For Sale : Used Cogeneration 51 MW, 50Hz Gas-Steam Combined Cycle Power Plant in Excellent Condition.

Similar documents
Technical Specification

93 MWe natural gas fired Combined Cycle Power Plant

Brief Introduction of The Selling Gen-set

CATERPILLAR 3516B DP2 System

5 x Solar Turbomach Taurus T60 (5.67MW ISO) Dual Fuel (Gas & HSD) Water Injection

BHARAT ALUMINIUM COMPANY LTD. SPECIFICATIONS FOR SYNCHRONOUS GENERATOR GENERAL Make : Jinan Power Equipment Factory Type : WX2

Introducing the TM /

Turbogenerators. With Top Performance for Steam and Gas Applications. Specifically tailored 4-pole Synchronous Turbogenerators

NITIN CORPORATION 402, 4 th Floor, Bezzola Commercial Complex, Sion Trombay Road, Chembur, Mumbai , India.

BRUSHLESS EXCITERS FOR TURBINE GENERATORS

SOAPP-CT.25 WorkStation 11/1/00. Equipment List Project: Sample Outputs Conceptual Design: Cogen, 1 x 27 MW, NG, Quarterly

1.) CENTAUR 50 GAS TURBINE GENERATOR PACKAGE

High Voltage Generators. TM21-TG Series. 2-Pole Air Cooled Turbine Generator Up to 80,000 kw (107,000 HP)

PI734G - Winding 312. Technical Data Sheet APPROVED DOCUMENT

PI736F - Winding 312. Technical Data Sheet

technical catalogue tetris KW Chiller and heat pumps air/water

Page 1 of 5. Project : CATERPILLAR CM GENSETS PROJECT (RADIATOR COOLING) 2 x 16CM32, 6.3 kv, 50 Hz. TUS(S)PL Supply. Customer Supply DESCRIPTION

1x New Siemens SGT MW 50 / 60Hz (DF) Gas Turbine Mobile Generator Set

MEC-CM-E-2001 Lead Mechanical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Document Code: 1 (8) Issuing date: Status:

COMPONENT IDENTIFICATION

PGDLS352KW 380/ / / / / / / / /

.3 Section Concrete Forms and Accessories: Installation of Anchor Devices, Setting Templates

PGDLS / / / / / / / / /

27 MW Combined Cycle Power Plant, for sale:

PM734E - Winding 28. Technical Data Sheet APPROVED DOCUMENT

Gas turbine power stations based on gas turbines rated at 32 MW

PGDLS200. Overall Dimensions (mm) & Weight (kg) Length:3900. Width:1140. Height: 1850

Liebert CSU3000 DISCONTINUED PRODUCT. CSI Mainframe Cooling Systems. CT(Three Module) Model 20, 30 & 37 ton Mainframe Chiller

COMPRESSOR STATION OPERATIONS

Appendix B6 Gas Turbine Unit Cause Codes

Mitsubishi Diesel Engine Generators (Year 2008) Model: S12R-PTA (1250 kva, 3300V, 50Hz)

13,000 Watt Diesel Generator AGi13P E

XQ-5200 Solar T60 Gas Turbine-Generator 5,200 ekw Iso Conditions 13.8 kv

abc CPD7948/075 Rotors, rotor shafts and rotor casings are coated with an anti-corrosive and anti wear coating to prolong element life and efficiency.

PGDLS / / / / / / / / /

10,000 Watt Diesel Generator AGi9P E

For Sale: Used Steam Turbine Generator Sets. Offer Ref. STG MW Steam Turbine Genset Condensing-Extraction type

Generating Rates WATER-COOLED THREE PHASE 50 HZ DIESEL. ADVANCED with quality certification ISO 9001

VLH 504 to Air-to-Water Reverse Cycle Heat Pumps. 126 to 294 kw. 133 to 307 kw

PI044G - Winding 06 APPROVED DOCUMENT. Technical Data Sheet

PI144J - Winding 05 APPROVED DOCUMENT. Technical Data Sheet

CLOSE CONTROL UNITS WITH CHILLED WATER COIL

ANNEX A-5 GAS TURBINE JET ENGINE EXPANDER TURBINE STEAM TURBINE GENERATOR

MV Air Insulated Switchgear TAP17. Technical Data TGOOD

SLH 1202 to Air-to-Water Reverse Cycle Heat Pumps. With Screw Compressors. 261 to 775 kw. 287 to 853 kw

