floor, 7,Race Course Road, Indore (M.P.) REQUIREMENT

Technical data sheet VH UL. Digital Energy Uninterruptible Power Supply. GE Digital Energy Power Quality

Technical Data Sheets

Technical Data Sheets

CORRIGENDUM. For more details visit website. Further, clarifications regarding queries are attached herewith.

Defender Mini Online Emergency Central Lighting Inverter (CLI) Technical Specifications

gimagination at work Technical data sheet Uninterruptible Power Supply LP Series 6 & 10 kva GE Digital Energy

Cobra 3 Stand-By Emergency Central Lighting Inverter (CLI) Technical Specifications

Fortress 1 Outdoor Emergency Central Lighting Inverter (CLI) Technical Specifications

Power Lynx 3 Uninterruptible Power System (UPS) Technical Specifications

3. MAJOR SYSTEM COMPONENTS Emergency Lighting Power System shall consist of the following major subsystems:

Technical Data Sheets

Technical Data Sheets

EFFEKTA Power Supplies

Technical data sheets

Supply of Batteries

Technical Data Sheets

Liebert. FP 50Z kva

POWERTRONIX QUASAR 5-40 KVA

APC Smart-UPS. GUIDE SPECIFICATIONS FOR 1000VA & 2000VA Smart-UPS 230VAC Uninterruptible Power Supply

Fortress 3 Harsh. Harsh Environment. Emergency Central Lighting Inverter (CLI) Technical Specifications

CENTRAL UNIVERSITY OF JHARKHAND, RANCHI

TECHNICAL DATA SHEET KVA UPS Systemss

Eaton 93PS 8-40kW UPS Technical Specification Manufacturer s declaration in accordance with IEC

TECHNICAL DATA SHEET INFINITY kva 3Ph(in) 3Ph(out)

SmartOnline SUT Series 3-Phase 208/120V 220/127V 20kVA 20kW On-Line Double- Conversion UPS, Tower, Extended Run, SNMP Option

Regional Office: Vijayapura Plot No6, Trimurthy Nagar Managuli Bypass Road, Vijayapura Diesel Generator Required on Rental Basis

Supply, testing, installation and commissioning of 5 ky A UPS system as per the following specification:

POWER kva

ENQUIRY QUOTATION SHOULD BE ADDRESSED TO PURCHASE OFFICER ONLY

NIT No. DEERS/SSDI-JK/05 of 2018 Dated 29/08/2018 E-Tender id No: 2018_FD_ 60565

Supply, Installation and Commissioning of 1 No 50 Watt LED. based SPV SLS at Nadia District Library, Krishna Nagar, Nadia.

SmartOnline SUT Series 3-Phase 208/120V 220/127V 30kVA 30kW On-Line Double- Conversion UPS, Tower, Extended Run, SNMP Option

POWER kva Nominal output power (Cos φ0,8) kva Nominal output power (Cos φ1,0) kw >88 Efficiency (AC AC)

POWER kva

TECHNICAL SPECIFICATIONS OF 2 KVA POWER CONDITIONING UNIT

Technical Data Sheets

Pre-Qualification- Cum Bid Notice

Liebert GXT & 6000VA RT230 Rack-Tower models GUIDE SPECIFICATIONS 1.0 GENERAL

Technical Data Sheet. Uninterruptible Power Supply. Digital Energy. imagination at work

Technical data sheets

TECHNICAL SPECIFICATION FOR A 10 TO 50 KVA THREE PHASE, UNINTERRUPTIBLE POWER SYSTEM WaveRider III

TECHNICAL DATA SHEET B8033FXS kva 3Ph(In) 3Ph(Out)

Industrial PFC UPS System

Three Phase UPS Systems

Supply of 63 kva DIESEL GENERATOR SET WITH AMF

TLE Series UPS 400/500 kw With eboost Technology

Technical Data Sheets

Liebert GXT VA RT230 Rack-Tower model GUIDE SPECIFICATIONS 1.0 GENERAL

Technical Data Sheet. Uninterruptible Power Supply. Critical Power. imagination at work

TECHNICAL DATA SHEET B8031 FXS kva 3Ph(In) 1Ph(Out)

Illuminator Series CR NEMA 3R

UPS Sentry HPS. power supply sources - isolation transformers and generators over less sophisticated power systems.