SEASONAL MAINTENANCE CHECKLISTS Johnson Controls

HCI634V - Technical Data Sheet

PI044D - Winding 311 Single Phase APPROVED DOCUMENT. Technical Data Sheet

PI144G - Winding 311 Single Phase APPROVED DOCUMENT. Technical Data Sheet

PI044H - Winding 311 Single Phase APPROVED DOCUMENT. Technical Data Sheet

PI044F - Winding 311 Single Phase APPROVED DOCUMENT. Technical Data Sheet

PI044E - Winding 311 Single Phase APPROVED DOCUMENT. Technical Data Sheet

PI144E - Winding 311 Single Phase APPROVED DOCUMENT. Technical Data Sheet

PI144F - Winding 311 Single Phase APPROVED DOCUMENT. Technical Data Sheet

SECTION H3 TRAYMASTER SERIES DEAERATORS

UCI224F - Winding 25. Technical Data Sheet APPROVED DOCUMENT

PRESSURE REDUCING AND DESUPERHEATING STATIONS SERIES

PI144D - Winding 17. Technical Data Sheet APPROVED DOCUMENT

UCI224F - Winding 14. Technical Data Sheet APPROVED DOCUMENT

Chiller. AQL/AQH 40 to 75. Air Cooled Water Chillers Cooling Only and Heat Pump Engineering Data Manual to 77.2 kw to 75.

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

Table of Contents. 1. Model Designation And Unit Models Guide Specifications Technical Data Performance Data 10

Make : BHEL / Siemens Type : THDF 115/ Reference Standard : IEC 60034

PI044D - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

VOLUME: IIIC SCHEDULE IIIC/4 11 KV AND 3.3 KV SWITCHGEARS

Diesel Powered Generating Set MBH6350DM

kva kw kva Dry Weigt Length Width kg K.U.N.Z. Handels-&Produktions GmbH

PGCLS Hz/1800 r.p.m-p.f.0.8 Prime Power Standby Power Rated Current Genset Engine Alternator Voltage(V) PH kw/kva kw/kva Amps

DIESEL GENERATOR SET MTU 16V4000 DS2500

Air Cooled Water Chillers. CLS 182 to to 150 kw. Technical Brochure TM CLS-W.3GB Date : October 2004 Supersedes : TM CLS-W.2GB/07.

HCI434C/444C - Winding 17 APPROVED DOCUMENT. Technical Data Sheet

SECTION H4 BOILERMATE DEAERATORS

PGPLS215Kw. 60Hz/1800 r.p.m-p.f.0.8 Prime Power Standby Power Rated Current Genset Engine Alternator Voltage(V) PH kw/kva kw/kva Amps

UCI274D - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

Appendix B8 Combined Cycle Cogeneration Block Cause Codes

UCI274E - Winding 14 APPROVED DOCUMENT. Technical Data Sheet

UCI274E - Winding 06 APPROVED DOCUMENT. Technical Data Sheet

UCI224E - Winding 06. Technical Data Sheet APPROVED DOCUMENT

UCDI224E - Technical Data Sheet

High-voltage motors TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

UCDI274J - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

UCI224C - Winding 06. Technical Data Sheet APPROVED DOCUMENT

All From One Source Hydraulic Closed Loop Control Systems for Gas and Steam Turbines

Pete Jacobs. Business Development Manager Wartsila North America, Inc. (281)

Voltage adjusting range % Voltage stabilization time(100% load sudden reduce) 3. Voltage fluctuation rate: Frequency volatility ±0.

JMC 320 GS-N.L. Technical Description. Cogeneration Unit-Container. with Island Operation no special Grid Code

AQVSL/AQVSH STAR 85 to 140

NITIN CORPORATION 402, 4 th Floor, Bezzola Commercial Complex, Sion Trombay Road, Chembur, Mumbai , India.

AGi20P 2.2 L 20 kw Perkins Powered Diesel Generator AURORA GENERATORS INCORPORATED AURORA STANDARD FEATURES STANDBY POWER RATING 20 KW, 20 KVA, 60 HZ.