Technical Data Sheet. Uninterruptible Power Supply. Critical Power. imagination at work

SmartOnline 120V 2.2kVA 1.8kW Double-Conversion UPS, 2U, Extended Run, Network Card Slot, LCD, USB, DB9

SmartOnline SUT Series 3-Phase 208/120V 220/127V 40kVA 40kW On-Line Double- Conversion UPS, Tower, Extended Run, SNMP Option

Technical Data Sheets

Technical Data Sheet. Uninterruptible Power Supply. Critical Power. imagination at work

MERU Solar Off-Grid Inverters

TENDER FOR DG SET. Tender for DG SET. POCKET-14, SECTOR-8, PHASE-1, DWARKA, NEW DELHI Website: TENDER DOCUMENTS FOR

TLE Series UPS 160/200/225/250 kw with eboost Technology

Tender No:- MTL/PUR/213/Elect/ (K)/9. 2 NEW Moulded case Circuit Breaker with O/L & S/C No 02

AMULFED DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY

PowerValue 11/31 T kva

Tender documents for supply, erection & commissioning of Plante Type Battery to 2x210 MW IB Thermal Power Station.

D Series: UPS UPTO - 300KVA - Three / Three Phase

POWER+ CLASSIC 20/30 KVA, 3X208 VAC WITH INTERNAL BATTERIES. GAMATRONIC, A SolarEdge Division

POWER+ CLASSIC 20/30 KVA, 3X208 VAC WITH INTERNAL BATTERIES. GAMATRONIC, A SolarEdge Division

SitePro UPS 400Vac / CE. GE Consumer & Industrial August 2004

Model ESV Uninterruptible Power System 1.5 KVA/KW KVA/KW Single Phase

UniStar III Series. Full Three Year Warranty. On-line, Single-phase UPS System. 1, 2, & 3kVA Tower Model

TLE Series UPS 750/1000 kw With eboost Technology

SmartOnline S3MX Series 3-Phase 380/400/415V 60kVA 54kW On-Line Double-Conversion UPS

True double-conversion online single-phase UPS. PowerValue 11 RT 1 10 kva Single-phase UPS for critical applications

SmartOnline SVTX Series 3-Phase 380/400/415V 20kVA 18kW On-Line Double-Conversion UPS, Tower, Extended Run, SNMP Option

Power+ CLASSIC. 20/30 kva, 3x208 Vac

MKN-DSP SERIES - THREE PHASE

Technical Data Sheet. Uninterruptible Power Supply. Critical Power. imagination at work

Technical Data Sheet. Uninterruptible Power Supply. Critical Power. imagination at work

U n i n t e r r u p t i b l e P o w e r S y s t e m

Illuminator Series CM. GUIDE SPECIFICATIONS And TECHNICAL DESCRIPTION. 500W, 1000W, 1500W and 2000W Single-Phase Emergency Power System

Master Plus kva

Standard 1000VA, 2000VA & 3000VA Universal Tower/Rack Mount LB Extended Models 900VA, 1700VA & 2500VA

Series 120/120VAC Universal Tower/Rack Mount

E-15 Uninterruptible Power Systems (UPS)

Liebert GXT & 10000VA RT208 Rack-Tower models, Dual Inverter GUIDE SPECIFICATIONS 1.0 GENERAL

INVITATION FOR TENDER FOR SUPPLY OF SOLAR PV SYSTEMS

TECHNICAL BID T 3627

On-line, Single Phase, Double Conversion UPS

POWER+ PREMIUM CBS. BS-EN Emergency electrical installations Electric power systems Emergency lighting Escape lighting

Application. Battery. Public Grid GS HYBRID INVERTER

Solar Inverter Manual

Technical Specification SENTINEL PRO

Three-phase UPS system. DPA UPScale ST kw Best-in-class modular UPS for maximum availability

TENDER DOCUMENT BHARAT HEAVY ELECTRICALS LIMITED, HEEP, RANIPUR, HARIDWAR

Technical Data Sheet. Uninterruptible Power Supply. Critical Power. imagination at work

E-15 Uninterruptible Power Systems (UPS)

Transcription:

SPICES BOARD (Ministry of Commerce & Industry, Govt. of India) Palarivattom.P.O. N H By Pass Kochi 682025 Phone: 0484-2333603 Email: sbqelkochi@gmail.com REQUIREMENT OF UPS Systems and Batteries for Quality Evaluation Laboratories of Spices Board No.QEL/NEW/UPS/2015 Dated 22 nd September 2015 Sealed tenders are invited for the supply and installation of UPS systems and batteries in Board s Quality Evaluation Laboratories under buy-back of existing UPS and batteries, as per the requirement and specification given in Annexure - I, subject to the terms and conditions given in Annexure-II. The quotations, addressed to the Scientist D and Head, Spices Board, Sugandha Bhavan, NH Byepass, Palarivattom PO, Kochi-682025, Kerala and should reach Quality Evaluation Laboratory of the Board latest by 5.00 p.m on 22 nd October 2015. The quotations will be opened at 11.00 a.m on 23 rd October 2015 in the presence of available vendors. The sealed cover containing the quotation shall be super-scribed as "Quotation for UPS and Batteries due on 23rd September 2015 ( QELs). As per normal payment terms of the Board, 90% of the payment will be released on delivery of items subject to inspection and, balance, on successful installation of the items. Spices Board has no C / D forms. The Board reserves its right to reject any or all quotations without assigning any reason thereof. Sd/- Secretary, Spices Board