DIESEL GENERATOR SET MTU 12V4000 DS1750

PI144K - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

PI044F - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

PI144J - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

Diesel generator set QSX15 series engine

60Hz/1800 r.p.m-p.f.0.8 Prime Power Standby Power Rated Current Genset Engine Alternator Voltage(V) PH kw/kva kw/kva Amps 240 ( )

STANDBY 2860 ekw 3575 kva 50 Hz 1000 rpm

UCI224G - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

50 HZ 60 HZ. l Standard ambient temperatures up to 50 C (122 F) l Fan, fan drive and charging alternator fully guarded

WPS137S. EP Series. Generator Set Specification. Super Quiet, Superior Life! 广泛应用于通讯 工业 租赁. Widely applied in Telecom, Industry, Rental, 户外工程 矿山 军事等领域

Transcription:

For Sale : Used Cogeneration 51 MW, 50Hz Gas-Steam Combined Cycle Power Plant in Excellent Condition. Combined Cycle Power Plant, 51 MW, 50 Hz, Heavy Oil- fired. Owner's purchased one set each of PG6471B Gas Turbine Generator andn15-3.43 Steam Turbine Generator. Total operation hours were 30268.1(LFO 29845.5 hours and HFO 422.6 hours) Due to various reasons, owner's is planning to sell the complete plant. All equipment is in perfect condition. Appendix I Technical Specification for PG6471B Gas Turbine Generating Set Nanjing Turbine & Electric Machinery ( Group ) Co., Ltd. Technical Specification for PG6471B Gas Turbine Generating Set 1. Manufacturing The gas turbine generating set is produced under Manufacture Associate Agreement with GE Company of USA. The compressor- turbine rotor, stator vane of compressor, turbine nozzles, combustion system and Speedtronic Mark IV control panel as well as drawings are provided by GE. 2. Structure PG6471B gas turbine generating set is a package unit and can be installed for outdoor operation. It is composed of four blocks i.e. the gas turbine and accessories compartment, control compartment, load gear box enclosure and generator compartment.

The control panel of gas turbine, control panel and protection panels of generator, motor control center ( M.C.C. ) are located in the control compartment. Neutral point and outgoing leads cabinet are situated at each sides of the generator compartment. The whole unit is furnished with necessary ventilation, lighting and fire-fighting system. There is air conditioners in the control compartment. 1. Technical Specification. 3.1 Base load ( ISO condition ) ( guaranteed value ) Distillate oil HFO Output kw 36475 35200 Heat rate kj/kw.h 11786 12099 o Inlet temp. of turbine 1104 1104 o Exhaust temperature C 539 529 Exhaust gas flow kg/h x10 x3 491 491 Note: above performance is measured at generator terminals and includes allowances for the effects on shaft driven auxiliaries, and 2.55 in H2O ( 6.48 mbar ) inlet and 2.52 in H2O ( 6.4 mbar ) exhaust pressure drops. 3.2 Performance correction on the non-iso conditions. 3.2.1 Altitude correction on curve 416HA662 Rev A. 3.2.2 Ambient temperature correction on curve 544HA876-2 Rev 0 and 544HA875-2Rev 0. 3.2.3 Effect of modulating IGV's on exhaust temperature and flow on curve 544HA876-3Rev 0.and 544875-3 Rev.0 3.2.4 Humidity correction on curve 498HA697 Rev B. 3.2.5 Effect on pressure drop. Air inlet pressure loss increase every 996 Pa, results an output decrease of 1.50%, and a heat rate increase of 0.50%, exhaust o temperature increase 1.2 C. Exhaust pressure loss increase every 996 Pa, results an output decrease of 0.50%, and a heat o rate increase of 0.50%, exhaust temperature increase of 1.2 C. 3.2.6 Noise 93 db (A) at 1m from each machine 3.4 Generator Type: Output: Voltage: Current: Frequency: Power factor: Speed: Efficiency: Protection type: QFR-36-2 36000 kw 10500 V 2474.4 A 50 Hz 0.8 3000 rpm 97.7% IF 44

Synchronous reactance (saturated): Transient reactance (saturated): Sub-transient reactance (saturated): Negative sequence reactance (saturated): Short circuit ratio: Insulation class: Connection: Cooling mode: Cooling temperature _œ 0.46 B Y CACW 40 247% 22% 14.8% 19% Note: The output of generator can be matched with the gas turbine output requirement. Appendix II Scope of Supply for PG6471B Gas Turbine Generating Set (SMD start, simple cycle, axial air inlet, upward exhaust) 1. Gas Turbine Compartments Single shaft gas turbine fitted on a common base with its accessories is built for weatherproof conditions, the enclosure is provided with thermal and acoustical insulation, heating and ventilation. 1.1 1.1.1 1.1.2 1.1.3 Gas turbine Air inlet plenum and ducting of compressor Inlet guide vane ( IGV ) 17 stages single shaft axial compressor 1.1.4 10 can-type combustors and ignitor, flame detector etc. 1.1.5 3 stages axial turbine There are borescope inspection holes on the casings for maintenance. There is anti-corrosion coating on first stage bucket. 1.1.6 1.1.7 1.1.8 Exhaust plenum and ducting Turbine supports Load coupling 1.2 Accessory equipment 1.2.1 1.2.2 Multi-shaft accessory gear and over-speed bolts Auxiliary coupling