Annexure - I REQUIREMENTS Present requirements of UPS and Batteries in various Quality Evaluation Labs (QELs) of Spices Board, locations were supply and installation is required, and units available for buyback: Table 1 1 2 3 4 No. Location of QEL Requirement of new UPS and Batteries 1 QEL Kochi 15 KVA UPS and batteries x 1 No. 10 KVA UPS and batteries x 7 Nos. Units available under buyback 7.5KVA UPS (Electronics and Controls) and batteries x 2 Nos. 10 KVA UPS (Numeric) and batteries x 2 Nos. 10KVA UPS (Power Gun), without batteries x 2 Nos. 10 KVA UPS (Power Gun) with batteries x 1 No. 7.5 KVA UPS (Apblab) + batteries x 1 No. 10KVA UPS (Unitek) + batteries x 1 No. 100 AH Exide Powersafe SMF batteries x 40 Nos. 2 QEL Chennai Exide EL Tubular 150AH batteries x 80 Nos. 3 QEL Narela Following Exide El Tubular Batteries: 150 AH x 40 Nos. 65 AH x 16 Nos. 100 AH x 32 Nos. 130 AH x 40 Nos. Numeric LP12-120(12 V 120 AH) Rechargeable sealed Lead Acid Batteries x 80 Nos. Following numbers of batteries Exide Tubular batteries 150 AH x 40 Nos. Okaya 65 AH batteries x 16 Nos. Power safe 100 AH x 32 Nos.

Quanta 130 AH x 40 Nos.. 4 QEL Tuticorin Following Exide El Tubular Batteries: 150 AH x 20 Nos. 100 AH x 32 Nos. Following numbers of batteries 150 AH x 20 Nos.(Rocket SMF) 100 AH x 32 Nos. (Exide SMF) 75 AH x 15 Nos. (Exide Tubular) Detailed Specifications of UPS systems and Batteries: Table 2 TECHNICAL SPECIFICATIONS FOR 15 kva TRUE ON-LINE DOUBLE CONVERSION UPS SYSTEMS SPECIFICATION OUR REQUIREMENT Modern, compact and portable model of UPS system should be quoted. 1 Capacity 15 KVA - 12000 Watts (0.8 pf) Technology 2 Converter Input Voltage True Online Double Conversion Compact and portable unit is to be quoted. 415 V (3 phase) Input Voltage range 400 VAC ± 15% Input Frequency Input Frequency range Input Power Factor 50 Hz 45 to 55 Hz 0.9 at full load and nominal input Voltage 3 Battery Charger Type of Charger Constant voltage -constant current. Battery Recharge Time to 80% Will not exceed 10-12 Hours after 100% discharge capacity after 100% Discharge. 4 Output (Inverter) Output Voltage 230 VAC, Single Phase Regulation (Steady State) +/-1 %

Dynamic Regulation ± 5% with 100% step load of 0.8PF & 3:1 CF and (Transient Response) recovery in less than 50 milliseconds Total Harmonic Distortion < 3 % for 100% linear load < 5% for 100% non-linear load Output Power Factor 0.6 to Unity Switching Frequency 12-24 KHz Inverter Technology Sine Weighted Pulse width Modulation Technology using IGBT power Devices Crest Factor 3:1 Output Wave form Sinusoidal Output Frequency 50 Hz ± 0.1% (Free Running Mode) Overall Efficiency > 85 % Overload Capacity 125% for 10 Minutes and 150% for 1 Minute 7 Bypass Static Bypass Provided Manual Bypass Manual /Maintanance Bypass 8 Protection and Controls Advanced Electronic protection for device safety backed with MCBs / Softstart feature for rectifier and inverter,built in overload protection, output short-circuit protection, Inverter over-temperature 9 Indications LED indications will be provided for the following Mains ON DC On Output On DC Low Converter Fault Inverter Trip Output High Output Low Load on Bypass Load on Battery 10 LCD Display LCD Display will be provided Input Voltage Output voltage Output current Output frequency Battery Voltage