1.2.3 Lube oil system Main lube oil pump, accessory lube oil pump and emergency pump, duplex filters, duplex oil coolers, safety valves, pressure regulating valves, oil level indicators, oil heaters, temperature switches, pressure switches and piping. 1.2.4 Cooling and sealing system Two cooler fans of turbine, two bleeding valves of compressor and solenoid valves, limit switches, pneumatic isolating valve, orifice and piping. 1.2.5 Hydraulic oil system Main hydraulic oil pump, accessory hydraulic oil pump, safety valves, change-over duplex filter and valves, manifold, pressure switches and piping. 1.2.6 Trip oil system Emergency trip oil device, pressure switches, fuel oil stop valve, orifice and piping. 1.2.7 Cooling water system Temperature control valve of lube oil manifold, orifice and piping. 1.2.8 Starting means SMD, hydraulic torque converter, starting clutch, control solenoid valves, safety valves, pressure switches. 1.2.9 Hydraulic turning gear system Turning gear device, oil pump ( DC ), control unit, servo-operated cylinder of clutch, oil filter, safety valves, limit switches and piping. 1.2.10 Fuel oil system Fuel oil pump, fuel oil stop valve, fuel oil filter, flow divider, by-pass control valve, by-pass servo-valve, starting-failure draining valve, check valve, pressure measuring transfer valve, pressure switch, limit switch and piping. 1.2.11 Atomizing air system

Main atomizing air compressor, starting atomizing air compressor, atomizing air pre-cooler, solenoid valve, check valve, safety valve, temperature switch, pressure switch and piping. 1.2.13 Ventilation in enclosure Ventilation fans 1.2.14 IGV system IGV actuating device, IGV servo-unit, hydraulic control modules, accumulator, transmitter for travel, solenoid valve and piping 1.2.15 Measuring system including protection system for over-speed, over-temperature, vibration, flame-off, lube oil pressure, lube oil temperature and measuring elements and local instrumentation such as speed sensor, various thermocouples, vibration sensor, flame detectors, pressure switches, temperature switches. 1.2.16 Lighting system ( AC, DC ) in gas turbine enclosure 1.2.17 Ductwork for internal wiring of system 1.2.18 Water washing system for compressor 1.2.19 CO fire-fighting system and flame detection system 2 1.3 Gas turbine base The gas turbine and accessories are mounted on the same base. The lube oil tank and 1#, 2# junction boxes are also mounted on it. 1.4 Enclosure With ventilation, lighting and fire-fighting devices, the enclosure contain the GT compartment and accessory compartment. 1.5 Walk-way on the unit Walk-way grid, railing, staircase etc. 2. Control Compartment The main control panel of the gas turbine generating set are contained in the cabinet. It is air-conditioned and well illuminated. The cabinet is set on its own base and enclosure.

2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 3. GT control panel ( SPEEDTRONIC MARK IV ) Generator control panel Generator protection panel M.C.C Two sets of air conditioners located at wall Cabling and tubing for air conditioning, lighting in the cabinet Base of the cabinet Enclosure of the cabinet Load Gearbox Compartment Load gearbox, gearbox base, enclosure with weatherproof, sound insulation, ventilation, lighting and fire-fighting devices. 4. 4.1 4.2 4.3 4.4 Generator compartment Generator ( type: QFR-36-2 ) AC brushless exciter Permanent magnet pilot exciter Generator outgoing lead booth Including three phases arrestor, discharge counter, protection capacitor and outgoing terminals 4.5 Generator neutral point booth Including CT, arrestor, etc. 4.6 4.7 4.8 Modular Automatic Voltage Regulator ( MAVR ) Air cooler of generator Enclosure of generator ( with weatherproof, sound insulation, lighting and fire-fighting devices ) 5. Air Inlet system 5.1 5.2 5.3 Self-cleaning air filter and control system Air inlet ducting, silencer and support Air process system (provide for purging of air filter after treatment of compressing air from compressor) and standby air purging source