Battery Charge/discharge current 11 Audible Alarms Mains failure Battery Low Over temperature Inverter Trip Load On Bypass 12 Communication Port Interface Port RS 232 13 Standards (Mandatory) Quality System ISO 9001-2008 and ISO 14001:2004 14 General Cold Start in the absence of mains power Relative Humidity Cooling Cold Start is available to start on batteries. 10 to 95% non-condensing Forced Air Cooling 15 Battery 12V EXIDE 6EL TUBULAR C10 RATED Battery VAH Required Battery DC Voltage 62400 VAH 240VDC Table 3 TECHNICAL SPECIFICATIONS FOR 10 kva TRUE ON-LINE DOUBLE CONVERSION UPS SYSTEMS SPECIFICATION 1 Capacity 10 KVA - 8000 Watts (0.8 pf) Technology 2 Converter Input Voltage True Online Double Conversion OUR REQUIREMENT Compact and portable unit is to be quoted. 415 V (3 phase) Input Voltage range 400 VAC ± 15% Input Frequency Input Frequency range Input Power Factor 50 Hz 45 to 55 Hz 0.9 at full load and nominal input Voltage 3 Battery Charger Type of Charger Constant voltage -constant current. Battery Recharge Time to 80% Will not exceed 10-12 Hours after 100% discharge

capacity after 100% Discharge. 4 Output (Inverter) Output Voltage 230 VAC, Single Phase Regulation (Steady State) +/-1 % Dynamic Regulation ± 5% with 100% step load of 0.8PF & 3:1 CF and (Transient Response) recovery in less than 50 milliseconds Total Harmonic Distortion < 3 % for 100% linear load < 5% for 100% non-linear load Output Power Factor 0.6 to Unity Switching Frequency 12-24 KHz Inverter Technology Sine Weighted Pulse width Modulation Technology using IGBT power Devices Crest Factor 3:1 Output Wave form Sinusoidal Output Frequency 50 Hz ± 0.1% (Free Running Mode) Overall Efficiency > 85 % Overload Capacity 125% for 10 Minutes and 150% for 1 Minute 7 Bypass Static Bypass Provided Manual Bypass Manual /Maintanance Bypass 8 Protection and Controls Advanced Electronic protection for device safety backed with MCBs / Softstart feature for rectifier and inverter,built in overload protection, output shortcircuit protection, Inverter overtemperature 9 Indications LED indications will be provided for the following Mains ON DC On Output On DC Low Converter Fault Inverter Trip Output High Output Low Load on Bypass Load on Battery 10 LCD Display LCD Display will be provided

Input Voltage Output voltage Output current Output frequency Battery Voltage Battery Charge/discharge current 11 Audible Alarms Mains failure Battery Low Over temperature Inverter Trip Load On Bypass 12 Communication Port Interface Port RS 232 13 Standards (Mandatory) Quality System ISO 9001-2008 and ISO 14001:2004 14 General Cold Start in the absence of mains power Cold Start is available to start on batteries. Relative Humidity 10 to 95% non-condensing Cooling Forced Air Cooling 15 Battery 12V EXIDE 6EL TUBULAR C10 RATED Battery VAH Required 48000 VAH Battery DC Voltage 240VDC Requirements of Batteries All the batteries quoted as per Annexure 1 Table 1 Column 3 should be Exide 6EL Tubular C10 rated.

Annexure-II 1. A compliance statement for each point in the technical specification for each model of product offered must necessarily accompany the quotation, without which the quotation is laible to be rejected. 2. Make/brand name of UPS and Batteries shall be specified. 3. The Tenderer shall submit along with the tender an EMD of 2% of the tender value in the form of Demand Draft in favour of Secretary, Spices Board. The EMD should be submitted in a sealed cover marked on the outside with the word EMD. The EMD of unsuccessful Tenderer(s) will be refunded, after short listing of proposals, without any interest. In case the tenderer withdraws from the process, the EMD deposited by him will be forfeited. EMD of the successful tenderer will be retained by the Board as security deposit till the successful completion of System installation. No interest shall be payable on this. 4. The tender received after the prescribed date and/or time and without EMD will be summarily, rejected. 5. There is no separate tender document. This enquiry notice can be downloaded from Board s web site at http://www.indianspices.com/html/quot.php for tender submission. 6. UPS and batteries shall be supplied from a factory with ISO 9001certification in manufacture of the respective equipments. 7. Cost shall include all taxes, duties, entry tax, packing, insurance, forwarding and installation charges. 8. Proposal shall include documents to prove quality of products, service support and technical competence. 9. The offer shall include delivery time, validity of quotation, warranty period and AMC rate for post-warranty period. 10. The units kept at each site for buyback, as per table in Annexure 1, should be cleared from the respective sites before the supply of the new systems. All labor charges involved in transport and installation of the UPS and batteries at the respective locations should be borne by the supplier. 11. Offers which are incomplete in terms of scope, items or specifications or required details will not be considered and such tenders are liable to be rejected forthwith.