6. 6.1 6.2 7. Exhaust System Exhaust ducting and exhaust silencer and expansion joint Stack (level of outlet is 20m above base) Fire-fighting Device CO 2 cabinet, control and alarming device and piping 8. Water Washing Skid (One unit will be provided for one power plant) 9. Special Tools (One set will be provided for one power plant. If there Are over three GT Gensets, additional one set will be provided.) 9.1 9.2 9.3 Tool for liner Fixture for fuel nozzles 2 guide stems ( for dismantling and assembling of bearing cover, compressor and turbine casing ) 9.4 9.5 Alignment tools Dismantling and assembling tools for No.2 bearing and load Coupling 9.6 9.7 9.8 9.9 10. GT Rotor lifting tool Generator rotor withdrawing tool Disassembling and assembling tools for retaining ring Diode fixture tool ( belong to exciter ) Wedge Plates and Anchor Bolts All special packing plates for the unit erection, regulating shims and anchor bolts ( including ordinary leveling plates and the embedded parts ) 11. Spare Parts Provided with GT Genset Shall be provided according to " Scope of Supply of PG6471B Gas Turbine Generating Set " 12. Five copies of drawings provided with the GT Genset 12.1 Installation drawings

12.2 Outline of foundation; Arrangement of anchor bolts; 12.3 Interface diagram of enduser's piping; 12.4 12.5 12.6 12.7 Wiring of gas turbine; Clearance of gas turbine; Arrangement of gas turbine generating set; Center of weight for gas turbine; Center of weight for gas turbine generating set; 12.8 12.9 12.10 12.11 Alignment; Schematic piping system; One-line diagram of generator; Drawings of spare parts 13. Five copies of documents provided with the GT Genset 13.1 Operation and maintenance manual including curves of output and heat rate at different environmental condition 13.2 Installation and alignment instruction 13.3 Control specification and manual of turbine control panel 13.4 Report of test-run in the factory; Product certificate 13.5 Other documents which the enduser's needs

PLEASE NOTE the following Scope of Supply WILL COMPLEMENT THE COMBINED CYCLE POWER PLANT: 1x15 MW condensing steam turbine generator Exhaust gas boiler (HRSG) including exhaust gas stack Exhaust gas duct work leading to exhaust gas stack, including baffles Plus all BOP. 1x55 t/h HRSG include all auxiliaries

Nanjing Turbine & Electric Machinery (Group) Co., Ltd. Main technical parameters of steam turbine 1. Main technical parameters of 15MW steam turbine 1.1 Model: N15-3.43 1.2 Type: Condensing turbine 1.3 Rated power: 15MW 1.4 Rated rotate speed: 3000r/min 1.5 Rotate direction of rotor: Clockwise (face to generator from the position of steam turbine) 1.6 Steam pressure at main stop valve: 1.7 Steam temperature at main stop valve: 1.8 Temperature of cooling water 3.43 Mpa (a) 435 20 (winter), 33 (summer) 1.9 Max. ability of steam admission for steam turbine: 1.10 Weight of biggest part in steam turbine: Weight of steam turbine rotor: Body dimension of steam turbine: 1.11 Power of examining operating condition: Condition: Rated pressure of main steam: Rated temperature of main steam: Flow of main steam: 74/h 21t 6.45t 6628 4890 3685 15MW 3.43 Mpa (a) 435 70.2t Steam consumption 4.184kg/kwh Feed-water ratio: Temperature of cooling water: 0 20 2. Technical requirements of steam turbine 2.1 Equipment performance requirements of steam turbine 2.1.1 Straight condensing operating conditions The steam turbine generator should be able to continuously operate without accident under following conditions, the net power from generator is 15 MW, and here, it is under the straight condensing operating conditions: 1 _ The parameter of main steam is rated value 2 _ Temperature of cooling water: 3 _ Feed-water ratio: 4 _ Efficiency of generator: 97.4% 0 25 3000t/h

3. Main parameters of condenser (1) Type: (2) Model: single shell, two-pass bisection, and surface model N-1000-2 (3) Total effective area of condenser tube: (4) Circulating water flow: (5) Average flow speed of circulating water in tube: (6) Design cleanliness factor: (7) Design of circulating water and thermometer 1000m 2 3000t/h 1.9 m /s 0.80 20 (allowed for feed water of max. temperature) (8) Total water resistance in tube (when water flow is 1.56m3/s): 42 kpa. g (9) External dimension of condenser: 8270(mm) 3400(mm) 4810(mm) (10) Connection type of condenser casing and turbine exhaust outlet: rigid Condenser (without water) Condenser (when operating) Condenser (full with water) 37500kg 58000kg 68700kg Technical specification of fixed-type steam turbine for power generation use (GB5578-198) 5 Scope of supply For the scope of supply, see appendix I (Scope of supply for 15MW steam turbine generator set) for details. Part Two: Generator 1. Brief introduction 1.1 This part is applied to the technical specifications for structures of steam turbine generator, excitation system and excitation regulator, design performance, function, installation, test, etc. 1.2 Under the conditions of rated frequency, rated voltage, rated power factor and rated cooling medium, the consecutive output power of generator is 15 MW. 1.3 Maximal output capacity of generator should be matched with the output power of steam turbine under the operating condition of maximal steam admission (VWO). In addition, the power factor should be same as the rated value, and for long operating, the each part of temperature rise should not exceed the value stipulated in GB- T7064-1996.

1.4 The rated power factor of generator is 0.80 (lag), the rated rotate speed is 3000rpm/min_.and the frequency is 50Hz. 1.5 The cooling mode of generator is air cooling mode. 1.6 The excitation mode of generator is coaxial alternating-current excitor excitation. 1.7 The unit used is State legal metrological unit. 1.8 The warranty service life of generator is not less than 30 years. 2. Technical requirement 2.1 Fundamental parameters and size Model: Rated power: Rated power factor: Rated voltage: Rated rotate speed: Rated frequency: Phase number: QF-15-2 15MW 0.80 (lag) 10.5KV 3000r/min 50Hz 3 Connection mode of stator coil: Y Rated efficiency: 额定效率 97.4% Insulation class of generator stator and rotor: Noise (1 m from shell, rated power): 2.2 Number of wire outlet of generator: 2.3 Rotating direction of generator: F 92 db (A grade) 6 Clockwise (face to generator from the position of steam turbine) 2.4 Max. hoisting weight: 32.7t 2.5 Party B should provide complete data to meet the requirements of thermal detection and control, including alarm value, protection actuation value for each parameter. 2.6 The temperature measurement elements and other thermal detection and control devices provided together with equipments should meet State current relevant standards. 2.7 The limit values of temperature and temperature rise for each part of stator and rotor of generator should meet the stipulations of "Technical specification of turbo-type synchronous motor (GB-T7064-1996)". 2.8 The temperature of generator bearing gathering should not exceed 65, and the temperature of metallic part of bearing should not exceed 80. 2.9 Permissible value of vibration for each part of generator

When running combined with steam turbine generator and exciter under rated rotate speed: The vibration limit value (double-amplitude) of bearing housing should not be greater than 0.03 in horizontal direction as well as vertical direction. If over the critical speed, it should be less than 0.15 mm. 2.10 For the design of air cooler, if one group of cooler stops operation due to some causation, the generator can be able to bear 75% of power to continuously operate, and not exceed the permissible value of temperature rise. Party B should ensure that the effective measures are adopted in the design of air cooler to prevent water leakage of air cooler tubes. 2.11 The stator winding should bear the following over-current in a short time without harmful deformation. Over current time (s) 10 30 60 120 Rated stator current (%) 226 154 130 116 2.12 The rotor winding should have the ability to bear following over-voltage in a short time. Over voltage time (s) 10 30 60 120 Rated excitation voltage (%) 208 146 125 112 2.13 The generator should have the ability of asynchronous operation under the condition of field loss. When the trouble of excitation system is occurred, if the electric network is normal, the generator should stably asynchronously operate with 50% of rated active power for 15-30 minutes. 2.14 Ability of leading phase operation: Under the condition that the power factor of leading phase is 0.95 (advance), the generator can continuously operate steadily with rated apparent power and the equipment is not damaged. 3. Excitation system 3.1 Excitation mode: The mode of generator excitation system is coaxial alternatingcurrent brushless excitation. The brushless excitation system is composed of AC exciter with rotary rectifier, permanent-magnet type sub exciter, and automatic voltage regulator.

3.2 If the excitation voltage and current of generator are not over the 1.1 times of the rated excitation voltage and current, the excitation system can be able to operate continuously. 3.3 The excitation system should have the edge load ability, the multiple of compelled excitation should not be less than 1.8, and permissible time of compelled excitation should not be less than 10 seconds. 3.4 Response ratio of excitation system (V) (namely rate of voltage rise) should not be lower than twofold/s. 3.5 Step response Under the conditions of no-load and rated voltage, when the stage response set by voltage is 10%, the voltage overshoot of generator should not be greater than 50% step amount, the oscillation number is not over 3, and the regulation time for stator voltage of generator is not over 10 seconds. 3.6 For voltage regulation range of automatic excitation regulator, the generator can smoothly and stably adjust the voltage in 20-110% of rated voltage under the condition of no-load. 3.7 The excitation regulator (AVR) should be the equipment with remarkable achievement, and its performance should be credible. The additive units, such as over-excitation limit, over-excitation protection, low-excitation limit, etc should be equipped for excitation regulator. 3.8 In order to ensure the reliable operation of voltage regulator (AVR), it should have two working modes of auto and manual, so as to ensure normal operation. 3.9 The AVR with air cooling should be able to continuously operate under the ambient temperature /10 ~ 45, max. monthly relative humidity 90% as well as average min. temperature 25 (in certain month every year). 3.10 When shutdown due to malfunction, the field circuit breaker and resistor can be actuated for field suppression. 3.11 The excitation system can correctly operate when symmetrical or dissymmetrical short-circuit is occurred near the generator. 3.12 In AVR, the automatic regulation units for regulating voltage, reactive power and power factor should be equipped. 3.13 150Hz alternating current generator is adopted for main exciter, so as to adapt the requirement of the load with rectification, it should bear the three- phase symmetrical

or dissymmetrical short-circuit at outlet, and not produce harmful deformation which will not be restored. 3.14 The permanent magnet constant voltage generator is adopted for sub exciter, it has good external characteristic. From no-load to compelled excitation of generator, the terminal voltage should not exceed 10~25% of rated value. 3.15 In brushless excitation system, the rotary rectification elements can bear powerful centrifugal force and not cause any change and damage of performances in electric and mechanical aspects. The structure of rotary fuse should have high mechanical intensity, and can bear the powerful centrifugal force. The rectification elements should be tested strictly. The performance of consistency should be ensured for each element in parallel. If the rectification circuit fails, there should be indicated signal. 4. Others 4.1 The generator should have the ability to output rated power under following conditions: When the temperature of cooling water in air cooler is 33, the generator can output rated power. 4.2 When rotor is over-speed (120% of rated rotate speed), the rotor of generator can bear it for 2 minute. 4.3 The user provide one path of 220 V DC power supply only. 4.4 Air cooling system 4.4.1 After shutdown of air cooler, the machine group can operate with rated load for more than 30 seconds. 4.4.2 The wording pressure of cooling water for air cooler of generator is 0.2 Mpa, and the working temperature is not higher than 33.The design pressure of air cooler is 0.4 Mpa, and Party B should provide side pressure of air cooler.

1.1 Brief Introduction of the Heat Recovery Steam Generator. Technical Conditions This HRSG Island system is specially designed for Shaoxing Cogeneration Phase 51MW _ü Gas- Steam Combined Cycle Power Project. Light oil is used for the gas turbine fuel. The whole HRSG boiler unit includes Exhaust gas system, HRSG boiler, boiler thermodynamic control system and accessorial facilities concerned. 1.1.1 Exhaust Gas System 1.1.1.1 General Description The exhaust gas system consists of boiler flue gas inlet and boiler flue gas outlet. The exhaust gas system is mainly used for the delivery and release of exhaust gas during the period of boiler single cycle and combined cycle operation as well as the control of exhaust gas flow direction during Technical conditions the period of HRSG startup and breakdown. Design temp. 548 Design pressure 2800Pa Nominal operating course 10 m 2 Operating duration of valve plate 90s Working medium GT exhaust gas Leakage rate 0.5% 1.1.2 1.1.2.1 HRSG Boiler General Description HRSG boiler is mainly used to recover waste heat from G.T. exhaust gas as much as possible and produce MT-MP steam which is carried to the steam turbine to do the work and drive the generator to generate. 1.1.2.2 Boiler Type and Main Technical Conditions

The heat recovery boiler is a natural circulation, one-pressure, non-afterburning, water-tube boiler with horizontal flue. The boiler is laid out in the open air. Located in the horizontal flue of boiler are vertical helical finned pipes of the heat-transmitting components. The boiler model is. 1.4.2.2.1 Boiler Main Technical Conditions Sr. No. Item Unit Value 1 Ambient temperature 15 (ISO conditions) 2 G.T. model / PG6471B 3 Unit operating condition / basic load combined cycle 4 G.T. fuel / 0# light oil 5 G.T. exhaust temperature 548 6 G.T. exhaust flow rate t/h 7 MP steam pressure MPa 3.82 8 MP steam temp. 5 445 10 9 MP steam output t/h 1.4.2.2.2 The operating life-span of Other Performance Data Maximum weight of overhaul parts: 14t Steam quality: If Feedwater quality reaches Total hardness 1.5umol/l Iron 50 g/l Copper PH Oiliness quantity 10g/l 8.8~9.2 1.0ug/l

The superheated steam quality would ensure: 过热蒸汽品质 Na SiO 2 Cu Fe _ 15 _ 20 _ 5 _ 20 _0 g/kg _0 g/kg _0 g/kg _0 g/kg main boiler pressure parts would be more than 30 years and the overhaul period be more than 4 years. At the place of 1m far away from outer surface of equipment the noise would be less than 85dB. The HRSG flue gas temperature would be considered to avoid low-temperature sulfur corrosion as far as possible. Materials of Boiler pressure parts Sr. No. 1 Name of Component MP Superheater Material Standard 1.1 Header 12Cr1MoVG 1.2 Heating surface pipe 15Cr1MoVG 1.3 Fin 1Cr13 GB3280 2 MP Evaporating pipe bank 2.1 Drum 20g GB713 2.2 Header 20G 2.3 Heating surface pipe 20G 2.4 Fin 08Al GB710 2.5 2.6 Steam-water communicating pipe Saturated steam communicating pipe 20G 20G 2.7 Downcomer 20G 3 MP Economizer 3.1 Header 20G 3.2 Heating surface pipe 20G 3.3 Fin 08Al GB710 3.4 communicating pipe 20G 4 LP boiler

Sr. No. Name of Component Material Standard 3.1 Header 20G 3.2 Heating surface pipe 20G 3.3 Fin 08Al GB710 3.4 communicating pipe 20G 3.5 Downcomer 20G 2 Scope of Supply The whole HRSG system would be composed of exhaust gas system, HRSG proper and HRSG thermodynamic control system and lighting. 2.1 Scope of Supply for Exhaust gas system The scope of supply for exhaust gas system includes boiler flue gas inlet, boiler flue gas outlet and flue accessories. 2.1.1 Scope of Supply for Flue Gas Inlet Three-way diverter damper Boiler inlet expansion joint Boiler inlet flue 2.1.2 Scope of Supply for Flue Gas outlet Boiler outlet expansion joint Main stack 2.2 Scope of supply for HRSG proper The scope of supply for HRSG proper would mainly include the following parts: MP superheater Mp evaporating pipe bank Mp economizer piping, valve, instrumentation within the scope of boiler desuperheating device LP boiler (including deaerating system) Boiler frame and casing Platform, staircase, ladder Rain-proof shed

Insulation of HRSG proper (The insulation for drum above the boiler top casing as well as that for the piping, valves within the scope of boiler would not be included.) MP feedwater pump (the pump made by Changsha water pump factory matched with motor made by Xiangtan Motor Factory or the pump with the same level would be recommended.) Impulse soot blowing system (including 24 soot blowing points) 2.3 Scope of Supply for HRSG Thermodynamic Supervision and Control System The scope of supply for HRSG thermodynamic supervision and control system would mainly include the following parts: primary measuring components for flow rate, temperature, pressure liquid level, impulse pipe, instrument valve (valve group), transmitter and so on. Motor-operated stop valve (gate valve) Motor-operated regulating valve Local control cabinet (IP54), control box of motor-operated valve, power distribution box, terminal box of transmitter sensor (not including thermocouple) Cable bridge frame within the HRSG island Secondary display instrument control box of electric contactor water level meter The electricity demand points would be taken as scope of supply of 380V power cable. control cabinet and terminal box be selected. For others the 2.4 Lighting of HRSG Island The lighting within the HRSG island includes normal lighting and emergency lighting. The lighting power distribution box would be selected as scope of supply of lighting. 2.5 Requirements for Equipment Type Selection Regulating valve body Actuator of regulating valve venture) Tianjin No.4 Factory FISHER (joint-venture) German BOSCH (imported) or Tianjin No.7 Bernard (joint- Other valve body with same level Qingdao Power Station Valve or other valve factory Instrument valve (welding connection for steam-water pipe) Transmitter Pressure switch Henghe EJA (joint-venture) SOR Ningbo Torch Factory